Paul Industries works as a data center mechanical contractor in New Hampshire, building chilled water plants, liquid cooling distribution, condenser and dry cooler loops, generator fuel systems and the piping that ties them together for new halls, mill conversions and expansions of operating enterprise rooms. The state is in the middle of deciding how it wants large loads to arrive, with town hearings, a stack of bills for the 2027 session and a governor on record for a pause, so the mechanical plan has to fit a permitting path that is still being drawn. Paul Industries designs, fabricates, supplies, installs, tests and maintains that plant, and offers supply-only packages, design-build and complete installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
2026 data center bills HB 1265, HB 1739 and HB 1722 all found inexpedient to legislate
Power prices 16.82 cents/kWh industrial, 20.11 commercial (EIA, 2025)
Sales tax None on goods bought in New Hampshire (NH DRA)
Mechanical code 2024 IMC, new permit applications from January 1, 2027
Reviewed November 2026

What does a data center mechanical contractor in New Hampshire handle?

A data center mechanical contractor in New Hampshire handles everything that moves heat and fuel on a data center site: chillers, dry coolers and cooling towers, pumps and heat exchangers, chilled water and condenser water mains, coolant distribution units and secondary loops for liquid cooled racks, humidification and makeup water, generator fuel storage and day tank piping, and the controls points, testing and records that come with each system. On a New Hampshire project the same scope also carries a short list of state obligations, from the boiler and pressure vessel law to NHDES fuel tank rules and generator air permits.

The national picture of what the trade does is set out on the data center mechanical contractors page. This page stays with New Hampshire: the bills and town votes, the four electric utilities, a climate that hands owners free cooling for most of the year, power prices about double the national industrial average, and a tax structure that has no general sales tax on goods.

Are data centers being built in New Hampshire?

Data centers in New Hampshire today are mostly enterprise rooms and smaller colocation and edge facilities serving hospitals, universities, insurers, manufacturers and regional networks, and the two large campus ideas that surfaced in 2026, in Nottingham and Bow, are both at an early or paused stage. Anyone asking “is there a data center in New Hampshire” will find plenty of server rooms with their own chillers and computer room units, but no operating hyperscale campus.

The Nottingham proposal would have converted a business park on Route 4 into a data hall. Its developer withdrew the application hours before the planning board’s May 27, 2026 discussion, after 244 people signed up to speak at the hearing. In Bow, Granite Shore Power owns the closed Merrimack Station, the coal plant that shut in September 2025, and the 343 acres around it. An April filing at the Federal Energy Regulatory Commission asked to begin discussions with Eversource about connecting a 350 megawatt project, without naming the use, and a town official confirmed in September 2026 that a company had held high-level talks about a data center there. By November, residents were petitioning for a town vote on a moratorium.

A hyperscale data center New Hampshire towns would host is therefore a question for 2027 and beyond. The mechanical work being bought now is mostly expansion, refresh and densification inside existing rooms, along with feasibility and early design for owners who want a plant concept ready if the state settles its rules.

New Hampshire data center legislation: the 2026 bills and the 2027 proposals

New Hampshire data center legislation went nowhere in the 2026 session: the House found all three of the main bills inexpedient to legislate, and the lawmakers who sponsored or opposed them have filed a new set of proposals for 2027. Owners planning a hall should read the table below as the starting position, with the 2027 outcome still open.

