Paul Industries designs, installs and services data center cooling in North Dakota, building economizer chilled water plants, dry coolers, cooling towers and the distribution mains that move rejected heat from each hall to the yard, for owners in Fargo, Bismarck, Grand Forks, Jamestown, Ellendale and the Harwood area. North Dakota gives a cooling plant thousands of cold, dry hours a year and then asks it to survive weeks of subzero air. Paul Industries lays out each plant so it runs with its compressors off for most of the year, holds design temperature on the hottest afternoon and keeps every outdoor coil, basin and header safe from freezing.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Fargo air below 50 F 4,951 of 8,760 hourly normals (NOAA, 1991-2020)
Peak hourly dew point normal 62.0 F at Fargo, 59.9 F at Bismarck (NOAA)
Commercial power 7.36 cents/kWh in 2025, US 13.37 (EIA)
Industrial water use State appropriation permit required (NDCC 61-04-02)
Reviewed November 2026

What does data center cooling in North Dakota involve?

Data center cooling in North Dakota involves the same three jobs as anywhere else, which are moving heat off the IT equipment, carrying it to the edge of the building and rejecting it to the outdoors, but the balance between those jobs is unusual here. Outdoor air at Fargo sits below 50 degrees Fahrenheit for 4,951 of the 8,760 hourly normals in a year, so heat rejection without refrigeration is the normal operating state and mechanical cooling becomes the backup for warm, humid summer afternoons. The design challenge moves from saving compressor energy to managing the cold: glycol concentration, coil freeze protection, snow on heat rejection equipment and controls that change modes without upsetting supply temperature.

Plant types, redundancy schemes and efficiency metrics in general are explained on the national data center cooling systems page. What follows covers the North Dakota specifics: the hourly climate record, the water rules, the campuses being built and the decisions that follow from them.

How many hours can a North Dakota hall run without compressors?

A North Dakota hall can run without compressors for well over half the year, because NOAA’s 1991 to 2020 hourly normals put more than 4,900 hours a year below 50 degrees at Fargo, Bismarck, Jamestown, Minot and Williston alike. A chilled water plant that supplies 65 degree water to the halls, with heat rejection sized for a few degrees of approach, can carry the whole load on dry coolers or towers during those hours. Plants built around warmer water for direct liquid cooling stretch that window further into spring and autumn.

North Dakota cooling climate from NOAA 1991 to 2020 normals
StationHourly normals below 50 FHourly normals at or below 32 FDays a year at or below 0 FDays a year at or above 90 F
Fargo (Hector International)4,9513,21441.711.2
Bismarck5,0353,21436.720.5
Jamestown5,1343,34841.39.0
Minot5,1063,27538.513.4
Williston5,1833,32442.221.4

Hourly normals are averages, and real years swing wider in both directions. The 10th percentile hourly value at Fargo drops to minus 16.1 degrees in the coldest part of winter, and Williston’s reaches minus 18. A free cooling data center design therefore has two limits to respect: the warmest summer hours, which size the mechanical plant, and the coldest winter nights, which size freeze protection, heaters and control logic. Paul Industries runs both checks against the site’s own station data before selecting equipment.

The same numbers show why the mechanical cooling plant in a North Dakota hall rarely sees full load. Hourly normals at Bismarck never reach 85 degrees, and Fargo’s top out near 80. Chillers still need full capacity for the hottest days of a real summer, but they spend most of their life idle or at low load, which shifts attention to low-load stability, oil return and the start sequence after a long winter standby.

Why dry air changes the heat rejection choice

Dry air changes the heat rejection choice because evaporative cooling gains little over dry cooling when the outdoor dew point stays low, and North Dakota’s dew points are low for most of the year. The peak hourly dew point normal is 62.0 degrees at Fargo, 59.9 at Bismarck and 57.0 at Williston, and the western half of the state sees far fewer humid hours than the Red River Valley. Fargo logs 1,821 hourly normals with a dew point at or above 55 degrees; Williston logs 325.

That pattern favors dry heat rejection, with water used only on the hottest afternoons if at all. An adiabatic dry cooler sprays or wets pads in front of the coil to cool the entering air for those few hours and runs dry the rest of the year, which keeps water use small while trimming the size of the coil. In the east, where humid July nights are more common, the gap between dry bulb and wet bulb is wider and an open cooling tower earns more of its keep. Paul Industries runs the hour-by-hour comparison for the specific county before recommending either.

