Paul Industries designs, pipes, tests and services data center liquid cooling in Georgia, installing coolant distribution units, cold plate and rear door loops, row manifolds and the warm-water dry cooler plants that carry rack heat outdoors for hyperscale campuses, colocation halls and research computing rooms. Racks for artificial intelligence training now arrive in metro Atlanta at densities that air cannot cool, and Georgia’s climate lets warm-water loops reject most of that heat without compressors. Paul Industries builds the loop from the rack manifold to the yard and proves it before the first server connects.
Request a quote or call 201-450-8280
What does data center liquid cooling in Georgia involve?
Data center liquid cooling in Georgia involves three linked loops: the technology cooling system that runs coolant through cold plates or rear door coils at the rack, the coolant distribution unit that separates that loop from the building, and the facility water system that carries heat from the units to dry coolers, fluid coolers, towers or chillers outside. Each loop has its own pressure, temperature, chemistry and filtration, and each joint between them is a place where a Georgia summer, a fouled strainer or an air pocket can take a rack offline.
The technology itself is set out on the data center liquid cooling page, including cold plate, rear door and coolant distribution unit types. Buyers in Georgia range from hyperscale owners building whole campuses to universities adding one cluster at a time and colocation operators refitting a single row for a tenant, and each needs the same discipline in a different size: clean pipe, proven pressure, correct coolant and controls that hold temperature when the load steps. This page covers what changes in Georgia: who is bringing dense racks here, how many hours Atlanta, Macon and Savannah weather lets a warm-water loop run on dry coolers, how humidity affects pipe outside the white space, and how liquid loops fit into older Atlanta halls.
Where dense racks are landing in Georgia
Dense racks in Georgia are landing in three kinds of rooms: hyperscale training campuses south and west of Atlanta, university research computing in Atlanta, and colocation and enterprise halls in the metro that are being refitted for tenants with liquid-cooled servers. The clearest public example is the Atlanta site Microsoft calls Fairwater Atlanta, which began operating in October 2025. Microsoft describes the Fairwater design as closed-loop liquid cooling at about 140 kilowatts per rack and 1,360 kilowatts per row in a two-story building, filled once with roughly the water 20 homes use in a year and topped up only when water chemistry calls for it.
Market facts like these show the range Georgia loops now have to cover, from a single research rack on campus chilled water to whole buildings of liquid-cooled training racks on dry coolers.
| Room type | Typical Georgia setting | What the loop has to do |
|---|---|---|
| Hyperscale training campus | New multi-building campuses around metro Atlanta | Carry 100 kW and denser racks; repeat one design across many halls; warm facility water to dry coolers or a central plant |
| University research computing | Atlanta and Athens campuses with grant-funded clusters | Grow in steps; tie into a campus chilled water plant; keep spare valved branches for the next cluster |
| Colocation hall refit | Older halls in Atlanta and the inner suburbs | Add CDUs and row manifolds while neighbor tenants stay live; share an air-designed chilled water plant |
| Enterprise room | Corporate and financial rooms in Atlanta office parks | Rear door heat exchangers or a single CDU on existing chilled water; minimal disruption |
| Coastal or Middle Georgia site | Savannah area, Macon, Columbus | More trim cooling on humid or hot afternoons; corrosion-resistant outdoor coils |
What the Georgia Tech Nexus supercomputer means for research rooms
The Georgia Tech Nexus supercomputer, funded by a $20 million National Science Foundation award announced in July 2025 and planned for completion in spring 2026, shows how research computing in Georgia is moving to accelerator-dense systems. Georgia Tech describes Nexus at 14.5 petaflops of double-precision and more than 400 petaflops of reduced-precision performance with a 10 petabyte all-flash file system, operated by PACE, the institute’s research computing group. Alongside it, the institute’s student Makerspace runs 304 NVIDIA H100 and H200 GPUs across 38 servers. These are named only as market facts, and for facility owners the Georgia Tech supercomputer program carries a lesson about how research rooms grow.
