Paul Industries provides pressure vessel fabrication in Massachusetts, designing, building and testing ASME Section VIII vessels for biotech, pharmaceutical, food, seafood, chemical and campus utility plants, and delivering each one with the data report, nameplate and records that Massachusetts inspectors look for at the first inspection. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, this East Coast contractor builds for plants throughout the Commonwealth, from Kendall Square and Route 128 to Devens, Worcester, Lowell and New Bedford. Design, fabrication, testing, delivery, setting and piping connections sit under one contract.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Construction code 2021 ASME Section VIII, as 522 CMR adopts it
Air tanks State inspection at least every two years above 50 psi
First inspection District Engineering Inspector, then a state registration tag
Refrigeration vessels Systems of 20 tons and up inspected every year
Reviewed November 2026

What does pressure vessel fabrication in Massachusetts cover?

Pressure vessel fabrication in Massachusetts covers the design, materials, welding, examination, testing and documentation of vessels that hold gas or liquid above atmospheric pressure, built to ASME Section VIII and to the 522 CMR rules the Commonwealth applies once the vessel is in service. The work ranges from jacketed process vessels, media and buffer preparation vessels and clean steam generators in biologics plants to compressed air receivers, ammonia receivers, deaerators, blowdown separators, expansion tanks and heat exchanger shells in utility plants.

The general method, from design pressure and joint efficiency to heads, nozzles and hydrostatic testing, is laid out on the national pressure vessel fabrication page. This page stays with Massachusetts: which vessels the state inspects and tags, how the first inspection works, what the 522 CMR chapters add to the ASME code, where vessel demand sits in the state’s industries, and how a vessel is designed, delivered and set at a Massachusetts site.

What is the Massachusetts pressure vessel code?

The Massachusetts pressure vessel code is the set of 522 CMR regulations that the Board of Boiler Rules adopts under chapter 146 of the General Laws, which in turn adopt the ASME Boiler and Pressure Vessel Code for construction and the National Board Inspection Code for inspection, repair and alteration. For air tanks, 522 CMR 7.01 adopts the 2021 edition of ASME Section VIII as the construction rule, and 522 CMR 15.00 adopts the 2021 NBIC.

The Massachusetts pressure vessel regulations are organized by equipment and topic: 522 CMR 7.00 for air tanks, 9.00 for refrigeration and air conditioning systems, 10.00 for material specifications, 11.00 for welding specifications, 12.00 for fiberglass-reinforced plastic vessels, 15.00 for the NBIC and 3.00 for vessels and piping in atomic energy installations. Massachusetts boiler and pressure vessel administration sits with the Department of Fire Services, whose Boiler and Pressure Vessel Safety Program assigns District Engineering Inspectors and keeps the registration record.

Two features of 522 CMR matter at the design table. A reconstructed vessel follows the code of construction originally stamped on it, so a rebuild keeps its original Section VIII basis. And changes the Board makes that affect new construction take effect six months after filing, which lets a purchase order settle the code edition the vessel will be built to.

Which vessels does Massachusetts inspect once they are in service?

Massachusetts inspects air tanks, the vessels within refrigeration and air conditioning systems of 20 tons or more, boilers, and the other categories its 522 CMR chapters name, and each inspected object receives a registration number on a nonferrous metal tag that only a District Engineering Inspector may remove. For other unfired process vessels, the right step is to confirm the category with the Division while the vessel is still on the drawing board, because the answer decides whether a first inspection and tag are part of the startup plan.

How 522 CMR reaches common vessels at Massachusetts plants
VesselMassachusetts ruleThresholdIn-service inspection
Compressed air receiver522 CMR 7.00, under chapter 146 sections 34 and 35Design MAWP over 50 psi, inside diameter over 6 inches and volume over 1 cubic foot, each test applied per vesselAt least every two years
Ammonia receiver, oil pot or chiller shell522 CMR 9.00, under section 45ARefrigeration or air conditioning system of 20 tons or moreFirst inspection before service, then every year
Fiberglass-reinforced plastic vessel522 CMR 12.00As the chapter definesAs the chapter defines
Deaerator, flash tank or blowdown separator in a boiler plantBuilt to ASME Section VIII; boiler-side rules in 522 CMR 2.00 and 4.00 for the boilers it servesCategory confirmed with the Division at designPlanned with the boiler inspection cycle
Jacketed process vessel, reactor or filter housingBuilt to ASME Section VIIICategory confirmed with the Division at designOwner’s inspection program, with state inspection where the category applies
Pressure storage vessel over 10,000 gallons502 CMR 5.00, under chapter 148 section 37, for fluids other than waterGross capacity over 10,000 gallonsState Fire Marshal construction and use permits

