Paul Industries designs, supplies, installs and services data center cooling in Washington, building chilled water plants, evaporative and adiabatic coolers, dry coolers and water treatment for halls in Quincy, East Wenatchee, Moses Lake and the Seattle area. Central Washington’s dry summers, cold winters, mineral-heavy groundwater and low-cost hydro power push cooling design in a different direction from humid states. Paul Industries plans each plant around those conditions and carries it from design through startup and long-term service.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Moses Lake July 90 F average high, 57 F average low (NOAA 1991-2020)
Grant County load Data centers about 280 of 757 average MW in 2025 (Grant PUD)
Quincy reuse plant Operating since June 30, 2021, recycling data center cooling water (EPA)
Industrial power 6.61 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What decides data center cooling in Washington?

Data center cooling in Washington is decided by three conditions that rarely line up anywhere else: a dry continental climate east of the Cascades, groundwater loaded with hardness and silica, and electricity that costs less than the national average and comes mostly from hydropower. A cooling plant that suits a humid East Coast campus wastes some of those advantages here, and a plant copied from a desert site misjudges the Washington winter.

The state also has two very different cooling markets. Most of the large campuses sit in the Columbia Basin around Quincy, Malaga, East Wenatchee and Moses Lake. Colocation and enterprise rooms cluster in Seattle, Tukwila and the rest of King County, where the marine climate is milder and the buildings are often older. The national design and equipment picture is on the data center cooling systems page; this page covers what is particular to Washington.

Columbia Basin weather and what it means for heat rejection

Columbia Basin weather favors evaporative heat rejection and long economizer seasons, because summer afternoons are hot but the air is dry and the nights cool off sharply. NOAA’s 1991 to 2020 normals put Moses Lake’s July average high at 90 degrees Fahrenheit and its average low at 57 degrees, a daily swing of more than 30 degrees. Kennewick in the Tri-Cities runs a 91 degree high and a 62 degree low.

Dry air keeps the wet bulb temperature far below the dry bulb on most summer days. An evaporative cooler, cooling tower or adiabatic precooler works toward the wet bulb, so the water it delivers is much cooler than the air temperature suggests. The same dry air lets direct and indirect evaporative air handlers hold a server inlet temperature inside the ASHRAE recommended range of 64.4 to 80.6 degrees Fahrenheit for most of the year with little or no mechanical refrigeration.

Winter is the other half of the design. Eastern Washington sees freezing weather for weeks at a time, and a plant that relies on water outdoors needs basin heaters, drain-down sequences, heat tracing on exposed makeup and drain lines, and glycol in any coil that can see outdoor air when fans are idle. The cooling plants that give trouble in the Basin are usually the ones that were designed only for July.

Washington climate regions and how each shapes a data center cooling plant
RegionJuly normals (NOAA, 1991 to 2020)Cooling consequenceDesign emphasis
Quincy, Moses Lake and Grant CountyMoses Lake: 90 F high, 57 F lowLow wet bulb, wide daily swing, hard winter freezesEvaporative and adiabatic cooling, economizers, freeze protection, water treatment for hard groundwater
Wenatchee, East Wenatchee and MalagaHot, dry summers in the Columbia valleySimilar to the Basin, with river-valley wind and smoke seasonsFiltration for smoke and dust on outside-air systems, dry cooler sizing for peak days
Tri-Cities and PascoKennewick: 91 F high, 62 F lowWarmest nights in the state’s data center areasLarger trim cooling allowance, condenser approach checked against hot-night hours
Seattle, Tukwila and King CountySeattle: 77 F high, 57 F lowMild marine summers, cool damp winters, older building stockEconomizer retrofits in existing rooms, humidity control, roof and structural limits
SpokaneSpokane: 84 F high, 58 F lowShort hot season, cold wintersFree cooling most of the year, glycol and freeze protection on outdoor equipment

Data center cooling in Quincy and the Grant County campuses

Data center cooling in Quincy grew out of cheap Columbia River hydropower, open land and a dry climate, and Grant County now carries one of the heaviest data center loads of any utility in the Northwest. Grant PUD reports that its 8 data center operators drew about 280 average megawatts in 2025, about 37 percent of a total system load near 757 average megawatts, with roughly 800 megawatts of further large-load requests in its queue.

