For data center cooling in New Hampshire, Paul Industries engineers, builds, starts up and maintains the whole heat path: CRAH units and containment in the room, chillers and water-side economizers in the plant, and towers, dry coolers and glycol loops outside. A Granite State plant sees Manchester heat waves above 90 F, North Country nights near minus 30 F and commercial power priced about 52 percent above the national average, so the design that wins is one that switches its compressors off for months at a time. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes cooling work across New Hampshire, in all 50 states and at sites abroad through its international projects.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Manchester design wet bulb 75.9 F exceeded 0.4% of hours (MHT, 2021-2025)
Economizer weather Wet bulb at or below 50 F for 57% of Manchester hours
Commercial power 21.40 cents/kWh in New Hampshire vs 14.04 US (EIA, Jan-Aug 2026)
Coldest hour -29 F at Berlin Regional Airport (2021-2025)
Reviewed November 2026

What shapes data center cooling in New Hampshire?

Data center cooling in New Hampshire is shaped by three facts that pull in different directions: summers in the Merrimack Valley are hotter than most buyers expect, winters in the north are severe enough to freeze any outdoor water left unprotected, and power costs about half again what the national average costs. A plant designed for the August afternoon in Manchester and the February night in Berlin, and run to make the most of everything in between, is the plant that keeps its owner’s energy bill under control.

The national mechanics of chillers, CRAH units, containment and economizers are covered on the data center cooling systems page. This page is about the Granite State: where its computer rooms are, what the weather stations say, which utility serves a site, what the 2026 debate over new campuses means for owners, and how Paul Industries plans cooling work in rooms that must stay live.

Is there a data center in New Hampshire, and where are they?

New Hampshire has roughly ten commercial data centers, concentrated in and around Manchester, according to a September 2026 Concord Monitor count that found none in Merrimack County. The commercial market is built from colocation suites and carrier rooms rather than large campuses, and one Bedford colocation site announced a roughly 25 percent expansion in March 2026 to take denser enterprise racks.

Behind those commercial rooms sit many enterprise computer rooms: hospital and university server rooms, insurance and financial back offices, manufacturing plants that run their own engineering and quality systems, and state and municipal rooms in Concord. Cooling work in a Manchester NH data center suite usually means a mix of chilled water CRAH units and older direct expansion CRAC units, on raised floor or slab, with room to add denser racks. Those rooms are where most New Hampshire cooling work happens: chiller replacements, containment retrofits, economizer additions and the first liquid-cooled racks. The same is true of a Portsmouth NH data center room on the Seacoast, where salt air adds coil corrosion to the list.

Are data centers being built in New Hampshire?

Large data centers have been proposed in New Hampshire, and the two proposals that surfaced in 2026, in Bow and Nottingham, drew organized opposition, with Nottingham’s withdrawn in May. For a cooling buyer the practical point is that existing rooms keep upgrading while the rules for new campuses are written.

The Bow NH data center interconnection request

The Bow NH data center question began with an April 2026 filing at the Federal Energy Regulatory Commission in which Granite Shore Power, owner of Merrimack Station, asked to discuss connecting a 350 megawatt project to the grid through Eversource. Merrimack Station, New England’s last operating coal-fired plant, closed in September 2025, and the site offers existing grid connections and Merrimack River access for cooling. Bow residents were petitioning in November 2026 for a town vote on a one-year moratorium.

What happened to the Nottingham NH data center?

The Nottingham NH data center proposal would have converted a vacant warehouse on Route 4, and the developer withdrew it on May 27, 2026 after heavy public opposition centered on electricity and water use. The planning board then advanced a 12-month moratorium for a town vote. Canterbury voters had already prohibited data centers at their March 2026 town meeting.

NH data center legislation for 2026 and 2027

NH data center legislation in the 2026 session went nowhere: the House killed HB 1265, a one-year construction pause, on March 11, 2026, and tabled SB 439, which would have limited towns’ power to regulate data centers, in May. For 2027, Senator Dan Innis has filed for a statewide moratorium through the end of 2027, Representative Thomas Cormen has drafted one through 2028 for facilities of 20 megawatts or more of peak load, and Governor Kelly Ayotte has said she will propose a multi-year moratorium in the next biennial budget. A New Hampshire data center moratorium written around peak load would leave the enterprise and colocation rooms described above, which sit far below 20 megawatts, outside its reach, and a hyperscale data center New Hampshire towns accept remains a question for 2027 and later.

