Paul Industries installs data center liquid cooling in Oregon: coolant distribution units, cold plate and rear door heat exchanger loops, facility water mains, and the warm-water dry coolers and trim chillers that reject the heat, for new halls and for retrofits in Hillsboro, Portland, The Dalles and Central Oregon. In Oregon the case for liquid cooling rests on power more than on climate: utility connections for large data loads now carry their own rate class and connection costs, so every megawatt has to deliver as much computing as possible. Paul Industries designs, supplies, installs, flushes, tests and services the liquid loop from the facility plant to the rack manifold.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Large-load class 20 MW and up, data processing and hosting (HB 3546, 2025)
Backup generation 6,000 MW across 40+ permitted or proposed sites (DEQ, 2025)
Coolant piping ASME B31.5 adopted by the state Board of Boiler Rules
Freeze exposure 181 nights at or below 32 F in Redmond (NOAA normals)
Reviewed November 2026

Why data center liquid cooling in Oregon starts with the utility connection

Data center liquid cooling in Oregon starts with the utility connection because the state now treats very large data loads as a distinct class of electric customer. House Bill 3546, passed in 2025, directs the Public Utility Commission to give facilities that use 20 megawatts or more, and are primarily in data processing and hosting, their own classification of service and tariff, with the costs of serving them assigned to that class.

The Public Utility Commission has also approved a Pacific Power proposal that removes most of the line extension allowance for new customers seeking more than 25 megawatts, and it has opened an investigation into how Portland General Electric charges large new loads for their connections. Together these steps make new power more expensive and slower to obtain. An owner who already holds a connection gets more value by fitting more computing inside it, and liquid cooling is the most direct way to do that: it carries heat from dense racks with far less fan power than air, and it lets the facility plant run warmer, cutting compressor energy.

The national description of the technology sits on the data center liquid cooling page. This page covers what Oregon’s power rules, climate and pressure piping law change about the work.

Do data centers use liquid cooling in Oregon today?

Data centers in Oregon use liquid cooling in a growing share of new and refitted halls, mostly as direct-to-chip cold plates served by coolant distribution units and as rear door heat exchangers on mixed rows, with air still cooling storage, networking and the residual heat from liquid-cooled servers. Most Oregon halls are hybrids: a liquid loop carries the bulk of the heat from dense racks, and the existing air system handles the rest.

The Oregon Department of Environmental Quality counted more than 40 data centers permitted or proposed in the state as of 2025, carrying 6,000 megawatts of backup generation. Halls built before dense racks arrived were laid out for air cooling at modest densities, so a good part of Oregon liquid cooling work happens inside operating buildings as well as in new construction.

How does data center liquid cooling work in an Oregon hall?

Data center liquid cooling in an Oregon hall works as three linked loops: a technology cooling system that carries treated coolant through cold plates or rear doors at the rack, a coolant distribution unit that separates that loop from the building, and a facility water system that takes the heat from the CDU to dry coolers, towers or chillers outdoors. Each loop has its own fluid, pressure and cleanliness requirements.

The facility water loop is where Oregon’s climate helps. Liquid-cooled servers accept much warmer water than air-cooled halls need for their coils, and ASHRAE’s liquid cooling classes, from W17 to W45, name the maximum facility water supply temperature in degrees Celsius. A loop designed for a warm class can reject heat to dry coolers for most of the year west of the Cascades, where Hillsboro’s July nights average about 52 degrees Fahrenheit. Trim chillers or evaporative assist then cover only the hottest afternoons.

The three loops of an Oregon liquid cooling installation
LoopFluidOregon design pointWhat Paul Industries installs and proves
Technology cooling system (rack side)Treated water or propylene glycol mix specified by the server makerClean fill water and fine filtration; the loop sits indoorsRow headers, rack manifolds, quick disconnect drops, flushing and filling
Coolant distribution unitHeat exchanger between the two loopsPump redundancy and power on the same footing as the IT it servesSetting, piping, controls wiring, startup with the maker’s procedure
Facility water systemWater or glycol, depending on outdoor exposureWarm supply temperature for dry cooling; glycol east of the CascadesMains, valves, heat exchangers, dry coolers, trim chillers, pressure tests

Retrofitting a data center: Hillsboro halls built for air

Retrofitting a liquid-cooled row into an air-cooled hall means building a new loop around servers that are already running, and in the Hillsboro and Portland market many halls were laid out for air at modest densities and are fully leased. For a colocation data center, Hillsboro, Oregon buildings tend to be multi-story, with chilled water risers and limited overhead space, which shapes how new pipe can be routed to the rows.

