Paul Industries designs, supplies, installs and commissions data center liquid cooling in Oklahoma: coolant distribution units, row manifolds, technology cooling loops, facility water piping and the dry coolers or chillers that reject the heat, for new campuses and for existing halls in Oklahoma City and Tulsa. Dense racks of accelerator servers produce more heat than air handles economically, and Oklahoma’s long cool seasons let warm-water loops reject much of that heat without compressors. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes liquid cooling work across Oklahoma and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Free-cooling weather Oklahoma City January normals 49 F high, 27 F low (NOAA, 1991-2020)
Design heat Tulsa July normal high 94 F; 74 days a year at 90 F or above
Mechanical and plumbing codes 2024 IMC and IPC statewide from September 14, 2026
Electricity for industry Oklahoma 6.14 cents/kWh against 8.51 nationally (EIA 2025)
Reviewed November 2026

Data center liquid cooling in Oklahoma: what the scope covers

Data center liquid cooling in Oklahoma covers everything between the cold plate on a processor and the heat rejection equipment in the yard. At the rack, cold plates or rear-door coils pick up heat; in the row, manifolds and hoses carry coolant to a coolant distribution unit; the CDU passes heat across a heat exchanger into the facility water loop; and the facility loop carries it to dry coolers, towers or chillers. Each boundary has its own fluid, pressure, cleanliness and controls, and each one is a place where a project can lose time if the details are left until the servers arrive.

The national explanation of liquid cooling architectures is on the data center liquid cooling page. This page covers how those architectures are built and run in Oklahoma, where summer design days near 100 degrees Fahrenheit, freezing nights by the dozen and spring hail all act on the same plant.

Why Oklahoma’s new campuses are planning for liquid-cooled racks

Oklahoma’s new campuses are planning for liquid-cooled racks because the compute now being deployed draws heat densities that air alone removes only with very large fans and very cold supply air. Google lists new campuses in development in Stillwater, Muskogee County and Tulsa County beside its operating site in Pryor, following a $9 billion investment announced in 2025, and Meta lists a Tulsa data center with a 2026 groundbreaking. Owners rarely publish their mechanical designs, but new halls built for dense accelerator racks are being designed with liquid to the chip, and the facility water loops behind them are sized from the start.

Why liquid cooling data center designs now? Water carries far more heat per unit volume than air, so a modest flow through a cold plate removes heat that would need a large volume of chilled air. Liquid also lets the loop run warm, and a warm loop is the key to Oklahoma’s free-cooling hours. Research computing follows the same path; the OU Supercomputing Center for Education and Research supports advanced computing at the University of Oklahoma, and university and enterprise clusters are moving toward the same rack densities.

How does data center liquid cooling work, from chip to dry cooler?

Data center liquid cooling works by pumping a treated coolant through cold plates fastened to the hottest components, collecting the warmed coolant in a row manifold, and transferring its heat to facility water in a coolant distribution unit. What is data center liquid cooling, in plain terms? It replaces most of the air that would have crossed the servers with a closed loop of liquid that touches the heat source through metal, which is why the loop can run at temperatures that would be useless for air cooling.

The technology cooling loop on the server side stays small, clean and tightly controlled, because its fluid passes through fine channels in the cold plates. The facility loop on the plant side is larger and runs between the CDUs and the heat rejection equipment. Keeping the two separate means the coolant that touches the servers never sees outdoor coils, tower water or freeze risk. A data center liquid cooling system therefore has two sets of pumps, two sets of filters and two water chemistry programs, and the commissioning plan proves both.