The Quincy data center market is now a mix of first-generation buildings from the late 2000s and much denser halls built since. For cooling, that means two kinds of work running side by side: upgrades to evaporative and air-side systems in older buildings whose IT loads have risen, and new plants designed from the start for higher rack densities, warmer supply water and liquid-cooled rows. A Washington State data center built ten years ago may need new fans, controls, filtration and water treatment long before its structure needs anything.

Grant PUD’s policy is that large users, data centers included, pay for the additional generation and the transmission and distribution built to serve them. Power is still inexpensive by national standards, but every new megawatt of cooling load now arrives with a utility cost conversation attached, which gives owners a reason to cut fan and pump energy that a low tariff once hid.

How much water do data centers use for cooling in the Columbia Basin?

Columbia Basin data centers that cool with evaporation use water in proportion to the heat they reject and the number of cycles of concentration their water chemistry allows, and Quincy’s groundwater limits those cycles. The EPA’s case study of Quincy describes groundwater from the Columbia Plateau aquifer system with high total dissolved solids, including calcium, magnesium and silica. Before 2021, cooling water at one large campus was drained after about four to five cycles and sent to the city sewer, where the high mineral load caused extra fees and trouble at the city’s treatment facility.

The question of how much water do data centers use for cooling therefore has a Washington-specific answer: the volume depends less on the climate, which is favorable, and more on how hard the makeup water is and how far treatment lets the plant concentrate it. Every additional cycle of concentration cuts both makeup and blowdown. Silica is often the limit, because it forms a glassy scale that resists acid cleaning.

The Quincy Water Reuse Utility

The Quincy Water Reuse Utility, operating since June 30, 2021, treats cooling tower blowdown from a data center campus and returns it to cooling use in a closed loop. The EPA lists its treatment steps as lime softening, ultrafiltration, high-efficiency softening, reverse osmosis and blending to a conductivity target, with the concentrated brine sent to lined evaporation ponds. The $31 million plant saves an estimated 138 million gallons a year of potable groundwater and draws makeup from Columbia Basin Project canal water, mostly in summer.

For a new campus, the lesson is that data center cooling water usage in the Basin is a design variable rather than a fixed number. Softening, silica control, side-stream filtration and a reuse or zero-discharge arrangement can be planned into the plant on day one, and the piping, storage and controls for them cost much less to install early than to retrofit into a live yard. Paul Industries designs and installs makeup treatment, side-stream filtration, chemical feed and blowdown recovery as part of the cooling plant, with the details on cooling tower water treatment.

Cooling approaches for Washington halls and how each handles water, power and winter
ApproachWater useEnergy useWashington fit
Direct or indirect evaporative air handlersModerate, highest on hot afternoonsLow; fans plus small pumpsStrong east of the Cascades; needs treatment for hard makeup and freeze protection
Water-cooled chillers with cooling towersHighest; set by cycles of concentrationLow compressor energy, long waterside economizer hoursCommon on large campuses; silica and hardness drive treatment design
Air-cooled chillers with integral free coolingNear zeroHigher on hot days, very low in winterGood where water is constrained; condenser sizing set by 90 F plus afternoons
Dry coolers with adiabatic precoolingLow; spray only at peakFan energy, little compressor use with warm supply waterStrong fit for warm-water and liquid-cooled halls in the Basin
Closed-loop liquid cooling to dry coolersNear zero after fillPumps and fansFavored for new dense halls; glycol needed for outdoor loops

Water discharge and the Columbia River

Water discharge from a Washington data center cooling plant is regulated by the Washington Department of Ecology, and the state’s 2025 Data Center Workgroup noted that discharges to the Columbia River carry temperature restrictions to protect salmon and their habitat. Blowdown sent to a city sewer is governed by that city’s pretreatment rules, and the Quincy experience shows how a high-mineral stream can overload a treatment plant built for domestic wastewater.

