Paul Industries provides pressure vessel fabrication in New Hampshire, designing, building, testing, delivering and installing ASME Section VIII receivers, process and jacketed vessels, separators, filter housings and boiler room vessels for biologics, manufacturing, food, campus and power plants. New Hampshire’s boiler law, RSA 157-A, reaches unfired pressure vessels as well as boilers, so a new vessel is inspected during construction, carries a state certificate once installed and comes back for certificate inspections on a schedule set by its service. Paul Industries builds each vessel with the drawings, data report and test records that path requires.
Request a quote or call 201-450-8280
What does pressure vessel fabrication in New Hampshire have to satisfy?
Pressure vessel fabrication in New Hampshire has to satisfy the ASME Boiler and Pressure Vessel Code and the state’s Boilers and Pressure Vessels Law, RSA 157-A, which the Department of Labor administers through its Lab 1200 rules. The statute applies to all boilers and pressure vessels except those it lists as exempt, and it defines a pressure vessel as a vessel in which the pressure comes from an external source or from heat applied indirectly. That definition takes in air receivers, steam-heated jacketed vessels, deaerators, blowdown tanks, heat exchanger shells, filter housings and process reactors fed by pumps or compressors.
For anyone asking who regulates pressure vessels in the state, the answer is the Commissioner of Labor, who adopts rules consistent with the ASME code and the National Board Inspection Code under RSA 157-A:3 and who qualifies and licenses the inspectors. Who inspects pressure vessels is set by RSA 157-A:7: an inspector must hold an active commission from the National Board of Boiler and Pressure Vessel Inspectors and be qualified by the commissioner, with the license renewed every year. Lab 1200 took effect in readopted and amended form on September 19, 2026, and the law still points every new vessel toward ASME construction and every repair toward the NBIC.
Which unfired vessels does RSA 157-A reach, and which are exempt?
RSA 157-A reaches every unfired pressure vessel in a New Hampshire plant except the categories listed in RSA 157-A:6, and those exemptions answer the common question of at what pressure is a vessel considered a pressure vessel under state law. A vessel operating at a working pressure of 15 psig or less is outside the chapter. Small vessels drop out by size: no more than 5 cubic feet at 250 psig, or no more than 1.5 cubic feet or a 6 inch inside diameter at 3,000 psig.
The exemptions also follow service. Water-containing vessels at no more than 125 psig, including those with an air cushion, are exempt, though hot water heaters are handled separately. Tanks holding air and liquid with pressure maintained by pumps, Group I refrigerant receivers, compressed gas containers built and requalified to federal transport specifications, air tanks on vehicles and railroad air tanks, and vessels under federal or Coast Guard control sit outside the law. These state exemptions differ from the ASME pressure vessel exemptions in Section VIII, so the answer to what is considered a pressure vessel depends on which rule is asking; the code exemptions set what the construction code itself covers, and a vessel can fall outside one and inside the other.
| Exemption | Statutory limit | Plant examples | What still applies |
|---|---|---|---|
| Low pressure | Working pressure not exceeding 15 psig | Vented process tanks, low pressure condensate receivers | Section VIII where the owner specifies it, relief protection, building code |
| Small volume | 5 cu ft at 250 psig; 1.5 cu ft or 6 in ID at 3,000 psig | Small air receivers, accumulators, sample cylinders | ASME construction where the code applies; OSHA 1910.169 for air receivers |
| Water vessels | Up to 125 psig, air cushion allowed; water heaters excluded | Expansion tanks, hydropneumatic tanks, water filters | Manufacturer’s rating and relief protection |
| Pump-pressurized air and liquid | Pressure maintained by pumps | Pump-fed liquid surge vessels with an air space | Design pressure set above pump shutoff head |
| Group I refrigerant receivers | ASHRAE Group I refrigerants | Receivers on halocarbon chiller and refrigeration systems | ASHRAE 15 and the mechanical code |
| Transport and federal | Federal transport-spec cylinders, vehicle and railroad air tanks, federal control | Gas cylinders, truck air tanks | Federal rules for each |
Anything outside those limits is a covered New Hampshire pressure vessel. In practice that includes most plant air receivers above 5 cubic feet, ammonia receivers, steam-jacketed kettles and reactors, deaerators and the shells of steam-to-water heat exchangers.