The air tank threshold has a detail that catches out multi-vessel assemblies: the one cubic foot test applies to each vessel on its own, not to a group of small vessels treated as one. The air tank rules also list exemptions, among them tanks under federal control, tanks on vehicles and rail equipment, air cushions in systems that hold water, hydraulic elevator tanks and other tanks where pumps maintain the pressure, diver tanks, breathing air bottles and their filling systems for firefighting and rescue, and air tanks in electric company substations.

Massachusetts pressure vessel inspection: first inspection, tag and record

Massachusetts pressure vessel inspection starts with a first inspection made by a District Engineering Inspector of the Division, under 522 CMR 1.04, before the vessel goes to work, followed by in-service inspections on the cycle its chapter sets. For a new air receiver, the first pressure vessel inspection Massachusetts requires is where the inspector checks the nameplate against the ASME data report, confirms the relief valve setting and capacity, looks at the installation and attaches the registration tag.

Later in-service inspections of refrigeration systems may be made by a District Engineering Inspector or by an Authorized Inservice Inspector from a company authorized to insure pressure equipment in the Commonwealth. The inspection record then follows the tag number for the life of the vessel, which is why Paul Industries hands over the data report, National Board number, relief valve data and test record in one package before the inspector arrives.

What does a pressure vessel inspector do on a Massachusetts job?

What does a pressure vessel inspector do across the life of one Massachusetts vessel? Three roles appear in sequence. During fabrication, the ASME Authorized Inspector reviews the design and materials, watches the hold points, witnesses the hydrostatic test and signs the Manufacturer’s Data Report, which the code requires before the vessel can carry its code marking. At installation, the District Engineering Inspector makes the first state inspection and attaches the tag. In service, the District Engineering Inspector or an Authorized Inservice Inspector returns on the cycle 522 CMR sets and examines the vessel, its relief devices and its records.

Is there a Massachusetts pressure vessel permit?

A Massachusetts pressure vessel permit, in the sense most owners mean, is the first state inspection and registration tag rather than a separate permit document, combined with the building and fire code permits the installation itself needs. Owners asking about an MA pressure vessel permit usually need three things lined up: the state inspection and tag where 522 CMR applies, a building permit under 780 CMR, with the tenth edition of the State Building Code governing every permit issued since its concurrency period closed on June 30, 2025, and any permit the head of the fire department requires under 527 CMR 1.00 for flammable or hazardous contents.

Very large storage vessels add a fourth. A vessel of more than 10,000 gallons gross capacity holding a fluid other than water needs a State Fire Marshal permit under chapter 148 section 37 and 502 CMR 5.00, and that regulation counts mounded ASME tanks as aboveground storage tanks and lists the ASME pressure vessel inspector among those qualified to inspect them. Paul Industries identifies every permit the vessel and its setting need at the quotation stage, so the drawings and data that each application calls for are produced with the vessel rather than after it.

From data sheet to registration tag: how a Massachusetts vessel is built

A Massachusetts vessel is built through a fixed sequence that starts with the owner’s design conditions and ends with a tagged vessel in service, and knowing how are pressure vessels manufactured step by step helps an owner see where schedule and cost are set. The ASME pressure vessel requirements in Section VIII govern every step from calculation to nameplate, and the 522 CMR chapters add the material and welding specifications and the state inspection at the end.

