Paul Industries designs, supplies, installs and starts up data center liquid cooling in Washington, from direct to chip loops and coolant distribution units in Seattle colocation rooms to warm-water systems rejecting heat to dry coolers on Columbia Basin campuses. Seattle’s 2026 pause on new large data centers pushes dense computing into existing buildings, while the newest halls in central Washington are being designed to cool without consuming water. Paul Industries builds for both conditions and carries each loop through flushing, testing and turnover.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Seattle One-year pause on new data centers over 20 MVA, signed June 11, 2026
Columbia Basin New central Washington halls designed to use no water for cooling (Microsoft)
Malaga Microsoft campus in development; $86.5 million substation paid by Microsoft (Chelan PUD)
Power price Washington industrial average 6.61 cents/kWh in 2024 (EIA); US 8.13
Reviewed November 2026

Where data center liquid cooling in Washington is heading

Data center liquid cooling in Washington is moving along two separate paths: retrofits that bring cold plates and rear-door coolers into established rooms west of the Cascades, and new campuses east of the mountains that are planned around liquid-cooled racks from the first drawing. The equipment is similar on both paths, but the constraints, schedules and heat rejection choices are very different.

West of the Cascades, the limits are floor loading, riser space, ceiling height and the fact that the room never stops running. East of the Cascades, the limits are winter freezing, hard groundwater, utility capacity and the size of each phase. The principles of cold plates, CDUs and the technology cooling system are covered on the national data center liquid cooling page; this page deals with how they play out in Washington.

Data center liquid cooling in Seattle under the 2026 moratorium

Data center liquid cooling in Seattle has become the practical route to more computing capacity inside the city, because Ordinance 127447, signed on June 11, 2026, paused new data centers above 20 megavolt-amperes for one year while the city studies grid, water and community effects. The council acted after reports that four companies had approached Seattle City Light about five large facilities, and permanent zoning rules are expected to reach the council by early 2027.

The ordinance targets new large facilities, so the near-term growth path in Seattle runs through rooms that already exist. An operator adding dense racks to an established colocation floor gets far more heat removal per square foot from a liquid loop than from more air handlers, and avoids adding chillers or roof equipment where there is no space for them. Paul Industries plans those retrofits around what the building already has: the chilled water plant, the risers, the structure and the electrical capacity for CDU pumps.

Seattle’s mild climate helps. With a July average high of 77 degrees Fahrenheit and cool nights, a building’s existing chilled water plant or a waterside economizer often has spare capacity at warmer supply temperatures, which is exactly what a liquid-to-liquid CDU wants to see on its facility side.

Liquid-cooled campuses in the Columbia Basin

Liquid-cooled campuses in the Columbia Basin are being designed to reject heat to air without evaporating water, and Microsoft states that its newest central Washington datacenters will use no water for cooling. Closed-loop liquid systems make that practical, because chips cooled by cold plates tolerate facility water warm enough to be cooled by dry coolers for most or all of the year.

The Basin’s weather supports that approach. July in Moses Lake averages 90 degrees at the afternoon peak and 57 degrees before dawn (NOAA, 1991 to 2020), so a dry cooler sized with a moderate approach can deliver water in the ASHRAE W32 to W40 range through most summer afternoons, with adiabatic precooling or a trim chiller covering the hottest hours. In winter the same dry coolers deliver very cold water with almost no fan energy, which is the season when freeze protection decides whether the loop stays in service.

Wenatchee data center construction and the Malaga build

Wenatchee data center construction has spread down the Columbia valley to Malaga, where Chelan PUD reported in 2025 that Microsoft had paid for the $86.5 million Jumpoff Ridge substation and expected its first building to begin phased operations by mid-2026. Microsoft lists its Malaga site as in development, alongside operating datacenters in East Wenatchee and Quincy. New builds of this kind are where liquid cooling is designed in from the slab up rather than retrofitted, with manifolds, valve stations and CDU galleries laid out before the first rack arrives.

