Paul Industries designs, builds and services data center cooling in Oregon, from chilled water plants with water-side economizers in Hillsboro to evaporative and dry-cooler heat rejection for halls in The Dalles, Prineville and the Columbia Plateau. Oregon gives a cooling designer two very different climates on either side of the Cascades, a summer peak that can run far beyond the normals, and a power supply built on hydroelectricity. Paul Industries takes the plant from selection through installation, startup and service, and offers supply-only, design-build and complete installation routes.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Hillsboro July normal 82.1 F high, 52.2 F low (NOAA, 1991 to 2020)
The Dalles 41.6 days a year at 90 F or above (NOAA normals)
June 28, 2021 116 F at Portland airport, 114 F at Hillsboro (NOAA)
Commercial power 9.80 cents/kWh in Oregon vs 13.37 US (EIA, 2025)
Reviewed November 2026

What shapes data center cooling in Oregon?

Data center cooling in Oregon is shaped by three facts that change the plant before any equipment is chosen: the marine climate west of the Cascades and the high desert east of them, rare but extreme summer heat such as the June 2021 event, and electricity prices that sit well below the national commercial average. A cooling scheme that suits a Hillsboro colocation building can be the wrong answer for a campus in Prineville, and the reverse is just as true.

West of the mountains, dry summers and mild nights let economizers carry most of the year. East of them, hotter afternoons push the plant harder for a few weeks, while long, freezing winters turn every outdoor coil and pipe into a freeze risk. Paul Industries designs each plant from the site’s own weather data and its own power and water terms, so the economizer, heat rejection and freeze protection fit the place where the hall stands. The national background on plant types sits on the data center cooling systems page; this page stays with what Oregon changes.

Data centers in Oregon and where the cooling load sits

Data centers in Oregon cluster in three areas: the Hillsboro and Portland metro west of the Cascades, The Dalles and the Columbia River Gorge, and Prineville in Central Oregon, with further campuses on the Columbia Plateau. The Oregon Department of Environmental Quality reported that, as of 2025, more than 40 data centers were permitted or proposed in the state, carrying 6,000 megawatts of backup generating capacity. That figure is a measure of the heat that the state’s cooling plants are being built to reject.

Google states that it opened its first data center in The Dalles in 2006 and began building a fourth there in 2015, and its own photographs show cooling towers on that campus. Meta lists its Prineville data center as a project of more than $2 billion on which ground was broken in 2010. These are market facts about the region; they show that both evaporative and air-side approaches have long operating histories in Oregon’s eastern climate.

Two Oregon climates, station by station

Oregon’s climate for data center cooling splits at the Cascades, and the NOAA 1991 to 2020 normals show how far apart the two sides are. Hillsboro and Portland have mild summer nights and few hot days; The Dalles, Redmond and Pendleton have hotter afternoons, very dry air and far more freezing nights.

NOAA 1991 to 2020 normals at Oregon stations near data center and industrial areas
StationJuly normal high / lowDays at or above 90 FDays at or below 32 FWhat it means for cooling
Hillsboro airport82.1 F / 52.2 F17.264.2Cool nights; long economizer hours; modest freeze exposure
Portland airport81.9 F / 58.5 F14.631.7Mild year; warmer nights than Hillsboro in summer
Salem83.5 F / 55.1 FHot spells in midsummerWinter frostsWillamette Valley profile similar to Hillsboro
The Dalles88.3 F / 58.2 F41.685.4More compressor hours in July and August; freeze protection needed
Redmond (Prineville and Bend area)87.5 F / 48.5 F31.7181.2Large daily swing and very cold nights; glycol or drain-down design
Pendleton (Umatilla and Hermiston area)89.2 F / 56.7 F37.195.8Hot, dry summers; adiabatic cooling works well, winter freeze risk

Two lines in that table matter more than the rest. Redmond averages 181 days a year at or below freezing, so any water-filled equipment in Central Oregon must be designed for winter as carefully as for summer. The Dalles averages almost 42 days at 90 degrees or above, nearly two and a half times Hillsboro’s figure, which shifts the balance between free cooling and mechanical cooling.