Research rooms differ from hyperscale halls in three ways that shape the loop. They grow in steps as grants arrive, so headers sized for the end state and valved branches capped for later save a shutdown when the next cluster lands. They usually sit on a campus with a central chilled water plant, which makes a liquid-to-liquid coolant distribution unit on campus water the quickest first step even where a warmer dedicated loop would cost less to run. And they mix hardware generations, so one room may hold cold plate servers that accept W32 water next to older racks that need cooler air. Paul Industries plans the facility water system so each new cluster connects to the loop that suits it.
The same pattern applies to research computing at other Georgia universities, hospital systems and federal laboratories in the state. Paul Industries designs and installs the loops, pumps, controls and heat recovery for those rooms and coordinates the work with the campus energy plant, as described on the research labs and universities page.
Direct to chip dry cooler hours at Atlanta, Macon and Savannah
A warm-water loop in metro Atlanta can run on dry coolers alone for about 84 percent of the year at the ASHRAE W32 class, which allows facility water up to 32 degrees Celsius (89.6 degrees Fahrenheit). Paul Industries computed the shares below from National Weather Service hourly observations at Atlanta, Macon and Savannah for 2021 through 2024, assuming a dry cooler leaves its fluid 10 degrees Fahrenheit above the outdoor dry bulb and an evaporative fluid cooler leaves it 7 degrees above the wet bulb.
| Class and maximum supply | Atlanta (ATL) | Macon (MCN) | Savannah (SAV) | What it means |
|---|---|---|---|---|
| W17, 62.6 F, dry cooler | 22.9% | 21.8% | 15.9% | Chillers carry most hours; suits rooms sharing an existing chilled water plant |
| W27, 80.6 F, dry cooler | 58.5% | 57.8% | 51.7% | Dry coolers carry cool months; trim cooling all summer |
| W27, 80.6 F, evaporative fluid cooler | 92.2% | 85.9% | 82.3% | Spray water replaces most compressor hours |
| W32, 89.6 F, dry cooler | 83.8% | 82.2% | 80.0% | Compressors or adiabatic assist only on warm afternoons |
| W40, 104 F, dry cooler | 99.6% | 99.1% | 99.7% | Compressor-free nearly all year; supply must suit the servers |
Those shares turn into a practical design rule for Georgia. A dry cooler plant sized for W32 in Atlanta needs trim cooling for roughly 1,400 hours a year, against about 6,750 hours at W17, so the warmer the servers allow, the smaller the chiller and the lower the annual energy. Macon’s hotter summers and Savannah’s humid air push the trim hours up modestly, and Macon’s 105 degree peak means its dry coolers need more coil surface for the same leaving temperature. Paul Industries selects dry cooler surface, fan speed range and any adiabatic assist from the station nearest the site. Trim chillers on those loops are serviced under the same program Paul Industries runs for chiller repair in Georgia.
Choosing a loop temperature for a Georgia room
The loop temperature for a Georgia room is set by the servers first and by the weather second: the server maker states the facility water class its cold plates accept, and the warmest class the hardware allows gives the most compressor-free hours. Mixed rooms complicate the choice. A hall with liquid-cooled training racks and air-cooled storage racks may run a W32 loop for the cold plates and keep a cooler chilled water loop for the air handlers, which means two sets of heat rejection or a heat exchanger between them.
Humidity sets the floor. Inside the white space the air handlers hold the dew point down, but facility water pipe often runs through corridors, ceiling spaces and mechanical rooms where Georgia air reaches a 70 degree dew point for 1,000 to 2,000 hours a year at the three airports measured. Pipe colder than that dew point sweats, and the drip lands on whatever is below. Paul Industries insulates and vapor-seals cold sections, routes pipe away from electrical gear, and keeps supply water above the dew point of each space it passes through wherever the server class allows.
Coolant distribution unit placement and redundancy in Georgia halls
Coolant distribution unit placement in a Georgia hall is a choice between in-rack units, in-row units at the end of each row, and larger central units in a gallery or mechanical room, and each moves cost and risk to a different place. In-rack units keep the facility water out of the row but multiply the number of pumps to service. In-row units share one unit across a row and need a facility water branch to each. Central units keep pumps and controls out of the white space but put long secondary loops under the floor or overhead, with more joints between the pump and the cold plate.