The practical result for owners is that blowdown volume, chemistry and temperature belong in the cooling design from the start. Paul Industries sizes blowdown recovery, neutralization and holding capacity to the discharge route the site actually has, and builds metering into the plant so that the owner can report volumes when the city, the utility or Ecology asks. Biocide selection also matters: the Workgroup flagged that water cooling systems can release anti-microbial emissions, so treatment programs are chosen with drift and exhaust in mind.

Refrigerant rules for Washington data center chillers

Refrigerant rules for Washington data center chillers come from the state as well as the EPA, because Ecology’s hydrofluorocarbon rule in chapter 173-443 WAC prohibits listed refrigerants in new centrifugal and positive displacement chillers for cooling from January 1, 2024. Chillers that heat, or heat and cool, came under the same table on January 1, 2025. A new chiller for a Washington hall therefore arrives with a lower global warming potential refrigerant, often in the A2L mildly flammable class, which changes machinery room ventilation and detection requirements under the state mechanical code.

Ecology’s Refrigerant Management Program adds ongoing duties for existing plants. Facilities with systems holding more than 50 pounds of refrigerant with a global warming potential of 150 or more register with Ecology, inspect for leaks on a schedule set by the charge of the biggest system on site, repair leaks within 14 days and keep records for five years. A large chiller plant usually falls in the medium or large category, which means quarterly or monthly leak inspections unless compliant automatic leak detection is installed.

Energy code and power: what Washington asks of a cooling plant

Washington’s commercial energy code, chapter 51-11C WAC in its 2021 edition effective March 15, 2024, applies to new and altered data center mechanical systems and requires the cooling plant to be commissioned before final inspection. Building departments in each city or county enforce it, so plan review for a Quincy campus runs through the City of Quincy or Grant County and a Seattle project through the City of Seattle. Section C403.1.3 requires data center systems to comply with Sections 6 and 8 of ASHRAE 90.4-2019, which judge the cooling design by its annualized mechanical load component rather than by the efficiency of each machine alone.

Washington’s clean energy law adds context for owners. The Clean Energy Transformation Act required utilities to remove coal power from Washington retail supply by the end of 2025, requires greenhouse gas neutral retail sales from 2030 and calls for 100 percent non-emitting and renewable supply by 2045. Industrial electricity averaged 6.61 cents per kilowatt-hour in 2024 against a national 8.13 (EIA). At that price, one megawatt of continuous cooling auxiliaries costs about $579,036 a year, so pumps and fans running at fixed speed against throttled valves still waste real money even in a cheap-power state.

Data center cooling in Seattle and King County

Data center cooling in Seattle is mostly a retrofit discipline, because the city’s colocation rooms sit in established buildings where roof space, structure and riser capacity were set decades before current rack densities arrived. Seattle’s July average high of 77 degrees and mild nights make airside economizers attractive, but many rooms were built around direct expansion units and raised-floor air distribution with no outside air path.

Typical Seattle cooling work includes replacing aging computer room air conditioners with chilled water air handlers or fan walls, adding a waterside economizer to an existing chilled water plant, installing containment and blanking to recover airflow, and bringing chilled or warm water to new liquid-cooled rows. Every one of those jobs happens around live IT load, so the work is sequenced one unit or one loop at a time with temporary cooling ready before anything is opened. Paul Industries plans those cutovers with the operator and prefabricates piping off site so that each tie-in window stays short.

Data center cooling requirements for a new Washington State data center

Data center cooling requirements for a new Washington State data center come from the IT equipment, the owner’s reliability target and a short list of state rules that shape the mechanical design before a single pipe is sized. Writing them down early keeps the design, the permit set and the equipment orders consistent.