Data center liquid cooling in Hillsboro therefore begins with a survey: where the chilled water mains run and how much spare capacity they carry, how much ceiling space sits above the target rows, what the slab and raised floor can carry, and where a CDU can stand with service clearance. Paul Industries then proposes one of three routes: tap the existing chilled water plant through CDUs, add a separate warm-water loop with its own dry coolers on the roof or in the yard, or start with rear door heat exchangers on the existing chilled water and move to cold plates as tenants require them.

Working in an occupied hall

Work in an occupied hall is planned under written methods of procedure for every tie-in, with redundancy confirmed before any valve closes. Paul Industries prefabricates headers and manifolds off site in measured spools, so field joints, hot work and noise inside the hall are kept short. Where hot work cannot be avoided, grooved or press joints and cold cutting reduce fire watch and smoke detection bypass time. Leak detection cable and drip trays under manifolds go in before the first rack is filled.

Retrofit routes for an Oregon air-cooled hall
RouteWhen it fitsPlant impactMain risk to manage
CDUs fed from the existing chilled water plantSpare chiller capacity and a few dense rowsAdds load to chillers at a cold supply temperatureRunning out of chiller and pipe capacity as racks are added
New warm-water loop with dry coolersMany dense rows and roof or yard space for coolersOffloads the chillers; compressor-free for most of the year west of the CascadesFreeze protection, roof structure and sound limits
Rear door heat exchangers on chilled waterMixed rows and tenants not yet on cold platesModerate added chilled water flowCondensation if water runs below the room dew point
Liquid-to-air CDUs in the rowA handful of racks and no new pipeHeat stays in the room airAir system capacity and hot spots

Oregon pressure piping law and the liquid loop

Oregon pressure piping law reaches liquid cooling because the state’s Boiler and Pressure Vessel Law, ORS 480.550, directs the Board of Boiler Rules to adopt ASME B31.5, which covers refrigerant, heat transfer components and secondary coolant piping, together with B31.9 for the piping that serves buildings. According to the Building Codes Division, enforcement of that law sits with the state’s boiler program, and a city or county inspection office takes part only where it has specific authority.

For an owner, that means a liquid cooling project in Oregon carries a second set of rules alongside the mechanical permit under the 2025 Oregon Mechanical Specialty Code. ORS 480.560 provides that nonboiler external piping is inspected on installation only, so the installation inspection is the one that counts. Paul Industries confirms with the Building Codes Division which parts of the technology and facility water loops fall under the pressure piping rules, documents the joining procedures, pressure tests and materials, and keeps those records with the turnover package. Welding on any loop that needs it follows written procedures and qualified welders, described on industrial welding services in Oregon.

Seismic bracing of liquid cooling piping in Oregon

Seismic bracing of liquid cooling piping in Oregon follows the 2025 Oregon Structural Specialty Code, mandatory from April 1, 2026, and the Building Codes Division notes that seismic and structural connections of process piping to a building are regulated and inspected under that structural code (OAR 918-225-0315). Western Oregon sits above the Cascadia subduction zone, so headers, manifolds and CDUs full of coolant are anchored and braced like any other heavy equipment.

Liquid loops add details that air systems lack. Rigid headers connected to racks on a raised floor need flexible connections where the floor and the structure can move differently in an earthquake, and CDUs need anchorage that keeps their pump and heat exchanger connections intact. Paul Industries lays out hangers and braces against the structural engineer of record’s design, keeps braces clear of rack service space, and records anchor and brace locations on the as-built drawings so later rows follow the same pattern.

Controls and monitoring that tie the loop to the building

Controls for an Oregon liquid cooling loop connect each CDU, dry cooler, trim chiller and leak detection zone to the building management system, so operators see supply temperature, flow, pressure and alarms for the liquid side next to the air side they already watch. CDUs usually arrive with their own controllers; the work is in mapping their points, setting alarm priorities and writing the sequences that change dry cooler fan speed and trim chiller staging as outdoor temperature moves.

Paul Industries writes and tests those sequences with the controls integrator, including the hand-off between dry cooling and trim cooling on a warm afternoon and the response to a CDU pump failure. Every point is checked end to end before turnover, from the sensor in the pipe to the screen in the control room.

Glycol and freeze protection east of the Cascades

Glycol and freeze protection matter for liquid cooling east of the Cascades because outdoor dry coolers there face long, hard winters: Redmond averages 181 nights a year at or below freezing, and The Dalles about 85. A facility water loop that runs outdoors in Central or Eastern Oregon needs a glycol concentration matched to the site’s extreme low, or an intermediate heat exchanger that keeps glycol outdoors and plain water indoors.