Washington liquid cooling settings and what each asks of the design
SettingTypical projectMain constraintHeat rejection route
Seattle and Tukwila colocation roomsDense rows added to an operating floorLive load, risers, floor rating, ceiling heightLiquid-to-liquid CDUs on the building chilled water or a new warm-water loop
Bellevue, Redmond and Eastside enterprise roomsResearch and engineering clusters in office buildingsTenant improvement limits, shared building plantIn-row or liquid-to-air CDUs, rear-door coolers
Quincy and Grant County campusesNew halls and conversions of earlier buildingsPhasing, utility capacity, hard makeup waterDry coolers with adiabatic assist, trim chillers
East Wenatchee and MalagaPurpose-built liquid-cooled hallsWinter freeze, smoke seasons, build paceDry coolers on glycol, heat exchangers to the technology loop
Spokane, Tri-Cities and Moses LakeExpansions and enterprise roomsCold winters, hot afternoons in the Tri-CitiesDry coolers or towers with economizer heat exchangers

Are data centers water cooled in Washington, or air cooled?

Washington data centers have mostly been air cooled at the rack, with water used in evaporative air handlers or cooling towers behind the scenes, and that balance is shifting as rack densities rise. Asking whether data centers are water cooled therefore has two answers: at the chip, more and more racks now take liquid directly; at the building, the newest Washington designs aim to reject that heat to air with little or no water consumed.

The distinction matters for permits and public debate. The state’s 2025 Data Center Workgroup recorded concerns about water use and discharge temperature, and noted that water cooling systems can release anti-microbial emissions. A closed liquid loop filled once with treated water or a glycol mix, rejecting heat through dry coolers, answers most of those concerns and leaves the evaporative system as a peak-day assist rather than the main heat sink.

Choosing facility water temperature for a Washington liquid loop

Facility water temperature for a Washington liquid loop should be chosen from the chip vendor’s cold plate requirements, the climate at the heat rejection equipment and whether the loop shares a plant with air-cooled equipment. Warmer water extends dry cooler hours and shrinks or removes chillers; colder water gives more margin to the chips and lets the same loop serve rear-door coolers and air handlers.

ASHRAE liquid cooling classes and how they fit Washington sites
ASHRAE classFacility water supply limitTypical heat rejectionWashington fit
W1717 C (62.6 F)Chillers with economizerSeattle rooms sharing an existing chilled water plant
W2727 C (80.6 F)Chillers in summer, economizer most of the yearMixed rooms where rear-door coolers and cold plates share a loop
W3232 C (89.6 F)Dry coolers or towers, chillers rarelySeattle and Spokane sites with dry coolers; Basin sites with adiabatic assist
W4040 C (104 F)Dry coolers year round in most climatesColumbia Basin campuses designed to use no water for cooling
W45 and W+45 C (113 F) and aboveDry coolers, heat reuse possibleNew halls with hardware rated for very warm inlet water

Paul Industries confirms the chosen class against the hardware specification, then sizes heat exchangers, CDUs and dry coolers so that the hottest hour on record still holds supply temperature, with a defined trim or adiabatic step if it does not.

Controls and monitoring for a Washington liquid loop

Controls and monitoring for a Washington liquid loop have to react faster than an air system, because a cold plate holds only seconds of thermal reserve if flow or supply temperature drifts. Each CDU controls its secondary supply temperature and differential pressure, and the building system watches flow, temperature, pressure, filter loss and coolant quality across every CDU in the row.

On Basin campuses the controls also manage the switch between dry cooler only, adiabatic assist and trim chiller operation as the afternoon heats up and the evening cools down. Paul Industries programs and tests those transitions, the alarm limits for each sensor and the response to a failed pump or CDU, and documents the settings so that operators can see why each one was chosen. Trend data from the first summer and the first winter are reviewed with the owner, because those two seasons show whether the setpoints suit the site.

