Paul Industries is a data center mechanical contractor in Oregon that builds central chiller and heat rejection plants, campus chilled water and facility water mains, hall distribution, prefabricated pipe racks and pump skids, and generator fuel and compressed air systems for colocation and hyperscale campuses in Hillsboro, Portland, The Dalles, Prineville and the Columbia Plateau. Oregon’s build-out is shaped by power more than land: large data loads now face their own electric rate class and connection costs, and every campus phase is timed to when power can be delivered. Paul Industries plans the mechanical package around that clock, with design-build, supply-only and complete installation routes.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pipeline of sites 40+ data centers permitted or proposed (DEQ, 2025)
Large-load class 20 MW and up placed in their own rate class (HB 3546)
Contractor license CCB license and endorsement required by ORS 701.021
Structural code 2025 OSSC on the 2024 IBC, mandatory April 1, 2026
Reviewed November 2026

What does a data center mechanical contractor in Oregon build?

A data center mechanical contractor in Oregon builds everything that moves heat, water, fuel and air on the campus: chillers, cooling towers, dry coolers and adiabatic coolers in the yard; pumps, heat exchangers and water treatment in the central plant; mains and headers to each building; hall-level piping to air handlers, fan walls and coolant distribution units; and the fuel, compressed air and drainage systems around them. The scope ends with flushing, testing, startup and turnover records.

The national description of the scope and how it is coordinated sits on the data center mechanical contractors page. This page covers what Oregon changes: where campuses are built, the utility and permitting clock, the state’s pressure piping and licensing rules, seismic design, and the wage rules that apply when public money is involved.

Data center construction: Oregon’s three markets

Data center construction in Oregon concentrates in three markets with different building types and climates: the Hillsboro and Portland metro, the Columbia River Gorge around The Dalles, and Central Oregon around Prineville, with more campuses spreading onto the Columbia Plateau in the state’s northeast. Each market asks something different of the mechanical package.

Data center construction: Hillsboro, Oregon

Data center construction in Hillsboro, Oregon centers on multi-story colocation buildings on tight sites in Washington County. Mechanical work there means rooftop or compact yard heat rejection, vertical risers, sound limits at property lines, and phases built floor by floor while earlier floors are already live. Prefabricated risers and rack modules save the most time in this market, because crane picks and laydown space are scarce.

The Dalles and the Columbia River Gorge

Google states that its own program of building and operating data centers began in The Dalles in 2006, and that it started a fourth data center there in 2015. Campuses in the Gorge are large, single-story and spread across several buildings, so the mechanical package becomes a campus utility system, with long underground or overhead mains, multiple plant buildings and phased tie-ins to systems already serving operating halls. Hot, dry summers and freezing winters both appear in the design basis.

Prineville and Central Oregon

Central Oregon’s high desert campuses face the widest temperature swing in the state’s data center markets, with Redmond averaging about 181 nights a year at or below freezing. Meta puts its Prineville investment above $2 billion and says about 1,000 skilled trade workers were on that site at the height of construction. Mechanical packages there combine evaporative equipment that works well in dry summer air with freeze protection on every outdoor water line.

How many data centers in Oregon are built or planned?

DEQ’s own tally for 2025 was upward of 40 data center sites in the permitted or proposed stage, which together hold 6,000 megawatts of standby generation. The tally covers data centers built in Oregon and running today as well as data centers under construction in Oregon and those still in permitting, so it is a measure of the mechanical work in the pipeline as much as of existing capacity.

For a mechanical contractor the useful reading of that figure is the backup generation. Each megawatt of standby power stands behind IT load that has to be cooled, and each generator needs fuel storage, fuel piping, exhaust and, under DEQ’s streamlined permit for data centers, emission controls. Paul Industries builds those systems as part of the same mechanical package as the cooling plant, so fuel, cooling and controls are installed and tested together.

Why are there so many data centers in Oregon?

Oregon attracted data centers through a combination its own operators describe: a power system whose primary energy source is hydroelectricity, commercial electricity prices well below the national average, a workforce with construction and technical skills, and a climate that cools servers with outside air or evaporation for most of the year. EIA data show Oregon’s 2025 average commercial price at 9.80 cents per kilowatt-hour, against 13.37 nationally.

Google, explaining its choice of The Dalles, points to the region’s workforce, its business environment and policies, and its energy infrastructure. Those same advantages now bring tighter rules: as large loads have grown, the state has moved to make them carry their own utility costs, which changes how campuses are phased.