New Hampshire data center bills and proposals, 2025 to 2027
MeasureWhat it proposedWhere it standsWhat it would mean for the mechanical plan
HB 672 (2025)A class of off-grid electricity providers that supply customers without connecting to the regulated gridBecame law in 2025Opens the door to on-site generation, which brings exhaust heat, fuel systems and recovery loops into the mechanical scope
HB 1265 (2026)Prohibit construction of data centers and study their environmental impactInexpedient to legislate, March 11, 2026No statewide ban in force
HB 1739 (2026)Energy infrastructure, economic development and workforce training for large-scale data facilitiesInexpedient to legislate, February 19, 2026No state siting or incentive framework in force
HB 1722 (2026)Consumer protections and energy classifications for large-use electric facilitiesInexpedient to legislate on a 185 to 156 roll call, March 12, 2026No large-load rate class in statute
Innis proposal (2027 session)Statewide moratorium on data center construction ending in late 2027Filed as an early proposalConstruction pause; design and studies would carry on
Cormen proposals (2027 session)Moratorium through 2028 for data centers of 20 megawatts or more at peak; a separate 30 megawatt large-load bill requiring clean on-site generation and peak demand reductionFiled as early proposalsOn-site generation and load shedding would shape plant layout and controls
Stavis proposals (2027 session)Statutory size classes, zoning board review when a building is repurposed as a 50 megawatt large-load data center, no nondisclosure agreements with town officialsFiled as early proposalsMill and warehouse conversions would face a zoning step before mechanical permits

The governor said in September 2026 that she would support a multi-year moratorium and planned to carry one in the next biennial budget, which is finalized in the summer of 2027. A New Hampshire data center moratorium is therefore a real possibility for the larger projects, while the 20, 30 and 50 megawatt thresholds in the drafts are set well above the enterprise rooms, hospital plants and university loads that make up most of today’s mechanical work. Each New Hampshire data center bill will change between filing and a floor vote, so Paul Industries plans schedules with a decision point for each measure rather than a single assumed outcome.

How town votes and planning boards shape the schedule

Town votes and planning boards decide the first months of a New Hampshire data center schedule, because zoning, site plan review and any town meeting moratorium all come before a building permit, and the mechanical permit follows the building permit. The data center in Nottingham NH residents opposed never reached a planning board vote, and Bow residents have moved to put a pause on the ballot.

For the mechanical plan, three things follow. First, noise and water use become planning questions: dry coolers and air-cooled chillers trade water for fan noise, and cooling towers trade fan noise for evaporation and blowdown, so the cooling choice is often settled in front of the planning board rather than in the design office. Second, site plan conditions on sound levels at the property line set fan speeds, enclosure design and equipment spacing. Third, long-lead equipment orders need release dates tied to permit milestones, so an owner is protected if a vote slips by a season.

Off-grid power under HB 672 and the mechanical plant

HB 672 lets an off-grid electricity provider supply a customer without becoming a regulated public utility, as long as it stays disconnected from the regulated grid, and that option changes the mechanical scope of any New Hampshire data center that takes it. Power generated on site means engines, turbines or fuel cells inside the fence, and each brings fuel delivery and storage, exhaust heat, jacket water cooling and its own air permit.

The heat is the mechanical opportunity. Jacket water and exhaust heat can drive absorption chillers, preheat makeup air, or feed a heating loop for neighboring buildings, while the generation plant itself needs cooling water, lube oil cooling and fuel conditioning. A site with no grid backup also needs more redundancy in its cooling plant, because a loss of generation and a loss of cooling arrive together. Paul Industries designs the heat recovery, fuel and cooling water systems around the generation choice, and sizes thermal storage so the cooling plant rides through a generator transfer.

Which utilities and grid rules apply to a New Hampshire data center?

Four distribution utilities serve New Hampshire, and the one that owns the wires at a site sets the interconnection study, the service voltage and the timing of the power that every chiller and pump depends on. All four sit inside ISO New England, the six-state grid that runs the wholesale market and transmission planning.