Redundancy follows the same logic as any cooling plant: N+1 pumps inside each unit, N+1 units on each loop, or both, with isolation valves so one unit can be serviced while the others carry the load. Power for the pumps deserves the same attention. Microsoft has said its Atlanta Fairwater site was chosen for utility power reliable enough to skip on-site generation and UPS for its GPU fleet, which is a design choice for that owner; most Georgia halls still put CDU pumps on UPS or fast-start generation, because a cold plate loses its margin within seconds when flow stops. Paul Industries sets placement, redundancy and the pump power path with the owner’s electrical engineer before the first manifold is ordered.
Liquid cooling vs air cooling data center decisions in Georgia
The liquid cooling vs air cooling data center decision in Georgia usually turns on rack density, because air handlers and containment reach a practical ceiling well below the roughly 140 kilowatt racks in Microsoft’s Fairwater design. Below that ceiling, air remains simpler, and rear door heat exchangers extend it for moderately dense racks served from existing chilled water. Above it, cold plates are needed, and the question becomes how much of the room moves to liquid and when.
Georgia’s climate tilts the answer toward liquid on energy grounds as well. An air-cooled hall needs supply air cool enough to remove moisture from Georgia air, which keeps chilled water temperatures low and compressor hours high. A cold plate loop has no moisture to remove at the rack, so it can run far warmer. Immersion is a third route for some rooms, covered on the data center immersion cooling page, and Paul Industries builds its facility water side the same way.
Water, fill and chemistry in a Georgia liquid loop
Water use in a Georgia liquid loop is mostly a question of heat rejection, because the rack loop and the facility loop are closed and lose little once filled. That matters in Georgia, where counties now watch campus water closely: a W32 loop on dry coolers needs no evaporative water at all for most of the year, while the same heat on open towers consumes makeup every hour. The water and metering side of the plant is covered on the data center cooling in Georgia page.
Chemistry is where closed loops fail quietly. Paul Industries fills rack loops with the coolant the cold plate maker specifies, usually treated water or a propylene glycol blend, and sets inhibitor levels, biocide, filtration and sampling points from day one. Glycol belongs on any facility loop that runs through outdoor dry coolers in north Georgia, where Atlanta’s lowest reading from 2021 through 2024 was 8 degrees Fahrenheit and Macon’s was 13. Glycol lowers heat transfer and raises pump power, so Paul Industries sizes coils and pumps for the blend actually used rather than for plain water.
Codes and records on a Georgia liquid cooling job
Codes for a Georgia liquid cooling job come mainly from the 2024 International Mechanical Code with Georgia Amendments, in force since January 1, 2026, the Georgia energy code based on the 2015 IECC, and the piping code the engineer names for each loop, usually ASME B31.9 for building services or ASME B31.3 where the owner asks for process piping rules. Georgia’s energy amendments exempt computer room applications from the economizer requirement, but a warm-water loop on dry coolers gives most of the economizer’s benefit anyway. Buffer and expansion tanks on facility water loops need attention too: Georgia’s boiler and pressure vessel law exempts vessels holding water under pressure only up to a 120 gallon capacity, so larger tanks fall under state inspection.
Paul Industries hands the owner a complete record for each loop: hydrostatic or pneumatic test reports, flushing logs with particle counts, fill and coolant analysis, valve and sensor lists, and as-built drawings. Facility water mains for these loops are fabricated and installed to the same practice as process piping in Georgia. Those records support the server maker’s warranty, the operator’s change control and every future connection to the loop.
Leak detection belongs in the same package. Paul Industries installs rope or spot sensors under manifolds, CDUs and quick disconnect points, drip trays where pipe crosses electrical gear, and isolation valves that let the operator shut one row without draining the loop. Sensors report to the building management system or the CDU controller, alarms are tested before turnover, and the owner receives a map of every sensor zone with the valves that isolate it. In a Georgia summer, the same sensors also catch condensation on cold sections of facility water pipe before it reaches equipment, which is often the first sign that insulation or vapor sealing needs repair.
