Paul Industries designs, builds, starts up and services data center cooling in West Virginia, from chilled water plants and dry cooler yards to the heat rejection behind gas-powered microgrid campuses, from its headquarters at 256 Shore Drive, Kilmarnock, Virginia. West Virginia gives a cooling designer an unusual combination: a cool mountain climate, a 2025 law that lets campus-scale projects generate their own power, and river valleys where most flat ground sits beside water. Paul Industries supplies, installs and maintains every part of the plant, from the chillers to the piping that reaches the white space.
Request a quote or call 201-450-8280
What shapes data center cooling in West Virginia?
Data center cooling in West Virginia is shaped by three conditions that rarely appear together: a mountain climate with long cool seasons, a power framework under which a campus can run behind its own generation, and terrain that pushes large sites onto river terraces and former industrial land. Each one changes the plant. The climate rewards economizers and warm water design. The power framework turns the cooling plant into the biggest moving load on a generator fleet. The terrain decides whether heat goes to the air, to a cooling tower or to a river intake.
Paul Industries is an East Coast contractor that was formerly based in northern New Jersey, then Pennsylvania, and is now headquartered in Kilmarnock, Virginia. West Virginia owners reach the same team that serves all 50 states and plants outside the United States. The West Virginia overview covers the chemical, gas processing and brownfield plant work Paul delivers across the state; this page stays with the cooling plant for data halls. The national guide to data center cooling systems explains the equipment types in general terms, and this page applies them to West Virginia sites.
Which data centers in West Virginia need new cooling plants?
The data centers in West Virginia that need new cooling plants fall into two groups: a handful of campus projects measured in gigawatts, and a long list of enterprise, university, hospital and government rooms that need upgrades as rack densities rise. Public reporting in August 2026 counted at least five large-scale projects in various stages of development, which is a large figure for a state whose electricity sales are modest by national standards.
Several proposed data centers in West Virginia have been described publicly in enough detail to show what their cooling plants face. They appear here as market facts that set the scale of cooling work in the state.
| Project as reported | Location | Reported scale | Cooling consequence |
|---|---|---|---|
| Monarch Compute Campus | Mason County, on the Ohio River north of Point Pleasant | About 2,000 acres; High Impact Data Center certification; about 2 GW of power for phase one in the 2026 state announcement, with expansion described up to 8 GW | River terrace site: flood elevations govern where chillers, pumps and electrical gear sit |
| Project Tamarack | Mason County, about four miles north of Point Pleasant | About 2.16 GW from the grid; High Impact Data Center certification in September 2026; closed-loop cooling described; grading permit sought for six building pads | Dry or hybrid heat rejection at gigawatt scale, phased building by building |
| Gas-fired microgrid data center project | Tucker County, in the Allegheny highlands | State air permit for an off-grid gas plant, under appeal | High elevation: deep winter cold, snow loads and long dry cooler seasons |
Campus construction at this scale moves in phases, and the cooling plant has to be designed for the last phase while built for the first. Headers sized for the full campus, valved and capped branches for future halls, and pump and chiller pads placed so that later equipment arrives without a shutdown are cheap at the start and expensive to retrofit. Smaller rooms in Charleston, Huntington, Morgantown and Martinsburg face the opposite problem: an existing plant sized for 5 kW racks that now has to serve a row at 40 kW or more.
What does West Virginia data center legislation change for a cooling plant?
West Virginia data center legislation changed the cooling plant brief in 2025, when the Power Generation and Consumption Act (House Bill 2014) created a path for large campuses to build inside microgrid districts with their own generation. Governor Morrisey signed the bill at the end of April 2025 and it took effect on July 11, 2025. The Division of Economic Development in the Department of Commerce filed the certification rules on November 10, 2025.
Under the law, a West Virginia high impact data center is one that enters service after July 1, 2025 carrying at least 90 megawatts of critical IT load. Nearly all of that electrical power leaves the servers as heat, so a single qualifying building needs heat rejection for about 25,600 tons before any allowance for redundancy, lighting, power conversion losses or future growth. Campuses inside a microgrid district sit outside county and municipal ordinances, and the law limits how much of a microgrid’s output can be sold into the PJM wholesale market, so most of the electricity has to be used on the campus that generates it.
