Paul Industries designs, installs, flushes, starts up and services data center liquid cooling in Montana: direct-to-chip cold plate loops, coolant distribution units, rear-door heat exchangers and the warm-water facility loops and dry coolers that carry the heat outdoors. Montana’s thin, cold air makes air cooling of dense racks harder and liquid heat rejection easier, and its long heating season gives the recovered heat somewhere useful to go. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, takes liquid cooling projects across Montana and in every other state.
Request a quote or call 201-450-8280
Why data center liquid cooling in Montana suits the state’s altitude and cold
Data center liquid cooling in Montana suits the state’s altitude and cold because water carries heat the same way at 5,500 feet as at sea level, while air carries less of it the higher a site sits. A liquid loop also runs at supply temperatures warm enough to be cooled by outdoor air almost all year, so the compressor plant shrinks to a trim role or disappears.
The general method for choosing and building a liquid system is on the national data center liquid cooling page. This page covers what changes in Montana: the air density penalty at each city, warm-water supply against Montana weather, freeze protection on outdoor coolers, heat reuse through a long winter, and the work of fitting a loop into a Montana building. The plant around the loop, from economizers to chillers, is covered on data center cooling in Montana.
How thin air at Montana elevations limits air cooling
Thin air at Montana elevations limits air cooling because the heat a cubic foot of air can carry falls in step with its density, and Montana’s main cities sit between about 3,200 and 5,500 feet. To remove the same heat at the same temperature rise, an air system must move more volume through the same racks, coils and filters, which raises fan speed, noise and fan power.
| City | Elevation, feet | Air density compared with sea level | Extra airflow for the same heat and temperature rise |
|---|---|---|---|
| Butte | 5,506 | About 85 percent | About 18 percent more |
| Helena | 3,828 | About 89 percent | About 12 percent more |
| Great Falls | 3,664 | About 90 percent | About 12 percent more |
| Billings | 3,581 | About 90 percent | About 11 percent more |
| Missoula | 3,192 | About 91 percent | About 10 percent more |
Server fans feel the same penalty. A rack designed for a given heat load at sea level draws more fan power at altitude, and at very high densities the fans cannot move enough air at all. Water does not care: a cubic foot of water holds roughly 3,400 times the heat of a cubic foot of sea-level air for each degree of temperature rise, and about 4,000 times the heat of air at Butte’s elevation. That is the physical reason a Montana hall gains more from the switch than the same hall at the coast.
How are data centers liquid cooled, from chip to outdoor air?
Data centers are liquid cooled through a chain of separate loops: a technology cooling loop of treated water or glycol that runs through cold plates or rear doors at the racks, a coolant distribution unit that isolates and controls that loop, and a facility water loop that carries heat from the CDU to dry coolers, towers or a chiller. Each loop has its own fluid, pressure, temperature and cleanliness limits, and the CDU is where they meet.
| Option | What it cools | Share of rack heat to liquid | Montana fit |
|---|---|---|---|
| Direct-to-chip cold plates, single-phase | Processors and accelerators through plates fed by the CDU | Most of the rack, with the rest left to air | Warm supply water lets dry coolers carry the load nearly all year |
| Rear-door heat exchangers | Whole-rack exhaust air passing a water coil in the door | Much of the rack, through air | Practical retrofit in existing Helena or Bozeman rooms on chilled or glycol water |
| Single-phase immersion | Entire servers in tanks of dielectric fluid | Nearly all | Tank weight and fluid handling decide the room; heat leaves warm for reuse |
| Two-phase cold plates | Chips through plates where a fluid boils and condenses | Most of the rack | Refrigerant rules and leak detection apply as for any refrigerant system |
| Hybrid cold plate plus air | Chips on liquid; memory, storage and power on air | Most to liquid, remainder to air | The common case; the residual air system still needs altitude corrections |
Most new dense halls choose single-phase cold plates with a residual air system. The share left to air is the part Montana altitude still penalizes, so the air side is sized with the density correction from the table above even in a hall that is mostly liquid. Paul Industries supplies and installs the data center liquid cooling equipment on every one of these paths: CDUs, manifolds, rear doors, facility piping, dry coolers and controls.
Liquid cooling at the scale of Montana’s announced campuses
Liquid cooling at campus scale changes the plant from a room accessory into the main heat path, and the loads NorthWestern Energy has announced for Montana sit squarely at that scale. The utility’s December 2024 releases describe 75 MW of new supply for Atlas Power Group’s Butte data center beginning in 2026 and a separate developer letter of intent for at least 50 MW from 2027, rising to 250 MW or more by 2029.
