Paul Industries is a data center mechanical contractor in North Dakota, designing, prefabricating and installing central cooling plants, dry cooler yards, liquid cooling piping, generator fuel systems and the controls that tie them together for campuses and halls near Ellendale, Harwood, Jamestown, Fargo, Grand Forks and Bismarck. North Dakota data center construction runs at campus scale, on a short outdoor building season and under a tax exemption that reaches cooling equipment, so the mechanical scope carries more of the schedule and more of the paperwork than in most states. Paul Industries carries that scope from design through start-up under one contract.
Request a quote or call 201-450-8280
What does a data center mechanical contractor in North Dakota build?
A data center mechanical contractor in North Dakota builds everything that moves heat and fluids on the site: the central plant or heat rejection yard, the facility water mains to each hall, coolant distribution units and rack manifolds for liquid cooled rows, air handling for the residual load, glycol and freeze protection systems, makeup water and treatment, generator fuel storage and piping, and the controls and instruments that run them. On a North Dakota campus most of that work happens at a scale measured in hundreds of megawatts and in buildings delivered in phases months apart.
The national view of the trade, including scope splits and procurement models, is on the data center mechanical contractors page. This page covers the North Dakota specifics: where the campuses are, how the tax exemption and licensing rules touch the mechanical scope, how utilities and grid operators set the schedule, and how a contractor builds through a prairie winter.
| System | What it includes | North Dakota emphasis |
|---|---|---|
| Heat rejection yard | Dry coolers, adiabatic coolers or towers, plate exchangers, glycol pumps | Raised steel and spacing for snow; glycol strength for minus 16 to minus 18 hourly lows |
| Central plant | Trim chillers, primary pumps, expansion and air separation, water treatment | Low-load stability for chillers that idle most of the year |
| Facility water distribution | Mains, risers, branch piping, isolation valves, metering | Prefabricated rack modules installed inside the closed shell |
| Liquid cooling in the halls | CDUs, row manifolds, rack hoses, leak detection | Treated fill water; cleanliness to the cold plate maker’s limit |
| Air side | Air handlers or fan walls for residual heat, humidification | Very dry winter air drives humidity control in the white space |
| Generator fuel | Day tanks, bulk storage, fuel piping, polishing | Fuel heating and cold-flow handling for subzero starts; air permit before installation |
Where is North Dakota data center development happening?
North Dakota data center development is concentrated in a handful of large campuses in the southeast and east of the state, along with enterprise, hospital, university and carrier rooms in the cities. Applied Digital’s Polaris Forge 1 near Ellendale had 250 megawatts operating by October 2026, with 400 megawatts contracted and a third 150 megawatt building under construction. Its Polaris Forge 2 near Harwood, north of Fargo, covers more than 900 acres, carries a 200 megawatt lease with rights to 800 megawatts more, and is being built toward first operation before 2027. A third North Dakota campus, Polaris Forge 3, is leased for 300 megawatts and is in construction. The same company runs hosting facilities at Jamestown and Ellendale. For an owner planning a data center, North Dakota offers long hours of free cooling, commercial power well below the national average price and a sales tax exemption that reaches the cooling plant.
Those campuses are cited as market facts, to show the scale of data center construction North Dakota is seeing and the pattern of the buildings going up. For a mechanical contractor, the lesson is that hyperscale data center construction in the state follows a repeatable pattern: large single-story buildings, warm-water liquid cooling, dry heat rejection and phased delivery of halls, with the next building’s mechanical work under way while the last one is commissioned. The data center liquid cooling in North Dakota page covers the loops those buildings use.
How the North Dakota data center sales tax exemption reaches the mechanical scope
The North Dakota data center sales tax exemption reaches the mechanical scope directly, because the statute defines exempt enterprise information technology equipment to include cooling systems, cooling towers and temperature control infrastructure alongside servers and racks. Under NDCC 57-39.2-04.17, purchases of that equipment for use by the owner, operator or tenants of a qualified data center are exempt from sales and use tax, and upgrades and replacements qualify as well. The same definition also covers backup power generation, battery systems and business-owned substations.
A qualified data center is a new or substantially refurbished facility in the state, of 15,000 square feet or more with at least half used for data processing, finished or refurbished after December 31, 2020, with fire suppression and enhanced security, and carrying the tax commissioner’s certification as a qualified data center. To buy tax-free at the time of purchase, the business needs a certificate from the commissioner for the equipment; without it, tax is paid and a refund is claimed. Where a contractor subject to the tax buys or installs the equipment, the owner can apply for a refund of the difference.