Data center liquid cooling options and how they suit Oklahoma halls
OptionHow heat leaves the rackWhere it fits in OklahomaPoints to plan for
Direct-to-chip, single-phaseCold plates on processors; residual heat to room airNew hyperscale and enterprise halls; retrofits with CDU spaceAir system still sized for residual heat; coolant cleanliness
Rear-door heat exchangersCoil on the rack door cools exhaust airExisting Oklahoma City and Tulsa halls raising density in placeWater piping above or below racks; condensation control
In-row liquid-to-air unitsFacility water to coils between racksTransitional halls with mixed rack densitiesFloor space; containment
ImmersionServers submerged in dielectric fluidSpecialist clusters and edge sitesFloor loading, fluid handling, server compatibility

Most Oklahoma projects start with direct-to-chip cooling for the densest rows and keep air for the rest, which is why the plant behind them has to serve both a warm liquid loop and a cooler air system. Immersion is covered on the data center immersion cooling page.

Warm-water loops and Oklahoma’s free-cooling season

Warm-water liquid loops let Oklahoma plants reject heat with dry coolers for most of the year, because the loop supply temperature sits well above the outdoor air temperature from autumn through spring. Oklahoma City’s January normals are a 49 degree high and a 27 degree low, and much of the spring and autumn stays in the 60s and 70s. A facility loop designed for warm supply water can run without compressors through all of those hours.

The test comes in July and August. Tulsa averages a 94 degree July high and 74 days a year at 90 degrees or above, and Oklahoma City is close behind. On those afternoons a dry cooler falls short of the facility water setpoint for some hours, so the plant needs a trim chiller, adiabatic assist on the dry coolers or a tower loop sized for the peak. The warmer the loop the servers accept, within the limits set by the server maker and the ASHRAE TC 9.9 liquid cooling classes, the fewer hours that trim equipment runs. Is data center cooling without water realistic here? For most of the year, yes, and the remaining hours are a choice between a little water and a little more electricity.

Keeping liquid loops safe through Oklahoma freezes

Liquid loops in Oklahoma must be protected from freezing wherever they run outdoors, since Oklahoma City sees about 72 nights a year at or below freezing and a couple of nights near 10 degrees. The National Weather Service in Norman recorded an extreme cold event across the state on January 23 to 25, 2026, the kind of week in which a stalled outdoor coil freezes in hours. A liquid-cooled hall keeps producing heat through that weather, so the heat rejection plant has to keep running and protect itself at the same time.

The standard approach keeps glycol only in the outdoor loop. Dry coolers run on a propylene glycol mix, a plate heat exchanger separates that loop from the indoor facility water, and the CDUs never see glycol at all. Pumps run continuously in cold weather, low-flow and low-temperature alarms trip before ice forms, and drain points are placed so a coil can be emptied if a pump fails. Paul Industries tests those sequences during commissioning, with simulated pump failures, before the first winter on line.

Coolant and fill water for Oklahoma technology cooling loops

Coolant for the technology cooling loop is chosen and treated to protect the fine channels in cold plates, which clog or corrode if the fluid carries particles, dissolved oxygen or the wrong chemistry. Oklahoma city water comes mostly from lakes and rivers; Tulsa draws on Lakes Spavinaw and Eucha and on Lake Oologah. Surface water quality shifts with the seasons, and municipal water carries the disinfectant residual and minerals that suit drinking water rather than server coolant.

For that reason, technology cooling loops are filled with purified water or a pre-mixed coolant to the server maker’s specification rather than straight from the tap. Paul Industries flushes and cleans each loop, fills it with the specified fluid, verifies the filtration and inhibitor levels, and records the results for the owner. Purified fill water systems are covered on the ultrapure water systems in Oklahoma page.

Dew point, insulation and warm loops in Oklahoma halls

Dew point control decides whether liquid cooling piping in an Oklahoma hall stays dry, since any pipe or coil colder than the room dew point collects condensation. Summer outdoor air carries moisture, and every door opening and makeup air unit carries some of that moisture into the building. Warm technology and facility loops, running well above the room dew point, rarely sweat at all, which is one of the quieter advantages of warm-water design.