At those sizes, facility water mains run to large diameters, CDUs number in the dozens or hundreds, and dry cooler yards cover acres, so prefabrication, repeatable row modules and a disciplined cleaning and testing program decide the schedule. Each new hall is built and proven while earlier halls run, which means isolation valves, capped stubs for future rows and pressure-tested headers have to be designed in from the first phase. Paul Industries plans those phases with the owner so that every extension ties into a live loop without draining it.
Warm-water supply against Montana weather
Warm-water supply suits Montana weather because a facility loop held near the upper ASHRAE liquid cooling classes can be cooled by outdoor air on nearly every hour of a Montana year. ASHRAE’s liquid cooling guidelines name facility water classes by their upper supply temperature in degrees Celsius, such as W17 for cold water and W45 for warm water, and the server maker states which class each platform accepts.
Billings, the warmest of the larger cities, has a July normal high of 87.3 degrees Fahrenheit. A dry cooler with a 10 degree approach would return facility water near 97 degrees, about 36 degrees Celsius, on such an afternoon, comfortably inside a warm-water class. Hotter design days need a check against the site’s extreme data, and the answer is usually a small evaporative assist or a trim chiller sized only for those hours rather than a full chiller plant. In Butte and Great Falls, cooler summers widen the margin further.
Warm supply also protects against condensation, because the loop stays far above the room dew point, and very dry Montana air lowers that dew point further. The opposite risk appears in winter: a loop that runs too cold at light load can drop below a server’s minimum inlet temperature, so controls hold a minimum supply temperature with bypass or fan staging when outdoor air is far below freezing.
Glycol, water and freeze protection on outdoor coolers
Freeze protection on outdoor coolers matters in Montana because Butte’s January normal low is 7.9 degrees Fahrenheit and cold snaps reach far below that, while a dry cooler coil holds only a few gallons that freeze quickly when flow stops. There are two sound answers, and the choice affects the whole loop.
- Glycol on the outdoor loop, water on the inside loop. A plate heat exchanger separates a glycol loop to the dry coolers from a water facility loop indoors, keeping glycol away from the CDUs and the technology loop and its effect on heat transfer out of the white space.
- Glycol through the facility loop. Simpler piping with no intermediate exchanger, at the cost of a pumping and heat transfer penalty on every circuit, which has to be included when CDUs are selected.
Either way, the glycol concentration is set for the extreme low with margin, coils drain or stay protected if a unit is isolated, fans and dampers are sequenced so a coil does not overcool at light load, and makeup water passes through a fill station that keeps concentration constant. Paul Industries tests the concentration at startup and before each winter as part of a glycol cooling systems service program.
Heat reuse through a long Montana heating season
Heat reuse earns more in Montana than in most states because the heating season is long: Butte records about 9,129 heating degree days in a normal year and Great Falls about 7,722, compared with the 6,754 of Billings, the mildest of the five larger cities. A liquid-cooled hall returns water warm enough to heat offices, warehouses, snowmelt slabs or greenhouses directly or through a heat pump, which is far harder to do with the lukewarm exhaust air of an air-cooled hall.
Reuse is designed as an option on the facility loop: a plate exchanger or heat pump connection, a temperature the receiving system can use, and controls that put the dry coolers back in charge whenever the heat customer needs less. ASHRAE 90.4, which Montana’s 2024 energy code references for data centers, gives credit for recovered heat shared with non-data-center spaces, so the reuse loop can also help the design meet its mechanical efficiency limit.
Water use and the closed loops of a liquid-cooled hall
Water use in a liquid-cooled hall comes down to the initial fill and small makeup volumes when every loop is closed and heat leaves through dry coolers. That matters in Montana, where most new water appropriations need a DNRC permit under the Water Use Act, and where an evaporative plant of any size quickly exceeds the exempt volumes. A dry cooler path keeps the water question to the fill, flush and makeup volumes, and those can usually come from the building’s normal supply.
When an owner adds evaporative assist for the hottest hours, it runs only for those hours, and the treatment, makeup and blowdown are sized for a seasonal duty. The water quality of the closed loops themselves is a separate and stricter question, covered below.
Treating and filtering the technology loop coolant
Coolant in the technology loop is usually treated water or a propylene glycol mixture with corrosion inhibitors and a biocide, chosen to match the wetted materials the cold plate and server makers approve. Montana fill water ranges from low-mineral western supplies to eastern groundwater whose median dissolved solids run from about 400 to 5,000 mg/L in USGS data, so no technology loop is filled from the tap: it gets purified water or a premixed coolant, made where needed by a skid like those on ultrapure water systems in Montana, and its chemistry is tested at startup and on a schedule after.