New Hampshire electric distribution utilities and what they mean for mechanical planning
UtilityTerritoryPlanning note for the mechanical scope
Eversource (Public Service Company of New Hampshire)Roughly seven in ten retail customers across most of the state, including Manchester, Nashua and the Bow siteLarge-load requests start with a viability or system impact study; equipment release dates follow the study results
UnitilThe Concord area and parts of the SeacoastSmaller system; service upgrades for a growing data room need early coordination of transformer and switchgear lead times
Liberty UtilitiesWestern and southern communitiesSame planning sequence; cooling plant staging matched to service capacity steps
New Hampshire Electric CooperativeMember-owned, rural central and northern areas and the Lakes RegionEdge and enterprise rooms at resorts, schools and plants; redundancy planned for longer rural lines

Utility territory also decides which efficiency programs an owner draws on for chillers, pumps and drives, and the co-op matters most for the smallest site type, the edge data center. NH Electric Cooperative serves the northern and Lakes Region areas where such rooms sit, and runs the statewide NHSaves programs alongside Eversource, Unitil and Liberty. Paul Industries prepares the equipment data that a pre-approval application asks for before purchase.

New Hampshire power prices and the cooling design

New Hampshire power prices make cooling efficiency worth more than in most states: in 2025 industrial customers paid an average of 16.82 cents per kilowatt-hour and commercial customers 20.11 cents, against national averages of 8.51 and 13.37 (EIA). At the industrial rate, every 1,000 kilowatts of continuous cooling-related load costs about $1.47 million a year, against about $0.75 million at the national industrial average.

The same arithmetic applies to power usage effectiveness. On a 5 megawatt IT load, each tenth of a point of PUE is 500 kilowatts running all year, or about 4.4 million kilowatt-hours, close to $737,000 a year at the 2025 industrial rate. That number is why New Hampshire designs lean toward warmer chilled water, waterside economizers with large heat exchangers, variable speed pumping, and liquid cooling that rejects heat at temperatures dry coolers can reach for most of the year. Paul Industries runs the energy case on the owner’s tariff and load profile before the equipment schedule is fixed, so the plant is chosen on lifetime cost rather than first cost.

No sales tax, the business profits tax and buying equipment

New Hampshire has no general sales tax on goods, so chillers, pumps, pipe, valves and prefabricated skids delivered to a New Hampshire site carry no state sales tax line, and the Department of Revenue Administration issues no resale or exemption certificates because none are needed. Businesses pay the Business Profits Tax at 7.5 percent and the Business Enterprise Tax at 0.55 percent, which fall on the operator’s income and enterprise value base rather than on the equipment invoice.

For the mechanical budget, the practical effect is that owner-furnished and contractor-furnished equipment cost the same in tax terms, which simplifies the choice of who buys the chillers and coolant distribution units. The decision then rests on lead time, warranty start and who carries the delivery and storage risk. Paul Industries prices both routes on request and holds the equipment schedule under one contract when it buys.

Designing for a Concord winter and a New Hampshire July

New Hampshire’s climate gives a data center long economizer seasons and a short, moderate peak: Concord’s January averages run from about 32 degrees Fahrenheit by day to 13 at night, and its July averages from 83 by day to 59 at night (NWS, 1991 to 2020). Those numbers set both the free cooling hours and the freeze protection every outdoor loop needs.

Waterside economizers, dry coolers and air-side systems can carry a large share of the annual load, especially for liquid cooled racks that accept warm supply water. The price is freeze risk. Outdoor coils and tower basins need glycol, basin heaters, drain-down provisions or indoor sumps; heat tracing and insulation go on exposed piping; and economizer heat exchangers need controls that prevent a frozen plate when the plant swings between modes on a January night. Snow load and drifting decide where yard equipment sits and how high it stands, and access paths for maintenance in deep snow belong on the yard layout. Field work in winter is planned around heated enclosures for welding, tested antifreeze for hydrotest water and delivery windows that respect spring weight limits posted on town roads.

Boilers and pressure vessels in a data center plant under RSA 157-A

New Hampshire’s boiler and pressure vessel law, RSA 157-A, reaches some of the vessels in a data center plant and exempts others, and the line matters because operating a nonexempt boiler or vessel without a valid certificate is unlawful under RSA 157-A:10. The commissioner of labor administers the program.