For the mechanical package, that means procurement paperwork matters as much as pipe sizes. Paul Industries identifies exempt cooling equipment on the schedule of values, keeps purchase records by item and building, and supports the owner’s certificate and refund filings with the invoices and installation records the commissioner asks for. Owners asking about North Dakota data center incentives should also note that a qualified owner files a yearly report with the tax commissioner by January 31.
Licensing and code rules on the mechanical work
North Dakota sets out the licensing and code rules for the mechanical work in state law and the State Building Code. State law, administered by the Secretary of State, requires a North Dakota contractor license for any construction job whose cost, value or price exceeds $4,000 (NDCC chapter 43-07), for resident and nonresident firms and for every tier of a project. The Secretary of State keeps a public registry of North Dakota contractors, and plumbing and electrical installations answer to separate state boards for their trades.
The State Building Code is built on the International Building Code, Mechanical Code and Fuel Gas Code, and the 2024 editions, with the 2024 International Energy Conservation Code, took effect on January 1, 2026. Cities, counties and townships that enforce a code must use the state code and may amend it, so the plan review and mechanical inspections come from the jurisdiction where the campus sits. Before design starts, Paul Industries identifies which body enforces the code at the site and which amendments it has adopted. Process-grade piping beyond the building services, such as fuel and treatment systems, follows the practices on process piping in North Dakota.
Water, air and fuel permits on the site
Water, air and fuel permits on a North Dakota data center site shape the mechanical design from the first layout. Industrial water drawn from a river, lake or well calls for an appropriation permit under NDCC 61-04-02, issued by the Department of Water Resources and followed by a yearly use report, which is one reason the state’s large campuses favor waterless heat rejection. Standby generator plants go to the Department of Environmental Quality, whose Permit to Construct under NDAC chapter 33.1-15-14 must be in hand before a new stationary source in a designated category is built or installed.
Generator fuel storage brings tanks, containment, piping and fuel conditioning into the mechanical package. Paul Industries builds day tanks, bulk storage piping and fuel polishing systems, and the tank fabrication in North Dakota page covers the vessels themselves.
| Rule or filing | Agency | What triggers it | Effect on the mechanical work |
|---|---|---|---|
| Contractor license, NDCC chapter 43-07 | Secretary of State | Any construction job above $4,000 | Applies to every firm on the job before work starts |
| Qualified data center exemption, NDCC 57-39.2-04.17 | Tax Commissioner | Purchases of exempt equipment, including cooling systems and towers | Item-level purchase records, certificates or refund claims, yearly owner report by January 31 |
| Building, mechanical and energy codes | The city, county or township that enforces the State Building Code | Construction permit for the building and its systems | Plan review and inspections to the 2024 editions with that jurisdiction’s amendments |
| Water appropriation permit, NDCC 61-04-02 | Department of Water Resources | Industrial use of the site’s own surface water or groundwater | Sets how much evaporative cooling the site can use; annual use report by March 31 |
| Permit to Construct, NDAC 33.1-15-14 | Department of Environmental Quality | New stationary sources such as generator plants in designated categories | Generator and fuel work sequenced after the permit; test run hours logged against its conditions |
| Industrial discharge rules | Pretreatment cities (Bismarck, Fargo, Grand Forks, Mandan, West Fargo) or the Department of Environmental Quality | Blowdown, flush water and regeneration waste sent to sewer | Sampling points, neutralization and holding capacity in the design |
None of these filings sits on the critical path if it is planned from the first layout, and all of them can stall a phase if they surface late. Paul Industries lists each one in the project execution plan with its owner, its trigger and the documents the mechanical team supplies, so permits, certificates and reports are ready when the equipment arrives.
Power, utilities and the mechanical schedule
Power delivery sets the mechanical schedule on a North Dakota campus, because each hall’s cooling plant must be complete and commissioned by the date its utility capacity arrives. Electric service in the state comes from Montana-Dakota Utilities, Otter Tail Power and Northern States Power (Xcel Energy), the three investor-owned companies the Public Service Commission regulates, and from rural cooperatives that set their own rates. Those utilities sit in two regional grid operators, MISO and SPP. Montana-Dakota Utilities serves the Ellendale data center, and the Harwood campus secured its power through Cass County Electric Cooperative.
New generation is following the load. Applied Digital reported in October 2026 a power purchase agreement for capacity from an approximately 1,200 megawatt natural gas plant to be developed in North Dakota. For the mechanical contractor, power milestones become hard dates: the heat rejection yard and the first hall’s loops must be pressure tested, flushed and filled before energization, so integrated testing can start the day power is available. Paul Industries builds the data center construction timeline backward from those dates.