Dry cooler vs cooling tower on a North Dakota campus

The choice of dry cooler vs cooling tower on a North Dakota campus comes down to water rights, winter operation and how warm the facility water can run. People who ask what is a dry cooler are usually looking at the same trade: a dry cooler is a finned coil with fans that rejects heat from a closed glycol or water loop directly to the air, with no evaporation, while a cooling tower evaporates part of the condenser water to cool the rest. The table sets out how each behaves in a North Dakota year.

Heat rejection options for a North Dakota data hall
OptionWater useWinter behaviorWhere it fits in North Dakota
Dry cooler on a glycol loopNone in normal operationGlycol protects the coil; fans step down or stop on cold nightsHalls with warm facility water and direct liquid cooling; sites without a large water permit
Adiabatic dry coolerSmall, on hot afternoons onlyWetting system drained and isolated before the first frostMost of the state, where humid hours are few and short
Open cooling tower with plate exchangerContinuous evaporation plus blowdown in warm monthsBasin heaters, bypass to the basin, fan cycling and ice controlLarge plants in the Red River Valley with a secure water source
Closed-circuit fluid coolerSpray water in summer, dry in winterCoil holds glycol; spray section drained in the cold monthsMid-size halls that want evaporative help without opening the loop
Air-cooled chiller with free cooling coilNoneIntegral economizer coil carries the load once air is cold enoughEdge sites and smaller enterprise rooms in Bismarck, Minot and Grand Forks

A dry cooler for data center duty in this climate needs more than a catalog selection. Coils face drifting snow, hoarfrost and wind, so Paul Industries sets units on raised steel with clear space beneath and around them, spaces rows to keep discharge air from recirculating into neighboring intakes, and checks fan motors and controls for starting at the coldest design hour. Glycol strength is set from the site’s design low and from whether the owner wants burst protection only or full freeze protection, and the pumps and exchangers are sized for the extra viscosity of cold glycol.

Data center cooling water and the state water permit

Data center cooling water in North Dakota is governed by the state’s appropriation law, under which any industrial use of surface water or groundwater needs a water appropriation permit from the Department of Water Resources before the water is put to use (NDCC 61-04-02). Permitted industrial users also file an annual water use report, due by March 31. A campus that buys its water from a city works within the city’s own permit and rates instead; in both cases the volume an evaporative plant needs is a planning item, not a footnote.

Evaporation is easy to estimate. Each pound of water evaporated carries away roughly 1,000 Btu, so a tower rejecting one megawatt evaporates on the order of 3,400 pounds, or about 410 gallons, an hour before blowdown is added. A dry or adiabatic plant removes almost all of that, which is why closed loop data center cooling water usage is measured in fill and top-off volumes rather than gallons per minute. Several North Dakota campuses are being designed that way.

Water quality matters as much as quantity. Fargo draws on the Red River and the Sheyenne River and reports that Red River water is hard, averaging 17 grains per gallon before the city softens it to a target of 7; the water is ozonated, filtered and dosed with chloramine before distribution. Tower makeup from that supply still carries enough hardness to set cycles of concentration, and closed loops filled from it need treatment before glycol goes in. Blowdown leaving the site is an industrial discharge: Bismarck, Fargo, Grand Forks, Mandan and West Fargo run their own pretreatment programs, and the state Department of Environmental Quality regulates discharges in other cities. The ultrapure water systems in North Dakota page covers treatment trains that produce fill water for sensitive loops.

North Dakota data center campuses and what they show designers

North Dakota data center construction is concentrated in a few large campuses, and their published designs show where cooling in the state is heading. Applied Digital’s Polaris Forge 1, the Ellendale, North Dakota data center campus, had 250 megawatts of critical IT load operating across two buildings and ten data halls by October 2026, is contracted to reach 400 megawatts, and has a third 150 megawatt building under construction. The company describes the design as a closed-loop, waterless, direct-to-chip cooling system with a projected PUE of 1.18 and water use near zero, and it credits the state with more than 220 days a year of free cooling.