Five New Hampshire weather stations and what they ask of a cooling plant

New Hampshire weather varies more from south to north than most cooling designers assume, and five years of hourly airport observations from 2021 through 2025 show it clearly. Manchester’s airport recorded 113 hours a year at or above 90 F, more than twice Portsmouth’s 45, while Berlin Regional Airport in the North Country fell to minus 29 F and logged 166 hours a year at or below zero.

Hourly airport observations, 2021 to 2025, computed from National Weather Service records
StationDry bulb exceeded 0.4% of hoursWet bulb exceeded 0.4% of hoursHours per year at or above 90 FHours per year at or below 0 FColdest hour
Manchester (MHT)93 F75.9 F1139-11.9 F
Concord (CON)91 F75.6 F7034-16 F
Portsmouth, Pease (PSM)90.7 F76.0 F454-12.5 F
Lebanon (LEB)91 F75.6 F6264-20 F
Berlin (BML)88 F73.4 F15166-29 F

Manchester’s hot hours vary from year to year, from 57 in 2023 to 140 in 2022, so a Merrimack Valley plant is sized for the hot years, with condensers and towers selected at or above the 0.4 percent figures and checked against a heat wave rather than an average July. The Seacoast’s wet bulb is a fraction higher than Manchester’s even though its dry bulb is lower, because sea air carries more moisture, which matters for cooling tower selection in Portsmouth, Dover and Rochester.

Winter design runs the other way. Concord and Lebanon see dozens of hours below zero each year and Berlin sees well over a hundred, and the coldest North Country spell in the record held below freezing for 492 hours straight, more than twenty days. Equipment and piping outdoors, on roofs and in unheated penthouses are protected for those conditions with glycol, heat tracing, insulation and controls that keep water moving.

How many economizer hours does a New Hampshire room get, Seacoast to North Country?

Economizer hours in New Hampshire are plentiful: the wet bulb sits at or below 50 F for 57 percent of the year in Manchester and 66 percent in Berlin, enough for a water-side economizer to carry the whole load for long stretches. Assuming roughly a 7 degree tower approach and a 3 degree plate heat exchanger approach, a 50 F wet bulb yields chilled water near 60 F, which is cold enough for most modern air-cooled IT within the ASHRAE recommended envelope.

Share of hours below economizer thresholds, 2021 to 2025
StationWet bulb at or below 50 FDry bulb at or below 40 FWhat the plant does with those hours
Manchester56.7%31.6%Water-side economizer through most of autumn, winter and spring; partial economizing in shoulder months
Concord59.3%36.9%Same pattern with a longer full-economizer season
Portsmouth56.6%31.5%Similar to Manchester; tower and coil materials chosen for coastal air
Lebanon59.8%37.8%Long economizer season; dry coolers become practical for warm-water loops
Berlin66.0%45.3%Dry coolers carry most of the year; freeze protection drives the design

The economizer hours are only as valuable as the controls that use them. Paul Industries sets the changeover so the plant moves between full economizer, partial economizer and mechanical cooling without a chilled water temperature swing, tunes the plate heat exchanger bypass and tower fan staging for winter, and raises the chilled water supply setpoint where the IT equipment allows it, because every degree of supply temperature adds economizer hours in a climate like this.

What does cooling a computer room cost on New Hampshire power?

Cooling a computer room in New Hampshire costs about 52 percent more per kilowatt-hour than the national average: commercial customers paid 21.40 cents per kWh in the first eight months of 2026 against 14.04 cents for the United States, and industrial customers paid 18.07 cents against 9.09, according to the EIA. Every 100 kilowatts of round-the-clock cooling load adds up to 876,000 kWh a year, or about $187,464 at the 2026 commercial average and $158,293 at the industrial average.

