Paul Industries engineers and builds data center cooling in Oklahoma: chiller plants, dry coolers, cooling towers, pumps, piping and controls for hyperscale campuses in Pryor, Tulsa County, Muskogee County and Stillwater and for enterprise and colocation halls in Oklahoma City and Tulsa. Oklahoma asks a cooling plant to carry long runs of 90 degree days, then ride out hard freezes, hail and wind in the same year. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, is an East Coast contractor that takes this work across Oklahoma and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Oklahoma City summer July normals 93 F high, 70 F low; 73 days a year at 90 F or above (NOAA, 1991-2020)
Oklahoma City winter 72 nights a year at or below freezing (NOAA, 1991-2020)
Mechanical code 2024 IMC statewide from September 14, 2026 (OUBCC)
Industrial power 6.14 cents/kWh in Oklahoma, 8.51 US average (EIA, 2025)
Grid Southwest Power Pool regional transmission organization
Reviewed November 2026

Data center cooling in Oklahoma: the conditions a plant is built for

Data center cooling in Oklahoma is shaped by a climate that swings further than most data center markets, by a grid run through the Southwest Power Pool, and by owners who now watch water as closely as power. A plant that only answers the July peak will struggle in January, and a plant built only for efficiency will struggle when an ice storm or a hailstorm reaches the equipment yard. The design job is to cover the whole range with one set of equipment and controls that operators trust.

The national overview of plant types and how they compare sits on the data center cooling systems page. This page works through what changes in Oklahoma: where the campuses are going, what the weather does to heat rejection, how water and power are priced and permitted, and which state and municipal codes apply.

Oklahoma’s data center map: Pryor, Tulsa County, Muskogee County and Stillwater

The hyperscale data centers in Oklahoma are clustered in the northeast of the state, with Google’s operating campus in Pryor, Mayes County, and new Google campuses in development in Tulsa County, Muskogee County and Stillwater. Google built its Mayes County data center in 2007 and expanded it in 2012, 2015 and 2019, and in 2025 it announced a $9 billion investment in cloud infrastructure in the state. Meta lists a Tulsa data center with more than $1 billion of investment and a 2026 groundbreaking, which places that project under development rather than in service.

Beyond the hyperscale campuses, Oklahoma City and Tulsa hold enterprise data halls for banks, energy companies, hospitals and universities, along with colocation buildings and telecom sites. Those halls are smaller, older on average and more likely to run on air-cooled chillers or computer room units that are reaching the end of their service life. The cooling questions for them are retrofit questions: adding capacity in a live building, replacing refrigerant-era equipment and raising supply temperatures without risking the IT load.

Google data center, Oklahoma: Pryor and the new campuses

The Pryor campus sits at MidAmerica Industrial Park, a 9,000 acre park that still advertises more than 1,500 available acres. A campus of that age carries several generations of mechanical equipment, and the new campuses at Stillwater, Muskogee County and Tulsa County start from a clean sheet. For contractors and owners, that mix means demand for both new plant construction and the repair, replacement and controls work that keeps an older plant running beside a new one.

How does data center cooling work in Oklahoma heat?

Oklahoma data center cooling moves heat from the servers into air or liquid, carries it to chillers or heat exchangers, and rejects it outdoors through condensers, dry coolers or cooling towers sized for the state’s summer. Oklahoma City’s 1991 to 2020 normals put the July high at 93 degrees Fahrenheit and the low at 70, with 73 days a year at 90 degrees or above. Tulsa runs a little warmer, especially at night, with a 94 degree July high, a 73 degree July low and 74 days a year at 90 or above.

How does data center cooling work when the outdoor air is that hot? The compressor carries the load, because a dry cooler only rejects heat to a fluid warmer than the air around it, and a tower only approaches the wet bulb. Inside the white space, the ASHRAE recommended inlet range of 64.4 to 80.6 degrees Fahrenheit gives room to raise supply air and chilled water temperatures, and every degree of that headroom shortens the hours the compressors must run in an Oklahoma summer. Data center cooling requirements are written as a design condition, a redundancy level and a supply temperature, and the Oklahoma design condition sits well above the July normal because the plant has to meet the hottest afternoons.