The risk returns wherever colder water is used: rear-door coils fed from an existing chilled water plant, liquid-to-liquid CDUs tied into cold chilled water, and the piping that serves them. Those runs get closed-cell insulation with sealed joints, and the hall’s humidity control keeps the dew point below the coldest water temperature in the room. Paul Industries checks the coldest surface in each design against the room conditions before the insulation specification is fixed.

Piping, leak detection and drip protection in the white space

Piping inside an Oklahoma liquid-cooled hall is laid out so that a leak is detected early, contained at the source and isolated without taking down neighboring rows. Supply and return headers run overhead or below a raised floor with isolation valves at each row, drip trays sit under manifolds and quick-disconnect points, and sensing cable runs beneath anything that holds coolant. Valves are placed so that one manifold can be drained while the rest of the hall keeps running.

Material choice matters as much as layout. Stainless steel or copper headers with welded or pressed joints, compatible elastomers and dielectric isolation between dissimilar metals keep the loop clean for years. Paul Industries fabricates header spools off site, pressure tests them before delivery and welds or presses joints in the field to the specification. Piping practice for those loops is covered on the process piping in Oklahoma page.

Data center liquid cooling equipment on an Oklahoma submittal list

Data center liquid cooling equipment for an Oklahoma hall spans the white space, the mechanical rooms and the yard, and each item has its own lead time, test and maintenance need. A liquid cooling system for data centers is only as reliable as its weakest component, so the submittal review covers hoses, valves, heat exchangers and sensors with the same care as the CDUs.

Main components of an Oklahoma liquid cooling installation
ComponentJob it doesOklahoma point to check
Coolant distribution unit (CDU)Pumps the technology loop and exchanges heat to facility waterApproach temperature at the warm facility supply chosen for summer peaks
Row manifolds and hosesCarry coolant to each rackMaterial compatibility with the specified coolant; drip containment
Facility water headersLink CDUs to the heat rejection plantIsolation valves by row; spool fabrication off site to shorten field work
Plate heat exchangerSeparates outdoor glycol from indoor waterSized for glycol at the coldest design temperature
Dry coolersReject heat to outdoor airHail guards, wind anchorage, adiabatic assist for July and August
Trim chillerCovers peak hours above dry cooler capabilityRun hours estimated from Oklahoma City or Tulsa weather data
Leak detection and controlsAlarm, isolate and log faultsIntegration with the building management system and the owner’s alarm routing

Paul Industries reviews the submittals against the design and the server maker’s requirements, buys the long-lead items early, and keeps spare parts lists with the turnover documents.

Dry cooler yards for liquid loops in hail and wind country

Dry cooler yards serving Oklahoma liquid loops are exposed to the spring storms that cross the state, and their large, thin-finned coils are the part of the system most likely to be damaged by weather. A coil that loses fin area to hail rejects less heat, and on a warm-water plant that lost capacity shows up first as more trim chiller hours. Yards are laid out with spare dry coolers, hail guards with a gap from the coil, fan decks anchored for code wind loads and access lanes so a damaged coil can be replaced while the others run. After a hailstorm, Paul Industries inspects each coil and combs, repairs or replaces the damaged sections.

Building the facility loop once and adding CDUs hall by hall

Campus owners in Oklahoma usually build the facility water loop for the final load and add CDUs as each hall fills, because headers and heat rejection are cheaper to install once than to enlarge later. The loop is sized for the end-state flow, valved and capped at each future CDU location, and flushed and tested in sections so later connections can be made without draining the live system. Heat rejection is added in blocks, and controls are written from the start to stage dry coolers and trim cooling across all phases. Paul Industries plans that phasing with the owner’s leasing or deployment schedule so cooling capacity arrives a step ahead of the racks.

Controls and monitoring that keep liquid loops stable

Controls for a liquid cooling plant hold the technology loop supply temperature steady while the facility side swings between free cooling and trim cooling through the Oklahoma day. CDUs control their own pumps and valves to a supply setpoint; the plant controls stage dry coolers, adiabatic assist and chillers from the facility return temperature and the outdoor conditions. Monitoring logs flows, temperatures, pressures, pump status and leak alarms, and trends those values so a fouling filter or failing pump is seen before it trips. Paul Industries programs and tests those sequences and hands the owner the points list and trend set.