Freeze protection and glycol east of the Cascades

Freeze protection east of the Cascades is a design requirement for any liquid cooling loop that reaches outdoor equipment, because a dry cooler coil left full of plain water at low flow can freeze and split during a cold night. The usual answer is a glycol loop between the dry coolers and a plate heat exchanger, with the technology cooling system on the other side holding the treated water or propylene glycol mix the cold plate vendor specifies.

Glycol brings its own duties: concentration checks each autumn, inhibitor levels, compatibility with seals and quick disconnects, and a slightly higher pump energy because of its viscosity. Paul Industries sets concentration from the site’s design low temperature, provides fill and makeup stations that blend to the right mix, and labels every loop so that nobody tops up a glycol system with plain water during winter maintenance.

Installing liquid cooling in an operating Washington hall

Installing liquid cooling in an operating Washington hall starts with a survey of what the room can carry: floor and slab capacity for heavier racks and filled manifolds, ceiling space for overhead headers, riser routes to the plant, the electrical path for CDU pumps and the condition of the existing chilled water. Each answer narrows the choice between liquid-to-liquid CDUs, liquid-to-air CDUs and rear-door heat exchangers.

The installation itself is staged around live equipment. Paul Industries prefabricates headers and branch assemblies off site, pressure tests them before they enter the room, installs them in short windows agreed with the operator, and makes hot taps or valved tie-ins to the existing plant only after redundancy has been confirmed. In Seattle and other Puget Sound buildings, overhead manifolds and CDUs are braced for the site’s seismic design category under the Washington State Building Code, and every valve station is placed where a technician can reach it without lifting floor tiles over live cabling.

Before any server is connected, the new loop is flushed to a cleanliness target, filled with the specified coolant, vented and run on load banks or a heat load test. The owner receives the pressure test records, flushing and water quality results, coolant data and as-built drawings at turnover.

Rear-door heat exchangers as a first step in older rooms

Rear-door heat exchangers are often the first liquid cooling step in older Washington rooms, because they remove most of a rack’s heat at the cabinet without any change to the servers and with a single supply and return per rack. They suit racks in the range that strains air handlers yet stays below cold plate densities, and they let an operator add density without rebuilding the room’s air path.

A rear door still needs water at the right temperature and above the room’s dew point. In Seattle buildings the existing chilled water is usually colder than a rear door needs, so a CDU or a mixing station raises the supply temperature and keeps the coil dry. Paul Industries sizes the CDU, the branch piping and the hoses, installs the doors rack by rack and balances flow so that each door delivers its rated capacity. When the same row later moves to cold plates, the CDU and headers are reused, which is why the first design should allow for the larger flows that cold plates need.

Fill water, makeup and filtration for Washington loops

Fill water and makeup for a Washington liquid loop need treatment before they enter the technology cooling system, because cold plate channels are narrow and the coolant vendor’s warranty depends on its chemistry. Groundwater in the Columbia Basin carries high dissolved solids, including calcium, magnesium and silica, which would scale cold plates and heat exchangers if used untreated. City water west of the Cascades is much softer, but it still carries chlorine or chloramine and dissolved oxygen that inhibitor packages must handle.

Paul Industries specifies deionized or reverse osmosis water for the initial fill and for makeup, adds side-stream filtration at the CDU to the micron rating the cold plate vendor sets, and provides sampling points so that conductivity, pH, inhibitor level and bacterial counts can be trended. Ultrapure and deionized water equipment for larger sites is covered under ultrapure water systems in Washington.

Protecting live equipment from coolant leaks

Protecting live equipment from coolant leaks starts with fewer joints in the room: prefabricated headers with welded or factory-made connections, valve stations outside the rack footprint, and quick disconnects only where a server or rack is meant to be removed. Rope or spot leak sensors under manifolds and CDUs, drip trays where piping crosses over equipment, and isolation valves that close automatically on a confirmed leak complete the protection.