For the cooling designer, a West Virginia microgrid means the chillers, pumps and fans are no longer a small load on a large utility grid. They are a large load on a finite set of turbines or reciprocating engines. Three consequences follow:
- Step loads matter. Starting a large centrifugal chiller across a generator bus is a measurable event. Variable speed drives, staggered restart sequences and soft loading after a transfer protect the generators as well as the chillers.
- Chiller count follows generator blocks. Chillers and pump sets sized to match the size of each generator block let the plant add or shed cooling in steps the power plant absorbs without frequency swings.
- Restart after a trip is a design case. On an islanded campus, the order in which chillers, pumps and air handlers come back after a generator trip is written into the control sequence and proven before turnover.
Projects outside a microgrid district still follow the West Virginia data center regulations that apply to any building: the State Building Code where a city or county has adopted it, the mechanical code for refrigeration and hydronic piping, and the state’s licensing law for heating, ventilating and cooling work.
How the mountain climate sizes a West Virginia cooling plant
The mountain climate sizes a West Virginia cooling plant from two directions at once: summers mild enough to give long economizer seasons, and winters cold enough that every outdoor coil, pipe and basin needs freeze protection. The state spans IECC climate zones 4A and 5A, and elevation changes conditions sharply over short distances. A July afternoon at Snowshoe averages 70 F while Huntington, on the Ohio River, averages 87 F.
| Station | January high / low | July high / low | What it means for the plant |
|---|---|---|---|
| Charleston | 44 / 26 | 86 / 66 | Humid valley summers; towers and chillers carry the afternoon load from June to September |
| Huntington | 44 / 25 | 87 / 66 | July normals at the warm end of the state’s range; size heat rejection with margin |
| Parkersburg | 40 / 24 | 87 / 66 | Ohio River valley conditions much like Huntington’s, with colder winters |
| Wheeling | 39 / 22 | 85 / 64 | Northern Panhandle winters argue for glycol on any outdoor coil |
| Martinsburg | 41 / 24 | 87 / 65 | Eastern Panhandle climate close to the Washington region’s |
| Beckley | 41 / 24 | 81 / 62 | Plateau elevation trims summer peaks and lengthens economizer seasons |
| Elkins | 42 / 20 | 83 / 60 | Cool nights recharge any thermal storage and favor dry coolers |
| Canaan Valley | 34 / 17 | 77 / 56 | Highland site conditions: deep cold, heavy snow, short cooling peaks |
| Snowshoe | 30 / 14 | 70 / 55 | Mechanical cooling becomes a summer trim, while freeze protection governs the design |
Morgantown shows how this plays out across a year. NOAA’s 1991 to 2020 normals for Hart Field, at 1,240 feet, record an average of 101.8 nights at or below freezing, 1.3 nights at or below zero and 13.2 days at or above 90 F. Cooling degree days total 930 against 4,964 heating degree days. In plain terms, the plant spends far more of the year rejecting heat into cold air than fighting hot air, and the design questions are how much free cooling it captures and how it survives the cold.
Economizer seasons, month by month at Morgantown
Economizer seasons at Morgantown run long because the normal daily high stays under 55 F for five months of the year. The table below reads NOAA’s monthly normals against the cooling mode a water-side economizer plant typically runs in, assuming a chilled water supply in the mid 60s that current servers accept.
| Months | Normal high / low, F | Typical cooling mode | Plant attention |
|---|---|---|---|
| December to February | 40 to 44 / 24 to 29 | Full economizer around the clock; chillers idle | Freeze protection, tower basin heat, snow on coils |
| March and November | 53 to 54 / 33 to 36 | Full economizer most hours | Changeover controls that avoid hunting between modes |
| April and October | 65 to 66 / 42 to 45 | Economizer at night, partial economizer in the afternoon | Chiller staging at low load without surge |
| May and September | 74 to 77 / 52 to 56 | Partial economizer with chillers trimming | Tower approach and fan speed control |
| June to August | 81 to 84 / 60 to 64 | Mechanical cooling in the afternoon, partial economizer overnight | Peak capacity, redundancy and condenser water quality |
Raising the supply temperature moves months up this table. A plant built around 45 F water sees free cooling only in deep winter, while a plant built for warm water liquid cooling, in the ASHRAE W27 or W32 classes, can run on dry coolers alone for most of the year in north central West Virginia. The data center liquid cooling in West Virginia page works through those warm water loops in detail.