The Oregon data center bill and the utility clock

The Oregon data center bill most owners mean is House Bill 3546, passed in 2025, under which the Public Utility Commission must set up a rate class of its own for any site able to draw 20 MW or more whose main business is data processing or hosting, and must charge that class what it costs to serve. The act carried an emergency clause, so it applied at once, and it runs until January 2, 2035.

Regulators have also moved on connection costs: Pacific Power customers asking for service above 25 MW lost most of their line extension allowance under a commission decision in docket UE 424, and docket UE 430 examines what Portland General Electric should charge to connect big new loads. The effect on the mechanical side is timing: a campus’s buildings come online when power arrives, so central plants, mains and the first hall’s mechanical systems are built to be ready for that date, and later phases follow each power increment.

How Oregon power and permit steps shape the mechanical schedule
StepWhat it setsMechanical response
Utility service agreement and large-load tariffWhen and how much power each phase receivesPlant and mains sized for full build-out; equipment purchased per phase
Line extension and connection costsOwner’s share of new substation and line investmentCooling power per megawatt of IT minimized to stretch the connection
DEQ air contaminant discharge permitGenerator count, controls and fuel limitsFuel systems, emission control space and test plans built to the permit
City or county land use and building permitsSite layout, sound limits, structural and mechanical approvalsYard layout, sound attenuation, permit drawings and inspections
State boiler and pressure vessel programVessel and pressure piping permits and inspectionsVessel register and piping records prepared from the start
Water service and discharge termsHow much water the plant can use and dischargeEvaporative, hybrid or dry heat rejection

Oregon licensing, pressure piping and wage rules on the mechanical scope

Oregon licensing rules on a data center mechanical scope start with ORS 701.021, which requires anyone who undertakes, offers or bids on contracting work to hold a current Construction Contractors Board license with the appropriate endorsement. Work on boilers and pressure vessels carries its own requirement under ORS 480.630: the business installing, repairing or altering them needs a boiler contractor license from the Department of Consumer and Business Services, its workers need employee licenses, and an installation permit has to be secured before the work begins.

Pressure piping is also a state matter in Oregon. The Board of Boiler Rules adopts ASME B31.1, B31.3, B31.5 and B31.9 under ORS 480.550, so refrigerant, secondary coolant and building services piping on a data center campus can fall under the state program as well as the mechanical permit. Paul Industries plans each project to those requirements and prepares the vessel register, piping procedures and test records the state program expects.

Prevailing wage on public and publicly funded data centers

Oregon’s prevailing wage law, ORS 279C.800 to 279C.870, requires prevailing rates on public works, and ORS 279C.810 sets out what is covered. Projects of $50,000 or less and projects that use no funds of a public agency are excluded, and the statute states that tax credits and tax abatements are not counted as public funds. A privately financed colocation campus is therefore usually outside the law, while a data center built for a university, a state agency or with direct public funding needs a coverage review with the Bureau of Labor and Industries. Paul Industries prices each project on the wage basis that applies and keeps payroll records in the form the Bureau requires on covered work.

Seismic design for Oregon campuses

Seismic design for Oregon data center campuses comes from the state’s 2025 structural code (the OSSC, built on the 2024 IBC and required for permits since April 1, 2026), and OAR 918-225-0315 assigns the anchorage of process piping to a building to that same code. Because the Cascadia subduction zone lies off the coast, chillers, towers, pumps, tanks and pipe racks are anchored and braced to the structural engineer’s design.

Seismic design changes the mechanical layout in practical ways: flexible connections where pipe crosses building joints or meets equipment on isolators, bracing on every run of large pipe, anchorage designed for full tanks and loaded racks, and clearances so braces do not block valves or service space. Paul Industries builds bracing into prefabricated rack modules, which is faster and more consistent than installing it piece by piece overhead.

Water service, treatment and discharge on Oregon campuses

Water service on an Oregon data center campus decides how much evaporative cooling the plant can use, and it is negotiated with the city, water district or water right holder that serves the site before the heat rejection design is fixed. Campuses in the dry eastern half of the state weigh water carefully, because evaporative equipment that saves power in July also draws its peak water in the weeks when irrigation and municipal demand climb too. A plant designed without that in mind can face supply limits in exactly the weather when it needs water most, so the water agreement, storage volume and dry-mode capacity are settled together.