Adding liquid cooling to existing Oklahoma City and Tulsa halls

Existing Oklahoma City and Tulsa halls take on liquid cooling one row or one room at a time, using CDUs that connect to the chilled water system the building already has. A liquid-to-liquid CDU tied into existing chilled water is the quickest route, though it runs the liquid loop colder than ideal; a dedicated warm-water loop with its own dry coolers takes more work but cuts energy over time. Owners often start with the first and plan the second.

Retrofit work checks floor loading for CDUs and filled racks, space for headers above or below the racks, the capacity of the existing chilled water plant and the electrical supply to the CDU pumps. Each tie-in to a live chilled water system is done in a planned window with isolation proven beforehand. Paul Industries surveys the hall, designs the tie-in, supplies the equipment and installs it under the owner’s change control.

Energy, the Southwest Power Pool and the case for liquid cooling

Energy savings from liquid cooling come from fewer fan watts at the rack and fewer compressor hours at the plant, and in Oklahoma those savings are priced against an Oklahoma industrial electricity price of 6.14 cents per kilowatt-hour in 2025, well under the 8.51 cent national figure reported by the EIA. Every 100 kilowatts of continuous plant load that a warm-water design removes saves about $53,786 a year at the Oklahoma average. At campus scale those savings run into millions, and they also free grid capacity for IT load.

The utilities serving the new campuses operate within the Southwest Power Pool, the regional transmission organization for the region, and large-load customers now negotiate terms that reward predictable demand. A liquid-cooled plant with a large share of compressor-free hours draws a flatter load through the year, which suits those terms.

Oklahoma codes for liquid cooling piping and equipment

Oklahoma codes apply to liquid cooling the same way they apply to any hydronic system: the 2024 International Mechanical Code for piping, pressure testing and equipment, the 2024 International Plumbing Code for the potable connections that fill the loops, and the 2023 National Electrical Code for CDUs and pumps. The Oklahoma Uniform Building Code Commission made the 2024 mechanical and plumbing codes effective statewide on September 14, 2026, and cities may add stricter rules under 59 O.S. 1000.23.

Rules that reach a liquid cooling installation in Oklahoma
ItemRuleEffect on the work
Facility and technology loop piping2024 International Mechanical Code; ASME B31.9 where specifiedMaterials, joining, supports and pressure testing
Fill and makeup connections2024 International Plumbing CodeBackflow protection between city water and the loops
CDUs, pumps and leak sensors2023 National Electrical CodeCircuits, disconnects and equipment grounding
Mechanical installationConstruction Industries Board rules under the Mechanical Licensing Act (59 O.S. 1850.1; OAC 158:50)State license requirement for mechanical work
Municipal additions59 O.S. 1000.23City or county rules above the state minimum

Testing and turnover of the finished loops are described on the data center commissioning in Oklahoma page.

What sets the data center liquid cooling cost for an Oklahoma hall?

Data center liquid cooling cost in Oklahoma is set by the number of liquid-cooled racks and their heat load, the CDU arrangement, the header materials, the heat rejection choice and how much of the work happens inside a live hall. Data center liquid cooling equipment such as CDUs, manifolds, quick disconnects and leak detection carries long lead times while demand is high, and dry coolers and trim chillers sized for Oklahoma summers add to the plant cost. A retrofit costs more per rack than new construction because of the planning and tie-in work around live equipment.

Paul Industries prices liquid cooling from a budget range based on comparable scope, then gives a firm price once the rack count, loop temperatures and site conditions are fixed. Data center liquid cooling solutions for a whole campus are often phased, with the facility loop built for the final load and CDUs added as racks arrive.

Who builds liquid cooling loops for Oklahoma data centers?