Air-cooled, evaporative or hybrid heat rejection?
Heat rejection choice for a West Virginia hall comes down to water supply, winter operation and the power cost of each approach. Evaporative cooling towers deliver colder condenser water in summer than dry equipment and so improve chiller efficiency, but they consume water and need basin heat, freeze protected makeup lines and year-round water treatment. Dry coolers and air-cooled chillers use no water and suit the long cool seasons, at the cost of more fan power and larger yards. Hybrid units run dry most of the year and wet only on the warmest afternoons.
How much water does a data center use for cooling when it relies on evaporation? A practical estimate comes from the heat of vaporization: each pound of water evaporated carries away roughly 1,000 Btu, so every megawatt rejected through evaporation alone uses about 409 gallons an hour, or close to 9,800 gallons a day, before blowdown and drift. A campus rejecting 90 MW that way would evaporate about 880,000 gallons a day at full load. Those numbers explain why the Mason County announcements describe closed-loop cooling, which Project Tamarack’s developer compared to a very large car radiator: the heat leaves through dry coil surface, and the water stays in the pipe.
West Virginia data center water planning also runs through state reporting. Under W. Va. Code 22-26, a withdrawal above 300,000 gallons in any 30-day period makes the owner a large-quantity user, and at the evaporation rate above a tower plant rejecting a single megawatt from its own well or intake reaches that volume in about a month. Paul Industries fits makeup and blowdown meters with trend logging, so the annual report comes from measured flow rather than estimates. The data center mechanical contractors in West Virginia page covers discharge permits and campus water treatment.
River sites along the Ohio and Kanawha add intake and treatment work: screens, strainers, side-stream filtration and a cooling tower chemistry program matched to river water that changes with the season and with high water events.
Which utility serves the site, and what PJM means for the cooling plant
Utility territory decides who supplies a grid-connected West Virginia data center and how its cooling plant is tested against outages. Appalachian Power serves generally the southern half of the state, including the Kanawha Valley. Mon Power serves about 395,000 customers in 34 counties across the north and center, Potomac Edison serves about 155,000 customers in the Eastern Panhandle, and Wheeling Power, an AEP company, serves part of the Northern Panhandle. All of West Virginia sits inside PJM, the grid operator that serves all or part of 13 states and the District of Columbia.
Energy price sets the value of every efficiency choice. The EIA’s 2024 averages for West Virginia were 7.81 cents per kWh for industrial customers and 11.62 cents for commercial customers, against US averages of 8.13 and 12.75. For a 10 MW IT hall, each 0.05 of PUE spent on mechanical cooling is 4,380,000 kWh a year: about $342,000 at the industrial average or $509,000 at the commercial average. A plant whose mechanical overhead runs at 0.15 spends between about $1.03 million and $1.53 million a year to cool the same hall. Those figures are energy only, before demand charges, and they explain why economizer hours carry so much weight in a West Virginia design.
| Power situation | Where it applies | Cooling plant response |
|---|---|---|
| Grid service, southern territory | Charleston, Huntington, Beckley, Bluefield | Chiller restart on generator, ride-through for pumps, thermal storage sized for transfer |
| Grid service, northern and central territory | Morgantown, Fairmont, Clarksburg, Parkersburg | Economizer-first controls, warm water design, glycol on outdoor coils |
| Grid service, Eastern Panhandle | Martinsburg and Berkeley and Jefferson counties | Plant sized for humid summers much like Northern Virginia’s |
| Microgrid district | Campuses with on-site generation under HB 2014 | Soft starts, staged restarts, recovered engine heat, controls tied to the generation plant |
Freeze protection and snow in the highlands
Freeze protection is a primary design case for any West Virginia cooling plant above the river valleys, because highland January lows average in the teens and single-digit nights are routine. Dry coolers and air-cooled chillers run on propylene glycol at a concentration chosen for the site’s design low and for whether the loop needs burst protection or full freeze protection. Cooling towers that stay in service in winter need basin heaters, heat traced makeup and drain lines, and fan controls that prevent icing on the fill.