Those numbers turn small efficiency gains into real money. Improving a chiller plant by 0.1 kW per ton on an average 500-ton load saves 50 kilowatts continuously, about 438,000 kWh and $93,732 a year at the commercial average. That is why New Hampshire upgrades tend to focus on raising chilled water temperature, adding or repairing the water-side economizer, variable speed on pumps and tower fans, and containment that lets supply air run warmer. The arithmetic for your own site uses your tariff, your load profile and your utility’s demand charges, and Paul Industries builds it into every proposal.

Eversource, Unitil, Liberty, the Co-op and five town utilities

New Hampshire’s electric service is split among four distribution companies with exclusive franchise territories, Eversource, Unitil, Liberty and the New Hampshire Electric Cooperative, plus five municipal utilities in Ashland, Littleton, New Hampton, Wolfeboro and Woodsville. Eversource serves roughly 70 percent of the state’s retail customers, Unitil serves the Concord area and parts of the Seacoast, Liberty serves western and southern territory including Salem and Lebanon, and the Co-op is member-owned and outside Public Utilities Commission rate regulation.

The utility matters to a cooling design in three ways. Tariff structure and demand charges decide whether chilled water storage or load shifting pays back. Service capacity at the meter decides how much new chiller or CDU load a site can add without a service upgrade, which is often the longest lead item on a cooling project. And outage history decides how much ride-through the cooling system needs: pumps and controls on UPS, thermal storage, or chillers with fast restart. The five municipal systems sit in the Lakes Region and North Country, much of which the Co-op also serves, and there storms and long distribution lines make ride-through a design question rather than a footnote.

Above the utilities, ISO New England runs the bulk power system and wholesale market for all six New England states, and New Hampshire’s 2025 law on off-grid electricity providers, HB 672, lets a generator that serves a customer without touching the regulated grid operate outside the state’s public utility statutes. For an existing room the practical effect is small; for a new campus it adds a power route to evaluate alongside the cooling plant it would feed.

Which heat rejection suits a New Hampshire site?

Heat rejection for a New Hampshire computer room is chosen by the chilled water temperature the IT equipment accepts, the water and sound limits of the site, and how far north it sits. The table below sets out how Paul Industries weighs the common options.

Heat rejection options for New Hampshire computer rooms
OptionWhere it fitsWinter considerationsTrade-offs
Open cooling tower with water-side economizerLarger chilled water plants in Manchester, Nashua and ConcordBasin heaters, bypass to the basin, fan cycling and ice management on intake louversLowest condenser water temperature in summer; uses makeup water and needs water treatment
Closed-circuit fluid coolerSites that want evaporative performance with a clean loopCoil protected with glycol or drained; spray water drained in deep coldHigher first cost than an open tower; still uses water in summer
Dry cooler with glycolWarm-water loops, Lakes Region and North Country sites, water-limited sitesGlycol concentration set to the coldest expected hourNo water use; larger footprint and fan power on hot days
Hybrid or adiabatic dry coolerSites that want dry operation most of the year with a summer boostPads or sprays drained and isolated before freezing weatherSmall summer water use; more controls to maintain
Air-cooled chiller with integral free cooling coilSmaller rooms and rooftops where no tower is wantedGlycol in the free cooling circuit; low-ambient head pressure controlSimple to own; lower efficiency at peak than water-cooled plants

For outdoor glycol loops, propylene glycol at about 40 percent by volume has a freeze point near minus 8 F, which suits Manchester and Portsmouth, while Berlin’s coldest hour of minus 29 F calls for about a 50 percent mix or a design that keeps the outdoor loop separate from the indoor water through a heat exchanger. Higher glycol concentration costs pump energy and heat transfer every hour of the year, so Paul Industries sizes it to the site’s own weather rather than to a statewide worst case. Glycol packages and fill systems are covered on the glycol cooling systems page.

Snow, ice and sound on a New Hampshire pad

Snow drifting against dry coolers, ice on tower louvers and fan noise in a residential neighborhood all shape where heat rejection equipment goes. Paul Industries raises equipment on dunnage above expected drift depth, leaves clear space around air intakes, and selects low-sound fans or enclosures where a town’s noise limits apply, since noise was one of the concerns raised in the 2026 statewide debate over data centers.