Paul Industries installs liquid cooling for data centers in Oklahoma, from the dry cooler yard and facility loop to the CDUs, row manifolds and the final connections at the rack. Who does liquid cooling for data centers when the owner wants one contract for plant and white space? Paul Industries designs the loops, fabricates the header spools off site, supplies the equipment, installs and tests it, and services it after turnover. The routes are design-build, supply-only packages and complete installation to an owner’s design.

Owners comparing approaches can see how the headquarters state handles density on the data center liquid cooling in Virginia page and how Texas loops deal with its grid on the data center liquid cooling in Texas page. For the plant that sits behind the loops, read data center cooling in Oklahoma; for building the whole campus mechanical scope, read data center mechanical contractor in Oklahoma.

Paul Industries and liquid-cooled racks across Oklahoma

Paul Industries designs, fabricates, supplies, installs, commissions and maintains liquid cooling for Oklahoma data centers, including CDUs, manifolds, technology and facility loops, closed-loop cooling systems and freeze-protected heat rejection, for campuses in Stillwater, Pryor, Muskogee County and Tulsa County and for existing rooms in the two metros. More on the state is on the Oklahoma page, and the wider region is on the Southwest page. Send the rack count, heat per rack, the server maker’s coolant specification and the site, and request a quote.

Standards referenced: ASHRAE TC 9.9 liquid cooling guidelines · ASHRAE TC 9.9 Thermal Guidelines · 2024 International Mechanical Code (Oklahoma, effective September 14, 2026) · 2024 International Plumbing Code · 2023 National Electrical Code (NFPA 70) · Mechanical Licensing Act, 59 O.S. 1850.1 and OAC 158:50 · ASME B31.9

Frequently asked questions

Who installs data center liquid cooling in Stillwater and north central Oklahoma?

Paul Industries installs data center liquid cooling in Stillwater and across north central Oklahoma, from facility water loops and dry cooler yards to CDUs and row manifolds. Projects there include new campus halls and university research computing rooms, and each loop is designed with glycol kept outdoors and purified coolant kept on the server side.

Does Paul Industries build liquid cooling loops for data centers in Tulsa and Muskogee County?

Yes. Paul Industries builds liquid cooling loops for data centers across Tulsa and Muskogee County, including header fabrication, CDU installation, leak detection and the facility loop back to the heat rejection plant. Tulsa’s warm July nights are allowed for in the trim cooling that supports the dry coolers on peak days.

Who provides liquid cooling for data centers in Oklahoma City and Norman?

Paul Industries provides liquid cooling for data centers in Oklahoma City and Norman, often as retrofits that add CDUs and rear-door coils to halls built for air cooling. The work includes a survey of floor loading and chilled water capacity, a tie-in plan for the live system and the installation and testing of each row.

Do data centers use liquid cooling at the new Oklahoma campuses?

Owners rarely publish their mechanical designs, but halls built for dense accelerator servers are being designed with liquid cooling to the chip, because air alone would need very large fans and very cold air at those densities. Oklahoma’s new campuses in Stillwater, Muskogee County and Tulsa County are being planned in that market, with facility water loops sized for liquid-cooled racks.

Are data centers water cooled, or is liquid cooling something different?

Many data centers already use water in the plant: chilled water to air handlers, or condenser water to towers. Liquid cooling goes further and brings coolant to the server itself through cold plates or rear-door coils. The difference matters in Oklahoma because a liquid loop runs warm enough to use dry coolers most of the year, while chilled water for air cooling needs compressors far more often.

Is data center cooling without water realistic in Oklahoma with liquid-cooled racks?

For most of the year it is. A warm facility loop rejects heat through dry coolers from autumn through spring with no evaporation. On the hottest summer afternoons the plant either adds a trim chiller, which uses electricity, or adiabatic assist, which uses some water. The owner chooses that balance from the site’s water terms and power contract.

What facility water temperature suits an Oklahoma liquid cooling loop?