Fine filtration at the CDU protects cold plate channels that are measured in fractions of a millimeter. Before the first server connects, Paul Industries flushes the facility and technology piping at velocity until filters stay clean and particle counts meet the specification, then fills, vents and tests chemistry. That cleaning step is where many first-month cold plate problems start or are prevented.
Wetted materials are the other half of coolant control. Cold plates, quick disconnects, hoses, manifolds and CDU heat exchangers can mix copper, stainless steel, brass, nickel plating and polymers, and a loop that combines incompatible metals or an unapproved hose compound corrodes or sheds particles over time. Paul Industries checks every component on the submittal against the coolant maker’s and server maker’s approved lists before anything is ordered.
Building the loop: piping, joints and leak detection
Building the loop for a liquid cooled data center in Montana follows the 2024 International Mechanical Code, adopted by the state effective September 26, 2026, whose hydronic piping chapter covers materials, joints and testing for the facility side. Paul Industries builds facility water mains in stainless steel or other materials the design specifies, prefabricates headers and CDU connections off site to cut work inside an occupied building, and pressure tests every section before insulation.
| Step | What is checked | Record handed to the owner |
|---|---|---|
| Prefabrication | Weld and joint quality, cleanliness, end caps | Spool list, material records, inspection results |
| Installation | Supports, slopes, valve access, clearances to electrical gear | Marked-up drawings |
| Pressure test | Hold pressure and duration per specification | Signed test record for each section |
| Flush and clean | Velocity, filter loading, particle count | Flush log with readings |
| Fill and chemistry | Inhibitor, glycol strength, conductivity, biocide | Laboratory or field test results |
| Leak detection | Sensing cable and point sensors under manifolds and CDUs | Alarm test record |
| Startup | Flow, pressure and temperature at each rack row, CDU failover | Startup report and setpoint list |
Commissioning of the loop under simulated load, including CDU pump failover and loss of a dry cooler, is planned with the owner and covered on data center commissioning in Montana.
Liquid cooling data center retrofits in existing Montana rooms
Retrofitting an existing Montana room for liquid-cooled racks starts with three surveys: the floor loading where heavier liquid-cooled racks will stand, the routes for facility water from the plant to the rows, and the electrical capacity the denser racks will draw. Many enterprise, state and university rooms in Helena, Missoula and Bozeman have chilled water already, and a rear-door or CDU retrofit can tap it with a heat exchanger that keeps the room’s chilled water and the new loop separate.
Work in an operating room runs row by row under a written method of procedure, with hot work, drain-down and tie-ins scheduled when the existing plant has spare capacity. In Montana that is often autumn through spring, when the existing air system runs on economizer and the chilled water plant is lightly loaded. For larger campus programs, Paul Industries also carries the surrounding mechanical scope described on data center mechanical contractors in Montana.
Data center liquid cooling systems: controls and monitoring
Data center liquid cooling systems need controls that react in seconds, because a cold plate loop holds little thermal mass and a chip can overheat quickly if flow stops. Each CDU controls its own pumps and valves to hold a supply temperature and a differential pressure across the rack manifolds, and the facility controls stage dry coolers, trim cooling and any heat reuse connection around the CDUs’ demand.
Paul Industries sets the points that matter for a Montana hall: supply and return temperature at every CDU, flow and differential pressure at each row, filter differential pressure, coolant conductivity and, on glycol circuits, concentration checks on a schedule. Leak detection alarms go to both the building system and the operator’s monitoring platform. Winter sequences hold a minimum supply temperature, protect outdoor coils when fans are idle, and ramp dry cooler fans slowly so a sudden cold front does not chill the loop below the servers’ lower limit. Every alarm and setpoint is proven during commissioning and written into the turnover documents.
Keeping CDU pumps running through a Montana power interruption
CDU pumps have to keep running through a power interruption, because a liquid-cooled rack can reach its thermal limit long before standby generators pick up the load. Designs therefore put CDU pumps, the controls that run them and often the facility water pumps on uninterruptible power, sized for the transfer time to generation, while dry cooler fans and trim chillers return on the generator.
Winter storms and wind events in Montana make the cold-weather side of that sequence important. If the facility loop stops while outdoor coolers sit in subzero air, glycol protection and drain-down valves keep coils intact, and the restart sequence brings flow back before fans so the loop does not overcool. Paul Industries tests the whole sequence by interrupting power during commissioning rather than assuming it from drawings.