How are data centers kept cool west of the Cascades?

Data centers west of the Cascades are kept cool mainly by economizers: outside air, or cool water from towers and dry coolers, carries the load for most hours, and chillers trim the peak. Hillsboro’s July nights average about 52 degrees, so even in midsummer a plant with a reset chilled water temperature can often return to economizer mode overnight.

The Willamette Valley’s summers are also dry, with most rain falling between autumn and spring. Dry summer air widens the gap between dry bulb and wet bulb temperature, which helps cooling towers and adiabatic coolers, and it lowers the latent load on air handlers compared with humid climates. In winter the problem turns around: damp, cold outdoor air can push hall humidity up or down, so air-side economizer designs carry humidity control and filtration, and water-side designs carry freeze protection for coils and towers on the 64 or so nights a year Hillsboro drops to freezing.

Data center cooling in Hillsboro and Portland

Data center cooling in Hillsboro usually means multi-story colocation halls on a chilled water loop, with air-cooled or water-cooled chillers, fan walls or computer room air handlers, and a water-side economizer that runs whenever the condenser water or dry cooler can make chilled water on its own. Data center cooling in Portland follows the same pattern on tighter urban sites, where roof space, sound limits and structural capacity often decide whether heat rejection goes on the roof or in a yard. Paul Industries sizes towers and dry coolers to the space that exists, then sets the economizer changeover points from the site’s weather file so the plant spends as many hours as possible without compressors.

Cooling east of the Cascades: The Dalles, Prineville and the Columbia Plateau

Cooling east of the Cascades has to answer hotter afternoons and far colder nights than the Willamette Valley, often within the same week. A data center in The Dalles, Oregon sees more 90-degree days than Hillsboro, but the air is dry, so evaporative cooling and cooling towers produce low water temperatures even on hot afternoons.

For a new data center, The Dalles, Oregon and the rest of the Gorge offer dry summer air that rewards evaporative design. Data centers in The Dalles and on the Columbia Plateau therefore tend toward evaporative heat rejection, adiabatic coolers or direct and indirect evaporative air handling, with chillers sized for the hottest hours rather than for the whole season. In winter the same equipment has to survive dozens of freezing nights: basin heaters, heat tracing on makeup and drain lines, drain-down sequences for idle cells, and glycol in any dry cooler loop. Paul Industries designs those winter details with the summer plant, because a frozen tower cell in January is as much an outage as a failed chiller in August.

Data center cooling in Prineville and Central Oregon

Data center cooling in Prineville, Bend and the rest of Central Oregon works in high desert air with very low summer humidity and a large daily swing: Redmond’s July normals run from 87.5 degrees in the afternoon to 48.5 degrees at night. That swing makes evaporative and economizer cooling very effective for most of the year, and it makes freeze protection a design input rather than an afterthought, with January lows averaging about 25 degrees.

Designing for heat beyond the normals: the June 2021 event

Oregon cooling plants have to be checked against extreme heat as well as normal summers, because the June 2021 heat event pushed temperatures far past anything the averages suggest. NOAA daily records show 116 degrees Fahrenheit at Portland’s airport, 114 degrees at Hillsboro and 117 degrees at Salem on June 28, 2021, after two days that had already passed 105.

Those temperatures matter because air-cooled chillers and dry coolers lose capacity as outdoor air warms, and many are rated at ambient conditions well below 114 degrees. Paul Industries checks every heat rejection device against the site’s extreme design temperature, confirms high-ambient ratings or adds margin, reviews condenser fan and compressor limits, and writes control sequences that raise chilled water and supply air setpoints within the IT equipment’s allowable range before any machine trips on high pressure. Where evaporative equipment is installed, a heat event also raises water use sharply, so makeup supply, storage and treatment are sized for the worst days rather than the average.