Boiler and pressure vessel inspection during construction: the step New Hampshire requires
Boiler and pressure vessel inspection during construction is the step New Hampshire requires before a new vessel ever reaches the site. RSA 157-A:8 V requires pressure vessels to be installed in the state to be inspected during construction, as the commissioner’s rules require, by an inspector authorized to inspect in New Hampshire or, for a vessel built outside the state, by an inspector holding a commission or license from a state whose requirements for inspectors are substantially equal. Under ASME Section VIII that inspection runs through the build: material and procedure review, fit-up and weld checks at hold points, nondestructive examination results and the final pressure test.
RSA 157-A:4 then requires every vessel installed and operated in the state to conform to the applicable codes and to the commissioner’s construction and installation rules. Vessels of unusual design have their own permit route, described further down this page. Paul Industries builds vessels for New Hampshire service to ASME Section VIII with the Authorized Inspector involved from the first hold point, so the vessel arrives with the Manufacturer’s Data Report, nameplate and test record the state inspector checks at the first certificate inspection.
NH pressure vessel inspection requirements after installation: corrosive and non-corrosive service
An NH pressure vessel inspection after installation follows the vessel’s service, and RSA 157-A:8 sets two tracks. A vessel subject to internal corrosion receives a certificate inspection every two years. A vessel that is not subject to internal corrosion is inspected at intervals the commissioner sets, and the statute waives the internal inspection where the contents are known to be non-corrosive to the shell, heads and fittings, by their chemistry or because they are treated with a corrosion inhibitor, provided the vessel was built to the commissioner’s rules. A two-month grace period follows each interval, and the commissioner may permit longer periods.
That answers how often does a pressure vessel need to be inspected in New Hampshire, but the pressure vessel inspection requirements in the statute add a judgment that matters to designers. RSA 157-A:8 directs that the inspection requirements for operating equipment follow generally accepted practice and the actual service: the vessel’s records of performance and maintenance, its location with respect to people, the quality of operating personnel, its safety controls and its connection to other operations. Pressure vessel inspection frequency in New Hampshire therefore tracks the evidence the owner keeps. Plants that already run an API 510 pressure vessel inspection program for in service pressure vessel inspection find that its thickness data and corrosion rates fit naturally alongside the state certificate inspection.
After each inspection the inspector files a pressure vessel inspection report with the commissioner stating whether the vessel is certifiable, and a certificate costs $50 and is displayed near the vessel. A covered vessel needs that certificate before it first operates and again after each interval, since RSA 157-A:10 treats running one without a valid certificate, or above the pressure printed on it, as a criminal offense: a misdemeanor for an individual operator and a felony for a company.
| Stage | What is checked | Record that answers it |
|---|---|---|
| During construction | Materials, weld procedures, fit-up, examination, pressure test | Manufacturer’s Data Report signed by the Authorized Inspector |
| Before first operation | Nameplate, relief device set pressure and capacity, installation, supports, drains | State certificate after the first certificate inspection |
| Every two years, corrosive service | Internal surfaces where construction permits, wall thickness, nozzles, relief devices | Inspection report filed with the commissioner; renewed certificate |
| Commissioner’s interval, non-corrosive service | External condition, supports, relief protection; internal waived where the statute allows | Inspection report and evidence of non-corrosive or inhibited contents |
| After a failed inspection | The items in the inspector’s abstract and repair recommendations | NBIC repair record, completion notice to the commissioner and inspector |
| Whenever the inspector asks | Hydrostatic or other test, made by the owner under RSA 157-A:8 | Signed test record |
Pressure vessel fabrication, New Hampshire service and the build sequence
Pressure vessel fabrication for New Hampshire service follows the ASME Section VIII sequence, with the state’s inspection and certificate steps at either end. Design comes first: the data sheet sets design pressure and temperature, the minimum design metal temperature, corrosion allowance, contents, loads, nozzles and supports. Calculations then set shell and head thickness under Division 1, or under Division 2 where its design-by-analysis rules save material on large, high pressure vessels, which is where high pressure vessel fabrication earns its engineering cost.