Build sequence for an ASME Section VIII vessel bound for a Massachusetts plant
StepWhat happensRecord produced
Design conditionsDesign pressure and temperature, vacuum, minimum design metal temperature, corrosion allowance, contents and cleanability are fixed with the ownerVessel data sheet
Code calculationsShell and head thickness, nozzle reinforcement, jacket and support loads, wind and snow loads for outdoor vessels under 780 CMRCalculation package
Drawings and approvalGeneral arrangement, nozzle schedule, weld map and finish callouts reviewed by the ownerApproved fabrication drawings
MaterialsPlate, heads, forgings and pipe received against specifications and traced to their heat numbersMaterial test reports
Welding and examinationQualified procedures and welders under ASME Section IX; radiography or ultrasonic examination as the joint efficiency requiresWeld procedure and examination records
Hydrostatic testStandard Section VIII test at 1.3 times MAWP, adjusted for the stress ratio, witnessed by the Authorized InspectorTest record
Marking and data reportNameplate attached, Manufacturer’s Data Report completed and the vessel registered with the National BoardU-1 or U-1A data report and National Board number
Delivery, setting and first inspectionVessel rigged, anchored and piped; relief devices installed; District Engineering Inspector makes the first inspection where 522 CMR appliesState registration tag and inspection report

The ASME pressure vessel exemptions in Section VIII Division 1 sit in its scope paragraph, U-1(c)(2), which excludes, among others, vessels with a design pressure of 15 psi or less and vessels whose inside diameter, width, height or cross-section diagonal does not exceed 6 inches. That 6 inch dimension is the ASME pressure vessel minimum size test, and Massachusetts layers its own air tank thresholds on top: above 50 psi, over 6 inches in diameter and over one cubic foot in volume.

Where do the pressure vessels Massachusetts plants buy go to work?

Vessel demand in Massachusetts follows the state’s industrial map: biologics and cell therapy plants around Boston and along the I-495 belt, food and seafood processing on the South Coast, specialty manufacturers in the old mill cities, and the steam and chilled water plants that serve hospitals and universities everywhere.

Biologics, cell therapy and pharmaceutical plants

Massachusetts biomanufacturing sites include Bristol Myers Squibb’s biologics campus of about 89 acres in Devens with its cell therapy facility, Moderna’s technology center in Norwood, where the company announced an expansion of more than $140 million in 2025, and Sanofi’s manufacturing in Framingham. Research and pilot plants cluster in Kendall Square, Lexington and Waltham. These plants buy jacketed media and buffer vessels, vessels rated for full vacuum and steam sterilization, clean steam generators and receivers, and pressure-rated storage for purified water and water for injection, built with ASME BPE surface finishes, electropolishing and passivation. Paul Industries builds those vessels with the cleaning and sterilizing connections in mind, including the spray devices and steam paths covered on CIP and SIP systems in Massachusetts and the finishing work on passivation services in Massachusetts.

Seafood and food plants on the South Coast

New Bedford ranked first among US ports by the value of its landings for the 23rd consecutive year in NOAA’s report for 2023, driven by sea scallops, and the processing and cold storage plants around New Bedford and Fall River run ammonia refrigeration systems large enough to fall under 522 CMR 9.00. Those systems use high pressure receivers, oil pots, recirculator vessels and intercoolers, each built to Section VIII and inspected with the system every year. Food plants across the state add steam-jacketed kettles, retorts and hot water storage.

Manufacturing in Lowell, Lawrence and Worcester

Manufacturers in Lowell, Lawrence and Worcester run compressed air systems, process reactors, heat exchangers and vacuum vessels for electronics, specialty materials, plastics and medical devices. Receivers and process vessels in these plants often sit in buildings converted from older mills, which makes dimensions, floor loading and rigging paths part of the design from the start.

Hospital, university and district energy plants

Campus plants in Boston, Cambridge, Worcester and Springfield use deaerators, blowdown separators, flash tanks, condensate receivers and expansion tanks around their boilers and chillers. Those vessels are replaced or rerated alongside the boilers they serve, which is covered on boiler repair in Massachusetts.

Designing a vessel for New England service

Designing a vessel for New England service starts with the minimum design metal temperature, because carbon steel vessels placed outdoors, or fed by cold gas, have to resist brittle fracture at the coldest temperature they will see. Section VIII’s impact test rules in UCS-66 set whether the plate and weld need Charpy testing for the stated MDMT and thickness, and choosing the MDMT honestly at the data sheet stage avoids costly changes after material is bought.

Outdoor vessels also carry wind and snow loads under 780 CMR, the State Building Code, which shape skirt, leg and anchor design on tall vessels and on horizontal vessels with platforms. Coastal sites around Boston Harbor, the North and South Shores and Buzzards Bay add salt exposure, which calls for coating systems and, on stainless vessels, attention to chloride-sensitive details such as crevices under insulation. Vessels set inside older buildings bring their own limits on diameter, weight and rigging path, and Paul Industries checks the route into the building before the drawing is approved.