Cooling approaches for Oregon data halls, compared
ApproachBest Oregon fitWater useHeat-event behaviorWinter care
Water-cooled chillers with towers and water-side economizerLarge campuses in Hillsboro, The Dalles and the PlateauEvaporation, drift and blowdownHolds capacity well in dry airBasin heaters, tracing, drain-down of idle cells
Air-cooled chillers with free-cooling coilsHillsboro and Portland sites with limited waterLittle or noneLoses capacity at extreme ambient; needs high-ambient selectionGlycol in the free-cooling loop
Dry coolers with trim chillersWest-side halls and warm-water liquid loopsLittle or noneTrim chillers carry the peakGlycol concentration matched to the site’s lowest temperature
Adiabatic coolersThe Dalles, Prineville, Umatilla CountyWater only on hot daysPre-cooling restores capacityWet media drained and isolated
Direct or indirect evaporative air handlingSingle-story halls east of the CascadesModerate in summerVery effective in dry heatHumidity control and freeze protection of wet sections

Data center cooling without water on the Oregon plateau

Data center cooling without water is possible on the Oregon plateau, but it trades water for electricity, because dry coolers and air-cooled chillers have to run compressors more of the time when afternoon temperatures climb toward 90 degrees and beyond. Whether that trade makes sense depends on the water right or municipal supply available at the site, its cost, and the discharge rules for tower blowdown.

Paul Industries compares the two paths on the site’s numbers: annual water use for evaporative heat rejection against the extra compressor energy of a dry plant, at the site’s own tariff. A hybrid plant that runs dry most of the year and adds evaporative assist on the hottest days is often the middle course. Water treatment, blowdown control and makeup metering for any evaporative option follow the methods on cooling tower water treatment, and the tower equipment itself is described on data center cooling towers.

Power prices and what they mean for the cooling plant

Power prices in Oregon change the cooling plant’s economics because the state’s average commercial electricity price was 9.80 cents per kilowatt-hour in 2025, against a national commercial average of 13.37 cents, according to EIA data. Industrial customers paid 8.20 cents, close to the national industrial figure of 8.51. Hydroelectricity is the state’s primary energy source.

Lower prices lengthen the payback on a single efficiency measure, yet cooling energy still matters: every kilowatt used by fans, pumps and compressors is a kilowatt the site cannot give to computing under its utility connection. Oregon’s 2025 House Bill 3546 directs the Public Utility Commission to place facilities of 20 megawatts or more that are primarily data processing and hosting into their own class of electric service, with costs assigned to that class. Cooling power is part of every megawatt counted against such a connection, so Paul Industries reports a plant’s expected peak and annual electrical demand alongside its capacity.

Oregon codes that apply to a data center cooling plant

Oregon codes that apply to a data center cooling plant include the 2025 Oregon Mechanical Specialty Code, built on the 2024 International Mechanical Code and mandatory from April 1, 2026, the 2025 Oregon Structural Specialty Code for equipment supports and seismic anchorage, and the 2025 Oregon Energy Efficiency Specialty Code, which adopts ASHRAE Standard 90.1-2022. City and county building departments issue the permits under those specialty codes.

Oregon adds one requirement that surprises many out-of-state owners. Under ORS 480.550, the state’s Board of Boiler Rules adopts the ASME pressure piping codes, including B31.5 for refrigerant and secondary coolant piping and B31.9 for building services piping, and the Building Codes Division states that the Boiler and Pressure Vessel Law is administered by the state rather than by municipal inspection programs. Chiller shells, receivers and expansion tanks can also fall under the state’s pressure vessel rules unless an exemption in ORS 480.525 applies. Paul Industries confirms with the Building Codes Division which permits and inspections a plant’s vessels and piping need before fabrication, so the cooling plant reaches startup with its paperwork in place. Seismic anchorage of chillers, towers and pipe racks is designed with the structural engineer of record for Oregon’s earthquake hazard.