  • Server inlet conditions. The ASHRAE thermal guidelines recommend 64.4 to 80.6 degrees Fahrenheit at the server inlet, and many owners now accept the wider allowable ranges for part of the year to stretch economizer hours.
  • Energy code. Section C403.1.3 of the Washington State Energy Code sends data center systems to ASHRAE 90.4, so the mechanical load component is calculated and documented with the permit set.
  • Refrigerant. New chillers must use refrigerants outside Ecology’s prohibited list, and the plant’s total charge decides its Refrigerant Management Program category.
  • Water. The makeup source, its analysis and the discharge route set the treatment train, the cycles of concentration and the storage needed for blowdown.
  • Sound. Washington’s noise rule, chapter 173-60 WAC, limits industrial sources to 60 dBA at a residential property line in the day and 50 dBA from 10 p.m. to 7 a.m., which governs fan selection and the placement of dry coolers and towers.
  • Seismic anchorage. The Washington State Building Code requires equipment and piping to be anchored and braced for the site’s seismic design category, which is more demanding around Puget Sound than in the Basin.

Paul Industries turns that list into a basis of design, then carries it into equipment schedules, anchorage details, sound data and the commissioning plan, so that each requirement is met by something that can be inspected and tested.

Redundancy, controls and the cold-weather failure modes

Redundancy for a Washington cooling plant has to cover cold-weather failure modes as well as the summer peak, because a frozen coil or a tower basin that ices over can take capacity out of service as surely as a failed compressor. N+1 chillers and pumps are typical, with 2N distribution where the owner’s tier target calls for it.

Controls deserve as much attention as hardware in the Basin. A plant that moves between full evaporative cooling, partial economizer and mechanical trim several times a day needs well-tuned transitions, or it will short-cycle compressors and swing supply temperature. Paul Industries programs and tests those changeovers, including the restart sequence after a utility outage, so that cooling returns in the right order when generators pick up the load.

Seasonal checks for a Washington data center cooling plant
SeasonCheckWhy it matters in Washington
Late springEvaporative media, nozzles, tower fill and drift eliminators inspected; scale and silica deposits removedHard groundwater leaves deposits during the shoulder months that cut summer capacity
Early summerWildfire smoke filtration ready; outside-air dampers and sensors calibratedSmoke seasons in central and eastern Washington force economizers to close at short notice
Peak summerCondenser approach and trim chiller staging reviewed on the hottest afternoons90 F plus days in the Basin set the true mechanical cooling capacity
AutumnBasin heaters, heat tracing, drain valves and glycol concentration testedFreeze protection has to be proven before the first hard frost
WinterEconomizer sequences and humidity control trended; idle coils protectedVery dry winter air can push humidity low and freeze unprotected coils

What does data center cooling cost in Washington?

Data center cooling cost in Washington is driven by the cooling architecture, the hardness of the makeup water, freeze protection, the size and phasing of the IT load and whether the work is a new plant or a retrofit in an operating hall. A new evaporative or dry cooler plant in the Basin carries less compressor capacity than a humid-climate plant of the same size, but it adds water treatment, winterization and filtration that East Coast plants seldom need.

Operating cost works the other way. With industrial power near 6.6 cents per kilowatt-hour, energy savings pay back more slowly here than in California or Virginia, which shifts the case toward reliability, water savings and reduced maintenance. Paul Industries prices each project from the load profile, the water analysis, the site drawings and the phasing plan, and gives a budget range early and a firm price once the scope is set.

Who installs data center cooling in Washington?

Paul Industries installs data center cooling in Washington, from new chilled water and evaporative plants on Columbia Basin campuses to retrofits inside Seattle colocation rooms. Paul Industries, formerly based in northern New Jersey and then Pennsylvania, is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes data center cooling work across Washington, in all 50 states and at sites outside the United States.

Owners comparing data center cooling contractors in Washington can choose the route that fits the project: supply of chillers, dry coolers, pumps and prefabricated skids; design-build of a complete plant; or complete installation to an engineer’s design. Paul Industries takes each of those routes, and the same team stays on for startup, testing and service. The cooling work ties into the rest of the Washington program, including data center liquid cooling in Washington, data center commissioning in Washington, data center mechanical contracting in Washington and chiller repair in Washington.