Retrofitting data center liquid cooling in Atlanta halls
Data center liquid cooling in Atlanta is often a retrofit, because many colocation and enterprise halls in the city and inner suburbs were built for air-cooled racks and now have tenants asking for liquid. A retrofit starts with a survey: floor loading under heavier racks, ceiling and underfloor routes for new pipe, the capacity and temperature of the existing chilled water plant, electrical capacity for CDU pumps, and the change control rules of the operator and its tenants.
Paul Industries then lays out the work so live tenants never notice it. Row manifolds and branch piping are prefabricated off site in lengths that fit the freight elevator, hot work is replaced with grooved or press joints wherever the pressure class and the owner allow, valved stubs go onto existing headers during planned windows, and each new loop is pressure tested, flushed and filled before it is connected to anything live. The commissioning steps that prove a loop are set out on the data center commissioning in Georgia page, and the building-wide mechanical work is on the Georgia data center mechanical contractor page.
Heat reuse from Georgia research and campus rooms
Heat reuse from a liquid loop is worth studying in Georgia wherever a room sits on a campus with winter heating load, because a cold plate loop returns water warm enough to preheat building heating water or domestic hot water. Atlanta saw about 2,400 hours a year at or below 55 degrees Fahrenheit from 2021 through 2024, enough to make a heat recovery exchanger pay on a university or hospital campus that already runs a heating plant. Paul Industries pipes the exchanger, controls and tie-ins to the campus system and sets the loop temperatures so both the servers and the heating side get what they need.
What does data center liquid cooling in Georgia cost?
Data center liquid cooling cost in Georgia depends on the number of racks and their density, the coolant distribution unit type, the length and material of facility water pipe, whether new heat rejection is needed, and how much of the work happens in a live hall. Paul Industries prices each job from rack count, layout and the existing plant rather than from a per-rack rule, and gives a budget range from comparable scope before a firm price.
The loop temperature drives operating cost, and verified numbers show how much. Take a stated example of 5,000 kilowatts of rack heat with 750 kilowatts of compressor power whenever the dry coolers cannot meet the loop. In Atlanta weather a W17 loop needs compressors for about 6,754 hours a year, or 5,065,500 kilowatt hours, while a W32 loop needs them for about 1,419 hours, or 1,064,250 kilowatt hours. The difference of about 4,000,000 kilowatt hours is worth about $315,000 a year at Georgia’s 2025 average industrial price of 7.88 cents, or about $461,000 at the commercial average of 11.53 cents. Owners comparing data center liquid cooling providers should ask each one to show this calculation for their own servers and site.
| Driver | Lower cost | Higher cost |
|---|---|---|
| Heat rejection | Existing chilled water plant with spare capacity | New dry cooler yard, trim chillers and electrical service |
| Room condition | New hall or empty space | Live colocation hall with tenant change control |
| Distribution | Rack-mounted or in-row CDUs on short runs | Central CDUs with long facility water mains |
| Pipe and joints | Grooved or press stainless where allowed | Welded pipe in an occupied space, with fire watch |
| Climate | Atlanta at W32 or warmer | Savannah or Macon at W17 with more trim hours |
Who installs data center liquid cooling in Georgia?
Paul Industries installs data center liquid cooling in Georgia, from coolant distribution units, row manifolds and rack connections to the facility water mains, dry coolers and controls, and then tests, flushes, fills and services the system. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, Paul Industries is an East Coast contractor with projects across Georgia, in all 50 states and at plants abroad. Its headquarters state work appears on the data center liquid cooling in Virginia page, and research room work on the Maryland data center liquid cooling page.
Owners pick the route. Supply-only covers CDUs, manifolds, dry coolers, pumps and prefabricated pipe modules built to the owner’s design. Design-build covers engineering, equipment and installation under one contract. Complete installation builds and starts up a design by the owner’s engineer. Each route ends with the same records: test reports, flushing and fill logs, coolant analysis and as-built drawings.