Data center cooling requirements for an Oregon hall

Data center cooling requirements for an Oregon hall start with the IT load and its growth path, the temperature envelope the IT equipment can accept, the redundancy level, and the site’s extreme weather, water and power terms. ASHRAE’s recommended inlet range for air-cooled IT equipment, 64.4 to 80.6 degrees Fahrenheit, is the usual starting point, and warmer supply air widens the hours an Oregon economizer can carry.

Design inputs Paul Industries asks for on an Oregon data center cooling project
InputWhy it matters in OregonHow it shows up in the design
Site weather file and extreme design temperatureWest and east of the Cascades differ sharply; 2021 showed 114 to 117 degree extremesEconomizer changeover points, high-ambient equipment ratings
IT load by phase and rack densityCampuses add halls in stages as power arrivesHeader sizes, valved stubs for future modules
Water source, cost and discharge termsEvaporative cooling saves power but draws water in dry summersEvaporative, hybrid or dry heat rejection
Utility service size and tariff classLarge loads face their own rate class and connection costsCooling power budget per megawatt of IT
Redundancy targetMaintenance has to happen with the hall runningN+1 or 2N machines, isolation valves, dual paths
Winter low and freeze daysUp to 181 freezing nights a year in Central OregonGlycol, heat tracing, drain-down and basin heaters
Liquid cooling plansDense racks need warm facility water to the CDUsSeparate warm-water loop and heat exchangers

Halls that will move to liquid-cooled racks need a facility water loop at a higher temperature than a traditional chilled water system, which suits Oregon’s climate well because dry coolers can make warm water for most of the year. That work is described on data center liquid cooling in Oregon.

How do data center cooling systems work through an Oregon year?

Data center cooling systems in Oregon work in three modes through the year: full economizer in the cool months, partial economizer with chillers trimming the load in spring and autumn, and mechanical cooling with economizer assist in the hottest weeks. The plant controls move between modes on measured outdoor wet bulb or dry bulb temperature and the return water temperature from the hall.

West of the Cascades, a well-tuned plant can spend most of the year in the first two modes. East of the Cascades, the mechanical mode lasts longer in July and August, but the very dry air keeps evaporative equipment productive even then. The transitions are where plants fail: valves that hunt between modes, chillers that short-cycle at low load, and towers that ice when they switch back to economizer on a cold morning. Paul Industries tests each transition during startup and again in the first season, and the test results are written into the plant’s sequence of operations. Operators then receive trend screens that show which mode the plant is in, how many hours it spent there each month, and where the changeover points sit, so the economizer savings stay visible after turnover rather than drifting away as setpoints are adjusted by hand. The startup and test sequence is set out on data center commissioning in Oregon.

Who installs data center cooling systems in Oregon?

Paul Industries installs data center cooling systems in Oregon, from chillers, towers, dry coolers and adiabatic units to pumps, chilled water and condenser water piping, air handling, controls integration and the testing that proves them. Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, and takes data center work across Oregon, in all 50 states and at plants abroad (see international projects).

One contract covers the plant from the equipment pads to the hall connections, so a change in one part is checked against the rest. On larger campuses the same team that builds the cooling plant builds the mechanical package around it, described on data center mechanical contractor in Oregon, and chillers that need service later are covered on chiller repair in Oregon. Owners comparing data center cooling contractors can judge Paul Industries on the things that decide outcomes in Oregon: weather-based economizer design, freeze protection, extreme-heat checks, and complete records at turnover.

What does data center cooling cost in Oregon?

Data center cooling costs in Oregon depend on the IT load and redundancy level, the choice between evaporative and dry heat rejection, extreme-heat and freeze provisions, seismic anchorage, the length of piping between the yard and the halls, and how the work is phased as power arrives. Operating cost then follows the plant’s annual energy and water use at the site’s tariff and water rate.