The same owner runs a 106 megawatt hosting facility at Jamestown and a 180 megawatt hosting facility at Ellendale, and its Polaris Forge 2 campus near Harwood, north of Fargo, is under construction with initial operation expected by the end of 2026. People searching is there a data center in Fargo ND usually mean that Harwood site, alongside the enterprise, hospital, university and carrier rooms that already operate in the metro. Those named campuses are market facts about data centers in North Dakota, cited to show the design direction; the cooling work described on this page is what Paul Industries delivers for any owner building or upgrading a hall in the state.

The lesson for smaller projects is that the big campuses chose warm-water liquid cooling and dry heat rejection because the climate rewards it. A 2 megawatt enterprise hall or a Jamestown ND data center expansion can take the same approach at a smaller scale: warmer supply water, a dry or adiabatic heat rejection yard, and a small trim chiller for the hottest days. For rack-level loops and coolant distribution units, see data center liquid cooling in North Dakota.

Designing a cooling plant for minus 16 degree nights

Designing a cooling plant for minus 16 degree nights means treating every component that holds water or sits outdoors as a freeze risk, from the dry cooler coil to the cooling tower basin and the last section of exposed header. Paul Industries designs the protection into the layout before equipment is ordered rather than adding it after a coil splits.

  • Outdoor loops run on propylene glycol at a strength set from the site’s design low, with a fill and makeup station that blends and logs it.
  • Cooling towers get basin heaters, a bypass to the basin for startup in cold weather, fan cycling and reversing for ice control, and drainable makeup lines.
  • Plate exchangers that separate a tower loop from the building loop get low-temperature protection on the tower side so the plates stay above freezing through a cold start.
  • Exposed piping, valve stations and instrument lines get heat tracing and insulation sized for wind as well as temperature.
  • Chillers that sit idle all winter get a standby routine: oil heaters energized, evaporators drained or glycol protected, and a spring start-up under load.

Controls carry the other half of the job. A plant that swings between full mechanical cooling, partial economizer and full economizer several times on a spring day has to change modes without a jump in supply temperature, and in winter it has to keep enough heat in the loop to stay above the glycol’s safe range. Paul Industries writes and tests those sequences with the plant, including the response to a power interruption at minus 20.

Which data center cooling methods suit North Dakota?

The data center cooling methods that suit North Dakota are the ones that make the most of cold, dry air while protecting the plant from freezing, and the table compares the main types of data center cooling on that basis. Most new halls in the state combine two or three of them.

Data center cooling methods judged against a North Dakota year
MethodHow it uses the climateWhat to watch in North Dakota
Water-side economizer on a chilled water plantDry coolers or towers carry the load through a plate exchanger whenever outdoor air is cold enoughChangeover sequences, glycol on the outdoor side, cold-start protection for the exchanger
Direct air-side economizerOutdoor air enters the hall directly once filtered and mixedVery dry winter air drives static and humidification needs; mixing must temper subzero air; filters load with dust from fields and roads
Indirect evaporative air handlerOutdoor air cools the hall air through a heat exchanger, with evaporative assist in summerFreeze protection of the wet section; drainage in winter
Direct liquid cooling on warm waterFacility water at 85 degrees or more can be cooled by dry coolers for nearly every hourCoolant distribution units, water quality, leak detection, backup heat rejection for the residual air load
Air-cooled chillers with integral free coolingBuilt-in coils carry the load in winter with compressors offGlycol in the chiller loop, low-ambient kits, snow clearance around units

The question are data center cooling systems closed loop has a simple answer in this climate: the loops that serve the halls are closed, and the open part, if there is one, is the tower water on the far side of a heat exchanger. Closed loop data center cooling with dry coolers removes even that, at the cost of a larger coil yard and slightly warmer supply water on the hottest days. Paul Industries prices both so the owner sees the trade in equipment, land, water and power.

Power prices and the cooling overhead

Power prices shape the cooling overhead because every fraction of PUE is paid for at the utility rate, and North Dakota’s rate is low by national standards. The EIA’s 2025 average commercial price in the state was 7.36 cents per kilowatt-hour against 13.37 nationally. On a 10 megawatt IT load, each 0.1 of PUE is about 1 megawatt of continuous demand, or 8,760,000 kilowatt-hours a year, worth roughly $644,736 at the state average commercial price.