Fabrication follows qualified procedures under ASME Section IX, with examination to the joint category and efficiency the design assumed. The pressure test closes the build: a hydrostatic test under UG-99 at no less than 1.3 times the maximum allowable working pressure, adjusted by the ratio of allowable stresses at test and design temperature, or a pneumatic test under UG-100 at no less than 1.1 times, used where water cannot be tolerated and with added examination and safety precautions. That answers how often do pressure vessels need to be tested at the factory end: once, witnessed, before the nameplate goes on; in service, the inspector decides when another test is needed.
| Step | Work | Code basis | Document for the owner |
|---|---|---|---|
| 1. Data sheet | Design conditions, MDMT, contents, nozzles, loads, finish | Owner’s specification, ASME Section VIII | Approved data sheet |
| 2. Design | Thickness, nozzle reinforcement, supports, wind and seismic anchorage | Section VIII Division 1 or 2; ASCE 7-22 through the 2024 IBC | Calculations and general arrangement drawing |
| 3. Materials | Plate, heads, forgings and pipe with traceable heat numbers; impact testing where MDMT requires it | Section II and UCS-66 | Material test reports |
| 4. Welding and examination | Qualified procedures and welders, radiography or ultrasonic examination, visual and dimensional checks | Section IX and Section VIII | Weld map, examination reports |
| 5. Pressure test | Hydrostatic or pneumatic test witnessed by the Authorized Inspector | UG-99 or UG-100 | Test record |
| 6. Nameplate and data report | Code marking, nameplate, Manufacturer’s Data Report, National Board registration where specified | Section VIII, National Board | U-1 or U-1A data report, nameplate rubbing |
| 7. Installation and first certificate | Setting, anchoring, piping, relief devices, first state inspection | RSA 157-A:8, mechanical code | New Hampshire certificate posted near the vessel |
An ASME pressure vessel inspection during construction and the state’s certificate inspection afterward look at the same vessel from two ends, and the records from the first are what make the second straightforward. Paul Industries hands both sets to the owner in one turnover package.
Which vessels New Hampshire plants buy, from Pease biologics to North Country steam
New Hampshire plants buy pressure vessels for clean utilities, compressed air, steam and process work, and the mix follows the state’s industries. At the Pease International Tradeport in Portsmouth, Lonza’s biologics site added multiple 6,000 liter bioreactors in 2018 and later planned up to eight 2,000 liter single-use bioreactors; biologics plants of that kind run clean steam generators, sterilizable buffer and media vessels, filter housings and pure water storage built to ASME Section VIII with hygienic finishes. That work ties into high-purity water systems in New Hampshire and the plant’s CIP and SIP circuits.
Along the Merrimack Valley, defense electronics and precision manufacturers with sites in Nashua, Hudson, Merrimack and Manchester run compressed air systems with large receivers, nitrogen buffer vessels and process gas separators. Food and dairy plants around Londonderry run jacketed kettles and steam-heated vessels. Campus and hospital plants, from Durham to Hanover, carry deaerators, blowdown tanks, condensate receivers and the shells of absorption chillers and heat exchangers that turn steam into hot and chilled water. Biomass and cogeneration plants add flash tanks, blowdown separators and feedwater heaters.
Designing for New Hampshire service: cold metal, snow and anchorage
Designing a vessel for New Hampshire service starts with the minimum design metal temperature, because an outdoor carbon steel vessel in the Lakes Region or the North Country sees winters well below zero degrees F. ASME Section VIII ties toughness to that temperature through the UCS-66 exemption curves, which group materials by their notch toughness and set the coldest temperature each thickness can carry without impact testing. A vessel that fails the exemption is built from impact-tested plate or a fine-grain material, which adds cost and lead time, so the MDMT belongs on the data sheet at the first quote.
Loads come next. The State Building Code adopts the 2024 International Building Code, which takes its wind, snow and seismic loads from ASCE 7-22, so an outdoor vertical vessel’s skirt, legs and anchor bolts are designed to those loads, and platforms and ladders carry the snow that sits on them. Insulation, heat tracing and drain points keep water legs, level bridles and relief valve inlets from freezing, and the nameplate is mounted where insulation will not hide it. On the Seacoast, salt air adds coating and stainless selection questions for vessels set outdoors near the water.
