Paul Industries installs data center liquid cooling in Texas: coolant distribution units, direct-to-chip and rear door heat exchanger loops, facility water piping and the dry coolers or trim chillers that reject the heat, for new halls and retrofits from Round Rock and Dallas to Abilene and Houston. Texas racks are getting heavier and hotter, and the state’s dry west, humid coast and winter freezes each change how a liquid loop is built. Paul Industries supplies equipment, delivers design-build loops and completes full installations, then flushes, fills, tests and documents them before servers connect.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Research racks About 215 kW per GPU rack on TACC's Horizon, Round Rock (TACC, 2026)
Rack weight About 6,000 lb with liquid and rear doors (TACC)
West Texas example Abilene campus: closed-loop, non-evaporative liquid cooling
Freeze benchmark DFW at -2 F, February 16, 2021 (NWS)
Reviewed November 2026

What does data center liquid cooling in Texas involve?

Data center liquid cooling in Texas involves two connected loops and the plant behind them: a technology cooling loop that carries coolant from coolant distribution units to cold plates or rear door coils at the racks, and a facility water loop that carries the heat from those units to dry coolers, towers or chillers outside. The rack side looks much the same anywhere in the country. The facility side does not, because a loop that rejects heat through dry coolers in Midland behaves differently from one in Houston, and both must survive a hard freeze.

How data center liquid cooling works in general, from cold plates to manifolds to quick disconnects, is set out on the national data center liquid cooling page. Here the subject is Texas: the densities Texas research and commercial halls are already running, the water and climate trade-offs across the state, the grid rules that decide how coolant keeps moving during curtailment, and the practical work of fitting liquid loops into Texas buildings.

The rack densities Texas research computing has reached

Texas research computing has reached rack densities that only liquid cooling can carry: the Texas Advanced Computing Center’s Horizon system, installed in a Round Rock hall built to support 250 kilowatts per cabinet, uses GPU racks of about 215 kilowatts each, according to a May 2026 TACC presentation. The same presentation put each loaded GPU rack at about 6,000 pounds with liquid and rear doors, and the system’s racks at roughly 13 megawatts, about double the 6 megawatts its predecessor, Frontera, drew.

TACC’s earlier machines show how quickly Texas moved. Frontera and Stampede3 used direct liquid cooling of processors, and other TACC systems used immersion, so Central Texas already has years of operating experience with liquid-cooled computing. Commercial colocation halls in Dallas-Fort Worth, Austin and San Antonio are following the same path as tenants bring dense GPU rows into rooms that were built for air.

Rack densities and what each asks of a Texas cooling loop
Rack typeTypical or reported loadCooling pathBuilding implication
Air-cooled enterprise or colocation rackSingle-digit to low double-digit kilowattsCRAH units or fan walls on chilled waterStandard raised floor or slab; no liquid at the rack
Rear door heat exchanger rackTens of kilowattsCoolant through a coil in the rack doorFacility or technology loop to each door; condensation control on humid days
Horizon-class CPU rackAbove 100 kW (TACC)Direct-to-chip cold plates plus residual airRow manifolds, CDUs and a heavier floor rating
Horizon-class GPU rackAbout 215 kW (TACC)Direct-to-chip cold plates with rear doorsAbout 6,000 lb per rack; hall designed for 250 kW per cabinet
Immersion tankVaries by tank and fluidDielectric fluid to a heat exchangerSlab loading, fluid handling and containment

Closed-loop, non-evaporative cooling on the West Texas plains

Closed-loop, non-evaporative liquid cooling suits the West Texas plains because the region’s dry air lets dry coolers reject warm-loop heat for much of the year while water is the resource a site most needs to protect. The large campus at Abilene shows the approach at scale: its operator’s 2025 fact sheet describes eight buildings on 1,100 acres using closed-loop, non-evaporative liquid cooling, with cooling-system maintenance water estimated at about 12,625 gallons per building per year. The first building ran in 2025 and the remaining buildings were still being completed through 2026.

A data center in Abilene, Texas, or anywhere on the plains, using that design trades water for fan and compressor power. Dry coolers need a large yard, the loop has to run warm enough that the coolers carry the load on most days, and trim chillers or adiabatic assist cover the hottest afternoons, when Abilene’s July normal high reaches 96 degrees Fahrenheit. The initial fill is a large one-time volume, and after that the loop’s makeup water is small, which is why chemistry and filtration matter so much: the same coolant circulates for years.

Choosing a facility water temperature for Texas dry coolers

A facility water temperature for Texas dry coolers is chosen by setting the ASHRAE W class the IT equipment accepts against the site’s summer dry bulb, because dry coolers reject heat to the air and their leaving water always sits some degrees above the outdoor dry bulb. The warmer the class, the more hours dry coolers carry the hall without chillers, and Texas summers make that margin decisive.