Cooling a data center: New Hampshire rooms that stay live during upgrades

Cooling upgrades in New Hampshire computer rooms are almost always made while the room stays in service, because few owners have a second room to move into. Paul Industries plans each change under a written method of procedure: redundancy is verified before any unit is isolated, temporary cooling is connected where the margin is thin, hot taps or line stops are used where a valve is missing, and each step has a defined back-out plan.

Typical New Hampshire projects include replacing aging chillers with high-efficiency units that run at a higher leaving water temperature, adding a plate heat exchanger and controls to an existing tower plant for winter free cooling, converting CRAC rooms to chilled water CRAH units, building hot or cold aisle containment, and running supply and return headers for future liquid-cooled rows. Chiller faults and overhauls are covered under chiller repair in New Hampshire, and the full mechanical scope of a new or expanded hall under data center mechanical contractors in New Hampshire.

Under the 2024 International Mechanical Code, part of the New Hampshire State Building Code since July 1, 2026, piping must be protected against condensation on its exterior (Section 1206.11), which matters for chilled water piping run through mill buildings and above ceilings in humid summers: Manchester’s dew point is at or above 65 F for about 750 hours a year. Permit applications filed from January 1, 2027 follow the 2024 codes.

Common cooling upgrades in New Hampshire computer rooms
UpgradeWhat it changesWhere it pays backHow the room stays live
Water-side economizer added to a tower plantTowers carry the load through the plate exchanger in cold weatherEvery site south of the White Mountains with a tower plantTie-ins made at valved connections or with line stops; changeover tested before winter
Higher chilled water supply temperatureRaises chiller efficiency and adds economizer hoursRooms with containment and modern ITSetpoint raised in steps with rack inlet temperatures logged
Chiller replacementNew compressor technology and refrigerant, better part-load efficiencyMachines 20 years or older on New Hampshire tariffsOne machine at a time with redundancy confirmed; temporary chiller where needed
CRAC to CRAH conversionMoves compressors out of the room onto the central plantRooms with failing DX units and an available chilled water sourceUnits swapped one at a time; containment holds conditions
Dry cooler loop for warm-water racksServes liquid-cooled racks without chillers most of the yearRooms adding dense computeNew loop built alongside; connected at a planned window

What does data center cooling in New Hampshire cost to build?

Data center cooling in New Hampshire costs what the scope, the existing plant and the outage plan make it cost, and Paul Industries prices each job from a site survey rather than a rate per kilowatt. The main cost drivers are the size and type of chillers and heat rejection, the length and size of new piping, how many tie-ins have to be made into live systems, structural work for rooftop or pad equipment, crane picks, electrical service capacity, glycol and freeze protection, controls integration with the building management system, and the testing and documentation the owner requires.

Operating cost belongs in the same decision, because on New Hampshire tariffs a cheaper plant that runs its compressors more hours costs far more over ten years. Paul Industries presents the first cost and the energy arithmetic together, using the owner’s own utility bills, so the finance team sees the payback alongside the price. Supply-only equipment, design-build and complete installation are each priced as separate routes where the owner wants to compare them.

Who designs and builds data center cooling in New Hampshire?

Paul Industries designs, builds and services data center cooling in New Hampshire, from Manchester and Nashua colocation suites to hospital and campus computer rooms in Lebanon, Concord and Portsmouth and enterprise rooms in the North Country. The work covers chilled water plants, water-side economizers, cooling towers, dry coolers, CRAH units, containment, glycol systems, controls and the liquid cooling loops that dense racks now need.

Paul Industries, formerly based in northern New Jersey and then Pennsylvania, is headquartered in Kilmarnock, Virginia, and its data center cooling in Virginia page covers the home state. The same cold-climate approach applies across New England, including data center cooling in Massachusetts and data center cooling in Connecticut. Dense racks are covered by data center liquid cooling in New Hampshire, and startup and functional testing by data center commissioning in New Hampshire. The New Hampshire hub lists every Paul Industries service in the state.