Data center cooling methods that suit the state usually combine mechanical cooling for summer with free cooling for the long shoulder seasons. A January normal high of 49 degrees and a low of 27 in Oklahoma City means several months in which dry coolers or water-side economizers carry most or all of the load, provided the plant is laid out so economizer and chiller can run together during the hours in between.

Freeze protection for Oklahoma cooling yards

Freeze protection in an Oklahoma cooling yard has to cover the 72 nights a year that Oklahoma City drops to freezing, plus the rarer arctic outbreaks when temperatures fall to zero or below. The National Weather Service office in Norman documented an extreme cold event across Oklahoma on January 23 to 25, 2026, and a cold outbreak in mid January 2024. During events like those, the cooling plant keeps running because the IT load does, and any outdoor water that stops moving is at risk.

The design answers are well known; the work is applying them to every outdoor pipe, coil and sensing line. Closed loops that run outdoors carry propylene or ethylene glycol at a concentration set from the coldest design temperature. Cooling tower basins get heaters and controls that bypass the fill at light load, and makeup lines, drains and instrument taps get heat tracing and insulation. Dry coolers either run on glycol or sit behind a heat exchanger that keeps water out of the outdoor coil. Paul Industries designs that protection into the plant and tests it during commissioning, with heat trace circuits and basin heaters proven before the first winter.

Hail, wind and tornado exposure on outdoor cooling equipment

Hail and wind are a direct risk to Oklahoma cooling equipment, because air-cooled chillers and dry coolers expose thin aluminum fins and fan assemblies on the roof or in an open yard. The National Weather Service in Norman lists events such as the April 19, 2023 large hail and tornado outbreak among the state’s significant weather, and a single hailstorm can flatten fin surfaces across a whole row of condensers. Flattened fins choke airflow, raise head pressure and push compressors toward high-pressure trips on the next hot afternoon.

Plants in Oklahoma are therefore built with hail guards on coils, fan guards rated for the exposure, equipment anchorage designed for the wind loads in the building code, and a yard layout that lets a damaged unit be isolated while the others carry the load. Spare capacity in the heat rejection yard is worth more here than in a calm climate, because hail tends to damage several units at once.

Oklahoma conditions and the cooling plant response
ConditionWhat it does to the plantDesign and build response
Summer heat (73 to 74 days at 90 F or above)Raises condensing temperature and compressor lift for months at a timeSize heat rejection for the design day, raise supply temperatures, stage chillers on efficiency
Warm summer nights (73 F July normal low in Tulsa)Keeps tower leaving water warm overnightTower approach selected for the wet bulb, variable-speed fans, clean fill
Freezing nights (about 72 a year in Oklahoma City)Freezes idle outdoor water in coils, basins and small linesGlycol loops, basin heaters, heat tracing, drain-down points, freeze alarms
Arctic outbreaksStresses glycol margins and starting controlsGlycol strength checked against the coldest design temperature, cold-start sequences tested
Hail and high windCrushes coil fins and damages fan assembliesHail guards, anchorage to code wind loads, spare units in the yard
Long mild shoulder seasonsOffers many hours of free coolingDry coolers or water-side economizers piped to run in series with chillers

Data center cooling options for Oklahoma campuses

Data center cooling options for an Oklahoma campus fall into four families: air-cooled chiller plants, water-cooled chiller plants with cooling towers, dry cooler plants with trim chillers, and liquid loops that feed rack-level equipment. Each family trades water, power and first cost differently, and the Oklahoma climate pushes the trade further than a mild coastal climate would.

Cooling plant families and how they fit Oklahoma
Plant typeWater useSummer performance in OklahomaWinter and storm considerations
Air-cooled chillers with free-cooling coilsVery lowEfficiency drops on 95 to 100 degree afternoons; capacity must be rated at the design dayGlycol in the outdoor loop; coils exposed to hail
Water-cooled chillers with cooling towersHigh; evaporation plus blowdownLess compressor energy than air-cooled plants in summerBasin heat and bypass for freezing nights; water treatment year round
Dry coolers with trim chillersVery lowChillers carry the load through the hottest weeksLong free-cooling season; glycol and coil protection required
Warm-water liquid loops to the rackDepends on the heat rejection chosenWarmer loop temperatures extend free cooling into summerSecondary loops stay indoors; outdoor side still needs freeze design

Many Oklahoma owners blend these. A hybrid plant might use dry coolers through the cool months, adiabatic assist or a small tower on the hottest days, and chillers sized to carry the full load if heat rejection is lost. Paul Industries prices each option against the owner’s water allocation, power contract and redundancy target, then builds the one that fits. Higher-density halls are covered in more depth on the data center liquid cooling in Oklahoma page.