Repairs, rerates and relocations in Massachusetts

Repairs, rerates and relocations of vessels already in Massachusetts service follow the 2021 National Board Inspection Code as adopted in 522 CMR 15.00, with every repair pressure tested under NBIC Part 3 at a test pressure the District Engineering Inspector or Authorized Inspector approves, and air or gas testing allowed only with the Chief’s approval. A welded repair is made under the National Board R program and documented on an R-1 form, and a rerate or design change is an alteration documented on an R-2.

Owners often ask how often do pressure vessels need to be tested once they are working. Under 522 CMR 15.00 a pressure test follows every repair and routine repair, at the pressure the inspector approves, while the in-service inspection cycle covers the vessel between repairs. Relocated or used vessels need their data report and National Board number, a legible nameplate and an evaluation of their condition before they go back to work, and where 522 CMR applies, a first inspection at the new location. Paul Industries carries out the evaluation, repair or alteration, testing and paperwork so the vessel arrives at its new location ready for the inspector.

How much does a pressure vessel cost for a Massachusetts plant?

How much does a pressure vessel cost for a Massachusetts plant depends on design pressure and temperature, size, material, finish, nozzle count, jackets and internals, the examination the joint efficiency requires, and the documentation package, far more than on the state the vessel is bound for. Stainless biologics vessels with polished, passivated product surfaces and full traceability sit at the high end; carbon steel air receivers built to a standard design sit at the low end.

What moves the price of a Massachusetts vessel
FactorEffect on priceWhat the data sheet should say
Design pressure, vacuum and temperatureSets wall and head thickness and the nozzle reinforcementInternal and external design pressure, design temperature, MDMT
MaterialStainless and alloy plate and forgings raise material and welding costMaterial grade for shell, heads, nozzles and jacket
Surface finishPolishing, electropolishing and passivation add labor and inspectionProduct contact Ra, BPE designation, passivation standard
Jackets, coils and internalsEach jacket or coil is a second pressure boundary to design and testJacket type and service, agitator mounting, baffles, spray devices
ExaminationFull radiography raises joint efficiency and examination costJoint efficiency or examination level required
Setting and connectionsRigging into existing buildings, anchoring and piping tie-insSite access, foundation status and connection points
DocumentsTurnover packages for GMP plants add review and assembly timeTurnover package contents and any validation documents

Paul Industries gives a budget range from comparable vessels as soon as the data sheet arrives, then a firm price once the design is calculated and the drawings are agreed.

Who fabricates pressure vessels in Massachusetts?

Paul Industries fabricates pressure vessels for Massachusetts plants, taking each vessel from data sheet and code calculations through materials, welding, examination, hydrostatic testing, data report and National Board registration to delivery, setting, piping connections and the first state inspection. Formerly based in northern New Jersey and then Pennsylvania, Paul Industries now runs from its Kilmarnock, Virginia headquarters and builds vessels for plants in every state.

Among pressure vessel manufacturers Massachusetts buyers compare, and among ASME pressure vessel manufacturers generally, the questions that separate one offer from another are about the whole job: whether design, fabrication, testing, delivery, setting and piping sit in one contract; whether the turnover package matches what a District Engineering Inspector and a GMP quality team will ask for; and whether repairs and rerates later on run through the same records. Paul Industries answers each of them in one scope. On the question of who approves pressure vessels, the answer is layered: ASME sets the construction rules, the Authorized Inspector accepts the vessel during fabrication, and each state’s inspection program accepts it into service, which is why pressure vessel requirements by state differ mainly in the in-service step. The same work for the headquarters state is on pressure vessel fabrication in Virginia, and neighboring markets are covered on pressure vessel fabrication in New York and pressure vessel fabrication in New Jersey.

Plants that compare pressure vessel fabricators for a whole system often add the atmospheric vessels around the code vessels, covered on tank fabrication in Massachusetts, and the interconnecting pipework welded to the same standards, covered on industrial welding services in Massachusetts.