Refrigerants and codes for liquid cooling systems
Refrigerant rules apply to liquid cooling only where a system uses a refrigerant, as two-phase cold plates and any trim chillers do. For those, the EPA caps refrigerant global warming potential at 700 for new data center and IT cooling equipment installed from January 1, 2027 under its Technology Transitions rule, and machine rooms need detection and ventilation to the mechanical code and ASHRAE 15. Single-phase water and glycol loops sit under the hydronic provisions of the mechanical code instead.
What drives data center liquid cooling cost in Montana?
The cost of data center liquid cooling in Montana is driven by the number of racks and their heat per rack, the cooling option chosen, the CDU count and redundancy, the length and material of facility water mains, the heat rejection path, freeze protection, any heat reuse connection, and how much of the work happens inside an operating room. Prefabricated manifolds and headers lower field labor; retrofits in occupied space raise it.
The operating side favors liquid in Montana. Each 10 kilowatts of fan power a liquid system removes from the air side saves about 87,600 kilowatt-hours a year, roughly $6,200 at the state’s 2025 industrial average of 7.03 cents. The budget an owner sees therefore includes a capital figure and an annual saving, and Paul Industries presents both. A budget range follows from comparable scope once rack count and density are known, and a firm price once the layout is fixed.
Who installs data center liquid cooling in Montana?
Paul Industries installs data center liquid cooling in Montana and provides the full set of data center liquid cooling services: design, supply, prefabrication, installation, flushing, filling, testing, startup and ongoing maintenance of cold plate loops, CDUs, rear doors, facility water and dry coolers. Owners can buy equipment supply only, a design-build package, or complete installation.
Paul Industries is an East Coast contractor, headquartered in Kilmarnock, Virginia, that takes work across Montana, the West Coast and all 50 states. Projects in its home state follow the same method, as on data center liquid cooling in Virginia, and northern sites with comparable winters are covered on data center liquid cooling in Wisconsin.
Paul Industries on liquid-cooled halls in Montana
Paul Industries takes a Montana data center with liquid cooling from rack density and site review through CDU and dry cooler selection, prefabricated piping, installation, cleaning, startup and service, and keeps one contract and one set of records across the loop. More on the sector is on the data centers industry page and the Montana overview. Send rack counts, densities, the server platform and the site, and request a quote.
Standards referenced: ASHRAE TC 9.9 Liquid Cooling Guidelines (facility water classes) · ASHRAE 90.4 · 2024 International Mechanical Code, Chapter 12 Hydronic Piping (Montana adoption) · 2024 International Energy Conservation Code (Montana adoption) · ASME B31.9 · EPA Technology Transitions rule (AIM Act)
Frequently asked questions
Which contractor builds cold plate loops for Butte data halls?
Paul Industries installs liquid cooling in Butte, including cold plate loops, CDUs, rear-door heat exchangers, facility water mains and dry coolers. At Butte’s 5,506 feet, air is about 15 percent less dense than at sea level, so dense racks gain more from liquid cooling there than at lower sites, and winter lows that average 7.9 degrees in January make freeze protection on outdoor coolers part of every design.
Is warm-water liquid cooling practical through a Billings summer?
Yes. Paul Industries designs and installs data center liquid cooling in Billings, Laurel and eastern Montana. The city’s 87.3 degree July normal high is the warmest figure among Montana’s five airport stations in NOAA’s 1991 to 2020 normals, so warm-water loops there are checked against the hottest design hours and may carry a small evaporative assist or trim chiller for those few afternoons, while dry coolers handle the rest of the year.
Who builds liquid cooling for research computing in Bozeman and Missoula?
Paul Industries builds liquid cooling for research and enterprise rooms in Bozeman, Missoula and Helena. Those rooms are often in occupied buildings with existing chilled water, so rear-door heat exchangers or a compact CDU loop isolated from the building water by a heat exchanger usually fit best. Paul Industries surveys floor loading, pipe routes and power first, then installs row by row while the room stays in service.
Why does a liquid cooled data center gain more at high elevation?
Yes, physically it does. Air carries heat in proportion to its density, and at Butte’s elevation air is about 15 percent thinner than at sea level, so air-cooled racks need about 18 percent more airflow for the same heat. Water’s ability to carry heat is unchanged by altitude. The higher the site and the denser the racks, the larger the fan energy and noise a liquid system avoids.
How warm can the facility water run in a Montana liquid-cooled hall?
The warmest the server platform allows, within its ASHRAE liquid cooling class, because warm water lets dry coolers carry the load nearly all year in Montana. Even on a Billings July afternoon near the 87 degree normal high, a dry cooler with a 10 degree approach returns water near 36 degrees Celsius. In winter the controls hold a minimum supply temperature so the loop never runs below the server’s lower limit.
Should a Montana dry cooler loop run glycol all the way to the racks?