Oklahoma data center water usage and the cooling choice

Oklahoma data center water usage is set mostly by how the plant rejects heat, since an evaporative tower consumes water continuously while a dry cooler plant uses very little after the loops are filled. In Tulsa, drinking water comes from Lakes Spavinaw and Eucha on Spavinaw Creek and from Lake Oologah on the Verdigris River, and Meta states that it paid the Tulsa Metropolitan Utility Authority the full cost of water and wastewater service for its Tulsa project. Utilities and cities are now negotiating water terms with large campuses directly, and those terms feed straight into the cooling design.

Where towers are used, blowdown has to go somewhere. A discharge to surface water falls under the Oklahoma Pollutant Discharge Elimination System standards in OAC 252:606, administered by the Department of Environmental Quality, and a discharge to a city sewer falls under that city’s pretreatment limits. Paul Industries designs the treatment, metering and blowdown control so the owner can show the water figures a utility or city will ask for, and details tower water care on the cooling tower water treatment page.

Power, the Southwest Power Pool and cooling plant efficiency

Power for Oklahoma data centers moves through the Southwest Power Pool, the regional transmission organization that runs the wholesale market across the state, with utilities such as OG&E, Public Service Company of Oklahoma and the Grand River Dam Authority serving the sites. OG&E has filed a large-load tariff to set pricing and terms for large customers including data centers, and Meta reports planning its Tulsa energy needs with PSO. Large campuses now negotiate power terms that make cooling efficiency a contract issue as much as an engineering one.

Oklahoma’s industrial electricity averaged 6.14 cents per kilowatt-hour in 2025, against a national average of 8.51 (EIA). A continuous megawatt of cooling plant input costs about $537,864 a year at the Oklahoma average, against about $745,476 at the national figure. The lower price eases the penalty of an air-cooled or dry plant, but at hyperscale every tenth of a point in plant efficiency is still worth real money, and the cooling plant is a large share of the load the utility sees.

Data center cooling regulations in Oklahoma

Data center cooling regulations in Oklahoma start with the codes adopted by the Oklahoma Uniform Building Code Commission, which made the 2024 International Building Code, Mechanical Code, Fire Code, Fuel Gas Code and Plumbing Code effective statewide on September 14, 2026. The 2023 National Electrical Code has applied since September 14, 2024. Under 59 O.S. 1000.23 those codes are minimum standards, and municipalities and other political subdivisions keep the authority to enforce stricter requirements, so the permitting city or county sets the final rules for each site.

Rules that touch an Oklahoma data center cooling plant
SubjectRule or agencyWhat it means for the cooling work
Mechanical design2024 International Mechanical Code, effective September 14, 2026 (OUBCC)Equipment access, refrigerant machinery rooms, ventilation and piping for new permits
Stricter municipal rules59 O.S. 1000.23Cities and counties may add requirements above the state minimum
Mechanical workMechanical Licensing Act, 59 O.S. 1850.1 and OAC 158:50 (Construction Industries Board)Sets the state license requirement for mechanical installation work
Boilers and pressure vesselsBoiler and Pressure Vessel Safety Act, 40 O.S. 141.1, and OAC 380:25 (Department of Labor)Installation permit before setting vessels within the act’s scope
Refrigerant safetyASHRAE 15 through the mechanical codeMachinery room ventilation, detection and relief for large chillers
Tower blowdown to surface waterOPDES standards, OAC 252:606 (DEQ)Discharge permit and monitoring

Energy performance for data center mechanical systems is typically addressed through ASHRAE 90.4, which the International Energy Conservation Code points to for data centers; the commission has been reviewing the commercial provisions of the 2021 and 2024 energy codes, so the design team confirms the edition in force with the permitting office at the start of each project. Commissioning of the finished plant is covered on the data center commissioning in Oklahoma page.