A low rate stretches the payback on some efficiency features, but the cold climate makes the efficient choice cheaper to build here as well, because the economizer side of the plant carries the load for most of the year and the chillers can be sized as trim units. Three investor-owned utilities serve North Dakota (Montana-Dakota Utilities, Xcel Energy through Northern States Power, and Otter Tail Power), cooperatives such as Cass County Electric serve rural sites, and the state’s utilities belong to two grid operators, MISO and SPP. The utility and its large-load terms set the power delivery date, which in turn sets when the cooling plant has to be ready for its first load; the data center mechanical contractor in North Dakota page goes into that sequence.

Codes and data center cooling requirements in North Dakota

Data center cooling requirements in North Dakota come from the State Building Code, federal refrigerant rules and the owner’s own standards. The state code is built on the International Building Code, International Mechanical Code and International Fuel Gas Code; the 2024 editions, along with the 2024 International Energy Conservation Code, were adopted in September 2025 and took effect on January 1, 2026. Cities, counties and townships that choose to enforce a building code must use the state code, with their own amendments, so the permit, the plan review and the mechanical inspection come from the jurisdiction where the hall sits.

On the federal side, the EPA’s Technology Transitions rule limits refrigerants in new data center and IT cooling equipment to a global warming potential below 700 for products manufactured or imported from January 1, 2027, and stand-alone comfort cooling chillers have been under the same limit since January 1, 2025. Machinery rooms for chillers follow ASHRAE 15 through the mechanical code. Those data center cooling regulations shape equipment selection now, because a plant designed in 2026 will buy most of its equipment after the 2027 date.

How does data center cooling work in a cold-climate hall?

Data center cooling in a cold-climate hall works by moving heat from the servers into air or liquid, carrying it to a heat exchanger or coil, and rejecting it outdoors, with refrigeration added only when the outdoor air is too warm to do the job alone. In a typical North Dakota plant, the halls receive chilled or warm facility water from a central loop. On a winter day that loop rejects its heat through a plate exchanger to a glycol loop and dry coolers, with the chillers off. As spring arrives, the plant enters partial economizer, where the outdoor side pre-cools the return water and the chillers trim the remainder. On the warmest summer afternoons the chillers carry the load and the dry coolers or towers serve as their condensers.

That sequence is where a data center cooling strategy succeeds or fails. The switch points, deadbands and valve timing decide whether the plant spends 50 hours or 500 hours a year in the awkward partial mode. Paul Industries tunes those settings against the site’s hourly normals at design and then against the first year of trend data, and the data center commissioning in North Dakota page explains how each mode is proven before the hall takes load.

Data center cooling design across the state

Data center cooling design in North Dakota varies with the region, because the Red River Valley, the central plains and the western oil country differ in humidity, water supply and wind. Data center cooling in Fargo and Grand Forks deals with more humid summers than the west of the state, hard river water and long, cold winters, so towers there need careful water treatment and robust ice control. Data center cooling in Bismarck and Mandan sees drier summers with more hot days, which favors dry and adiabatic heat rejection. Jamestown and the Ellendale area sit between the two, with long cold seasons and campuses large enough to justify dedicated heat rejection yards.

Smaller rooms matter as well. A Bismarck data center serving a hospital, a state agency or a utility control center often runs on air-cooled chillers or split systems that were never designed for economizer operation. Paul Industries adds free cooling coils, replaces aging chillers with units that include integral economizers, and reroutes piping so the room’s data center cooling infrastructure grows with the next expansion. Owners with process cooling elsewhere in the building can see the chiller repair in North Dakota page for the repair side of that equipment.

What does data center cooling cost in North Dakota?

Data center cooling in North Dakota costs what the IT load, the redundancy level, the heat rejection method and the water source require, and Paul Industries prices each plant from the owner’s load profile rather than from a rule of thumb per megawatt. The main cost drivers are the share of the load carried by direct liquid cooling, the supply water temperature, the number and size of dry coolers or towers, the redundancy target for chillers and pumps, glycol volume and freeze protection, controls, and the phasing of later halls.

Climate cuts both ways on cost. Warmer supply water and a dry heat rejection yard reduce chiller tonnage and remove most water treatment, but they add coil area, glycol and the winter protection that goes with it. The energy side is easier to state: with commercial power at 7.36 cents per kilowatt-hour in 2025, every 0.1 of PUE on a 10 megawatt load is worth about $645,000 a year. Paul Industries gives a budget range from comparable scope once the load and redundancy are known, then a firm price once drawings and the equipment list are settled. Supply-only equipment packages, design-build plants and complete installation of an engineer’s design are all available routes.