Liquid cooling from Paul Industries for Georgia rooms
Paul Industries builds liquid cooling for hyperscale campuses, colocation refits, enterprise rooms and research computing across metro Atlanta, Athens, Augusta, Macon, Columbus and Savannah, and connects that work to the cooling plants and piping described on the Georgia page and across the East Coast. Send the rack count, server cooling class and room drawings, and request a quote for the loop.
Standards referenced: ASHRAE TC 9.9 Liquid Cooling Guidelines (W17 to W45 facility water classes) · ASHRAE Thermal Guidelines for Data Processing Environments · ASME B31.9 · ASME B31.3 · Georgia State Minimum Standard Energy Code (2015 IECC with Georgia Supplements and Amendments) · 2024 International Mechanical Code with Georgia Amendments
Frequently asked questions
Who provides liquid cooling for data centers in metro Atlanta?
Paul Industries provides liquid cooling for data centers across metro Atlanta, installing coolant distribution units, row manifolds, rack connections, facility water mains and dry cooler plants, then testing, flushing, filling and servicing them. Work ranges from new campus halls in the outer counties to refits of older colocation and enterprise rooms inside the city, where tenants stay live while new loops go in.
Does Paul Industries install liquid cooling for research computing in Atlanta and Athens?
Paul Industries installs liquid cooling for university and research computing rooms in Atlanta and Athens, where clusters grow in steps as grants arrive. Paul Industries leaves valved branches, spare header capacity and space for more coolant distribution units at the start, so the next cluster connects without draining the loop, and ties the facility side into the campus chilled water or heating plant where that suits the owner.
Can Paul Industries pipe liquid-cooled racks on campuses in Douglas, Fayette and Newton counties?
Paul Industries pipes liquid-cooled racks, row manifolds and facility water systems on large campuses in Douglas, Fayette and Newton counties. On campuses that repeat a building design, Paul Industries prefabricates manifolds and pipe spools off site to one standard, records field changes on the first hall, and carries them into every hall that follows, which keeps installation and service consistent across the site.
Who installs coolant distribution units in Augusta, Columbus or Macon?
Paul Industries installs coolant distribution units and the facility water piping that serves them in Augusta, Columbus, Macon and the rest of Georgia. In Middle Georgia, where Macon reached 105 degrees Fahrenheit and logged about 305 hours a year above 90 degrees from 2021 through 2024, Paul Industries sizes dry coolers with more surface or adds trim cooling so the loop holds its supply temperature through the hottest afternoons.
What has been disclosed about cooling at the Microsoft Atlanta data center?
Microsoft said the Atlanta site began operating in October 2025 and uses closed-loop liquid cooling that consumes almost zero water in operation, with an initial fill equal to what about 20 homes use in a year. The Fairwater design reaches about 140 kilowatts per rack. The site is cited here only as a market fact showing the densities Georgia loops now have to carry.
Does Georgia Tech have a supercomputer, and what does it mean for room design?
Georgia Tech runs research clusters through PACE, its research computing group, and received a $20 million NSF award in 2025 for Nexus, planned at more than 400 petaflops of reduced-precision performance. For room design, the lesson is phasing: research rooms take one cluster after another, so Paul Industries sizes headers for the end state and leaves valved, capped branches for the next system.
Which ASHRAE water class suits a Georgia room on dry coolers?
The warmest class the servers accept gives the most compressor-free hours. In Atlanta weather from 2021 through 2024, dry coolers with a 10 degree approach met W32 in about 84 percent of hours, W27 in about 59 percent and W17 in about 23 percent. Paul Industries confirms the class with the server maker’s documentation and then sizes heat rejection and trim cooling around it.
Does a direct to chip loop on Georgia dry coolers need glycol?
The facility water loop through outdoor dry coolers in north and Middle Georgia needs freeze protection, since Atlanta reached 8 degrees Fahrenheit and Macon 13 degrees from 2021 through 2024. Propylene glycol is the usual answer. The rack loop indoors can run on treated water or the blend the cold plate maker requires. Paul Industries sizes coils and pumps for the actual glycol concentration.
How many hours a year does an Atlanta liquid loop need chiller trim?