Building through a North Dakota winter
Building through a North Dakota winter means doing as much mechanical work as possible indoors, off site or before the frost. Fargo averages 92.7 days a year when the temperature never rises above freezing, and Grand Forks averages 101.3, with more than 40 days a year at or below zero at both. Welding, pressure testing and flushing outdoors in that weather is slow and risky, so the data center construction process on a North Dakota campus leans on prefabrication and on closing the building shell early.
- Pipe rack modules, pump skids and plate exchanger skids are fabricated, welded and pressure tested in a shop, then shipped and set with a few field joints.
- Heat rejection yards are set on steel and connected in the frost-free months wherever the schedule allows.
- Underground water, fuel and drain lines are laid before the ground freezes.
- Interior mains and risers are installed once the shell is closed and temporary heat is running.
- Outdoor test sections are filled with glycol when hydrostatic testing must happen in the cold.
Modular data center construction takes that further: complete mechanical modules, with pumps, exchangers, valves and controls installed and tested, are built in a fabrication shop and set on site as units. Paul Industries uses pipe fabrication and skid assembly to move hours out of the weather, leaving only the field welds that must be made in place.
Data center construction management on the mechanical side
Data center construction management on the mechanical side in North Dakota comes down to three things: phasing, procurement and documentation. Phasing means building the central plant and main headers for the final campus while equipping only the halls being delivered, with valved tie-in points for each future building. Procurement means ordering long-lead equipment, such as dry coolers, chillers, CDUs, large valves and switchgear-coupled controls, months ahead of each phase, and tracking exempt equipment for the sales tax filings. Documentation means test records, as-built drawings and turnover files for every hall, ready for the commissioning team.
| Phase | Mechanical work | Season fit | Hold point |
|---|---|---|---|
| Site and underground | Water, fuel, drain and duct banks for the full campus | Before ground freeze | Underground test and survey records |
| Central yard | Heat rejection, plate exchangers, pumps, main headers sized for build-out | Frost-free months where possible | Pressure test, glycol fill, start-up |
| First hall fit-out | Facility water branches, CDUs, manifolds, air handling, controls | Inside the closed, heated shell | Flush, fill, functional tests, energization |
| Later halls | Same scope, tied into live mains through valved connections | Year round inside the shell | Tie-in procedure and isolation test |
| Next building | Extension of the campus loop and a new yard section | Planned from the first building’s lessons | Integrated test with operating halls protected |
On new data center construction projects, Paul Industries assigns one project lead for the mechanical scope across all phases, so lessons from the first hall carry into the next and the turnover format stays consistent across the campus. The data center commissioning in North Dakota page covers the testing side of each hold point.
What is data center construction, and where does the mechanical package fit?
Data center construction is the design and building of a facility that houses computing equipment with the power, cooling, fire protection and security it needs to run continuously, and the mechanical package is one of the two biggest trade scopes on the job, alongside electrical. On a data center construction site in North Dakota the mechanical team works alongside the structural, electrical and controls teams from the foundations on, because pipe racks, yard steel and equipment pads must be ready before the shell closes and the first cold front arrives.
Data center construction services and delivery routes
Owners comparing data center construction services often split the work into a general contract and trade packages; others buy a design-build mechanical package that carries engineering, prefabrication, installation and start-up together. Paul Industries offers both, along with supply-only modules for owners who install with their own construction team.
Keeping a North Dakota campus plant running after turnover
Keeping a North Dakota campus plant running after turnover depends on a maintenance program built around the seasons, because the plant spends most of the year on economizer and only a few weeks at full mechanical load. Each autumn the glycol in the heat rejection loops is tested for strength and inhibitor, adiabatic and evaporative sections are drained, heaters and tracing are checked, and dry cooler coils are cleaned of the summer’s dust and seed. Each spring the trim chillers are started under load before the first warm spell, their oil and refrigerant are checked, and the economizer changeover points are reviewed against the winter’s trend data.
Liquid cooled halls add filter changes, fluid sampling and quick disconnect inspections on a schedule set by the cold plate maker, and generator fuel systems need polishing and cold-flow checks before winter. Paul Industries offers that work as a service contract for any North Dakota campus plant, whoever installed it, and the chiller repair in North Dakota page covers repairs when a machine fails.