Who installs data center cooling in North Dakota?

Paul Industries installs data center cooling in North Dakota: chilled water plants with water-side economizers, dry and adiabatic coolers, data center cooling towers, plate exchangers, pumps, glycol systems, distribution piping to the halls and the controls that tie them together. Owners looking for data center cooling contractors in the state get design, prefabrication, installation, testing, start-up and service under one contract. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, Paul Industries is an East Coast firm whose North Dakota projects sit alongside work in every one of the 50 states and international plant projects.

The Virginia counterpart, data center cooling in Virginia, covers a humid market where the economics run the other way, and data center cooling in Wisconsin covers another northern climate with a different water and code picture. The Midwest page sets North Dakota alongside the other states Paul Industries serves in the region, and the North Dakota hub lists the process and utility work the company takes across the state.

Data center cooling from Paul Industries for North Dakota halls

Paul Industries designs, fabricates, installs, starts up and maintains cooling plants for North Dakota data halls, from a single enterprise room in Minot to a multi-building campus near Ellendale or Harwood. Send the IT load by phase, the cooling method under consideration, the water source and the redundancy target, and request a quote to start the design.

Standards referenced: North Dakota State Building Code (2024 IBC, IMC, IFGC and IECC, effective January 1, 2026) · NDCC 61-04-02 water appropriation permits · EPA Technology Transitions rule (40 CFR Part 84) · ASHRAE 90.4 · ASHRAE TC 9.9 thermal guidelines · ASHRAE 15 · ASME B31.9

Frequently asked questions

Who builds data center cooling plants in Fargo, West Fargo and the Harwood area?

Paul Industries builds data center cooling plants in Fargo, West Fargo and the Harwood area, including economizer chilled water plants, dry cooler yards, towers with plate exchangers and the distribution piping to each hall. Red River Valley sites see more humid summers than western North Dakota and hard river water, so Paul Industries pairs heat rejection selection with a water treatment plan and freeze protection for every outdoor component.

Does Paul Industries handle data center cooling in Bismarck and Mandan?

Paul Industries handles data center cooling in Bismarck and Mandan for hospital, state agency, utility and enterprise rooms as well as larger halls. Central North Dakota has drier summers with more 90 degree days than the Red River Valley, which favors dry and adiabatic heat rejection. Typical work includes adding free cooling coils, replacing chillers with economizer units and extending piping for new rows.

Who installs cooling for data halls near Jamestown, Ellendale and Grand Forks?

Paul Industries installs cooling for data halls near Jamestown, Ellendale and Grand Forks, from heat rejection yards and glycol loops to chiller plants and controls. These sites see more than 40 days a year at or below zero, so equipment is set on raised steel clear of drifting snow, glycol strength is set from the design low, and every mode change is tested for cold-weather starts.

What economizer hours can a North Dakota data center expect?

NOAA’s 1991 to 2020 hourly normals put between 4,951 and 5,183 hours a year below 50 degrees at Fargo, Bismarck, Jamestown, Minot and Williston. A plant supplying 65 degree water can run without compressors through most of those hours, and a warm-water liquid cooling plant can extend the window well into spring and autumn. Paul Industries models the hours for the exact site before sizing the chillers.

Does a North Dakota data center need a water permit for cooling towers?

Any industrial use of surface water or groundwater in North Dakota needs a water appropriation permit from the Department of Water Resources under NDCC 61-04-02, and permitted industrial users report annual use by March 31. A site buying water from a city works under the city’s supply instead. Paul Industries estimates evaporation and blowdown early so the water source and permit fit the plant.

How much water does a cooling tower use per megawatt in North Dakota?

A cooling tower evaporates roughly 3,400 pounds, or about 410 gallons, of water an hour for each megawatt of heat it rejects, because each pound evaporated removes about 1,000 Btu. Blowdown adds to that figure depending on makeup water hardness. In North Dakota the tower runs only part of the year when dry coolers carry winter load, which cuts annual use sharply.

What glycol concentration does a North Dakota dry cooler loop need?

Glycol strength for a North Dakota dry cooler loop is set from the site’s design low temperature and from whether the owner wants burst protection, which tolerates slush without splitting pipe, or full freeze protection, which keeps the fluid pumpable. Hourly 10th percentile values reach minus 16 at Fargo and minus 18 at Williston, so most loops run propylene glycol at a strength chosen for that range, with pumps and exchangers sized for the higher viscosity.