Paul Industries prices a cooling plant from a defined scope: equipment schedule, piping take-off, controls points and test plan. Early in a project it gives a budget range from comparable scope so the owner can compare options, then a firm price once the load, site and heat rejection choice are fixed. Supply-only equipment packages are priced the same way, with installation added where the owner wants one contract for both. The biggest swings between Oregon options usually come from heat rejection: an evaporative yard costs less in equipment and power than a dry yard of the same capacity, but brings water, treatment and winter protection costs, while a dry yard adds coil area, glycol and compressor hours. Paul Industries sets those lines side by side on one sheet so the comparison is made on the whole life of the plant.

Paul Industries and Oregon data center cooling

Paul Industries designs, supplies, installs, starts up and maintains data center cooling plants for colocation, enterprise and hyperscale owners across Oregon, from Hillsboro and Portland to The Dalles, Prineville and the Columbia Plateau. Its headquarters-state cross-reference is data center cooling in Virginia, and owners with sites in both states can compare it with data center cooling in California. Send the IT load by phase, the site location, the water and power terms and any basis of design, and Paul Industries returns a plant concept and budget. The Oregon and West Coast pages list the rest of Paul’s work in the region. Call 201-450-8280 or request a quote.

Standards referenced: 2025 Oregon Mechanical Specialty Code (2024 IMC) · 2025 Oregon Structural Specialty Code (2024 IBC) · 2025 Oregon Energy Efficiency Specialty Code (ASHRAE 90.1-2022) · Oregon Boiler and Pressure Vessel Law, ORS 480.510 to 480.670 · ASME B31.5 and B31.9 · ASHRAE thermal guidelines for data processing environments · Oregon HB 3546 (2025)

Frequently asked questions

Who handles data center cooling in Hillsboro and the Portland metro?

Paul Industries handles data center cooling in Hillsboro, Beaverton, Portland and the rest of the metro, from chilled water plants and economizers to fan walls, air handlers and controls integration. Hillsboro’s cool July nights let a reset chilled water plant return to economizer mode overnight, so most of the design effort goes into economizer changeover, winter humidity and freeze protection. Send the hall layout and load, and Paul Industries scopes the plant.

Does Paul Industries build cooling plants for data centers in The Dalles?

Yes. Paul Industries builds and services cooling plants for data centers in The Dalles and the Columbia River Gorge. The Dalles averages about 42 days a year at 90 degrees or above and 85 nights at or below freezing, so plants there combine evaporative heat rejection that works hard in dry summer heat with basin heaters, heat tracing and drain-down sequences for winter.

Who installs data center cooling in Prineville, Redmond and Bend?

Paul Industries installs data center cooling in Prineville, Redmond, Bend and across Central Oregon. Redmond’s normals show 87 degree July afternoons, 48 degree July nights and about 181 freezing nights a year, which favors evaporative and economizer cooling in summer and demands glycol or drain-down protection for any outdoor water in winter. Paul Industries designs both seasons together.

Can Paul Industries cool data halls in Umatilla County, Hermiston and Boardman?

Paul Industries designs and installs cooling for data halls in Umatilla and Morrow counties, including Hermiston and Boardman. The Pendleton weather station in the same region averages 89 degree July highs and about 96 freezing nights a year, so adiabatic coolers and towers suit the summer while freeze protection decides winter reliability. Paul Industries sizes makeup water and treatment for the hottest weeks.

Why is Google's data center located in The Dalles?

Google gives three reasons on its own site for choosing The Dalles: a skilled workforce, a business-friendly environment and policies, and enhanced energy infrastructure. The company says it opened its first data center there in 2006. For cooling designers, the Gorge’s dry summer air also makes evaporative heat rejection effective, a point Paul Industries applies when sizing towers and adiabatic coolers in the region.

How hot can it get at an Oregon data center site?

Much hotter than the averages suggest. NOAA daily records show 116 degrees Fahrenheit at Portland airport, 114 at Hillsboro and 117 at Salem on June 28, 2021. Paul Industries checks every air-cooled chiller and dry cooler against an extreme design temperature, confirms high-ambient ratings, and writes control sequences that reset setpoints before equipment trips on high pressure.