Data center construction cost in North Dakota: the mechanical share
The mechanical share of data center construction cost in North Dakota depends on the IT load, the cooling method, the redundancy, the phasing and the construction season, and Paul Industries builds its price from the owner’s design and schedule rather than from a published average. People searching data center construction cost or data center construction cost per megawatt find national figures that bundle land, power, building and fit-out together; the mechanical share depends heavily on whether the halls run liquid cooling with dry heat rejection or air cooling with a chiller plant.
The cost drivers specific to North Dakota are the size of the dry cooler yard, the glycol volume and freeze protection, the amount of prefabrication used to avoid winter field work, temporary heat and enclosures, the treatment of exempt equipment under the sales tax statute, and the number of phases. Energy prices shape the design choices: commercial electricity averaged 7.36 cents per kilowatt-hour in North Dakota in 2025, against 13.37 nationally. A budget range based on similar campuses comes first, once loads and phasing are known, and a firm price follows complete drawings. The data center cooling in North Dakota page explains the plant choices behind those numbers.
Who builds the mechanical scope on North Dakota data center campuses?
Paul Industries builds the mechanical scope on North Dakota data center campuses: heat rejection yards, central plants, facility water distribution, liquid cooling loops, air handling, generator fuel systems and controls, from design through prefabrication, installation, testing and start-up. Owners and general contractors comparing data center construction contractors, data center construction companies or data center contractors for the mechanical package get one firm responsible for the whole scope, one schedule tied to the power dates and one set of records. Paul Industries is an East Coast contractor headquartered at 256 Shore Drive, Kilmarnock, Virginia; it was formerly based in northern New Jersey and then Pennsylvania, and it takes campus work in North Dakota as part of projects across all 50 states and international sites.
The Virginia counterpart, data center mechanical contractor in Virginia, covers campus plants and yard piping in Loudoun, Prince William and the Richmond region, and data center mechanical contractor in Illinois covers a Midwest market built around existing buildings and suburban campuses. The Midwest and North Dakota pages place this work with the other plant and utility projects Paul Industries takes in the region.
Mechanical work on North Dakota data centers from Paul Industries
Paul Industries designs, prefabricates, installs, tests and maintains the mechanical systems of North Dakota data centers, from a single enterprise hall to a multi-building campus. Send the IT load by phase, the cooling method, the site plan, the power delivery dates and the procurement model, and request a quote to start pricing the package.
Standards referenced: North Dakota State Building Code (2024 IBC, IMC, IFGC and IECC) · NDCC chapter 43-07 (contractor licensing) · NDCC 57-39.2-04.17 (qualified data center sales and use tax exemption) · NDCC 61-04-02 (water appropriation) · NDAC chapter 33.1-15-14 (Permit to Construct) · ASME B31.9 · ASME B31.3 · ASME Section VIII
Frequently asked questions
Which data center mechanical contractor builds campuses near Fargo and Harwood?
Paul Industries builds data center mechanical systems near Fargo and Harwood, including heat rejection yards, central plants, facility water mains, liquid cooling loops and generator fuel piping. Red River Valley campuses face long, hard winters, so Paul Industries lays underground lines before the freeze, prefabricates rack modules and works inside the closed shell through the cold months.
Does Paul Industries take data center mechanical work in Bismarck, Mandan and Minot?
Paul Industries takes data center mechanical work in Bismarck, Mandan and Minot, from enterprise and utility halls to new buildings. Typical scopes are plant replacements, free cooling additions, liquid cooling loops for new rows and generator fuel upgrades. Each job is delivered as supply-only, design-build or complete installation, with the same documentation set at turnover.
Which data center construction contractors handle mechanical work around Ellendale, Jamestown and Grand Forks?
Paul Industries installs mechanical systems for data centers near Ellendale, Jamestown and Grand Forks, covering heat rejection, facility water, CDUs and manifolds, air handling and controls. Grand Forks averages more than 100 days a year below freezing all day, so the schedule moves welding and testing indoors or off site and sets the yard in the frost-free months.
What is the North Dakota data center sales tax exemption?
NDCC 57-39.2-04.17 exempts enterprise information technology equipment and software bought for a qualified data center from sales and use tax, and the statute’s definition includes cooling systems, cooling towers and temperature control infrastructure along with servers, racks and backup power. A qualified data center needs the tax commissioner’s certification, and a certificate is needed to buy tax-free at the time of purchase.
Does the data center sales tax exemption cover chillers and dry coolers?