At W32, dry coolers in Atlanta weather leave about 1,400 hours a year when trim cooling is needed; at W27 the figure rises to about 3,600 hours, and at W17 to about 6,750. An evaporative fluid cooler cuts the W27 figure sharply. Paul Industries runs these hours for the specific site and server class before choosing trim chillers or adiabatic assist.
Can a Georgia chilled water plant built for air handlers feed coolant distribution units?
Many can, through a liquid-to-liquid coolant distribution unit, as long as the plant has spare capacity and the CDU accepts the chilled water temperature. The catch is efficiency: a plant built for cold water runs compressors for heat that a warm loop could reject with dry coolers. Paul Industries checks plant capacity, temperatures and pump head, then recommends a tie-in, a new warm-water loop or both.
What happens to a hall's air handlers when half the racks move to liquid cooling?
The air handlers still remove the heat that cold plates leave behind, typically from memory, drives and power supplies, plus the room’s humidity load. With less heat in the air, some units can be turned off, set to lower fan speed or moved to rows that stay air-cooled. Paul Industries rebalances airflow and controls after each phase so the room does not overcool or lose humidity control.
How is condensation kept off facility water pipe in a Savannah building?
Savannah’s dew point reached 70 degrees Fahrenheit or higher for about 2,000 hours a year from 2021 through 2024. Any facility water pipe colder than the dew point of the space it crosses will sweat. Paul Industries insulates and vapor-seals cold sections, keeps routes clear of electrical gear, adds drip protection where pipe must cross equipment, and sets supply temperature above the space dew point wherever the server class allows.
Can rack heat from a liquid loop warm a Georgia office or campus building?
Warm return water from cold plate loops can preheat heating water or domestic hot water through a heat exchanger. Atlanta had about 2,400 hours a year at or below 55 degrees Fahrenheit from 2021 through 2024, enough heating demand for heat recovery to pay on many university and hospital campuses. Paul Industries designs and pipes the exchanger, controls and tie-ins to the receiving system.
What sets the schedule for a liquid cooling refit in an Atlanta colocation hall?
Tenant change control sets most of it, since each tie-in to a shared header needs an approved window. Lead times for coolant distribution units, the floor and ceiling routes available, and the capacity of the existing plant set the rest. Paul Industries prefabricates manifolds and spools off site, tests each new loop before connection, and sequences tie-ins to the operator’s windows.
Does Paul Industries offer design-build for Georgia liquid cooling projects?
Paul Industries offers design-build, with engineering, equipment and installation under one contract, along with supply-only orders of CDUs, manifolds, dry coolers and prefabricated pipe modules, and complete installation of an owner’s design. All three routes end with pressure test, flushing and fill records, coolant analysis and as-built drawings for the owner.
Is immersion cooling a fit for Georgia data halls?
Immersion suits some dense deployments, particularly where operators want to remove server fans entirely or run very warm facility water. Its facility side looks much like a cold plate loop: a heat exchanger in or beside each tank, facility water mains and heat rejection outdoors. Paul Industries builds that facility side for immersion tanks in Georgia the same way it builds loops for cold plates.
How does liquid cooling change a Georgia campus water budget?
A closed liquid loop on dry coolers uses almost no water after filling, so moving heat from an evaporative tower plant to a warm-water dry cooler loop lowers the campus water draw. In Atlanta weather a W32 loop runs on dry coolers for about 84 percent of the year. Paul Industries models water and power together so the owner sees both effects before choosing heat rejection.
What details help Paul Industries price liquid cooling for a Georgia room?
Send the rack count and density, the server maker’s facility water class and flow per rack, the room layout with ceiling and floor routes, the existing chilled water plant data, the electrical capacity available for CDU pumps, and the schedule. Those details let Paul Industries set a budget from similar jobs first and fix the price once the loop design is settled. Call 201-450-8280 or request a quote.
Bringing dense racks into a Georgia hall?
Send the rack count, server cooling class and room drawings, and Paul Industries will lay out the loop, the heat rejection and what the job will cost to build. Call 201-450-8280 or request a quote.