Inside the plant, the questions are access and service. Manways, davits and inspection openings sized for the internal certificate inspection save hours at every two-year visit, and relief devices built to ASME Section XIII are sized for fire case and blocked outlet where the process allows them.
Special design, used and non-code vessels under RSA 157-A
Special design, used and non-code vessels each have a defined path under RSA 157-A. A vessel of special design that does not fit the applicable code can be installed and operated under a special installation and operating permit, granted at the commissioner’s discretion when the design is consistent with the spirit and safety objectives of the codes. A vessel carrying the ASME or API-ASME symbol keeps the maximum allowable pressure set by the code under which it was built and stamped, and one without either symbol has its pressure computed under the National Board Inspection Code.
Used vessels can be sold, reused or reinstalled in New Hampshire once they conform to the commissioner’s rules for existing installations and have not been found unsafe on inspection. Before buying a used receiver or reactor, a plant needs the data report, the nameplate, a thickness survey and the relief device data. Paul Industries evaluates used vessels on those records, replaces nozzles or relief protection where the new service requires it, and installs the vessel for its first New Hampshire certificate inspection.
Repairs, rerates and alterations of vessels in New Hampshire service
Repairs, rerates and alterations of vessels in New Hampshire service are governed by the National Board Inspection Code, the document RSA 157-A:3 names alongside the ASME code. A welded repair restores the original design; it proceeds under the National Board R program after consultation with the inspector, and an R-1 report records it. An alteration changes the design, such as a rerate to a higher pressure or temperature, an added nozzle or a change in a pressure-retaining part, and is supported by calculations and recorded on an R-2 report with revised nameplate data.
When a vessel fails an inspection, RSA 157-A:9-a gives the owner an abstract of the requirements and the inspector’s repair recommendations, and the owner notifies the commissioner and the inspector once the repairs are done. Paul Industries prices repair, rerate and replacement side by side on that basis, including the outage and the remaining life of the shell, and carries out the chosen route with hydrostatic testing and the records the reinspection needs.
Getting a large vessel to a New Hampshire site
Getting a large vessel to a New Hampshire site is a road question for most projects and a port question for a few. Vessels within legal dimensions move by truck on the interstate network into Manchester, Nashua, Concord and the Seacoast, while oversize loads need state permits and route surveys that account for bridges, rotaries and tight mill-town streets. For the heaviest project cargo, the state’s Market Street Marine Terminal in Portsmouth, run by the Pease Development Authority’s Division of Ports and Harbors, handles project cargo alongside road salt and small cruise ships, with most of its pierside dredged to 35 feet at mean low water.
Pressure vessel shipping also shapes the design. Lifting lugs and tailing lugs are designed into the shell, saddles are checked for transport loads, nozzles are capped and flanges protected, and stainless vessels ship with their passivated surfaces sealed. Where a vessel is too large to move complete, Paul Industries builds it in sections for assembly and testing in place, with the inspection during construction carried through the field welds.
What sets the price of a New Hampshire pressure vessel?
The price of a New Hampshire pressure vessel is set by its size, design pressure and temperature, material, MDMT and impact testing, nozzle count, internals, jacket, finish, examination level, documentation and delivery. For buyers asking how much does a pressure vessel cost, the drivers rank roughly in that order: a carbon steel air receiver is a catalog-style job, while a jacketed 316L vessel with a polished interior, sanitary nozzles and full radiography costs considerably more per gallon. Impact-tested plate for a cold outdoor service, Division 2 design and field assembly add to the total.
The state adds fixed charges of its own: RSA 157-A:3-a sets an hourly rate of $100 when Department of Labor staff perform the inspection, and the certificate itself costs $50. Paul Industries offers a budget figure from the data sheet, then a firm price once the design conditions, materials and documentation are fixed. Supply-only, design-build and complete installation are all available.
Who fabricates pressure vessels in New Hampshire?
Paul Industries designs, fabricates, tests, delivers and installs pressure vessels for plants across New Hampshire, from the Seacoast and the Merrimack Valley to the Upper Valley and the North Country. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, Paul Industries is an East Coast contractor that takes pressure vessel work across New Hampshire, in all 50 states and for plants outside the United States through its international work. Among ASME pressure vessel fabricators, Paul Industries carries a vessel from data sheet to the New Hampshire certificate under one contract.