Many Montana designs keep glycol on the outdoor side only, with a plate heat exchanger separating it from a water facility loop indoors, so CDUs and technology loops avoid glycol’s heat transfer and pumping penalty. Running glycol through the whole facility loop is simpler but costs efficiency on every circuit. Paul Industries prices both arrangements with the CDU selections that go with each before the owner decides.
Where can recovered heat from a Montana liquid-cooled hall go?
Yes, and the long heating season makes it worthwhile: Butte records about 9,129 heating degree days in a normal year. Liquid loops return water warm enough for space heating, snowmelt or greenhouse use directly or through a heat pump. The reuse connection is designed so dry coolers take over whenever the heat customer needs less, and ASHRAE 90.4 credits recovered heat in the data center efficiency calculation.
Does a liquid-cooled Montana hall need a water right?
With closed loops and dry coolers, water use is the initial fill and small makeup volumes, which usually come from the building’s normal supply. Evaporative assist, if added for peak hours, runs seasonally and is sized for that duty. That keeps a liquid-cooled hall clear of the large evaporative volumes that would need a water right permit from the Department of Natural Resources and Conservation.
How is coolant chemistry chosen for a Montana technology loop?
Purified water or a premixed coolant with inhibitors and biocide, chosen to match the wetted materials the server and cold plate makers approve. Montana tap water varies widely in mineral content, from low-solids western supplies to high-solids groundwater in the east, so it goes into a loop only after treatment. Paul Industries flushes the piping until filters stay clean, fills with the specified coolant, tests chemistry at startup, and repeats the tests on a schedule through a service agreement.
Which mechanical code edition applies to Montana liquid cooling piping?
The 2024 International Mechanical Code, adopted by Montana with state amendments effective September 26, 2026, governs hydronic piping for the facility side, along with the energy code for the cooling plant’s efficiency. Larger cities enforce the mechanical code through their own programs, and the state Building Codes Program covers the rest. Two-phase systems with refrigerant also fall under the refrigeration provisions and ASHRAE 15.
What proves a Montana liquid loop is ready for servers?
Each section is pressure tested, then the whole loop is flushed at velocity until filters stay clean and particle counts meet the specification. After filling and venting, chemistry is tested, leak detection alarms are proven, and flow, pressure and temperature are checked at every row. Commissioning then runs the loop under simulated heat load, including CDU pump failover and the loss of a dry cooler, before handover.
Will an older Montana chilled water plant carry rear-door coolers?
Usually, yes. Rear doors work well on chilled or glycol water that many Montana enterprise and campus rooms already have, and a heat exchanger or dedicated CDU keeps the door circuit separate from the building system. The plant’s spare capacity and supply temperature are checked first, and the existing air system is rebalanced once the doors take load off it.
How heavy a floor and what piping do immersion tanks need in Montana?
Immersion tanks are heavy when full, so floor loading comes first, followed by fluid handling and storage, spill containment, and a facility water connection for the tank heat exchangers. The heat leaves warm, which suits dry coolers and heat reuse in Montana’s climate. Paul Industries plans the floor, piping and heat rejection together and installs the facility side for the tanks.
How is a liquid cooling retrofit sequenced in a working Montana room?
Duration depends on row count, pipe routes and how much work must stay outside production hours. Prefabricated headers and manifolds shorten the time inside the room, and tie-ins are scheduled when the existing plant has spare capacity, often autumn to spring in Montana. Paul Industries sets the sequence in a written method of procedure, with each row tested before the next one starts.
Can CDUs, manifolds and dry coolers be bought separately for a Montana project?
Yes. Paul Industries supplies CDUs, manifolds, rear doors, dry coolers, plate exchangers and prefabricated piping as supply only, and also offers design-build and complete installation. Supply packages carry altitude-corrected selections for the site, factory test records and the documents installation and commissioning call for, and the scope can grow to full installation under the same contract.
What do data center liquid cooling services in Montana include after startup?
A service program covers coolant chemistry and glycol strength tests, filter changes, CDU pump and valve checks, leak detection alarm tests, dry cooler coil cleaning and fan checks, and a pre-winter review of freeze protection and minimum-temperature controls. Trend data on supply and return temperatures shows fouling early. Paul Industries runs the program on the same records it produced at installation.
What information does Paul Industries need for a Montana liquid cooling budget?
Send rack counts and heat per rack, the server platform and its facility water class, the building or site with drawings if it exists, the existing chilled water capacity, the heat rejection preference, and any heat reuse idea. Paul Industries returns a concept with options, annual energy estimates and a budget range, then a firm price once the layout is fixed.