Paul Industries tests every sensor during commissioning by wetting it and confirming the alarm and any automatic isolation at the building management system. The leak detection layout is drawn on the as-builts so that operators know which valves isolate which zone.

Phasing liquid cooling on a growing Basin campus

Phasing liquid cooling on a growing Columbia Basin campus means building headers, valve stations and heat rejection for the full hall while installing CDUs and rack branches only as the IT load arrives. Capped branches for future racks are kept short, flushed with the main loop and fitted with isolation valves so that new racks connect without draining anything that is already running. Dry coolers can be added in modules on a yard designed for the final count, with spare connections on the glycol headers.

Each phase is pressure tested, flushed and filled on its own before it is opened to the live loop. Paul Industries keeps the same weld procedures, valve standards and records format from phase to phase, so that the hall ends up as one consistent system rather than a patchwork of installations.

Refrigerants, two-phase systems and Washington rules

Refrigerants enter liquid cooling projects through two-phase cold plates, refrigerant-based CDUs and the trim chillers that back up dry coolers, and Washington’s Department of Ecology regulates all three under chapter 173-443 WAC. Any system with a charge above 50 pounds of a refrigerant whose GWP is 150 or higher falls under the Refrigerant Management Program, with registration, scheduled leak inspection, leak repair within 14 days and five years of records.

Single-phase cold plate loops using water or glycol stay outside those duties, which is one reason owners favor them for new Washington designs. Where a two-phase system is chosen, Paul Industries checks the fluid against Ecology’s current tables before equipment is ordered and sets up the leak inspection records from the first day of operation. Data centers using ASHRAE 90.4 under Section C403.1.3 of the Washington State Energy Code also gain on the mechanical load calculation when chillers are reduced or removed, which strengthens the case for warm-water loops.

Liquid cooling scope by stage on a Washington project
StageWorkWashington detail
Survey and basis of designRack loads, coolant, water class, redundancy, routesFreeze exposure and makeup water quality recorded for Basin sites
Design and submittalsCDU, manifold, valve and heat exchanger selections; piping drawingsSeismic bracing details for Puget Sound buildings
PrefabricationHeaders, branches and valve stations built and tested off siteShorter windows in operating Seattle rooms
InstallationSetting CDUs, piping, tie-ins, leak detection, controls wiringGlycol loops and heat tracing on outdoor runs east of the Cascades
Flush, fill and testPressure test, flush, fill, vent, heat load testGlycol concentration verified for the site’s design low
Turnover and serviceRecords, training, coolant monitoring, maintenanceAutumn freeze checks added to the service plan

What sets data center liquid cooling cost in Washington?

Data center liquid cooling cost in Washington is set by the number of liquid-cooled racks and their heat load, the CDU arrangement, the length and size of the manifolds, the heat rejection route and how much of the work has to happen inside an operating room. A Seattle retrofit spends more on survey, staging, night or weekend work and protection of live equipment; a Basin new build spends more on dry coolers, glycol systems and freeze protection.

Operating cost tilts the design too. Industrial electricity in Washington cost 6.61 cents per kilowatt-hour on average in 2024, compared with 8.13 cents nationally (EIA), so the savings from removing chillers pay back more slowly than in high-price states, while the water savings and reduced evaporative maintenance carry more weight. Paul Industries prices liquid cooling from the rack schedule, the hardware specification, the room drawings and the phasing plan, with an early budget figure drawn from similar jobs and a fixed price when the design is complete.

Who installs data center liquid cooling in Washington?

Paul Industries installs data center liquid cooling in Washington, covering CDUs, cold plate manifolds, rear-door heat exchangers, dry coolers, heat exchangers, glycol systems, leak detection and controls for rooms in Seattle and King County and campuses in Quincy, East Wenatchee, Malaga, Moses Lake and Spokane. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries takes liquid cooling projects throughout Washington and every other state, and at plants abroad.