The same work runs across New England, including pressure vessel fabrication in Massachusetts and pressure vessel fabrication in Connecticut, and in the headquarters state through pressure vessel fabrication in Virginia. The national pressure vessel fabrication page covers code divisions, heads and nozzles in depth, and the New Hampshire page sets out the state’s industries and codes. Vessels connect to process piping in New Hampshire, to atmospheric storage from tank fabrication in New Hampshire, and to steam plants served by boiler repair in New Hampshire.
Pressure vessels from Paul Industries for New Hampshire plants
Paul Industries builds and installs air and gas receivers, jacketed and agitated process vessels, clean steam and pure water vessels, deaerators, blowdown and flash tanks, separators and filter housings for New Hampshire plants, with ASME construction, inspection during construction, the pressure test, the data report, relief protection and the first state certificate inspection handled as one job. Send the data sheet or the service conditions, and request a quote for the vessel.
Standards referenced: RSA 157-A, Boilers and Pressure Vessels Law · N.H. Admin. Code Lab 1200, Boilers and Pressure Vessels (readopted effective September 19, 2026) · ASME Boiler and Pressure Vessel Code, Section VIII, Divisions 1 and 2 · ASME Section IX · ASME Section XIII (pressure relief devices) · National Board Inspection Code (NB-23) · API 510 · OSHA 29 CFR 1910.169 · New Hampshire State Building Code, RSA 155-A (2024 IBC with ASCE 7-22 loads)
Frequently asked questions
Who builds clean steam and buffer vessels for biologics plants at the Pease Tradeport in Portsmouth?
Paul Industries designs, fabricates and installs clean steam vessels, sterilizable buffer and media tanks, pure water storage and filter housings for biologics and pharmaceutical tenants at the Pease International Tradeport and across the Seacoast. Those vessels are built to ASME Section VIII with hygienic finishes and the documentation a validated plant needs, and they carry New Hampshire certificates once installed.
Does Paul Industries supply air receivers and gas vessels to manufacturers in Nashua, Hudson and Merrimack?
Paul Industries supplies and installs compressed air receivers, nitrogen buffer vessels and process gas separators for electronics, defense and precision manufacturers in Nashua, Hudson, Merrimack and Manchester. Receivers above the small-volume limits in RSA 157-A:6 carry state certificates, so Paul Industries delivers each with its data report, relief valve data and drain arrangement ready for the first inspection.
Who fabricates steam and heat exchanger vessels for hospitals and campuses in Hanover, Lebanon and Durham?
Paul Industries fabricates deaerators, condensate receivers, blowdown tanks, flash tanks and steam-to-water exchanger shells for hospital and campus plants in Hanover, Lebanon, Durham and Keene. Campuses moving from steam to hot water need conversion vessels and expansion tanks sized for the new system, and Paul Industries builds them to ASME Section VIII and installs them in operating plants.
Does Paul Industries build vessels for mills and biomass plants in Berlin and the North Country?
Paul Industries builds flash tanks, blowdown separators, feedwater heater shells and air receivers for biomass, mill and manufacturing plants in Berlin and across the North Country. Outdoor vessels there are designed for some of the coldest metal temperatures in the state, with impact-tested materials where the ASME exemption curves call for them and freeze protection on every water leg.
Does a 200-gallon air receiver need a New Hampshire certificate?
A 200-gallon receiver holds about 27 cubic feet, well above the 5 cubic foot limit in RSA 157-A:6, so at normal plant air pressures it is a covered pressure vessel. It needs inspection during construction, a state certificate before it operates and certificate inspections afterward. OSHA 1910.169 also requires an ASME-built receiver with a drain, gauge and safety valve.
Does an expansion tank on a New Hampshire hot water system need a state certificate?
RSA 157-A:6 exempts water-containing vessels with a working pressure of 125 psig or less, including those with an air cushion, so most expansion and hydropneumatic tanks on heating and domestic water systems sit outside the certificate requirement. Hot water heaters are handled separately in the statute. Paul Industries sizes and installs these tanks with the relief protection the mechanical code requires.
Can a New Hampshire vessel skip its internal inspection if the contents are clean?