Paul Industries cooling work for New Hampshire computer rooms

Paul Industries treats every New Hampshire computer room as its own weather and tariff problem. The plant gets the chilled water temperature its racks allow, an economizer that switches over cleanly, heat rejection picked for its station’s summer and winter, and a written energy case on the owner’s bills. Whether the job is one chiller in Keene or a new plant in Manchester, Paul Industries carries it from survey to turnover. Call 201-450-8280 or request a quote.

Standards referenced: New Hampshire State Building Code, RSA 155-A (2024 IBC, IMC and IEBC; 2018 IECC as amended) · 2024 International Mechanical Code, Section 1206.11 · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · New Hampshire HB 672 (2025), off-grid electricity providers

Frequently asked questions

Who provides cooling for data centers in Manchester and Bedford?

Paul Industries provides cooling for data centers in Manchester and Bedford, including colocation suites along the Everett Turnpike and enterprise computer rooms in the Millyard and the surrounding office parks. Manchester’s airport logged 113 hours a year at or above 90 F from 2021 to 2025, the hottest record of the five New Hampshire stations reviewed, so condensers and towers there are selected for real heat waves. Call 201-450-8280 or request a quote.

Does Paul Industries take data center cooling work in Nashua, Salem and Londonderry?

Paul Industries takes cooling work in Nashua, Salem, Londonderry, Hudson and Merrimack, where many computer rooms sit inside manufacturing plants, distribution centers and office buildings near the Massachusetts line. Typical jobs are chiller replacements, CRAC to CRAH conversions, containment and adding a water-side economizer to an existing tower plant. Southern tier sites sit in Eversource or Liberty territory, so the energy case is built on the right tariff from the start.

Who handles cooling for computer rooms in Portsmouth, Dover and the Seacoast?

Paul Industries handles cooling for computer rooms in Portsmouth, Dover, Rochester and Exeter, including rooms at the Pease Tradeport. Seacoast air carries salt and moisture, and the Pease station recorded a 0.4 percent wet bulb of 76.0 F, a fraction above Manchester’s, so coil coatings, stainless or coated tower components and tower selection get extra attention there. Unitil and Eversource both serve parts of the Seacoast.

Who services cooling plants for hospital and campus computer rooms in Lebanon and Hanover?

Paul Industries services and upgrades cooling plants for hospital, college and research computer rooms in Lebanon, Hanover and the Upper Valley. Lebanon’s airport recorded 64 hours a year at or below zero and a coldest hour of minus 20 F from 2021 to 2025, so outdoor glycol strength, heat tracing and winter changeover sequences are tested and documented before the cold arrives. Liberty serves much of the Lebanon area.

Can a computer room in Concord or Bow run its cooling on dry coolers?

A computer room in Concord or Bow can run much of its cooling on dry coolers if the IT equipment accepts warm water. Concord’s dry bulb sat at or below 40 F for 36.9 percent of the hours in the 2021 to 2025 record, and with a dry cooler sized for about a 10 degree approach, a liquid-cooled loop supplied at 90 F rejects its heat without a chiller for roughly 95 percent of Concord hours. Air-cooled rooms with 60 F chilled water still need a chiller or tower for summer.

How many data centers in New Hampshire are operating today?

About ten commercial data centers operate in New Hampshire, concentrated in Manchester, according to a September 2026 Concord Monitor count, and none were listed in Merrimack County. Hundreds of enterprise computer rooms in hospitals, universities, manufacturers, insurers and state offices sit alongside them, and those rooms account for most of the cooling work in the state.

Does NH allow data centers in every town?

New Hampshire law leaves much of the answer to towns, and several have acted. Canterbury voters prohibited data centers in March 2026, Nottingham’s planning board advanced a 12-month moratorium after a warehouse proposal was withdrawn, and Bow residents were petitioning for a vote in November 2026. SB 439, which would have limited towns’ power to regulate data centers, was tabled in May 2026, so zoning remains with the municipality.

What would a statewide moratorium mean for existing computer rooms?

The moratorium drafts filed for 2027 aim at new large facilities, with one draft using a threshold of 20 megawatts or more of peak load. Existing colocation suites and enterprise rooms in New Hampshire are far smaller, and replacing chillers, adding economizers or converting racks to liquid cooling inside them is routine building work under the state building code. Paul Industries keeps those upgrades moving while the policy debate continues.