Several common data center vessels fall within the exemptions in RSA 157-A:6. Water-containing vessels, other than hot water heaters, with a working pressure of 125 psig or less are exempt, including those with an air cushion, which covers most chilled water expansion tanks and buffer tanks. Vessels of 5 cubic feet or less at 250 psig or less are exempt, as are vessels operating at 15 psig or below, tanks where pumps maintain the pressure, and Group I refrigerant receivers under the ASHRAE classification. Air receivers larger than the small-vessel limits, heating boilers for office space or humidification, and any vessel above those pressures need the certificate inspections the chapter requires. Paul Industries supplies ASME Section VIII vessels with their data reports and lists each vessel’s exemption basis or certificate status in the turnover records.

Generator fuel and air permits from NHDES

Generator fuel at a New Hampshire data center falls under NHDES storage rules, and the standby engines fall under the state’s air rules. The two sets of requirements are best settled together, because the tank size, the number of engines and their hours of operation are linked.

State rules that touch the mechanical scope of a New Hampshire data center
ItemNew Hampshire ruleWhat it requiresHow the mechanical scope responds
Aboveground fuel storageNHDES Env-Or 300Applies to a single aboveground system over 660 gallons, or combined capacity over 1,320 gallonsTank, containment, overfill protection, piping and leak detection designed to the chapter; day tank piping to NFPA 37 and 110
Underground fuel storageNHDES Env-Or 400Underground storage tank facility rulesDouble-wall tanks and piping, interstitial monitoring and records
Standby generatorsNHDES Env-A 1311 and Env-A 610Emergency generators limited to under 500 hours in any 12 months by an enforceable permit; a general state permit covers emergency engines within that limitFuel sizing, run-hour metering and test schedules built around the permit limit
Boilers and pressure vesselsRSA 157-ACertificate inspections for nonexempt boilers and vesselsVessel list with exemption basis or certificate status
Mechanical codeState Building Code, RSA 155-A2024 International Mechanical Code for new applications from January 1, 2027Drawings, refrigerant machinery room provisions and inspections to the edition that applies
Fuel gas and plumbingRSA 153:27 to 153:38 and Mechanical Licensing Board rulesThe board’s licensing rules for fuel gas fitting and plumbing workGas trains, humidifier water and domestic water work done and inspected under those rules

An engine that exceeds the 500-hour limit triggers a written notice to NHDES within 10 days, so run hours are tracked from the first load bank test. Paul Industries builds fuel polishing, day tank controls and metering into the fuel system so test hours and fuel turnover are recorded from startup.

Building code and labor rules on New Hampshire mechanical permits

The New Hampshire State Building Code moved to the 2024 International Mechanical Code on July 1, 2026, with a transition that lets applications filed complete before that date proceed under the earlier edition and requires every new application from January 1, 2027 to use the 2024 code. Mechanical permits and inspections are handled by the town building department where one exists; where a town has no enforcement agency, the State Fire Marshal’s office enforces the code at the town’s written request (RSA 155-A:7).

New Hampshire has no state prevailing wage law; it was repealed in 1985. Federally funded construction still falls under the Davis-Bacon Act, which matters for a data room built with federal grant money at a university or public agency. Paul Industries confirms the funding source at bid so payroll records match from the first week.

Mill buildings, enterprise rooms and edge sites

Older New Hampshire buildings, from Manchester’s Millyard to brick mills along the Merrimack, Cocheco and Contoocook rivers, are attractive for data rooms because they have floor area and river water, but they bring structural and routing limits that shape the mechanical design. Timber or masonry floors limit where heavy coolant distribution units and pump skids sit, low ceilings crowd piping, and river intakes need screening, permits and water treatment.

Enterprise rooms inside operating hospitals, labs and manufacturing plants raise a different problem: the cooling plant often serves both the data room and the building, so every tie-in has to be made without interrupting either. Paul Industries makes those connections with hot taps, line stops and temporary cooling where needed, under a method of procedure reviewed with the facility team. Edge sites in the Lakes Region and the North Country, running on rural feeders and generator backup, call for packaged, prefabricated cooling with remote monitoring and spare parts on site.