ASHRAE facility water classes and how they play in Texas climates
Class (maximum facility supply)Heat rejection in TexasWhere it fits
W17 (17 C, about 63 F)Chillers most of the year; dry coolers only on cool nights and in winterRetrofits fed from an existing chilled water plant
W27 (27 C, about 81 F)Towers or chillers through summer; dry coolers through the cool seasonGulf Coast and North Texas halls with a mixed plant
W32 (32 C, about 90 F)Dry coolers for much of the year, trim chillers on hot afternoonsPanhandle and high plains sites with cooler nights
W40 (40 C, about 104 F)Dry coolers carry most hours statewide; adiabatic assist on peak daysNew direct-to-chip halls in West and Central Texas
W45 and W+ (45 C and above)Dry coolers year-round in most of Texas; heat reuse becomes possibleEquipment rated for high inlet temperatures; research and purpose-built halls

Paul Industries runs the hourly weather data for the actual site against the chosen class before the dry coolers are sized, and adds trim capacity for the summer hours the coolers cannot cover. In Houston and Corpus Christi, warm nights and high humidity keep more hours on towers or chillers; in Amarillo and Lubbock the cooler nights extend dry cooler hours substantially.

Coolant, glycol and freeze protection for Texas liquid loops

Coolant and freeze protection for Texas liquid loops start from the fact that the facility water loop runs outdoors through dry coolers, and February 2021 showed that a Texas freeze can be deep and long: Dallas-Fort Worth reached minus 2 degrees Fahrenheit on February 16 of that year. A dry cooler coil full of plain water does not survive that, so the outdoor loop either carries glycol at a concentration matched to the site’s design low or is isolated and drained when the coolers are idle.

Glycol changes the loop. Propylene glycol thickens the fluid and cuts its heat capacity relative to treated water, so the same heat needs more flow and more pump energy, so the dry coolers and pumps are sized for the actual fluid. The technology loop inside the building usually runs on a separate coolant specified by the server or CDU manufacturer, kept apart from the outdoor glycol loop by the CDU’s heat exchanger. Paul Industries fills each loop with its specified fluid, records concentration and chemistry at fill, and sets a sampling schedule so inhibitor depletion and glycol degradation show up before they cause corrosion.

Keeping coolant moving when ERCOT calls for curtailment

Keeping coolant moving during an ERCOT curtailment is a design requirement for large Texas halls, because Senate Bill 6 of 2025 requires transmission-voltage large loads connected after December 31, 2025 to be able to curtail during firm load shed and lets ERCOT direct large loads to run backup generation in emergencies. A direct-to-chip rack has very little thermal mass: if coolant flow stops, chip temperatures climb far faster than they would in an air-cooled room.

For that reason the CDU pumps and controls in a Texas liquid-cooled hall belong on uninterruptible power, the facility water pumps need to ride through the transfer to generators, and the loop needs enough volume or a buffer tank to absorb heat while the dry coolers or chillers restart. Paul Industries designs the transfer sequence together with the power design, then proves it in an integrated test with the loop at operating load. The broader plant behavior during curtailment is described on data center cooling in Texas.

Condensation on liquid cooling piping in Gulf Coast buildings

Condensation on liquid cooling piping is a Gulf Coast problem because Houston’s humid air holds a high dew point for most of the year, and any pipe or rear door coil colder than that dew point drips. Warm technology loops above the room dew point avoid the issue, but loops fed from chilled water, and the facility water mains that bring that water into the hall, need closed-cell insulation with sealed vapor barriers and controls that hold supply temperature above dew point.

Rear door heat exchangers in Houston, Beaumont and Corpus Christi rooms are the most exposed, since a door coil sits in the room air. Paul Industries sets door supply temperature with a dew point margin, installs drip trays and leak detection under row manifolds, and checks insulation joints during the first humid season after installation.

Retrofitting liquid cooling into Dallas, Austin and Houston halls

Retrofitting liquid cooling into an existing Dallas, Austin or Houston hall starts with three surveys: the floor’s load rating against racks that weigh several thousand pounds, the chilled water plant’s spare capacity and supply temperature, and the routes for row manifolds that avoid live cable trays and power whips. Many Texas colocation halls built for air have raised floors rated well below the loads of a 6,000-pound rack, so the retrofit may move dense rows onto slab or add floor reinforcement.