What does a year of cooling electricity cost a New Hampshire computer room?

A year of cooling electricity costs about $187,464 for every 100 kilowatts of continuous cooling load at New Hampshire’s 2026 average commercial price of 21.40 cents per kWh, and about $158,293 at the industrial average of 18.07 cents. Real bills add demand charges and vary by utility, so Paul Industries calculates the figure from the site’s own bills and load before recommending an upgrade.

Which New Hampshire utility serves my site, and why does it matter for cooling?

Your site is served by Eversource, Unitil, Liberty, the New Hampshire Electric Cooperative or one of five municipal utilities, depending on the town. The utility sets the tariff and demand charges that decide whether thermal storage or load shifting pays, the service capacity available for new chiller load, and the outage pattern the cooling system has to ride through. Paul Industries reviews the bills and service data as part of the survey.

Should a New Hampshire plant raise its chilled water supply temperature?

Most New Hampshire plants gain by raising chilled water supply temperature, because each degree adds economizer hours and improves chiller efficiency. Rooms with good containment and modern servers often move from 45 F toward 55 to 60 F. Paul Industries raises the setpoint in steps while logging rack inlet temperatures and humidity, and adjusts coil valves and air handler settings so the room stays inside the ASHRAE recommended range.

How is cooling kept running at a North Country site through weeks below freezing?

Cooling at a North Country site keeps running through long freezes by using glycol in every outdoor circuit, heat tracing and insulation on exposed piping, minimum-flow controls that keep water moving, and heat exchangers that separate outdoor glycol from indoor water. Berlin’s record from 2021 to 2025 includes 492 straight hours at or below freezing and a coldest hour of minus 29 F, so Paul Industries tests the low-temperature alarms and sequences before winter.

Do dry coolers remove the need for makeup water at a New Hampshire site?

Dry coolers use no makeup water, because the loop is closed and the heat leaves through finned coils and fans. That makes them a strong fit where water supply is limited or where a town has raised water use in its hearings, as residents did in Nottingham in 2026. The trade-off is fan energy on hot afternoons, so many New Hampshire plants pair dry coolers with a chiller or an adiabatic boost for the warmest hours.

Can a New Hampshire owner buy a design-build cooling package from Paul Industries?

Paul Industries sells design-build cooling packages to New Hampshire owners, covering engineering, equipment, installation, startup and turnover under one contract. Owners with their own engineer’s design can buy complete installation instead, and owners who want equipment delivered for their own schedule can buy supply-only packages of chillers, dry coolers, pump skids and glycol systems. Call 201-450-8280 or request a quote.

Does the 2024 mechanical code change a New Hampshire cooling project permitted in 2027?

A New Hampshire cooling project with a permit application filed from January 1, 2027 follows the 2024 International Mechanical Code and the rest of the 2024 State Building Code, which took effect July 1, 2026 with a six-month concurrency period. Projects with complete applications filed before July 1, 2026 continue under the earlier code. Paul Industries prepares drawings and test records to the edition that governs each permit.

How does a cooling tower stay in service through a Manchester winter?

A cooling tower in Manchester stays in service through winter with basin heaters, a bypass that sends water straight to the basin when the load is light, fan cycling or variable speed to avoid overcooling, and regular checks for ice on louvers and fill. Manchester sees about 1,540 hours a year at or below freezing, so Paul Industries commissions the winter sequence before the first hard frost and trains the operators on it.

What should a New Hampshire owner send to price a cooling upgrade?

Send the IT load today and planned, the redundancy target, floor and roof drawings, the existing chiller and air handler schedules, a year of utility bills, and the outage windows the room can accept. Photos of the mechanical room and roof help. With those, Paul Industries returns a scope, a price, the energy arithmetic on your tariff and a phasing plan that keeps the room live. Call 201-450-8280 or request a quote.

Upgrading cooling for a New Hampshire computer room?

Tell us the room’s IT load, how much redundancy it carries and which utility bills it, and attach drawings if you have them. Call 201-450-8280 or request a quote.