Buyers weighing data center liquid cooling companies can work with Paul Industries in three ways, and can buy on any of these terms: supply of CDUs, manifolds, valve stations and prefabricated skids; design-build of the complete liquid system; or complete installation to an engineer’s drawings. The same team pressure tests, flushes, fills and starts the system and stays on for service. Liquid cooling connects to the building plant described under data center cooling in Washington, is proven through data center commissioning in Washington, and often arrives as part of the wider package on the data center mechanical contractor in Washington page; trim chillers are kept running through chiller repair in Washington.

Liquid cooling for Washington halls from Paul Industries

Paul Industries designs, supplies, fabricates, installs, tests and maintains liquid cooling for Washington data centers, from a few dense rows in a Seattle colocation room to campus-scale warm-water systems in the Columbia Basin. Related systems include closed loop cooling systems and data center immersion cooling. For the same service in the headquarters state, see data center liquid cooling in Virginia; for a western comparison, see data center liquid cooling in California, and the regional picture on the West Coast and Washington pages. Send the rack schedule and room drawings and request a quote.

Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments (W classes) · ASHRAE 90.4 · Washington State Energy Code, commercial provisions (chapter 51-11C WAC) · Washington State Mechanical Code (chapter 51-52 WAC) · Chapter 173-443 WAC, Refrigerant Management Program · ASME B31.9 · Open Compute Project liquid cooling guidance

Frequently asked questions

Who does liquid cooling for data centers in Seattle and Tukwila?

Paul Industries designs and installs liquid cooling for colocation and enterprise rooms in Seattle, Tukwila and the rest of King County, including CDUs, cold plate manifolds, rear-door heat exchangers and the tie-ins to the building’s chilled water. Work is staged around live equipment, with prefabricated piping, pressure testing before installation and seismic bracing to the Washington State Building Code. Supply-only, design-build and complete installation routes are all available.

What does a new Wenatchee data center need from its liquid cooling loop?

A new Wenatchee data center needs a liquid loop that rejects heat to dry coolers through hot, dry summers and survives freezing winters, usually with a glycol loop outdoors and a plate heat exchanger to the technology cooling system indoors. Filtration for smoke seasons, makeup water treatment and redundant CDU pumps on backup power round out the design. Paul Industries builds these systems for East Wenatchee and Malaga projects from design through startup.

Do data centers use liquid cooling in central Washington today?

Liquid cooling is in use and expanding in central Washington, and Microsoft states that its newest datacenters there are designed to use no water for cooling, which closed liquid loops rejecting heat to air make practical. Earlier Quincy and Wenatchee buildings were mostly air cooled with evaporative systems, so many owners are now adding liquid-cooled rows to existing halls while new halls are planned around liquid from the start.

How does Seattle's data center moratorium affect liquid cooling projects?

Seattle’s one-year moratorium, signed June 11, 2026, pauses new data centers above 20 megavolt-amperes while the city studies their effects. Adding density inside existing rooms is the main way to grow capacity in the city during that time, and liquid cooling removes far more heat per rack than more air handlers. Paul Industries plans those retrofits within the building’s existing plant, risers and electrical capacity.

Can an existing Seattle chilled water plant feed coolant distribution units?

An existing Seattle chilled water plant can usually feed liquid-to-liquid CDUs, because cold plates accept warmer water than the plant already makes and Seattle’s mild climate leaves spare economizer capacity. The checks are spare flow at the riser, the plant’s response to a step load and the water quality in the old mains. Paul Industries tests flow and chemistry before design and adds filtration at the CDU connection.

What glycol mix suits a dry cooler loop in Moses Lake or Quincy?

The glycol mix for a dry cooler loop in Moses Lake or Quincy is set by the site’s design low temperature and the burst or slush protection the owner wants, and propylene glycol is the usual choice near IT equipment. Paul Industries sets the concentration from site weather data, installs a blending fill station and checks the mix and inhibitor level each autumn.

Can a liquid-cooled hall in Washington run without chillers?