Is an adiabatic dry cooler worth it in western North Dakota?

An adiabatic dry cooler suits western North Dakota well because the air is dry and hot hours are few. Williston logs only 325 hourly normals a year with a dew point at or above 55 degrees, so wetting the inlet air for a few afternoons trims coil size substantially while annual water use stays small. The wetting system is drained and isolated before the first frost each autumn.

Can an existing North Dakota hall add free cooling without replacing its chillers?

Most existing halls can add free cooling by installing a plate exchanger or dry cooler loop in parallel with the chillers, so the outdoor side pre-cools return water and carries the full load in winter. Older air-cooled chillers can be paired with separate free cooling coils. Paul Industries plans the tie-ins around redundancy so the hall keeps its cooling capacity while the new equipment is connected.

What does the 2026 North Dakota State Building Code change for cooling plants?

The North Dakota State Building Code moved to the 2024 International Mechanical Code and the 2024 International Energy Conservation Code on January 1, 2026. Projects permitted after that date are reviewed against the 2024 editions by the city, county or township that enforces the code, with any amendments that jurisdiction has adopted. Paul Industries prepares mechanical drawings and submittals for the edition and amendments that apply to the site.

Which refrigerant rules affect new data center cooling equipment in North Dakota?

Federal rules apply. The EPA’s Technology Transitions rule sets a global warming potential limit of 700 for refrigerants in new data center and IT cooling equipment manufactured or imported from January 1, 2027, and for stand-alone comfort cooling chillers from January 1, 2025. Paul Industries selects chillers and computer room units that meet those dates, so a plant ordered in 2026 is buildable with compliant equipment.

How does Fargo's hard water affect a cooling tower or closed loop?

Fargo reports that Red River water averages 17 grains per gallon of hardness before the city softens it to a target of 7, and the finished water carries chloramine. Tower makeup from that supply still limits cycles of concentration, so the treatment program sets blowdown and scale control. Closed loops are filled with softened or demineralized water and inhibited glycol, never raw makeup.

Where does cooling tower blowdown go at a North Dakota data center?

Cooling tower blowdown is an industrial discharge. Bismarck, Fargo, Grand Forks, Mandan and West Fargo run their own pretreatment programs, so a hall in those cities follows the city’s discharge rules, while the North Dakota Department of Environmental Quality regulates industrial discharges to sewer systems in other cities. Paul Industries designs blowdown, sampling points and chemical storage so the discharge permit is straightforward.

How cold can it get before a dry cooler fan must stop?

Dry cooler fans step down and eventually stop as outdoor air gets colder, because the coil rejects more heat per degree and the loop would otherwise overcool. In North Dakota winters many dry coolers run with few or no fans for long periods. The controls then hold loop temperature with bypass valves, and fan motors and bearings are specified for starting after sitting idle at subzero temperatures.

What redundancy suits a North Dakota data center cooling plant?

Redundancy follows the owner’s availability target, usually N+1 for pumps, chillers and heat rejection units, with 2N distribution for critical halls. North Dakota adds one consideration: the economizer side carries the load for most of the year, so its pumps, exchangers and coils need the same redundancy as the chillers. Paul Industries lays out both sides so any one unit can be serviced without losing capacity.

Will Paul Industries ship dry coolers, pump skids and spools to a North Dakota site as a supply-only order?

Paul Industries supplies dry coolers, adiabatic coolers, plate exchanger skids, pump skids and prefabricated piping as supply-only packages for North Dakota projects, delivered with test records and documentation. Owners can also choose design-build or complete installation. Prefabrication suits the state well because it moves welding and testing indoors and shortens the time spent working outdoors in the cold months.

What should a North Dakota operator send to price a data center cooling plant?

Send the IT load for each phase, the planned rack densities and the share on liquid cooling, the target supply temperature, the redundancy level, the site location and water source, and any existing equipment. Drawings or a site plan help with the heat rejection yard layout. From that, Paul Industries prepares a budget figure based on similar plants, then fixes the price when the design is complete.

Sizing a cooling plant for a North Dakota data hall?

Send the IT load by phase, the planned rack densities, the water source and the redundancy target. Call 201-450-8280 or request a quote.