The mechanical package carries the consequences: makeup water metering and backflow protection, side-stream filtration and chemical treatment for towers, blowdown control and metering, and discharge connections that meet the receiving system’s limits. Where water is tight, Paul Industries designs hybrid plants that run dry for most of the year and use evaporation only on the hottest days, and it sizes on-site storage so a supply interruption does not cut cooling. Water treatment equipment for makeup and blowdown is described on industrial water treatment, and every meter is listed with its location and purpose so the owner can report use by building and by season.

Prefabrication and phasing on an Oregon campus

Prefabrication on an Oregon data center campus moves pipe racks, pump skids, valve stations and even whole plant modules off the site and into controlled assembly, so field work becomes setting, bolting and joining modules. Wet winters west of the Cascades and freezing winters east of them both reward work done under cover.

Phasing ties the modules to the power schedule. Paul Industries sizes campus mains and plant headers for the full build-out on day one, with valved stubs for every future building, then builds and installs modules for each new hall as its power increment arrives. Each new building connects to the live campus loop under a written method of procedure, with redundancy confirmed before any isolation.

Mechanical scope by campus phase in Oregon
PhaseMechanical scopeOregon consideration
Site and utilitiesUnderground mains, fuel lines, drainage, water service and meteringFrost depth east of the Cascades; wet-season trenching in the west
Central plant, phase oneFirst chillers or heat rejection units, pumps, headers sized for full build-outVessel permits, seismic anchorage, freeze protection
First hallHall distribution, air handlers or fan walls, CDU connectionsReady for the date power arrives
Generators and fuelDay tanks, fuel piping, exhaust, emission control connectionsDEQ permit conditions and fuel limits
Later hallsPrefabricated modules tied into the live campus loopMethods of procedure; no loss of cooling to operating halls
DensificationLiquid cooling loops added to existing hallsMore computing inside the same utility connection

How long does it take to build a data center in Oregon?

How long it takes to build a data center in Oregon depends far more on power delivery and permits than on construction itself: once power, the air permit and building permits are in place, a single hall’s mechanical work is usually a matter of months, while a full campus is built over years in phases that follow each power increment. Long-lead equipment such as chillers, switchgear and generators also sets dates, so it is ordered as soon as the design is fixed.

Paul Industries protects the schedule by releasing equipment orders early, prefabricating modules while permits are processed, and building central plant capacity ahead of the first hall. Freeze and wet-season planning keep field work moving through Oregon winters: heated enclosures for welding and testing, temporary heat on filled piping, and laydown that keeps prefabricated modules dry until they are set. East of the Cascades, frost depth also shapes the trenching schedule for buried mains, so underground work is sequenced into the drier, warmer months wherever the power date allows. Commissioning is planned from the start, with state and municipal inspections and generator testing scheduled into the calendar as described on data center commissioning in Oregon.

Who builds data center mechanical systems in Oregon?

Paul Industries builds data center mechanical systems in Oregon, from central plants and campus mains to hall distribution, prefabricated modules, fuel and compressed air systems, and the testing and records that close each phase. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia after earlier years in northern New Jersey and then Pennsylvania, takes campus work in Oregon, across all 50 states and at sites outside the United States.

Among mechanical contractors in Oregon, owners can measure Paul Industries on the things that decide a campus schedule: plants ready on the power date, tie-ins to live loops without lost cooling, state vessel and pressure piping records complete at inspection, and prefabrication that shortens field time. The cooling plant design side is covered on data center cooling in Oregon, dense-rack loops on data center liquid cooling in Oregon, and welded campus piping on process piping in Oregon. Fuel and water storage tanks on campus are built as described on tank fabrication in Oregon.

Mechanical systems on an Oregon campus, from yard to rack

Mechanical systems on an Oregon data center campus run from the heat rejection yard through the central plant and campus mains to each hall, and each layer has an Oregon design driver that a generic campus standard misses. The table summarizes what Paul Industries builds at each layer and what the state’s climate, codes and permits add.