The facility water temperature is set by what the servers accept, using the server maker’s limits and the ASHRAE TC 9.9 liquid cooling classes, and by how many hours the Oklahoma climate can deliver that temperature through dry coolers. Warmer supply temperatures widen the compressor-free season. Paul Industries runs the hour-by-hour weather analysis before the plant is sized.

What glycol arrangement protects an Oklahoma liquid cooling plant from freezing?

Glycol is kept in the outdoor dry cooler loop only, separated from indoor facility water by a plate heat exchanger. That keeps the heat transfer penalty of glycol out of the CDUs and the server loop. Pumps run continuously in cold weather, alarms trip on low flow or low temperature, and glycol strength is tested every autumn.

What fluid goes into the technology cooling loop that feeds the servers?

The technology cooling loop takes purified water with inhibitors or a pre-mixed coolant to the server maker’s specification, never untreated city water. The loop is flushed and cleaned before filling, filtration is set to protect cold plate channels, and fluid samples are tested at startup and on a schedule. Paul Industries records each fill and test for the owner.

How is a leak in a liquid-cooled rack row detected and contained?

Sensing cable under manifolds and CDUs detects coolant within seconds and alarms to the building management system, drip trays hold small leaks, and row isolation valves let one manifold be drained while the rest of the hall runs. CDUs can also watch for falling pressure or level and shut their pumps if a large leak develops.

Can liquid cooling be added to an air-cooled Oklahoma hall without a full rebuild?

Yes. Rear-door heat exchangers or liquid-to-liquid CDUs connected to the existing chilled water plant add liquid cooling one row at a time. The project checks floor loading, header routes and chilled water capacity, and each tie-in is made in a planned window. A dedicated warm-water loop can follow later as density grows.

Does the 2024 mechanical code change anything for liquid cooling piping in Oklahoma?

Oklahoma adopted the 2024 International Mechanical Code effective September 14, 2026, so new permits issued under it follow that edition’s hydronic piping, testing and equipment provisions. Cities may add stricter requirements under state law. The design team confirms the edition and any city amendments with the permitting office before drawings are issued.

What does a data center liquid cooling system cost to price in Oklahoma?

Pricing turns on the rack count and heat per rack, the CDU arrangement, header materials, the heat rejection plant and whether the hall is live. Paul Industries gives a budget range from comparable scope, then a firm price once loop temperatures, rack layout and site conditions are fixed, with equipment, installation and commissioning shown separately.

Does Paul Industries supply the liquid cooling equipment for an Oklahoma hall as a package?

Yes. Paul Industries supplies CDUs, row manifolds, prefabricated header spools, dry coolers and leak detection as a supply-only package matched to the owner’s design, with submittals and test records. The same equipment is available under design-build or complete installation, with startup and commissioning included.

How are liquid cooling loops commissioned before servers arrive in an Oklahoma hall?

Loops are pressure tested, flushed until filters stay clean, filled with the specified coolant and run under load banks that simulate the rack heat. Controls are tested through pump failover, valve closure, leak alarms and the transfer between dry coolers and trim cooling. The results go into the turnover package before the first server is connected.

What maintenance does a liquid cooling loop need in an Oklahoma data center?

The technology loop needs regular fluid sampling for inhibitor level, conductivity and particles, filter changes, and inspection of quick disconnects and hoses. The facility loop needs glycol testing before winter, dry cooler coil cleaning and hail inspections, and pump and valve checks. Paul Industries provides that maintenance under scheduled service.

Who does liquid cooling for data centers in Oklahoma from the yard to the rack?

Paul Industries does liquid cooling for data centers in Oklahoma from the heat rejection yard to the rack connection, under one contract. That covers design, header fabrication, equipment supply, installation, testing, commissioning and ongoing service. Send the rack plan and coolant specification to begin.

Bringing liquid-cooled racks into an Oklahoma data center?

Send the rack count, heat per rack, the server maker’s coolant specification and the site. Call 201-450-8280 or request a quote.