Glycol reduces heat transfer and raises pumping power, so Paul Industries keeps it on the outdoor side wherever the layout allows, with a plate heat exchanger between the dry cooler loop and the facility water main. Data center liquid cooling in The Dalles and Prineville also has to handle idle periods: a new hall with no IT load yet can freeze an exposed coil in one night, so commissioning plans include heat sources or drain-down for loops that are filled before servers arrive.

Fill water, filtration and coolant quality in Oregon loops

Fill water for an Oregon technology cooling loop has to meet the server maker’s coolant specification, which normally means deionized or reverse osmosis water dosed with inhibitor and biocide, or a premixed propylene glycol coolant. Municipal water, even very soft supplies such as Portland’s, carries chlorine, dissolved solids and microbes that have no place in cold plate channels a fraction of a millimeter wide.

Paul Industries flushes new loops in stages, with temporary strainers and bypasses around CDUs and cold plates, then fills with specified coolant and confirms chemistry before the first server connects. Inline filtration at the CDU is selected to the cold plate maker’s particle limit. Owners who want treated water made on site can add a small purification skid; Oregon water treatment work is described on high-purity water systems in Oregon.

Are data centers water cooled in Oregon, and does liquid cooling raise water use?

Data centers in Oregon are water cooled at the rack when they use liquid cooling, but the rack-side loop is closed and uses almost no water once filled. Whether the site as a whole consumes water depends on how the facility loop rejects heat: dry coolers use none, while cooling towers and adiabatic coolers evaporate water to save electricity.

Liquid cooling often lowers site water use, because a warm facility loop can reject heat to dry coolers for more hours than a cold chilled water loop can. West of the Cascades, a warm-water loop can run dry for most of the year; on the drier Columbia Plateau, evaporative assist on hot afternoons is often worth its water. Paul Industries estimates annual water and energy for each option so the owner can choose with numbers. Plant-level cooling choices are compared on data center cooling in Oregon.

Who does liquid cooling for data centers in Oregon?

Paul Industries does liquid cooling for data centers in Oregon, installing coolant distribution units, technology and facility water piping, rack manifolds, rear door heat exchangers, dry coolers, trim chillers, leak detection and controls connections, then flushing, filling, testing and maintaining them. Paul Industries has its headquarters at 256 Shore Drive, Kilmarnock, Virginia, was formerly based in northern New Jersey and then Pennsylvania, and takes data center work across Oregon and in all 50 states.

Among data center liquid cooling companies, owners can measure Paul Industries on the outcomes that matter in a live Oregon hall: tie-ins made without lost cooling, clean loops on the first fill, and complete pressure test and chemistry records. Liquid cooling packages are offered supply-only, design-build or as complete installation. Immersion tanks, where an owner chooses them, are covered on data center immersion cooling, and the facility piping on process piping in Oregon.

Leak detection, drip protection and alarms

Leak detection for an Oregon liquid cooling installation combines sensing cable under every manifold, CDU and row header, drip trays with their own sensors under quick disconnect points, and flow and pressure alarms at each CDU that catch a slow loss before it reaches the floor. Each alarm is mapped to an action: a cable alarm under one rack closes that rack’s isolation valves, while a pressure loss across a whole row stops the CDU and alerts the operator.

Paul Industries routes supply and return headers so that a leak drains away from electrical gear, keeps valves and unions out of the space directly above live power distribution where the layout allows, and labels every isolation point on the as-built drawings. The alarm sequence is tested at commissioning by wetting each cable zone and confirming the alarm, the valve action and the message the operator receives. Those test sheets go into the turnover package with the pressure test records.

Maintenance after turnover: what an Oregon liquid loop needs

Maintenance after turnover keeps a liquid loop’s chemistry, filtration and moving parts within the limits the server maker set, because cold plate warranties often depend on documented coolant quality. A loop that is never sampled can drift for months before a blocked channel or corroded fitting shows up as a hot processor.