RSA 157-A:8 waives the internal inspection for a vessel whose contents are known to be non-corrosive to its materials, from the chemistry of the contents or from evidence of an effective corrosion inhibitor, provided the vessel was built to the commissioner’s rules. The owner keeps that evidence on file. Paul Industries documents materials and service conditions at delivery to support it.
How does an API 510 pressure vessel inspection program fit New Hampshire's certificate inspections?
API 510 sets an owner’s in-service inspection program: thickness monitoring locations, corrosion rates, remaining life and inspection dates. New Hampshire’s certificate inspection under RSA 157-A runs alongside it, and the statute lets inspection requirements reflect the owner’s performance and maintenance records. Plants with good API 510 data give the state inspector a clear picture. Paul Industries builds new vessels with marked thickness monitoring points to start that record.
Can a vessel built to a European or other non-ASME code be used in New Hampshire?
RSA 157-A:4 requires new vessels to conform to the applicable codes and the commissioner’s rules, though the commissioner can issue a special permit for an unusual design that meets the codes’ safety objectives. For an existing vessel without the ASME or API-ASME symbol, the maximum allowable pressure is computed under the National Board Inspection Code. Paul Industries builds replacement vessels to ASME Section VIII when that route is simpler.
What does National Board registration add to a pressure vessel for a New Hampshire plant?
Pressure vessel National Board registration places the Manufacturer’s Data Report on file with the National Board under the vessel’s registration number, so a copy can be retrieved if the plant’s records are lost. Owners often specify it for vessels that will move between sites or change hands. Paul Industries delivers registered vessels whenever the purchase order calls for it.
What minimum design metal temperature should an outdoor vessel in New Hampshire carry?
An outdoor vessel in New Hampshire should carry an MDMT at or below the coldest metal temperature it can see while pressurized, which in the Lakes Region and North Country means well below zero degrees F. The ASME UCS-66 curves then decide whether the chosen plate and thickness need impact testing. Paul Industries sets the MDMT with the owner at the data sheet stage.
Which relief devices go on a new pressure vessel for New Hampshire service?
A new vessel carries pressure relief devices built and marked to ASME Section XIII, set at or below the maximum allowable working pressure and sized for the worst credible case: blocked outlet, control failure, thermal expansion or external fire. The state inspector checks the device’s set pressure and capacity at each certificate inspection. Paul Industries sizes, supplies and installs the devices with the vessel.
How long does a new ASME pressure vessel take for a New Hampshire project?
Lead time depends on design approval, material availability, impact testing, finish and examination. A carbon steel receiver from standard plate moves faster than a jacketed stainless reactor or a Division 2 vessel with forged nozzles. Paul Industries sets the schedule at quote stage from the approved data sheet and confirms material dates once the order is placed.
Who pays the state inspection charges on a new New Hampshire pressure vessel?
The owner pays the state charges: $100 per hour for inspections performed by Department of Labor employees and $50 for each certificate under RSA 157-A. Inspection during construction is arranged through the Authorized Inspector at the point of manufacture. Paul Industries prepares the vessel, its records and its installation so the first certificate inspection closes in a single visit.
Can Paul Industries add a nozzle to a pressure vessel already operating in New Hampshire?
Paul Industries adds nozzles, manways and supports to vessels in service as alterations under the National Board Inspection Code, with calculations, the inspector consulted before work begins, a pressure test and an R-2 report with revised nameplate data. The work is planned into a plant outage with the vessel cleaned, isolated and gas-free before cutting starts.
What should a New Hampshire plant send to get a pressure vessel quoted?
Send the data sheet or the service conditions: contents, design pressure and temperature, MDMT, volume, orientation, nozzle list, internals, jacket, finish, examination level, relief requirements and where the vessel will sit. Add any plant specification and the target delivery date. Paul Industries returns a budget figure and then a firm price once the design is fixed.
Does a refrigeration receiver at a New Hampshire cold storage plant need a state certificate?
RSA 157-A:6 exempts receivers for ASHRAE Group I refrigerants, which covers many halocarbon chiller and refrigeration systems. Ammonia is outside Group I, so an ammonia receiver above the size and pressure limits is a covered vessel needing a state certificate. Paul Industries builds ammonia receivers to ASME Section VIII and installs them with the relief and ASHRAE 15 requirements of the system.