Retrofit checks for adding liquid-cooled racks to an operating Texas hall
CheckWhat Paul Industries measuresTypical outcome
Floor and slab capacityRated load against rack, CDU and manifold weightRows on slab, reinforced floor or spread rack layout
Chilled water spare capacityPlant trend data on the hottest days of the last summerFeed CDUs from the existing plant or add a dedicated warm loop
Supply temperaturePlant setpoint against the CDU approach and IT inlet limitsMixing valve on the CDU feed or a separate loop
Pipe routesClearances to cable trays, busway and sprinkler mainsOverhead manifolds with drip trays, or under-floor runs with leak detection
Tie-in pointsValves and branch connections on the live mainsHot taps or line stops where no isolation exists
Water qualityExisting loop chemistry and strainer conditionSide-stream filtration and cleaning before the CDU connects

Tie-ins are made under a written method of procedure, with redundancy confirmed on the existing plant before each valve is closed. New piping is pressure tested, flushed through temporary strainers and filled before the CDU is connected, so debris from construction never reaches cold plate passages, which can be fine enough to clog. The liquid cooling loop adds to the work on the hall’s mechanical package, described on data center mechanical contractor in Texas.

Do data centers use liquid cooling across Texas today?

Many Texas data centers use liquid cooling today, and more are being designed around it: research halls in Central Texas run direct-to-chip racks above 100 kilowatts, large new campuses on the plains are built with closed-loop liquid cooling from the start, and colocation halls in the metros add liquid-cooled rows for tenants with GPU clusters. Are data centers liquid cooled throughout? Most still carry air-cooled equipment as well, so a typical new Texas hall is a hybrid, with liquid loops for the dense rows and air handling for storage, network and residual heat.

A data center with liquid cooling still needs air. Cold plates remove most of a GPU server’s heat, but memory, power supplies and network gear shed the rest into the room, so fan walls or CRAH units remain, sized for the residual load. Paul Industries designs both sides together so the chilled water plant, the dry coolers and the air handling share the right loads.

Fill water for Texas loops: why municipal supply needs treatment first

Fill water for a Texas liquid cooling loop needs treatment before it goes in, because much of the state’s supply is hard: the U.S. Geological Survey describes Edwards Aquifer water around San Antonio as a calcium bicarbonate water that is hard, and many Central and West Texas sources carry high mineral content. Hardness that is harmless in a drinking glass deposits scale on hot cold plate surfaces and in the narrow channels of a CDU heat exchanger, where even a thin layer raises the chip temperature.

For that reason the technology loop receives purified water, deionized or from reverse osmosis, blended with the coolant concentrate and inhibitor package the equipment manufacturer specifies, never with straight city water. The facility water loop, which sees larger passages, is filled with treated water or glycol mix to its own specification. Paul Industries brings or produces the fill water to the specification, samples conductivity, pH, inhibitor level and particle count at fill, and keeps a side-stream filter on each loop so particles from the first months of operation are captured rather than circulating. The same water treatment knowledge applies to the purified water work described on ultrapure water systems in Texas.

Leak detection and drip protection in Texas data halls

Leak detection and drip protection in a Texas data hall are planned with the manifold layout, because a liquid loop brings water and glycol into a room full of energized equipment, and the cost of a leak is measured in damaged servers and downtime rather than the coolant lost. Detection cable under row manifolds and CDUs, drip trays beneath overhead connections, and leak sensors in CDU drain pans all report to the building management system with alarms that identify the location.

Valving matters as much as sensing. Isolation valves at each row and each rack connection let a leak be stopped without draining the whole loop, and quick disconnects with dry-break designs keep spills small during server changes. Paul Industries pressure tests every joint before fill, then walks the whole loop at operating pressure and temperature after the first week, when thermal cycling has had a chance to reveal any weak fitting. Records of the tests, the sensor layout and the valve schedule go to the owner at turnover. Operators then use the valve schedule during server changes, so the person isolating a rack knows exactly which pair of valves to close and how much coolant the branch holds before a connection is broken.

Phasing liquid cooling across a multi-building Texas campus

Phasing liquid cooling across a multi-building Texas campus means building the shared facility water mains and heat rejection yard ahead of the first hall while keeping each later building’s connection simple and isolated. Campuses on the plains are often planned as a row of identical buildings brought into service one after another, so the first phase sets the pattern for every one that follows.

Paul Industries designs the yard and mains with valved, capped branches for future buildings, so each new hall ties in without shutting down the loops already serving live racks. Prefabricated manifold and pump skid sections built off site to a repeating design shorten the time on each building, and the flushing, fill and test sequence is written once and repeated, so every hall reaches the owner with the same records.