The statute lists cooling systems, cooling towers and temperature control infrastructure as enterprise information technology equipment, so cooling plant equipment purchased for a qualified data center falls within the exemption’s definition. The owner confirms each purchase with the tax commissioner’s certificate or claims a refund afterward. Paul Industries keeps item-level purchase and installation records to support those filings.
What happens to sales tax when a contractor buys cooling equipment for a qualified data center?
Where a contractor subject to North Dakota sales tax buys or installs exempt equipment, the qualified business can apply to the tax commissioner for a refund of the difference between the tax the contractor remitted and the exemption allowed. Paul Industries separates exempt equipment on the schedule of values and provides the invoices and installation records the refund application needs.
Does North Dakota require a contractor license for data center mechanical work?
Under NDCC chapter 43-07, a North Dakota contractor license from the Secretary of State is required for any construction job worth more than $4,000, and the rule reaches every tier of a project and firms based outside the state. Plumbing and electrical installations have their own state boards. The Secretary of State’s contractor registry can be searched online.
Which building code applies to a new North Dakota data center?
The North Dakota State Building Code, based on the 2024 International Building, Mechanical and Fuel Gas Codes with the 2024 International Energy Conservation Code, took effect on January 1, 2026. The city, county or township that enforces a code applies it with any amendments it has adopted. Paul Industries prepares mechanical submittals for the edition and amendments that apply at the site.
Do data center generators in North Dakota need an air permit before installation?
A new stationary source in a category designated under NDAC 33.1-15-14 cannot be built or installed until the Department of Environmental Quality issues its Permit to Construct, and data center generator plants are reviewed on their potential to emit. Paul Industries sequences generator fuel and exhaust work so installation follows the permit, and plans test runs within its conditions.
Which utilities serve data center sites in North Dakota?
Retail power in North Dakota comes from rural electric cooperatives and from three investor-owned companies: Otter Tail Power, Montana-Dakota Utilities and Northern States Power, which does business as Xcel Energy. Montana-Dakota Utilities serves the Ellendale data center and the Harwood campus secured power through Cass County Electric Cooperative. The state’s utilities belong to the MISO and SPP grid operators.
How does winter change the data center construction timeline in North Dakota?
Winter moves work rather than stopping it. Underground lines go in before the freeze, heat rejection yards are set in the frost-free months, rack modules and skids are prefabricated indoors, and interior piping proceeds once the shell is closed and heated. Hydrostatic testing outdoors in the cold uses glycol. Paul Industries plans each phase around those seasons and the power delivery dates.
Can a North Dakota campus build its central plant for the full build-out on day one?
Many campuses build main headers, underground lines and yard foundations for the full build-out while equipping only the halls in the current phase, with valved tie-in points for later buildings. That avoids reopening live mains later. Paul Industries sizes the headers for the final load and installs heat rejection units phase by phase as halls are delivered.
How is a new hall tied into a campus loop that is already carrying load?
New halls connect through valved tie-in points installed during the first phase, so the live loop is never cut. The new branch is pressure tested, flushed and filled on its own, isolation is proven, and the valves are opened under a written procedure with the operations team present. Paul Industries writes that procedure for each tie-in and records the result.
Which parts of a North Dakota data center can be prefabricated?
Pipe rack modules, pump skids, plate exchanger skids, CDU skids, valve stations, fuel conditioning skids and complete mechanical modules can all be prefabricated, welded and pressure tested before shipping. In North Dakota, prefabrication moves hours out of the cold and shortens the time between shell close and energization. Paul Industries builds modules to the campus standard so every phase installs the same way.
Is a state water right part of planning a data center in North Dakota?
A campus that takes its own surface water or groundwater for cooling needs an appropriation permit from the Department of Water Resources, because NDCC 61-04-02 covers every industrial use, and it reports its yearly use to the department. Campuses on city water buy within the city’s own rights. Waterless heat rejection reduces the volume involved to fill and top-off water for closed loops.
Can Paul Industries supply prefabricated mechanical modules for a North Dakota campus without installing them?
Paul Industries supplies prefabricated rack modules, skids and spools for North Dakota campuses as supply-only packages, delivered with weld, pressure test and cleanliness records and installation drawings. Owners can also choose design-build or complete installation. Each route uses the same module standard, so phases built by different routes still match.
How do data center construction companies price the mechanical package in North Dakota?
Send the IT load by phase, the cooling method and redundancy, the site plan, the building drawings or design intent, the power delivery dates, the procurement model and whether the site is a qualified data center for sales tax. From those, Paul Industries works up a budget figure, then fixes the price when drawings and phasing are settled.