Cooling plant needs in each part of Oklahoma

Data center cooling needs differ across Oklahoma regions because the northeast holds the hyperscale campuses, the two metros hold the enterprise halls, and the west and south hold smaller telecom, enterprise and edge sites.

Pryor, Mayes County and the northeast

The northeast is where the hyperscale campuses run, and the work there is a mix of new halls and ongoing upgrades to plants built since 2007. Industrial park utilities, rail and available land make it the natural site for further phases, and plants there are designed for the warm summer nights of northeast Oklahoma.

Data centers in Tulsa, Oklahoma and Muskogee County

Tulsa combines older enterprise halls downtown and in office parks with the new Google and Meta projects in the county, while Muskogee County hosts a new Google campus. Tulsa’s warmer July nights favor tower plants sized with generous approach, or dry cooler plants with ample trim chiller capacity.

Data centers in Oklahoma City, Norman and Stillwater

Oklahoma City and Norman host enterprise and university halls that are often retrofits, and Stillwater gains a new Google campus. Central Oklahoma sees slightly cooler summer nights than Tulsa, which helps dry coolers in spring and autumn.

Enid, Lawton, Ardmore and western Oklahoma

Western and southern Oklahoma host smaller halls, telecom sites and edge facilities, often on air-cooled equipment exposed to strong wind and blowing dust, where coil cleaning and filter care matter as much as capacity.

Retrofitting cooling in older Oklahoma City and Tulsa halls

Retrofit cooling work in older Oklahoma City and Tulsa data halls usually starts with equipment that has run for fifteen or twenty years: air-cooled chillers on a roof, computer room units on a raised floor, and pumps and valves that have never been fully isolated since the building opened. Owners want more capacity per rack, lower energy bills and an exit from older refrigerants, and they want all of it without an outage.

The work is planned in stages. A survey records the actual loads, the condition of each machine and the valves that will be needed to isolate it. New chillers or dry coolers are set beside the old ones where space allows, or on a new structural frame where the roof cannot carry more weight. Chilled water supply temperatures are raised in steps, with each step checked against the warmest rack inlet, so that free-cooling hours grow without hot spots. Where the hall is moving toward liquid-cooled racks, the new plant is sized for the warmer loop those racks use, and the older air-side equipment is kept for the remaining air-cooled rows. Paul Industries supplies the equipment, installs it, makes each tie-in during a planned window and leaves the owner with updated drawings and operating sequences.

Maintaining an Oklahoma cooling plant through the year

An Oklahoma data center cooling plant needs a maintenance calendar built around three seasons of risk: summer peak load, winter freeze and spring hail. Before summer, coils are cleaned and checked for hail damage, tower fill and nozzles inspected, and chiller condenser tubes cleaned. Before winter, glycol strength is tested, heat tracing and basin heaters proven, and drain points confirmed. After each hailstorm, outdoor coils are inspected and combed or replaced. Paul Industries runs that calendar under service agreements and repairs the equipment it finds damaged, with chiller work covered on the chiller repair in Oklahoma page.

Which factors set the price of an Oklahoma data center cooling plant?

Data center cooling cost in Oklahoma is driven by the IT load and density, the redundancy target, the heat rejection choice, the freeze and hail protection the site needs, and the schedule for each phase. Equipment lead times on chillers, dry coolers, switchgear and pumps shape the start date as much as the price, and campuses that buy major equipment early protect both. Labor productivity on open rural sites differs from that in occupied city buildings, where work happens around live IT load.

A budget range comes from comparable scope, and a firm price follows once loads, redundancy and site conditions are set. Owners can learn about the full mechanical package on the data center mechanical contractor in Oklahoma page, and about the plant piping on the process piping in Oklahoma page.

Who engineers and installs data center cooling across Oklahoma?

Paul Industries engineers and installs data center cooling in Oklahoma, covering every piece between the outdoor heat rejection equipment and the valves at each hall. Among data center cooling contractors, Paul Industries takes the plant through design, build and startup on a single contract, offered three ways: a design-build plant, a supply-only package of data center chillers, dry coolers, pumps and spools fabricated off site, or full installation to an owner’s existing drawings. After turnover, Paul Industries keeps servicing and repairing the plant it built.