Paul Industries and Washington data center cooling

Paul Industries designs, supplies, fabricates, installs, starts up and maintains data center cooling systems across Washington: chilled water plants, cooling towers, evaporative and adiabatic air handlers, dry coolers, pumps and piping, water treatment and controls. The work covers new campuses in Quincy, Malaga, East Wenatchee and Moses Lake, expansions in the Tri-Cities and Spokane, and live-room retrofits in Seattle and King County. For the same service in the headquarters state, see data center cooling in Virginia; for other western conditions, see data center cooling in California, and the regional view on the West Coast page and the Washington page. To start, request a quote with the IT load, the site and the water analysis.

Standards referenced: Washington State Energy Code, commercial provisions (chapter 51-11C WAC) · Washington State Mechanical Code (chapter 51-52 WAC) · Chapter 173-443 WAC, hydrofluorocarbons and the Refrigerant Management Program · Clean Energy Transformation Act (chapter 19.405 RCW) · ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · ASME B31.9

Frequently asked questions

How is a Quincy data center cooled through a 90 degree July?

Most Quincy halls cool with evaporative or adiabatic systems, waterside economizers and trim chillers, because the dry Columbia Basin air keeps the wet bulb low even when the dry bulb passes 90 degrees. Moses Lake’s July normals are a 90 degree high and a 57 degree low, so mechanical cooling carries part of the load on hot afternoons and very little overnight. Paul Industries sizes the trim capacity from the hottest recorded afternoons rather than averages, and checks condenser approach during those hours after startup.

Who installs data center cooling in East Wenatchee and Malaga?

Paul Industries installs chilled water plants, dry coolers, evaporative systems and water treatment for data center campuses in East Wenatchee, Malaga and the wider Wenatchee valley. Projects there combine hot, dry summers with smoke seasons and freezing winters, so outside-air filtration and freeze protection are designed in from the start. Paul Industries takes supply-only, design-build and complete installation routes, and stays on for startup and service.

Does Paul Industries handle data center cooling in the Tri-Cities and Spokane?

Paul Industries handles data center cooling in Pasco, Kennewick, Richland and Spokane, including new plants, expansions and upgrades to existing rooms. Kennewick’s warm summer nights call for more trim cooling than Quincy, while Spokane’s long cold season gives many hours of free cooling and demands careful freeze protection. Each design starts from the site’s own weather and water data.

Why does hard groundwater matter so much to a Columbia Basin cooling plant?

Hard groundwater matters because evaporation concentrates calcium, magnesium and silica until they scale heat transfer surfaces, so the plant must drain water before it reaches that point. The EPA describes Quincy’s groundwater as high in dissolved solids, and one campus there once drained its cooling water after only four to five cycles. Softening, silica control and reverse osmosis raise the allowable cycles, which cuts both makeup and discharge.

Can a Washington data center reuse its cooling tower blowdown?

Blowdown reuse is proven in Washington. The Quincy Water Reuse Utility, operating since June 2021, treats data center blowdown with lime softening, ultrafiltration, softening and reverse osmosis and returns it to cooling use, with brine sent to lined evaporation ponds. A new campus can plan a similar side-stream or zero-discharge arrangement into its plant, and Paul Industries designs and installs the treatment, storage and piping for it.

Do Washington data centers need glycol in their cooling loops?

Any loop that runs outdoors or passes through a coil exposed to winter air east of the Cascades needs freeze protection, and glycol is the usual answer for dry cooler and free-cooling loops. Indoor chilled water loops normally stay as treated water, separated from glycol loops by a heat exchanger. Paul Industries sets glycol concentration from the site’s design low temperature and verifies it at startup and each autumn.

Which refrigerants can a new chiller for a Washington data hall use?

A new chiller for a Washington data hall must avoid the refrigerants that Ecology lists in chapter 173-443 WAC, which has applied to new cooling-only centrifugal and positive displacement chillers since January 1, 2024. In practice that points to lower global warming potential refrigerants, many of them in the A2L class, with ventilation and detection designed to the Washington State Mechanical Code. Paul Industries confirms the refrigerant against the current table before ordering equipment.

Does the Washington Refrigerant Management Program apply to data center chillers?