A service schedule for an Oregon liquid cooling system
IntervalTaskOregon note
ContinuousCDU flow, pressure, supply temperature and leak alarms trendedSupply temperature drift shows up first on the hottest afternoons
MonthlyFilter differential pressure and strainer checks; visual check of quick disconnectsMore frequent in the first months after a new phase is added
QuarterlyCoolant sample: conductivity, pH, inhibitor, microbial count, glycol strengthResults compared against the server maker’s limits
Before winterGlycol concentration and freeze point on outdoor loops; heat tracing and drain valvesCritical in The Dalles, Prineville and the Plateau
Before summerDry cooler coil cleaning, fan checks, trim chiller readinessSets the plant up for heat events like June 2021, when Hillsboro reached 114 F
AnnuallyCDU pump inspection, valve exercising, leak detection zone testsRecords kept with the original commissioning file

Paul Industries offers that schedule under a service agreement, with sample results and corrective actions logged per loop, so the owner can show warranty compliance at any time. Coolant top-ups use the same specified product and are recorded by volume, since repeated make-up is the earliest sign of a slow leak.

What does data center liquid cooling cost in Oregon?

Data center liquid cooling cost in Oregon is driven by the number and density of racks, the route chosen for the facility water, how far new pipe has to run from the plant to the rows, CDU and dry cooler counts, freeze protection, and how much of the work must be done in an operating hall. Retrofits carry extra cost for night work, methods of procedure and protection of running equipment.

Power terms change the value side of the calculation. With Oregon’s average commercial electricity at 9.80 cents per kilowatt-hour in 2025 (EIA), energy savings alone repay the work slowly; the larger gain is the computing that fits inside an existing connection when fan and compressor power fall. Paul Industries prices liquid cooling from a defined rack plan, gives a budget range from comparable scope early on, then a firm price once routes and equipment are fixed.

Phasing liquid cooling as racks arrive

Phasing liquid cooling as racks arrive keeps capital matched to tenants: mains and headers are sized for the full row count on day one, with valved and capped branches for each future rack position, and CDUs are added as racks are sold. Capped branches need care, because dead legs collect sediment and bacteria if they sit full and stagnant.

Paul Industries designs future branches short, with isolation at the header and a flush connection, and writes a procedure for bringing each new branch into service: isolate, flush, sample, open. The commissioning steps for each phase follow data center commissioning in Oregon, and campus-scale phasing is planned with the mechanical package described on data center mechanical contractor in Oregon.

Liquid cooling from Paul Industries in Oregon

Paul Industries designs, supplies, installs, flushes, tests and maintains data center liquid cooling across Oregon, from Hillsboro and Portland retrofits to new halls in The Dalles, Prineville and the Columbia Plateau. The headquarters-state version of this work is described on data center liquid cooling in Virginia, and a comparison with a hot, dry-cooled market sits on data center liquid cooling in Texas. Send the rack plan, densities, server maker’s coolant specification and the hall drawings, and Paul Industries returns a route and budget. Paul’s wider Oregon scope is listed on the Oregon page, and the five Pacific states on West Coast. To start, call 201-450-8280 or request a quote with the rack plan attached.

Standards referenced: Oregon Boiler and Pressure Vessel Law, ORS 480.550 (pressure piping) · ASME B31.5 Refrigeration Piping and Heat Transfer Components · ASME B31.9 Building Services Piping · 2025 Oregon Mechanical Specialty Code (2024 IMC) · ASHRAE liquid cooling classes (W17 to W45) · Oregon HB 3546 (2025)

Frequently asked questions

Who installs liquid cooling for colocation halls in Hillsboro and Beaverton?

Paul Industries installs liquid cooling for colocation halls in Hillsboro, Beaverton and the rest of Washington County, from CDUs and rack manifolds to new warm-water loops and roof dry coolers. Many of these buildings are multi-story and fully leased, so Paul Industries surveys risers, ceiling space and floor loading first and prefabricates headers to shorten work inside the hall.

Does Paul Industries add liquid-cooled rows to Portland data centers?

Yes. Paul Industries adds liquid-cooled rows to data centers in Portland and the inner metro, where urban sites often limit yard space and roof loads. Options include CDUs on the existing chilled water plant, rear door heat exchangers for mixed rows, and compact dry coolers on reinforced roof steel, each with leak detection and a written tie-in plan.

Who builds liquid cooling loops for new halls in The Dalles and Prineville?

Paul Industries builds liquid cooling loops for new halls in The Dalles, Prineville and Central Oregon, including facility water mains, CDUs, dry coolers and trim chillers. These sites face dozens to nearly two hundred freezing nights a year, so outdoor loops carry glycol behind a heat exchanger, and loops filled before servers arrive get heat or drain-down protection.

Can a liquid cooling loop on the Columbia Plateau near Hermiston run without towers?