Pressure vessel fabrication and installation by Paul Industries for Massachusetts

Paul Industries designs, fabricates, tests, delivers, sets and connects ASME Section VIII vessels for Massachusetts plants: jacketed process and sterile vessels, clean steam and water vessels, air and gas receivers, refrigeration receivers, deaerators and boiler plant vessels, heat exchanger shells and filter housings. Paul Industries also repairs, rerates and relocates vessels already in service under the NBIC, and offers supply of the vessel alone, a design-build package, or complete installation with piping, insulation and startup. The state overview is on the Massachusetts page. To start, request a quote with the data sheet, a sketch of the nozzles and the site conditions.

Standards referenced: Massachusetts General Laws chapter 146 · 522 CMR 1.00 General Provisions · 522 CMR 7.00 Air Tanks · 522 CMR 9.00 Refrigeration and Air Conditioning Systems · 522 CMR 10.00 Material Specifications · 522 CMR 11.00 Welding Specifications · 522 CMR 12.00 Fiberglass-Reinforced Plastic Pressure Vessels · 522 CMR 15.00 National Board Inspection Code (2021 NBIC) · 502 CMR 5.00 aboveground storage tanks over 10,000 gallons · 780 CMR Massachusetts State Building Code, tenth edition · ASME Boiler and Pressure Vessel Code Section VIII Division 1 · ASME Section IX · ASME BPE

Frequently asked questions

Who builds jacketed process vessels for biotech plants in Cambridge, Lexington and Waltham?

Paul Industries builds jacketed process vessels for biotech and pharmaceutical plants in Cambridge, Kendall Square, Lexington, Waltham and along Route 128, including media and buffer vessels, vessels rated for full vacuum and steam sterilization, and pressure-rated purified water storage. Each vessel is built to ASME Section VIII with ASME BPE finishes where the product contacts the surface, and arrives with the data report, material records and finish documentation a GMP quality team reviews.

Does Paul Industries supply pressure vessels to plants in Devens, Marlborough and the rest of the I-495 belt?

Paul Industries supplies and installs pressure vessels for plants in Devens, Marlborough, Andover, Framingham and across the I-495 belt, from sterile process vessels in biomanufacturing to air receivers and boiler plant vessels in manufacturing and utility buildings. Paul delivers, sets and connects the vessels and prepares them for the first state inspection where 522 CMR applies.

Who fabricates ammonia receivers for seafood plants in New Bedford and Fall River?

Paul Industries fabricates ammonia receivers, oil pots, recirculator vessels and intercoolers for seafood processing and cold storage plants in New Bedford, Fall River and along the South Coast. Systems of 20 tons or more fall under 522 CMR 9.00, with a first inspection before service and inspections every year, so Paul builds each vessel to Section VIII with the relief, nameplate and records the system inspection needs.

Does Paul Industries build vessels for manufacturers in Lowell, Lawrence and Worcester?

Paul Industries builds vessels for manufacturers in Lowell, Lawrence, Worcester and the surrounding region, including compressed air receivers, process reactors, vacuum vessels and heat exchanger shells. Many of these plants occupy converted mill buildings, so Paul checks door sizes, floor loading and rigging paths before the vessel dimensions are fixed, and sets and connects the vessel once it arrives.

How often do pressure vessels need to be inspected in Massachusetts?

The interval depends on the category. An air tank that passes all three size tests (over 50 psi, over 6 inches across, over one cubic foot) is due for state inspection at least once every two years, and a refrigeration or air conditioning system rated at 20 tons or more is inspected annually under 522 CMR 9.00. Other process vessels follow the owner’s inspection program and any state category confirmed with the Division at design.

Is a pressure vessel a boiler under Massachusetts law?

A boiler generates steam or heats water with fire, electricity or another heat source, while an unfired pressure vessel holds a fluid under pressure without that heat input of its own. Massachusetts writes separate chapters for them: 522 CMR 2.00 and 4.00 for boilers, and 7.00, 9.00 and 12.00 for air tanks, refrigeration systems and fiberglass vessels. Vessels attached to a boiler plant, such as deaerators, are built to Section VIII.

Does a compressed air receiver in Massachusetts need a state tag?

A receiver needs state inspection and a registration tag when its design pressure exceeds 50 psi, its inside diameter exceeds 6 inches and its volume exceeds one cubic foot, unless it falls under one of the listed exemptions. A District Engineering Inspector makes the first inspection and attaches the tag, and the receiver is reinspected at least every two years. Paul Industries supplies receivers with the ASME data report and relief valve data ready for that inspection.

Which air tanks fall outside the Massachusetts pressure vessel regulations?