Who builds data center mechanical systems in New Hampshire?

Paul Industries builds data center mechanical systems in New Hampshire, designing, fabricating, supplying, installing, testing and maintaining the cooling plants, liquid cooling loops and fuel systems for owners, developers and general contractors. The company is headquartered at 256 Shore Drive, Kilmarnock, Virginia, was formerly based in northern New Jersey and then Pennsylvania, and takes work across New Hampshire, New England and all 50 states.

Among new hampshire mechanical contractors, owners judge data center work by a few things: the ability to prefabricate pipe racks, skids and spool pieces so field time on a constrained site stays short; weld quality and test records for chilled water mains built to ASME B31.9 or B31.3; experience connecting to live plants; and the documents that support commissioning. Paul Industries carries all of that under one contract, from the first plant concept to data center commissioning in New Hampshire. The cooling equipment choices themselves are covered on the data center cooling systems in New Hampshire page, rack-level loops on data center liquid cooling in New Hampshire, and service on existing plants on chiller repair in New Hampshire.

The same approach runs through the company’s work on data center mechanical systems in Massachusetts and Connecticut data center mechanical work, and on the campuses covered from its headquarters state on the data center mechanical contractor in Virginia page. Across the region, the pattern for data centers in New England is the same: tight sites, cold winters, high power prices and town-by-town approvals.

What does data center mechanical work cost in New Hampshire?

Data center mechanical work in New Hampshire is priced on the cooling capacity and redundancy level, the cooling technology, the share of liquid cooling, the amount of prefabrication, the fuel system, site conditions and the season the field work falls in. No published New Hampshire benchmark gives a reliable cost per megawatt for the mechanical scope alone, so Paul Industries builds a budget range from comparable scope and a firm price from drawings.

What moves the price of a New Hampshire data center mechanical package
Cost driverWhy it moves the priceWhat to send for a firm number
Capacity and redundancyN, N+1 or 2N plants change the number of chillers, pumps and mainsIT load by phase and the redundancy target
Cooling approachDry coolers, towers, air-cooled chillers and economizers differ in equipment, piping and freeze protectionBasis of design or the owner’s preference and water limits
Liquid cooling shareCoolant distribution units, secondary loops and rack manifolds add cleanliness and testing workRack densities and the liquid cooled fraction
PrefabricationRacks, skids and spools shift labor off site and shorten field timeLayout drawings early enough to release fabrication
Fuel and generationTank size, containment, day tanks and any on-site generation under HB 672Generator count, run-time target and fuel type
Existing building or millStructure, routing and live tie-ins add engineering and stagingStructural drawings, photos and shutdown windows
Winter field workHeated enclosures, freeze-safe testing and snow managementTarget start date and site access plan

Owners comparing routes can buy prefabricated racks and skids supply-only, ask Paul Industries to design and build the full plant, or have it install a plant engineered by the owner’s consultant. Each route is priced on the same scope so the comparison is direct.

Data center mechanical work from Paul Industries in New Hampshire

Paul Industries designs, prefabricates, installs, tests, starts up and services the mechanical plant for New Hampshire data centers: chilled water and condenser systems, dry coolers and towers, liquid cooling distribution, heat recovery, generator fuel systems and the process piping in New Hampshire and ASME pressure vessels for New Hampshire sites that support them. Each project carries a permit and approval plan built around the state’s rules as they stand at the time, with the records that RSA 157-A, NHDES and the building code ask for. More on the state’s industries is on the New Hampshire page and the wider region on New England. To start a plant concept, an expansion or a supply-only package, request a quote or call 201-450-8280.