Snow is the other highland problem. Drifts against a dry cooler bank starve it of air, and snow melting on a warm coil refreezes as ice on the lower rows. Raised equipment platforms, wind fencing set back from the coils, and yard layouts that leave room for snow removal keep heat rejection available on the coldest mornings, which are also when an operator least wants a capacity alarm. Paul Industries builds the platforms, piping and heat tracing as part of the cooling scope.
Chilled water plants, piping and the white space
Chilled water plants for West Virginia data halls follow the same building blocks as anywhere else, but the cool climate shifts the emphasis toward economizer heat exchangers, variable primary pumping and controls that switch modes cleanly. Paul Industries sets and pipes data center chillers, plate and frame economizer exchangers, pumps, air separators, expansion tanks and chemical feed, then runs headers to CRAH galleries, fan walls or coolant distribution units.
Piping on a large campus is usually welded carbon steel or grooved steel in the plant and mains, built to ASME B31.9 for building services or to the owner’s specification. Refrigeration machinery rooms follow ASHRAE 15 for ventilation, detection and relief. The process piping in West Virginia page covers the welded systems Paul Industries builds beyond the data hall, from fuel gas to plant utilities.
Code requirements reach the cooling work from several directions. The West Virginia State Building Code, 87 CSR 4, carries the International Mechanical Code into every city and county that has adopted it. W. Va. Code 21-16 requires a license from the Labor Commissioner for anyone performing or offering heating, ventilating and cooling work in the state, and the Contractor Licensing Act, W. Va. Code 30-42, applies to commercial work of $25,000 or more. Testing, flushing and integrated testing of the finished plant are covered on the data center commissioning in West Virginia page.
What does data center cooling in West Virginia cost?
The cost of data center cooling in West Virginia depends far more on the site and the redundancy target than on the state, so a firm price follows a defined scope rather than a rule of thumb per ton. How much does it cost to cool a data center over its life? The energy figures above show that operating cost over ten years often rivals the capital cost of the plant, which is why economizer design and supply temperature belong in the first pricing conversation.
| Driver | Why it moves the price in West Virginia | What to send for pricing |
|---|---|---|
| Heat rejection type | Towers need water rights, treatment and winter protection; dry coolers need yard area and fan power | Water source, available yard area, sound limits |
| Site terrain and flood elevation | River terraces and benched hillsides add foundations, retaining work and raised equipment pads | Survey, flood study, geotechnical report |
| Redundancy | N+1, N+2 or 2N changes chiller, pump and pipe counts directly | Target tier and concurrent maintainability rules |
| Supply temperature | Warmer water shrinks chillers and lengthens economizer seasons in this climate | IT equipment specifications and any liquid cooling plans |
| Power arrangement | Microgrid campuses need soft-start equipment and tighter control integration | One-line diagram and generator data |
| Phasing | Campus headers sized for future halls cost more on day one and far less later | Phase plan and target megawatts per phase |
Paul Industries prices a budget range from comparable scope as soon as the basic load, redundancy and site are known, then a firm price once drawings and equipment selections are fixed.
Who installs and services data center cooling in West Virginia?
Paul Industries installs and services data center cooling in West Virginia, covering design, equipment supply, fabrication, installation, startup, maintenance and repair of chilled water plants, heat rejection yards and the piping to the white space. Owners and builders who ask who provides cooling for data centers in the state get one accountable contract with Paul Industries, one schedule and one set of turnover records.
Paul Industries brings the same approach to Virginia, its headquarters state, where the data center cooling in Virginia page covers a far more humid climate, and to the Pennsylvania data center cooling market across the northern border. West Virginia work sits within its wider Mid-Atlantic coverage. Paul Industries also repairs and overhauls existing machines through chiller repair in West Virginia.
Paul Industries cooling plants for West Virginia data halls
Paul Industries delivers data center cooling for West Virginia campuses, enterprise rooms and research facilities through three routes: supply-only equipment packages, design-build plants, and complete installation from foundations to integrated testing. The work covers chillers, cooling towers, dry coolers, economizer exchangers, pumps, glycol systems, heat tracing, controls, piping, startup and maintenance, for grid-connected halls and microgrid district campuses alike. Send the load, site and phase plan, and request a quote for a West Virginia cooling plant.