Campus mechanical layers and their Oregon design drivers
LayerTypical equipmentOregon design driver
Heat rejection yardCooling towers, dry coolers, adiabatic coolers, air-cooled chillersDry summers favor evaporation; freezing winters need basin heat and glycol
Central plantChillers, pumps, heat exchangers, water treatment, expansion tanksPressure vessels under the state boiler program; seismic anchorage
Campus mainsBuried or overhead chilled water and facility water pipingFrost depth east of the Cascades; B31.9 under the state pressure piping rules
Hall distributionAir handlers, fan walls, CDU headers, rack manifoldsWarm-water loops suit Oregon’s long economizer seasons
Standby power supportDay tanks, fuel piping, exhaust and emission control connectionsDEQ permit conditions and fuel limits
Support systemsCompressed air, domestic water, drainage, fire pump connectionsReceivers often fall under vessel permits

Paul Industries builds each layer to the same set of drawings and test standards, so the hand-offs between them are inside one contract rather than at the boundary of two. Pressure vessels such as expansion tanks, separators and air receivers are fabricated or supplied to the ASME code with data reports ready for the state inspector, as described on pressure vessel fabrication in Oregon.

Keeping the campus running after opening

Keeping an Oregon campus running after opening means maintaining the plant through two very different seasons and adding capacity without disturbing tenants. Winter brings freeze checks, tower basin heaters, glycol testing and economizer tuning; summer brings coil cleaning, tower water treatment and readiness for heat events like the one in June 2021, when Hillsboro reached 114 degrees Fahrenheit.

Paul Industries offers that work under service agreements written around the campus’s own equipment list and seasons, and returns for each expansion phase with the same records and methods the first phase used. Owners get a mechanical team that knows the plant’s history, the as-built drawings and the permits on file, which shortens every later tie-in.

What does data center mechanical work cost in Oregon?

Data center mechanical work in Oregon costs what the IT load, redundancy, heat rejection choice, seismic design, campus layout and phasing require; the mechanical share of a campus budget moves most with the cooling approach and the length of mains between plant and halls. Freeze protection, sound attenuation in the metro and emission control space for generators are Oregon-specific lines that often appear.

Paul Industries prices mechanical packages from the drawings and equipment schedule, offers a budget range from comparable scope during design, and gives a firm price once the scope is fixed. Owners can buy the package as design-build, as complete installation to an engineer’s design, or as supply-only prefabricated skids and modules, and later phases can be priced as options on the first contract so the campus keeps one mechanical team.

Paul Industries on Oregon data center campuses

Paul Industries designs, prefabricates, supplies, installs, tests and maintains data center mechanical systems across Oregon, from Hillsboro colocation buildings to multi-building campuses in The Dalles, Prineville and the Columbia Plateau. Its headquarters-state version of this work is on data center mechanical contractor in Virginia, and owners also building in the Pacific region can compare data center mechanical contractor in California. A campus plan, power schedule and basis of design are enough for a first look. The Oregon page lists Paul’s other Oregon services and West Coast covers the region; call 201-450-8280 or request a quote for a first budget.

Standards referenced: ORS 701.021 (Construction Contractors Board license and endorsement) · Oregon Boiler and Pressure Vessel Law, ORS 480.510 to 480.670 · ASME B31.5 and B31.9 · 2025 Oregon Structural Specialty Code (2024 IBC) · 2025 Oregon Mechanical Specialty Code (2024 IMC) · ORS 279C.800 to 279C.870 (prevailing wage on public works) · Oregon HB 3546 (2025) · Oregon DEQ air contaminant discharge permits

Frequently asked questions

Which contractor builds data center mechanical systems in Hillsboro and Washington County?

Paul Industries builds data center mechanical systems in Hillsboro and across Washington County, including multi-story colocation buildings with rooftop or compact yard heat rejection, vertical risers and floor-by-floor phases. Prefabricated risers and rack modules reduce crane picks and laydown needs on tight sites, and each new floor ties into live systems under a method of procedure.

Does Paul Industries take data center mechanical work in Portland, Salem and Eugene?

Yes. Paul Industries takes data center and computer room mechanical work in Portland, Salem, Eugene and across the Willamette Valley, from enterprise rooms in existing buildings to new colocation halls. Urban sites usually bring roof structure, sound and access limits, which Paul Industries designs around with compact heat rejection and prefabricated pipe assemblies.

Who builds campus mechanical packages in The Dalles and Prineville?

Paul Industries builds campus mechanical packages in The Dalles, Prineville, Redmond and Central Oregon: central plants, long campus mains, hall distribution, generator fuel systems and prefabricated modules. These campuses face hot, dry summers and long freezing winters, so evaporative equipment and freeze protection are designed together.

Does Paul Industries build data center mechanical systems near Hermiston and Boardman?

Paul Industries builds data center mechanical systems in Umatilla and Morrow counties, including Hermiston and Boardman on the Columbia Plateau. Campuses there are large and phased, with long mains, multiple plant buildings and summer heat paired with winter freezes. Paul Industries sizes headers for the full campus and adds modules as each power increment arrives.