Standards referenced: New Hampshire RSA 157-A (boilers and pressure vessels) · New Hampshire State Building Code, RSA 155-A (2024 International Mechanical Code) · RSA 153:27 to 153:38 and Mechanical Licensing Board rules (fuel gas and plumbing) · NHDES Env-Or 300 (aboveground petroleum storage) · NHDES Env-Or 400 (underground storage tanks) · NHDES Env-A 1311 and Env-A 610 (emergency generators) · NFPA 37 and NFPA 110 · ASME B31.9 and ASME B31.3 · ASME Section VIII · ASHRAE 90.4

Frequently asked questions

Which contractor builds data center cooling for enterprise rooms in Manchester and the Millyard?

Paul Industries builds and expands data center cooling for enterprise rooms in Manchester, including rooms inside converted mill buildings in the Millyard, where floor loads, ceiling heights and shared building plants shape every routing decision. The work covers chillers, coolant distribution units, piping and controls, with tie-ins to live plants made under a reviewed method of procedure. Call 201-450-8280 or request a quote.

Who expands data rooms at manufacturing campuses in Nashua and Merrimack?

Paul Industries expands data rooms in Nashua, Merrimack, Salem and Londonderry, where data rooms often sit inside manufacturing and office campuses along the Everett Turnpike and I-93. Typical scope includes adding cooling capacity for denser racks, converting rooms to liquid cooling, replacing aging air-cooled chillers with economizer plants and upgrading generator fuel systems to NHDES storage rules.

Who builds data center mechanical systems in Portsmouth and on the Seacoast?

Paul Industries builds data center mechanical systems in Portsmouth, Dover and across the Seacoast, including rooms at the Pease Tradeport and inside biotech and manufacturing campuses. Seacoast sites add salt air to the design brief, so outdoor coils, dry coolers and enclosures are specified with corrosion protection, and Unitil or Eversource service capacity is confirmed before the cooling plant is staged.

Does Paul Industries work on data center projects in Concord, Bow and the Merrimack Valley?

Paul Industries takes data center mechanical work in Concord, Bow, Hooksett and the rest of the Merrimack Valley, from state and hospital data rooms to early concept work for larger sites. For a large-load site the mechanical plan is staged around the utility study, the town’s planning process and any moratorium in force, with equipment release dates tied to those decisions.

Is a New Hampshire data center moratorium in force?

New Hampshire passed no statewide moratorium in 2026. The House found HB 1265, which would have prohibited data center construction, inexpedient to legislate on March 11, 2026. For the 2027 session, Sen. Daniel Innis and Rep. Thomas Cormen have filed moratorium proposals, and the governor has said she will support a multi-year pause through the next budget, so the question returns in 2027.

Which data centers in New Hampshire would the 2027 moratorium proposals cover?

The drafts aim at large loads. Rep. Cormen’s moratorium would run through 2028 for data centers drawing 20 megawatts or more at peak, his separate large-load bill sets a 30 megawatt threshold chosen to leave universities and hospitals out, and Rep. Stavis would require zoning review when a building is repurposed as a 50 megawatt data center. Enterprise rooms and most expansions sit far below those levels.

What happened to the data center in Nottingham, NH?

The developer withdrew the application for a data center at the Route 4 business park in Nottingham hours before the planning board’s May 27, 2026 discussion, after heavy public opposition over water, energy costs and noise. The proposal could return. For any revived plan, cooling choice, fan noise at the property line and water use would sit at the center of the planning board review.

Is a data center planned at Merrimack Station in Bow?

Granite Shore Power, which owns the closed Merrimack Station and 343 acres in Bow, asked the Federal Energy Regulatory Commission in April to begin discussions with Eversource about connecting a 350 megawatt project, and a town official confirmed talks with a company about a data center. No developer has been named, and residents are seeking a town vote on a moratorium.

Does HB 672 let a New Hampshire data center run its own power plant?