Standards referenced: West Virginia Power Generation and Consumption Act (HB 2014, 2025) · W. Va. Code 22-26 (large-quantity water users) · W. Va. Code 21-16 (heating, ventilating and cooling work) · West Virginia Contractor Licensing Act, W. Va. Code 30-42 · West Virginia State Building Code, 87 CSR 4 · International Mechanical Code · ASHRAE TC 9.9 Thermal Guidelines (liquid cooling classes) · ASHRAE 15 · ASME B31.9
Frequently asked questions
Who provides data center cooling in Huntington and the Tri-State area?
Paul Industries provides data center cooling in Huntington, Barboursville and the rest of the Tri-State area along the Ohio River, for hospital, university, enterprise and new campus data halls. Huntington’s July normals of 87 F and 66 F sit at the warm end of the state’s range, so heat rejection there carries more summer margin than in the highlands. Paul Industries designs, supplies, installs and maintains the chillers, towers or dry coolers and the piping to the room.
Who installs cooling for data center projects in Mason County, Point Pleasant and the Mid-Ohio Valley?
Paul Industries installs cooling for data center projects in Mason County, around Point Pleasant and up the Mid-Ohio Valley through Ravenswood and Parkersburg. River terrace sites bring flood elevation, intake and water treatment questions into the cooling design, and the gigawatt campuses proposed there call for heat rejection built in phases on headers sized for the full build-out. Paul Industries designs, supplies and installs the plant and its piping, phase by phase.
Who builds cooling plants for data halls around Wheeling and Moundsville?
Paul Industries builds and services data center cooling in Wheeling, Weirton, Moundsville and across the Northern Panhandle, from enterprise and hospital rooms to new halls on former industrial sites. Wheeling’s January normals of 39 F and 22 F mean every outdoor coil and tower line needs freeze protection, while July normals of 85 F and 64 F leave a long economizer season. Wheeling Power and Mon Power serve the area inside PJM.
Who services data center cooling plants in Beckley, Bluefield and southern West Virginia?
Paul Industries services and upgrades data center cooling plants in Beckley, Bluefield, Princeton and Lewisburg, covering chillers, pumps, CRAH units, dry coolers and controls. Plateau elevation keeps Beckley’s July normal high at 81 F, so plants there spend more of the year on economizer than valley plants. Appalachian Power serves most of the region. Send the plant schedule and alarm history, and Paul Industries scopes the repair, retrofit or replacement.
How many data centers in West Virginia are planned at campus scale?
Reporting in August 2026 counted at least five large-scale data centers in development across West Virginia, and Project Tamarack in Mason County added another when it received High Impact Data Center certification that September. Several are measured in gigawatts, including the Monarch Compute Campus and Project Tamarack north of Point Pleasant, and a gas-fired microgrid project is planned in Tucker County. Each would need cooling for well over a thousand megawatts of heat at full build-out.
How many tons of cooling does a 90 MW data hall need?
A 90 MW data hall needs heat rejection for roughly 25,600 tons at full IT load, because almost every watt delivered to servers leaves as heat and one ton equals 3.517 kW. Redundancy, UPS and transformer losses, lighting and future growth push the installed capacity higher. Ninety megawatts is also the threshold for high impact status under West Virginia’s 2025 law, so many campuses there size each building around it.
When does a West Virginia hybrid cooler run wet instead of dry?
A hybrid cooler in West Virginia typically runs wet only on the warm afternoons when outdoor dry bulb climbs too close to the loop’s leaving temperature, which at Morgantown means the June through September stretch, when normal daily highs run from 77 F to 84 F. The rest of the year the coils reject heat dry and use no water. Water treatment for the wet mode is sized for those few months, with drain-down or freeze protection for winter.
How is a cooling plant brought back after a generator trip on a microgrid campus?
A cooling plant on a microgrid campus comes back after a generator trip through a restart sequence written into the controls: pumps first to keep water moving through the coils, then chillers one at a time on soft starters or drives as the remaining generation accepts load, with thermal storage carrying the hall in between. Paul Industries builds and tests that sequence with the generation plant’s controls before turnover, so the order is proven rather than assumed.
What glycol concentration does a dry cooler yard in the West Virginia highlands need?
The glycol concentration for a highland dry cooler yard is set by the site’s winter design temperature and by whether the loop needs burst protection, where slush is tolerated, or full freeze protection, where the fluid stays pumpable. Canaan Valley and Snowshoe January lows average 17 F and 14 F, with colder extremes, so highland loops run richer mixtures than valley plants. Higher concentrations cost heat transfer and pump energy, so the selection is checked against the summer capacity case.