Owners comparing markets can read about water and grid limits in the headquarters state on the data center cooling in Virginia page and about the neighboring grid on the data center cooling in Texas page. Regional context is on the Southwest page.

Oklahoma cooling plants from design to service with Paul Industries

For Oklahoma data centers, Paul Industries handles the cooling plant end to end: engineering, fabrication, equipment supply, installation, testing and maintenance of chillers, dry coolers, data center cooling towers, pumps, piping and plant controls, for campuses in Pryor, Tulsa County, Muskogee County and Stillwater and halls in Oklahoma City and Tulsa. The state overview is on the Oklahoma page and industry context on the data centers page. To start, send the IT load by phase, the redundancy target, the site and the water source, and request a quote.

Standards referenced: 2024 International Mechanical Code (Oklahoma, effective September 14, 2026) · 2024 International Building Code · 2024 International Fire Code · 2023 National Electrical Code (NFPA 70) · Oklahoma Uniform Building Code Commission Act, 59 O.S. 1000.23 · Mechanical Licensing Act, 59 O.S. 1850.1 and OAC 158:50 · Oklahoma Boiler and Pressure Vessel Safety Act, 40 O.S. 141.1 and OAC 380:25 · OPDES standards, OAC 252:606 · ASHRAE TC 9.9 Thermal Guidelines · ASHRAE 90.4 · ASHRAE 15

Frequently asked questions

Who designs data center cooling for campuses in Pryor and Mayes County?

Paul Industries designs and installs cooling plants for data center campuses in Pryor and across Mayes County, including new halls and upgrades to plants that have run since the first campus was built in 2007. The work covers chillers, dry coolers and towers, pumps, headers and controls, with freeze and hail protection designed for northeast Oklahoma. Call 201-450-8280 to discuss a phase.

Does Paul Industries install cooling for data halls in Oklahoma City, Norman and Edmond?

Yes. Paul Industries installs and upgrades cooling for enterprise, university and colocation halls in Oklahoma City, Norman and Edmond, including chiller replacements, added capacity in live buildings and conversions to higher supply temperatures. Work in occupied buildings is phased around the IT load, with temporary cooling where the redundancy margin is thin.

Who provides data center cooling in Tulsa, Broken Arrow and Muskogee?

Paul Industries provides data center cooling across the Tulsa metro, Broken Arrow and Muskogee, from new campus plants to retrofits of older downtown and office-park halls. Tower plants in Tulsa are sized for the warmer July nights, and dry cooler plants carry trim chillers with enough margin for the hottest weeks.

How many data centers in Oklahoma are large hyperscale campuses?

Google lists one operating Oklahoma campus, in Pryor, and three in development in Tulsa County, Muskogee County and Stillwater, and Meta lists a Tulsa data center with a 2026 groundbreaking. Alongside those, the state holds many smaller enterprise, colocation and telecom halls in Oklahoma City and Tulsa, each with its own cooling plant that needs service, upgrades and eventual replacement.

Are there data centers in Oklahoma City as well as at the big rural campuses?

Yes. Data centers in Oklahoma City include enterprise halls run by energy companies, banks, hospitals and state agencies, along with colocation buildings. Many run on air-cooled chillers or computer room units installed years ago, and their owners face refrigerant changes, rising rack densities and aging equipment at the same time.

Is there a Google data center in Oklahoma, and where are the data centers in Oklahoma that Google is adding?

Google has operated a data center in Pryor, Mayes County, since it was built in 2007, and lists new campuses in development in Tulsa County, Muskogee County and Stillwater. In 2025 it announced a $9 billion investment in cloud infrastructure in Oklahoma. Each new campus adds chiller plants, heat rejection and piping on a scale the state’s mechanical market has rarely seen.

What do the new Google data centers in Oklahoma mean for other owners planning cooling plants?

Large campuses compete for chillers, dry coolers, switchgear, pipe and skilled trades during the same years, which stretches lead times. Owners of smaller projects protect their schedule by fixing the design early and releasing long-lead equipment first. Paul Industries plans procurement around those lead times and prefabricates pipe spools off site so field installation is shorter.