HB 672, which became law in 2025, lets an off-grid electricity provider supply a customer without being regulated as a public utility, provided it stays disconnected from the regulated grid. Siting, environmental and safety laws still apply. For the mechanical scope, on-site generation adds fuel systems, engine or turbine cooling and heat recovery that can drive absorption chillers or heating loops.

Does New Hampshire charge sales tax on data center cooling equipment?

New Hampshire has no general sales tax on goods, so chillers, pumps, piping and prefabricated skids delivered to a New Hampshire site carry no state sales tax. The Business Profits Tax of 7.5 percent and the Business Enterprise Tax of 0.55 percent apply to the operating business instead. With no tax difference between owner-furnished and contractor-furnished equipment, the buying decision turns on lead time and warranty.

Do chilled water expansion tanks need a New Hampshire pressure vessel certificate?

Most are exempt. RSA 157-A:6 exempts water-containing vessels, other than hot water heaters, with a working pressure of 125 psig or less, including those with an air cushion, which covers typical expansion and buffer tanks. Vessels above that pressure, larger air receivers and heating boilers fall under the certificate inspections the chapter requires. Paul Industries lists the basis for each vessel in the turnover records.

Which NHDES rules apply to generator fuel tanks at a data center?

Aboveground fuel storage falls under NHDES Env-Or 300 when a single tank system holds more than 660 gallons or several together hold more than 1,320 gallons, and underground tanks fall under Env-Or 400. Those chapters set containment, overfill protection, leak detection and registration. Day tank piping follows the NHDES guidance referencing NFPA 37 and NFPA 110.

How many hours a year can data center generators run under New Hampshire air rules?

Emergency generators covered by Env-A 1311 are limited to fewer than 500 hours in any consecutive 12 months by an enforceable NHDES permit, and the owner must notify NHDES in writing within 10 days of an exceedance. Emergency engines within that limit can operate under a general state permit. Testing, maintenance runs and real outages all count toward the total.

Does New Hampshire require prevailing wages on a data center project?

New Hampshire repealed its prevailing wage law in 1985, so a privately funded data center carries no state prevailing wage requirement. A project funded in part with federal money, such as a research computing room at a university, can fall under the federal Davis-Bacon Act. Paul Industries confirms the funding source at bid so federal payroll reporting is set up from the start where it applies.

Which mechanical code applies to a data center permit filed in New Hampshire in late 2026?

The State Building Code adopted the 2024 International Mechanical Code on July 1, 2026. Through December 31, 2026 the earlier and new editions run concurrently, and complete applications filed before July 1 may continue under the code in effect when received. Every new application from January 1, 2027 must use the 2024 edition, which governs refrigeration machinery rooms, equipment access and ventilation.

How much free cooling does a New Hampshire data center get?

A great deal. Concord’s average January low is about 13 degrees Fahrenheit and its average July high about 83 (NWS normals), so a waterside economizer or dry cooler carries the load for much of the year, and liquid cooled racks with warm supply water extend that further. At New Hampshire’s 2025 industrial rate of 16.82 cents per kilowatt-hour, those compressor-free hours are worth more than in most states.

Can Paul Industries supply prefabricated racks and skids for a New Hampshire data center without installing them?

Yes. Paul Industries supplies prefabricated pipe racks, pump skids, coolant distribution skids and spool pieces supply-only, built and tested to the project drawings and delivered with weld and test records. The same packages are available with installation, or as part of a design-build plant. Supply-only buyers receive the same documentation as installed work, so commissioning starts from complete records.

What should an owner send Paul Industries to price a New Hampshire data center mechanical package?

Send the IT load by phase, the redundancy target, the cooling basis of design or preferences, rack densities and the liquid cooled share, the site plan or building drawings, the electric utility and service status, generator count and fuel type, and the target dates. For existing buildings add photos and shutdown windows. Call 201-450-8280 or request a quote.

Planning a data hall or room expansion in New Hampshire?

Send the IT load, redundancy target, site or building drawings, utility status and target dates. Call 201-450-8280 or request a quote.