The air tank chapter lists exemptions for tanks under federal control, tanks on locomotives, rail cars and motor vehicles, air cushions in systems containing water or other liquids, tanks where pumps maintain the pressure such as hydraulic elevator tanks, diver tanks, breathing air bottles and their supply systems for firefighting and rescue, and air tanks in electric company substations. Each vessel is judged on its own against the size thresholds.

When are chiller shells and ammonia receivers inspected as part of a refrigeration system?

Refrigeration and air conditioning systems of 20 tons or more are inspected before they go into service by a District Engineering Inspector or an Authorized Inservice Inspector, and then every year under 522 CMR 9.00. The shells, receivers and relief devices are examined as part of the system. Paul Industries builds replacement receivers and shells to Section VIII and documents relief capacity so the next system inspection goes smoothly.

Can a used vessel from another state go into service in Massachusetts?

A used vessel can go back to work when its history is complete: the ASME data report, the National Board number, a legible nameplate, and an evaluation showing its condition supports the intended service. Any repair or alteration follows the NBIC as adopted in 522 CMR 15.00, and regulated categories get a first inspection by a District Engineering Inspector at the new site. Paul Industries evaluates, repairs, tests and documents relocated vessels.

What does the ASME data report tell a Massachusetts inspector?

The Manufacturer’s Data Report, usually a U-1 or U-1A for Section VIII Division 1, records the design pressure and temperature, MDMT, materials, thicknesses, joint efficiency, examination, hydrostatic test pressure and the National Board number. The inspector compares it with the nameplate and the installation before attaching the state tag. Paul Industries supplies the report with every code vessel and keeps a copy for later repairs or rerates.

Does a large ammonia or propane storage vessel need a State Fire Marshal permit?

A storage vessel with a gross capacity above 10,000 gallons that holds a fluid other than water falls under chapter 148 section 37 and 502 CMR 5.00, which requires permits from the State Fire Marshal to construct, maintain and use it, and which counts mounded ASME tanks as aboveground storage tanks. Paul Industries prepares the vessel drawings and data that the permit application and the later use inspections draw on.

What design temperature should an outdoor carbon steel vessel in Massachusetts carry?

The minimum design metal temperature should reflect the coldest metal temperature the vessel will see, from winter air or from cold process gas, and not just the operating temperature. Section VIII’s UCS-66 rules then decide whether plate and welds need impact testing for that MDMT and thickness. Paul Industries sets the MDMT with the owner at the data sheet stage, before material is ordered.

What sets the schedule from purchase order to a tagged vessel in Massachusetts?

Engineering and drawing approval, material availability for the shell, heads and forgings, finish and passivation work on stainless vessels, and the inspection hold points set the schedule, followed by delivery, setting and the state’s first inspection. Owners shorten it by fixing design conditions early, approving drawings promptly and confirming the inspection category with the Division at the design stage. Paul Industries gives a schedule with the quotation.

Can Paul Industries add a nozzle or rerate a vessel already in Massachusetts service?

Paul Industries adds nozzles, manways and supports and rerates vessels in Massachusetts service as alterations under NBIC Part 3. The work includes design calculations, welding under the National Board R program, examination, a pressure test at the pressure the inspector approves and an R-2 report, with the nameplate data updated to match. The vessel keeps its original code of construction as 522 CMR requires.

What surface finish should a vessel for a Massachusetts cell and gene therapy suite specify?

Product contact surfaces are usually specified by an ASME BPE surface finish designation with a maximum roughness average, often with electropolishing, followed by passivation and documentation of both. Non-product surfaces and jackets carry a lower finish. Paul Industries agrees the finish, weld finishing, borescope inspection and passivation records with the owner’s quality team before fabrication begins.

What does Paul Industries need on the data sheet to quote a Massachusetts vessel?

Send the contents, design pressure and vacuum, design temperature and MDMT, capacity and preferred dimensions, material, corrosion allowance, finish, jackets and internals, a nozzle list with sizes and ratings, supports, and whether the vessel sits indoors or outdoors and where in Massachusetts. Paul Industries returns a budget range quickly and a firm price once the design is calculated.

Need a code vessel built for a Massachusetts plant?

Send the data sheet with design pressure, temperature, contents, material and nozzle list, plus the site and setting conditions. Call 201-450-8280 or request a quote.