How many data centers are in Oregon?

Upward of 40, by the state air quality agency’s 2025 tally of data center sites at the permitted or proposed stage, backed by a combined 6,000 MW of standby generators. That number includes operating sites and those under construction or in permitting, and each needs cooling, fuel and mechanical systems sized for its full build-out.

What does Oregon's HB 3546 mean for a data center campus schedule?

Under the 2025 act, a hosting or data processing site of 20 MW and up pays rates set for its own customer class. Power for each phase becomes a negotiated, scheduled increment, so Paul Industries builds central plant capacity ahead of each power date and installs hall mechanical systems in step with it.

Does a private data center in Oregon pay prevailing wage on mechanical work?

Usually not, because Oregon’s prevailing wage law covers public works, and ORS 279C.810 excludes projects that use no public agency funds and states that tax credits and abatements are not public funds. Data centers built for universities, agencies or with direct public funding need a coverage review with the Bureau of Labor and Industries, and Paul Industries prices those on prevailing rates.

Which Oregon license rules apply to a data center mechanical package?

ORS 701.021 requires a current Construction Contractors Board license with the appropriate endorsement for anyone undertaking or bidding contracting work, and ORS 480.630 requires a boiler contractor license and employee licenses for installing, repairing or altering boilers and pressure vessels, with an installation permit first. Paul Industries plans each project to those requirements.

Is chilled water piping on an Oregon campus regulated by the state?

Parts of it often are. The state’s boiler law makes ASME B31.9 and B31.5 the minimum standards for building services piping and for refrigerant and secondary coolant piping, and those rules are run statewide by the Building Codes Division. Paul Industries confirms which campus piping falls under the state program and keeps joining procedures and test records ready for its installation inspection.

How does Oregon's earthquake risk change a data center mechanical design?

Chillers, towers, tanks, pumps and pipe racks are anchored and braced under the 2025 Oregon Structural Specialty Code, and piping connections to the structure fall under that code too. Flexible connections at building joints and isolated equipment, bracing on large pipe, and anchorage designed for full tanks are standard. Paul Industries builds bracing into prefabricated rack modules.

Can a new building be added to an operating Oregon campus without shutting down cooling?

Yes, when the campus mains were built with valved stubs for future buildings. Paul Industries connects new buildings under written methods of procedure, confirms redundancy before any isolation, flushes the new branch before opening it to the live loop, and tests the new plant in isolation before it shares load with the existing one.

How much of an Oregon data center mechanical package can be prefabricated?

Pipe racks with bracing, pump skids, valve stations, CDU headers, risers and whole plant modules can all be built off site once the design is fixed. Prefabrication saves the most where laydown space is scarce, as in Hillsboro, and where winter weather slows field work, as east of the Cascades. Paul Industries fixes module boundaries early so they can be released while permits are processed.

How are generator fuel systems handled on an Oregon data center campus?

Paul Industries installs day tanks, fuel transfer pumps, supply and return piping, leak detection and exhaust connections as part of the mechanical package, sized to the generator count and run time the owner specifies. Generators operate under DEQ air permits that can require emission controls and set fuel limits, so space and connections for those controls are built in from the start.

What mechanical records does an Oregon owner receive at turnover?

The vessel register with permits and data reports, pressure piping procedures and test records, flushing and water quality data, seismic anchorage inspection records, startup reports, completed test scripts, as-built drawings, valve and equipment schedules, and operation and maintenance manuals with training records, organized by phase so later halls add to the same file.

Can Paul Industries supply prefabricated skids for an Oregon campus without installing them?

Yes. Paul Industries supplies pump skids, valve stations, pipe rack modules and plant modules as supply-only orders for Oregon campuses, with fabrication records, pressure test reports and lifting plans. If the owner later wants one mechanical team across phases, installation, startup and service join the same agreement.

Which documents start a data center mechanical estimate for an Oregon campus?

Send the campus plan and phasing, the power delivery schedule, the basis of design or drawings, the redundancy level, the heat rejection preference, permit status and target dates. Paul Industries returns a scope, schedule and budget range, then a firm price for the first phase with later phases as options. Call 201-450-8280 to start.

Pricing a data center campus phase in Oregon?

Send the campus plan, power schedule, basis of design and permit status. Call 201-450-8280 or request a quote.