Data center liquid cooling cost in Texas

Data center liquid cooling cost in Texas is set by the number and size of CDUs, the length and material of row manifolds and facility water mains, the heat rejection plant behind them, freeze protection on the outdoor loop, and how much of the work happens inside a hall that is already running. Retrofits cost more per rack than new construction because of tie-ins, phasing and protection of live equipment.

Two Texas factors move the operating side. Texas industrial electricity, at 6.12 cents per kilowatt-hour for 2024 compared with a national 8.13 (EIA), which favors warm-water designs that save chiller energy without heavy capital, and the Texas sales tax exemption for qualifying data centers lists cooling systems and racks among eligible items, which changes the installed cost for owners whose sites qualify. Paul Industries prices a loop from the rack count, density and layout, giving a budget number first and a fixed price once drawings and equipment are settled.

Who does liquid cooling for data centers in Texas?

Paul Industries is the contractor for liquid cooling at data centers in Texas, installing CDUs, row manifolds, rear door connections, facility water piping, dry coolers and trim chillers, and flushing, filling and testing the loops before IT equipment connects. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries, an East Coast contractor, takes liquid cooling projects throughout Texas, in every one of the 50 states and at plants abroad.

Among data center liquid cooling providers, the difference that matters to a Texas owner is whether one contract runs from the rack manifold to the dry cooler yard. Paul Industries builds data center liquid cooling systems end to end, with the commissioning described on data center commissioning in Texas and the chiller side on chiller repair in Texas. The same work is delivered in Paul Industries’ headquarters state on data center liquid cooling in Virginia and in another hot-climate market on data center liquid cooling in Georgia.

Liquid cooling for Texas halls from Paul Industries

Paul Industries designs, supplies, installs and commissions data center liquid cooling in Texas, from a single row of rear door heat exchangers to a hall of direct-to-chip racks on a dedicated warm-water plant. Send the rack count and density, the server or CDU manufacturer’s coolant and temperature requirements, floor plans and recent trend data from the chilled water plant. Call 201-450-8280 or request a quote. Related Texas work is listed on the Texas page, and the neighboring states on the Southwest page.

Standards referenced: ASHRAE TC 9.9 Liquid Cooling Guidelines (W classes) · ASHRAE Thermal Guidelines for Data Processing Environments · Open Compute Project coolant distribution and quality guidance · ASME B31.9 · ASME B31.3 · Texas SB 6 (2025), Utilities Code 39.170 · International Mechanical Code and Uniform Mechanical Code as adopted by Texas cities

Frequently asked questions

Who installs liquid cooling for research and colocation halls in Austin and Round Rock?

Paul Industries installs liquid cooling for research and colocation halls in Austin, Round Rock, Georgetown and Taylor. Central Texas already hosts direct-to-chip research racks of about 215 kilowatts each, so new halls there are designed for heavy racks, warm-water loops and CDU pumps on uninterruptible power. Paul Industries pipes, flushes, fills and tests the loops before servers connect.

Does Paul Industries add liquid-cooled rows to Dallas-Fort Worth colocation halls?

Yes. Paul Industries adds liquid-cooled rows to colocation halls in Dallas, Garland, Plano, Richardson, Fort Worth and Allen, surveying floor loading, chilled water capacity and pipe routes first. Tie-ins to live mains are made under a written method of procedure, and the new loop is cleaned and tested before it connects to the hall’s plant.

Who does liquid cooling for data centers in Houston and on the Gulf Coast?

Along the coast, Paul Industries pipes and commissions liquid cooling in Houston, Katy, Pasadena, Beaumont and Corpus Christi. Gulf Coast humidity makes condensation control the first design issue, so loops run above the room dew point where possible, cold piping gets sealed vapor barriers, and row manifolds sit over drip trays with leak detection.

Can Paul Industries build closed-loop liquid cooling for a campus in Abilene, Lubbock or the Permian Basin?

Yes. Paul Industries builds closed-loop liquid cooling plants with dry coolers and trim chillers for campuses in Abilene, Lubbock, Midland, Odessa and the Panhandle. Dry West Texas air lets dry coolers carry warm loops for much of the year, keeping makeup water small, while glycol and freeze design protect the outdoor coils through winter.

How does data center liquid cooling work with dry coolers in the Texas summer?

The CDU passes rack heat into a facility water loop, and the dry coolers reject it to outdoor air, so the loop can only run some degrees warmer than the air around the coolers. On a 96 degree Abilene afternoon, a warm W40 loop still rejects heat through dry coolers with adiabatic assist, while a cooler loop needs trim chillers. Loop temperature is the decision that sets how often chillers run.

How heavy is a liquid-cooled GPU rack, and can an older Texas raised floor carry it?