Should an Oklahoma data center use cooling towers or dry coolers?

The answer turns on water, power and site. Towers give lower summer compressor energy than dry plants but consume water and need year-round treatment and freeze protection. Dry coolers use very little water and suit Oklahoma’s long cool seasons but need more chiller energy in July and August. Many campuses combine dry coolers with adiabatic assist or a small tower for peak days.

How is glycol strength chosen for an Oklahoma data center cooling loop?

Glycol strength is set from the coldest temperature the outdoor loop could see, with margin for arctic outbreaks like the January 2026 cold event in Oklahoma. Higher concentrations protect better but reduce heat transfer and raise pumping energy, so the loop is kept outdoors only where needed and isolated from indoor water by a heat exchanger. Concentration is tested each autumn.

What should a hail guard on an Oklahoma condenser or dry cooler do?

A hail guard should stop hailstones from striking the coil fins while letting enough air through that capacity and fan energy stay within the selection. Guards are mounted with a gap from the coil, made of material that resists the impact, and removable for coil cleaning. After a storm, the coils are still inspected, since wind-driven hail can strike at an angle.

Where can cooling tower blowdown from an Oklahoma campus be discharged?

A discharge to a creek, river or lake falls under the Oklahoma Pollutant Discharge Elimination System standards in OAC 252:606, administered by the Department of Environmental Quality, and needs a permit with monitoring. A discharge to a city sewer falls under that city’s pretreatment program instead. The treatment chemistry is chosen so the blowdown meets whichever limits apply.

Which mechanical code applies to an Oklahoma data center cooling plant in 2026 and 2027?

The Oklahoma Uniform Building Code Commission adopted the 2024 International Mechanical Code effective September 14, 2026, replacing the 2018 edition. The edition that governs a specific project depends on its permit date and on any stricter rules of the city or county issuing the permit, which state law allows. The design team confirms the edition with the permitting office at the start.

How does Oklahoma's power price affect cooling plant design?

Oklahoma industrial power averaged 6.14 cents per kilowatt-hour in 2025, against 8.51 nationally (EIA). The lower price narrows the energy penalty of dry and air-cooled plants, which makes water-saving designs easier to justify. At campus scale the cooling plant still draws megawatts around the clock, so chiller staging, supply temperatures and pump control remain worth optimizing.

How does the Southwest Power Pool affect a data center cooling plant in Oklahoma?

The Southwest Power Pool runs the regional grid and market that Oklahoma utilities operate within, and large-load terms from utilities such as OG&E shape how a campus may be asked to manage demand. A cooling plant with thermal storage, staged chillers and controls that ride through voltage dips gives the owner flexibility under those terms.

Can cooling capacity be added to an Oklahoma data hall while it stays live?

Yes. Capacity is added by installing new equipment beside the running plant, making hot taps or valved tie-ins during planned windows, and moving load across only after the new equipment has been tested. Temporary chillers cover any window where redundancy drops. Paul Industries plans each tie-in with the operator’s change control and rollback steps.

Can an Oklahoma owner buy the cooling equipment package from Paul Industries on a supply-only basis?

Yes. Paul Industries supplies chillers, dry coolers, pumps, heat exchangers and prefabricated pipe spools as a supply-only package matched to the owner’s design, and also offers design-build and complete installation. Supply-only packages include submittals, factory test records and startup support documents for the owner’s records.

What information lets Paul Industries price data center cooling in Oklahoma?

Send the IT load by phase, rack density, redundancy target, site location, water source and any water or power limits from the utility, along with drawings if a design exists. Paul Industries returns a budget range from comparable scope, then a firm price with equipment, installation and commissioning shown separately once the scope is fixed.

What maintenance does an Oklahoma data center cooling plant need before winter?

Before winter, glycol concentration is tested, heat tracing circuits and tower basin heaters are proven, drain points and low-point valves are checked, and freeze alarms are tested end to end. Chillers that will idle are laid up, and economizer sequences are checked so free cooling engages as the weather turns. Paul Industries performs that work under scheduled service.

Planning a cooling plant for an Oklahoma data center?

Send the IT load by phase, the redundancy target, the site and the water source. Call 201-450-8280 or request a quote.