The program applies to any facility with a system holding more than 50 pounds of refrigerant with a global warming potential of 150 or more, which covers most data center chillers that use HFC refrigerants. Owners register with Ecology, inspect for leaks on a monthly, quarterly or annual schedule depending on the charge of the biggest system, repair leaks within 14 days and keep records for five years. Paul Industries builds the inspection schedule into its service plan.

How does wildfire smoke affect an outside-air cooling system in central Washington?

Wildfire smoke can force an outside-air or evaporative system to close its dampers and switch to recirculation with mechanical cooling, sometimes for days. The plant therefore needs enough mechanical capacity to carry the hall with economizers closed, plus particle sensors and filtration that let operators decide when outside air is safe. Paul Industries designs and tests that smoke mode alongside the normal economizer sequences.

Does cheap Washington power still justify efficient cooling equipment?

Efficient equipment still pays in Washington, though more slowly than in high-price states. At the 2024 industrial average of 6.61 cents per kilowatt-hour, one megawatt of continuous pump and fan load costs about $579,036 a year, so variable speed drives, lower pressure drops and warmer supply temperatures remain worthwhile. Grant PUD also expects large users to pay for new generation and grid capacity, which raises the value of every avoided megawatt.

Can an older Quincy data hall be upgraded without shutting down cooling?

Older Quincy halls are routinely upgraded while they run, by replacing one air handler, chiller or pump at a time with redundancy confirmed before each step. Paul Industries surveys the existing plant, plans each cutover with the operator, sets temporary cooling where redundancy is thin and prefabricates piping so that tie-ins are short. Controls changes are tested on one unit before they are rolled across the hall.

What chilled water temperature suits a Columbia Basin data hall?

Many Columbia Basin halls run chilled water supply in the upper 50s to mid 60s Fahrenheit, and liquid-cooled rows often take warmer water still, because warm supply water extends economizer hours in a dry climate. The exact setpoint follows the IT equipment’s rated inlet conditions and the owner’s redundancy target. Paul Industries selects coils, pumps and controls for the chosen temperature and proves it during commissioning.

Is an air-cooled chiller plant a sensible choice for a Washington data center?

An air-cooled plant with integral free cooling suits Washington sites where water supply or discharge is limited, because it uses almost no water and runs in free cooling for much of the year. Its drawbacks are higher energy on the hottest afternoons and a larger footprint for condensers. Paul Industries compares air-cooled, evaporative and dry cooler options for each site using its weather, water and power data.

What does the Washington energy code require of a data center cooling plant?

The 2021 Washington State Energy Code, effective March 15, 2024, applies to new and altered data center mechanical systems, requires data center systems to meet Sections 6 and 8 of ASHRAE 90.4-2019 and requires commissioning of the mechanical systems before final inspection. The city or county building department enforces it. Paul Industries prepares the equipment data, test results and commissioning records the building official and the owner need.

How much does data center cooling cost in Washington?

The cost of data center cooling in Washington depends on the IT load and phasing, the cooling architecture, the water analysis, the freeze protection needed and whether the work is new construction or a live retrofit. Basin plants carry less compressor capacity than humid-climate plants but add water treatment, winterization and filtration. Paul Industries gives a budget range from comparable scope early and a firm price once drawings and loads are fixed.

Does Paul Industries supply cooling equipment for Washington projects without installing it?

Paul Industries supplies chillers, dry coolers, pumps, heat exchangers, water treatment equipment and prefabricated pump and piping skids for Washington projects on a supply-only basis, as well as design-build and complete installation. Supply-only orders include submittals, factory test records and startup support. Owners can move from supply to installation on later phases without changing the equipment standard.

What should a Washington owner send to get a data center cooling plant priced?

Send the IT load and how it phases in, rack densities and any liquid-cooled rows, the target supply temperatures and redundancy level, site plans, the water analysis for the makeup source, the discharge route and any noise limits. Utility service details help too. With that, Paul Industries returns a budget range and a design approach, then a firm price once the scope is confirmed.

Sizing a cooling plant for a Washington data hall?

Send the IT load and phasing, rack densities, supply temperatures, redundancy level, site plans and a water analysis for the makeup source. Call 201-450-8280 or request a quote.