A liquid-cooled hall in the Columbia Basin can often run without chillers when its hardware accepts warm facility water in the W32 to W40 range, because dry coolers deliver that temperature through most hours. Some designs keep a small trim chiller or adiabatic precooling for the hottest afternoons. Paul Industries models the site’s weather against the hardware’s limits before recommending a chiller-free design.

Does Washington's refrigerant program apply to liquid cooling?

Single-phase liquid loops using water or glycol carry no refrigerant charge, so Ecology’s Refrigerant Management Program applies only to the chillers, two-phase cold plates or refrigerant-based CDUs on a project. Any of those carrying over 50 pounds of a refrigerant rated at GWP 150 or higher must be registered, inspected for leaks and repaired within 14 days. Paul Industries checks each system against the rule at design stage.

How is a new liquid loop cleaned before servers connect in a Washington hall?

A new loop is pressure tested, flushed at velocity through temporary strainers until the water meets the cleanliness target, then drained and filled with the specified coolant, vented and run under heat load. Washington’s hard groundwater makes treated or deionized fill water essential on Basin sites. Paul Industries records each step and hands the results to the owner and the hardware vendor.

How heavy can a liquid-cooled rack get in an older Washington building?

Liquid-cooled racks loaded with dense hardware, cold plates and coolant are much heavier than the air-cooled racks many older floors were rated for, so the floor or slab capacity must be checked before layout. Paul Industries works from the structural engineer’s ratings, spreads loads with the rack layout and keeps filled manifolds overhead or on the slab where a raised floor lacks the rating.

Do CDU pumps need backup power in a Washington data center?

CDU pumps need uninterruptible or generator-backed power, because cold plates have very little thermal mass and chips heat up within seconds if flow stops. Most designs put CDU pumps on UPS with redundant pumps per CDU or redundant CDUs per row. Paul Industries tests the transfer to backup power and the restart sequence during commissioning.

Can liquid cooling heat be reused at a Washington campus?

Warm return water from cold plates can heat offices, warehouses or greenhouses when a user sits close to the campus and the loop runs in the W40 range or warmer. Reuse adds heat exchangers, controls and a second customer to the design, so it is settled early. Paul Industries designs the reuse branch and its isolation so that the data hall keeps priority when demand for heat drops.

Does the Washington energy code favor liquid cooling?

Under Section C403.1.3, Washington’s energy code points data center systems to Sections 6 and 8 of ASHRAE 90.4, which measures the annualized mechanical load component of the design. Warm-water liquid cooling that cuts chiller and fan energy lowers that figure, which helps a design comply and can count toward the code’s additional efficiency credits. Paul Industries provides the equipment data the engineer needs for the calculation.

What records does a Washington owner receive after a liquid cooling installation?

The owner receives pressure test certificates for each loop, flushing and water quality results, coolant and glycol data, CDU and valve settings, leak detection test results, as-built drawings and the operating and maintenance manuals. For refrigerant-based equipment, the initial Refrigerant Management Program records are set up too. Paul Industries assembles the package for the owner and the commissioning team.

What drives the per-rack price of liquid cooling in a Washington hall?

Per-rack cost depends on the heat load per rack, the CDU arrangement, manifold length, heat rejection and how much of the work happens inside an operating room, so Seattle retrofits and Basin new builds price very differently. Paul Industries gives a budget range from comparable scope once it has the rack schedule and room drawings, and a firm price after the design is fixed.

Does Paul Industries supply CDUs and manifolds without installing them?

Paul Industries supplies CDUs, manifolds, valve stations, heat exchangers, dry coolers and prefabricated piping skids for Washington projects on a supply-only basis, with submittals, factory test records and startup assistance. Owners can also choose design-build or complete installation, and can move between routes from one phase to the next.

Bringing liquid-cooled racks into a Washington hall?

Send the rack schedule and heat loads, the hardware’s coolant and temperature limits, room and riser drawings, the existing plant data and the phasing plan. Call 201-450-8280 or request a quote.