Should an Oregon data center use evaporative cooling or a dry plant?

The answer turns on the site’s water and power terms. Evaporative heat rejection uses less electricity, especially east of the Cascades where dry air keeps tower water cool, while a dry plant uses little water but runs compressors longer in hot weather. Paul Industries compares annual water and energy use at the site’s own rates and often proposes a hybrid that adds evaporative assist only on the hottest days.

What glycol strength do dry coolers need in Central Oregon?

Glycol strength is set from the lowest temperature the loop can see, including idle periods with no heat load, and Central Oregon winters bring frequent nights well below freezing. Paul Industries selects the concentration from the site’s extreme low with margin, accounts for the capacity and pumping penalty glycol brings, and verifies concentration at startup and at each seasonal service.

Do Oregon chiller shells and expansion tanks need state permits?

Many do. Oregon’s Boiler and Pressure Vessel Law covers pressure vessels broadly, with exemptions listed in ORS 480.525 and the state’s rules, and the Board of Boiler Rules adopts ASME B31.5 and B31.9 for refrigerant, secondary coolant and building services piping. Paul Industries confirms which vessels and piping on a cooling plant need installation permits and inspections with the Building Codes Division before work starts.

Which energy code applies to a new data center cooling plant in Oregon?

The 2025 Oregon Energy Efficiency Specialty Code, mandatory since July 1, 2025, adopts ASHRAE Standard 90.1-2022 as the commercial energy standard. Its economizer, fan power and equipment efficiency provisions shape plant selection, and Paul Industries documents compliance alongside the mechanical permit set under the 2025 Oregon Mechanical Specialty Code.

How do Oregon electricity prices compare for a data center?

EIA data put Oregon’s average commercial electricity price at 9.80 cents per kilowatt-hour in 2025, against 13.37 cents nationally, with industrial customers at 8.20 cents. Lower prices lengthen the payback on some efficiency upgrades, but cooling power still reduces the capacity left for computing under a fixed utility connection, so Paul Industries designs to a cooling power budget per megawatt of IT load.

Can an existing Hillsboro plant gain economizer hours without a shutdown?

Usually it can. Raising chilled water and supply air setpoints within the IT equipment’s allowable range, adding a plate heat exchanger for water-side economizing, and retuning changeover sequences can all be staged with the plant running. Paul Industries plans each tie-in under a written method of procedure, with redundancy confirmed before any valve is closed.

How should cooling towers be protected through an eastern Oregon winter?

Through basin heaters sized for the site’s low, heat tracing and insulation on makeup, drain and equalizer lines, bypass valves that keep warm water off cold fill, and drain-down of cells that stand idle. Fan cycling and reversing fans help clear ice. Paul Industries writes these steps into the controls and tests them before the first hard freeze.

What scale of cooling plant work is planned across Oregon?

Large, judging by the state’s air permits: DEQ counted over 40 data center sites permitted or proposed in 2025, with backup engines totaling 6,000 MW. Each of those sites needs a cooling plant sized for its full build-out, and Paul Industries designs headers and yards so later halls connect without shutting down the first.

Does Paul Industries supply cooling equipment for Oregon projects without installing it?

Yes. Paul Industries supplies chillers, dry coolers, adiabatic coolers, pumps, heat exchangers and prefabricated pump skids as supply-only packages for Oregon projects, with submittals, factory test records and startup support documents. Owners who later want installation, startup and service under the same contract can add them to the order.

What should an Oregon owner send to start a cooling plant estimate?

Send the IT load by phase, the target rack densities, the site address, the redundancy level, the water source and power terms, and any basis of design or drawings. With those, Paul Industries proposes a heat rejection approach, an equipment list and a budget range, then a firm price when the scope is fixed. Call 201-450-8280 or use the request a quote form.

Sizing a cooling plant for an Oregon data hall?

Send the IT load by phase, the site location, the water and power terms and any basis of design. Call 201-450-8280 or request a quote.