It can for much of the year. A warm facility water loop can reject heat to dry coolers whenever outdoor air is several degrees below the loop return temperature, and the plateau’s nights are cool even in July. On the hottest afternoons, adiabatic assist or a trim chiller holds supply temperature. Paul Industries models the hours in each mode from the site’s weather data.

How does Oregon's 2025 large-load law affect a liquid cooling decision?

House Bill 3546 puts facilities of 20 megawatts or more in data processing and hosting into their own electric service class, with their serving costs assigned to that class. New capacity becomes more expensive and slower to get, so owners gain by fitting more computing inside the connection they hold. Liquid cooling cuts fan and compressor power, freeing more of that connection for servers.

Is liquid cooling piping in Oregon covered by the state boiler and pressure vessel rules?

Parts of it can be. ORS 480.550 has the Board of Boiler Rules adopt ASME B31.5, which covers secondary coolant piping, and B31.9 for building services piping, and the Building Codes Division administers that law directly. Paul Industries confirms coverage for each loop with the division before work starts and keeps installation test records for the inspection.

What facility water temperature suits a Hillsboro liquid-cooled hall?

The highest temperature the server maker’s liquid cooling class allows, because each degree added extends the hours dry coolers can carry the load. Hillsboro’s mild summer nights let a warm loop run compressor-free most of the year. Paul Industries confirms the class with the IT vendor, then sets dry cooler, trim chiller and CDU approach temperatures to match.

How heavy is a liquid-cooled rack compared with an older Oregon raised floor rating?

Fully loaded liquid-cooled racks for dense computing commonly weigh far more than the racks older floors were designed around, and manifolds full of coolant add weight. Paul Industries checks rack weights against the floor and slab ratings with the structural engineer before routing, and recommends slab-level placement or reinforcement where the raised floor falls short.

What coolant goes into an Oregon technology cooling loop?

The coolant the server and cold plate makers specify, usually treated deionized water with inhibitor and biocide, or a premixed propylene glycol solution such as PG25. Paul Industries fills from sealed containers or a purification skid, confirms conductivity, pH and inhibitor levels before servers connect, and samples on a schedule after turnover.

Do CDU pumps need backup power in an Oregon data hall?

Yes, at the same level as the IT equipment they cool. Cold plates hold little coolant, so chips overheat within moments if flow stops. Paul Industries wires CDU pumps to UPS-backed or dual-fed power as the design requires and tests flow through a simulated utility outage, including the generator transfer.

Why do rear door heat exchangers sweat, and how is it prevented in Portland rooms?

Rear doors sweat when their water runs below the room’s dew point. Portland’s winter air is damp, so a room that brings in outdoor air can see dew points rise. Paul Industries sets the door water supply above the room dew point with margin, adds dew point monitoring to the control sequence, and insulates supply lines where they pass through cooler spaces.

Can existing chilled water in an Oregon hall feed coolant distribution units?

Often it can for the first rows. Liquid-to-liquid CDUs accept chilled water, and many Oregon plants have spare capacity at night and in the cool months. As more racks are added, the cold supply temperature wastes the warm-water advantage, so Paul Industries plans a route to a separate warm loop once the liquid load grows.

How is a new liquid loop cleaned before servers connect?

By staged flushing with the CDUs and cold plates bypassed, temporary fine strainers, and repeated drain and refill until samples meet the cleanliness limit. Paul Industries then fills with the specified coolant, vents every high point, runs the pumps to circulate through filters, and records chemistry before the server maker’s connection procedure begins.

How long does a liquid cooling retrofit take in an operating Oregon hall?

Schedules depend on row count, routing and how many tie-ins need outage windows. Prefabricated headers, valved taps installed in a single planned window, and work sequenced row by row shorten time inside the hall. Paul Industries builds a schedule around the owner’s change windows and tenant move-in dates once the survey is complete.

Does Paul Industries supply CDUs and manifolds without installing them?

Yes. Paul Industries supplies coolant distribution units, rack manifolds, prefabricated headers, dry coolers and heat exchangers as supply-only orders for Oregon projects, with submittals and test records. Installation, flushing, startup and service can be added under the same contract whenever the owner wants one point of accountability.

What should an Oregon owner send to price a liquid cooling project?

Send the rack count and density by phase, the server maker’s liquid cooling class and coolant specification, hall drawings showing existing mains and ceiling space, the plant’s spare capacity, and the target dates. Paul Industries returns a route, equipment list and budget range, then a firm price. Call 201-450-8280 or request a quote.

Bringing liquid-cooled racks into an Oregon hall?

Send the rack plan and densities, the server maker’s coolant specification and the hall drawings. Call 201-450-8280 or request a quote.