TACC reported its Horizon GPU racks at about 6,000 pounds with liquid and rear doors. Many raised floors installed in older colocation halls were rated for much lighter air-cooled racks, so dense rows often move onto the slab or onto reinforced floor sections. Paul Industries checks the rating before layout and plans manifold supports to suit.

What coolant goes into a Texas technology cooling loop?

The technology loop carries the coolant the server or CDU manufacturer specifies, commonly a treated propylene glycol mixture or inhibited water, held to their limits for particles, conductivity and microbial control. The outdoor facility loop usually carries its own glycol mix for freeze protection. Paul Industries records both fills and sets a sampling schedule for each.

What glycol concentration does a Texas dry cooler loop need?

The concentration comes from the site’s design low and whether the goal is freeze protection or burst protection. A loop in Amarillo needs more protection than one in Corpus Christi, and February 2021 showed that design lows in North and Central Texas deserve a margin. Higher glycol percentages raise pump power and cut heat transfer, so coolers and pumps are sized for the chosen mix.

Do CDU pumps need uninterruptible power in an ERCOT-connected hall?

For direct-to-chip racks, yes in practice. A cold plate loop has little thermal mass, and under SB 6 large Texas loads can be curtailed or directed onto backup generation during grid emergencies. CDU pumps and controls on uninterruptible power keep coolant moving through the transfer, and loop volume or a buffer tank covers the heat while outdoor equipment restarts.

Why do rear door heat exchangers sweat in Houston rooms, and how is it controlled?

A rear door coil colder than the room’s dew point condenses moisture, and Houston air keeps dew points high for months. Supply temperature to the doors is held a margin above the room dew point, the room is dehumidified, and leak and moisture detection is installed under door connections. Paul Industries sets the margin during commissioning and checks it in the first humid season.

Can a Texas hall's existing chilled water plant feed coolant distribution units?

Often, for a first phase. The checks are spare capacity on the hottest days, a supply temperature the CDU accepts, and water quality good enough not to foul the CDU heat exchanger. Where the plant is short on capacity or runs too cold, a dedicated warm loop with its own dry coolers is the better answer as density grows.

Is immersion cooling used in Texas data centers?

Yes. TACC has run immersion-cooled research systems in Central Texas, and immersion remains an option for owners with very dense, uniform hardware. Immersion asks more of the building in slab loading, fluid storage and handling, and containment than direct-to-chip cooling does, and its heat exchangers connect to the same kind of facility water loop and dry cooler plant.

How is a new liquid loop cleaned before servers connect in a Texas hall?

New piping is pressure tested, then flushed at high velocity through temporary strainers while CDUs and cold plates sit on bypass, until samples meet the cleanliness criteria in the specification. The loop is then filled with its specified coolant, vented and circulated, and only then connected to the racks. Paul Industries records each step for the owner’s turnover file.

Does the Texas data center sales tax exemption cover liquid cooling equipment?

The Comptroller lists cooling systems, racks and the mechanical systems needed to operate them among eligible items for qualifying data centers approved by the Comptroller, for the state portion of sales tax. Whether a given CDU or manifold qualifies for a particular owner depends on the owner’s certification and the Comptroller’s rules for that site.

How is a liquid cooling refit scheduled in a Texas colocation hall that stays live?

The schedule follows the tie-ins and the tenant’s outage windows more than the piping itself. Surveys, design and equipment lead times usually take longer than installation, and live-hall work proceeds in stages, one manifold or CDU at a time. Paul Industries builds the schedule around the hall’s change windows and prefabricates manifold sections off site to shorten time in the room.

Can a Texas owner buy CDUs and manifolds from Paul Industries as a supply-only order?

Yes. Paul Industries supplies coolant distribution units, row manifolds, valves, dry coolers and prefabricated spools on a supply route, and offers design-build and complete installation for owners who want one contract from rack to roof. Every route includes submittals and the test records that support equipment warranties.

Which details start a Texas liquid cooling estimate?

Paul Industries starts from the number of liquid-cooled racks and their load, the server or CDU manufacturer’s coolant and temperature requirements, hall drawings with floor ratings, the existing chilled water plant data, and the site location. With those in hand, the first answer is a budget figure drawn from similar Texas loops, followed by a fixed price once the drawings and equipment list are final.

Why can't city water from San Antonio or Austin go straight into a liquid cooling loop?

Much Texas municipal water is hard, and USGS describes Edwards Aquifer water as a hard calcium bicarbonate type. In a cold plate loop, that hardness forms scale in fine channels and on CDU plates, which raises chip temperatures and restricts flow. Loops are filled with deionized or reverse osmosis water mixed with the specified coolant and inhibitors, then sampled and filtered.