Which chilled water supply temperature suits a data hall in north central West Virginia?
A chilled water supply in the mid 60s Fahrenheit suits most air-cooled halls in north central West Virginia, because it sits within the server inlet ranges current equipment accepts and lets the economizer carry the plant for most of the cool season. Halls with direct liquid cooling go further, with facility water in the ASHRAE W27 or W32 classes that dry coolers produce for most of the year. Lower temperatures shorten free cooling and enlarge chillers.
Does West Virginia license heating, ventilating and cooling work on data center projects?
W. Va. Code 21-16 requires a license from the West Virginia Labor Commissioner for anyone performing or offering to perform work on a heating, ventilating and cooling system in the state, a requirement in force since January 1, 2016, with Division of Labor rules in 42 CSR 34. The law lists exemptions, including routine maintenance and employees working at their own employer’s manufacturing plant or industrial establishment.
How much does cooling energy cost a West Virginia data center each year?
Cooling energy for a West Virginia data center costs roughly $342,000 to $509,000 a year for every 0.05 of PUE spent on mechanical cooling in a 10 MW IT hall, using the EIA’s 2024 statewide industrial and commercial averages of 7.81 and 11.62 cents per kWh. A plant running at 0.15 mechanical overhead spends about $1.03 million to $1.53 million a year on the same hall. Tariff, demand charges and economizer hours move the actual figure.
Can a West Virginia owner buy cooling equipment and installation separately?
Yes. Paul Industries offers supply-only equipment packages, design-build cooling plants and complete installation for West Virginia data centers. Supply-only covers chillers, dry coolers, towers, pumps, exchangers and prefabricated piping skids delivered to the site. Design-build adds engineering to the owner’s performance targets, and complete installation runs from equipment setting through piping, controls, startup and integrated testing under one contract and one schedule.
How is snow kept from blocking dry coolers and air-cooled chillers in the Allegheny highlands?
Snow is kept from blocking highland heat rejection by raising the equipment on steel platforms above the expected drift depth, setting wind fencing far enough back that it does not create drifts against the coils, and leaving plowable lanes around the yard. Fans run in a winter mode that keeps air moving through the coils, and coil sections are piped so one bank can be isolated for clearing while the rest carry the load.
Which site documents start a West Virginia cooling plant estimate?
A West Virginia cooling plant estimate starts with the IT load by phase, the redundancy target, the site survey and flood study, the water source, the utility or microgrid arrangement and any planned liquid cooling. For an existing hall, add the current plant schedule, recent trend logs and the alarm history. With those, Paul Industries returns a budget range from comparable scope, then a firm price once the design is fixed.
Can river water from the Ohio or Kanawha feed a data center cooling tower?
Yes, with treatment. River makeup water carries suspended solids, organics and seasonal swings in hardness and temperature, so a tower drawing from the Ohio or Kanawha needs intake screening, clarification or filtration, side-stream filtration on the basin and a chemistry program that adjusts through high water events. Paul Industries designs and installs the intake, treatment and makeup systems, with metering for the state’s water use reporting.
How is a data center cooling plant protected from Ohio River flooding?
A cooling plant on an Ohio River terrace is protected from flooding by setting chillers, pumps, variable speed drives and electrical gear on pads or upper floors above the design flood elevation, routing buried piping with anchoring against buoyancy, and placing makeup intakes and outfalls where high water cannot back up into the plant. Controls panels and motor control centers go highest of all. Paul Industries lays out the plant from the site’s flood study.
Who provides cooling for data centers at West Virginia universities and hospitals?
Paul Industries provides cooling for data centers and research computing rooms at West Virginia universities, hospitals and state agencies, from campus chilled water connections and dedicated chillers to in-row coolers and rear-door heat exchangers. Many of these rooms sit in older buildings, so the work often includes tying new cooling into an existing campus plant without interrupting the buildings it already serves. Paul Industries plans each tie-in around the owner’s operations.
Planning a cooling plant for a West Virginia data hall?
Send the IT load by phase, the redundancy target, the site and water source, and the power arrangement. Call 201-450-8280 or request a quote.