Paul Industries provides tank fabrication in North Dakota, building welded steel and stainless storage and process tanks for oil production sites, crush and ethanol plants, sugar factories, water systems and industrial buildings, and setting each one on its foundation with the containment, piping and freeze protection the site needs. North Dakota adds two things to a tank order: an oil and gas rule that dictates dike size at every production site, and a winter in which tanks, nozzles and containment spend months below freezing. Paul Industries designs, fabricates, delivers, erects, coats, insulates, tests and repairs tanks for both.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Oilfield tank rule NDAC 43-02-03-49, amended April 1, 2026
Oil tank dikes Largest tank plus one day's production
Underground tanks Secondary containment for tanks and piping installed since 2009
Freezing days About 92 days a year with a high at or below 32 F in Fargo (NOAA)
Reviewed November 2026

Tank fabrication in North Dakota starts with the rules that apply to the contents

Tank fabrication in North Dakota starts with what the tank will hold, because the contents decide which rule applies: crude oil and produced water at production sites fall under the Industrial Commission’s oil and gas rules, underground fuel and chemical tanks fall under the Department of Environmental Quality’s underground storage tank rules, flammable and combustible liquids in aboveground tanks fall under the State Fire Code, and anything under pressure falls under the state’s unfired pressure vessel rule. Food, water and process tanks follow the codes and sanitary standards of their industry. The national picture of tank types, materials and construction methods is on the tank fabrication page; this page goes into the North Dakota rules and conditions, and the North Dakota hub covers the state’s wider process industries.

Which North Dakota rule governs which tank
Tank and contentsGoverning North Dakota ruleAgencyWhat it means for fabrication
Oil tanks at production sitesNDAC 43-02-03-49Industrial Commission, Oil and Gas DivisionAboveground only; materials resistant to produced fluids; diked for largest tank plus one day’s production
Underground fuel and hazardous substance tanksNDAC 33.1-24-08Department of Environmental QualitySecondary containment with interstitial monitoring for tanks and piping installed since January 1, 2009
Aboveground flammable and combustible liquid tanksState Fire Code, NDAC 45-18-01, built on the International Fire CodeState Fire Marshal and jurisdictions that enforce a fire codeListed or code-built tanks, venting, spacing and containment
Tanks under pressureNDAC 33.1-14-10Department of Environmental Quality boiler programASME Section VIII construction, stamping and National Board registration above the small-vessel limits
Oil storage above federal thresholds40 CFR Part 112 (SPCC)U.S. EPASecondary containment and integrity testing written into the facility’s plan
Tanks with emissions (solvents, fuels, ethanol)Permit to Construct, NDAC 33.1-15-14Department of Environmental Quality, Air QualityVapor controls and floating roofs decided before construction

Steel tank fabrication for Bakken production sites

Steel tank fabrication for Bakken production sites follows NDAC 43-02-03-49, which the Industrial Commission amended effective April 1, 2026. The rule prohibits storing oil in underground or partially buried tanks, requires surface tanks and production equipment to be free of leaks and built of materials resistant to the produced fluids and chemicals they hold, and requires unused tanks to be removed or returned to service within a year. Dikes go up around oil tanks, flowthrough process vessels and recycle pumps at any new production facility before the well is completed, and the dikes around oil tanks must contain the largest tank plus one day’s fluid production.

The same rule adds a perimeter berm at least six inches high at sites with storage tanks and more than 100 barrels a day of throughput where load lines or equipment sit outside the dikes, and numbered weather-resistant security seals on every oil access valve. Paul Industries builds production tanks to API 12F or, for larger sizes, through API 650 tank fabrication, with internal coatings chosen for produced water and sour service where hydrogen sulfide is present, and lays out the tank battery so dike volume, load lines and seals work together. Oil tank fabrication for these sites also covers gun barrels, water tanks for produced and fresh water, and the heated tanks that keep paraffin and emulsions moving in winter. The wider sector is on the oil and gas page.

NDAC 43-02-03-49 requirements and how a tank battery is built to them
RequirementRule text in shortFabrication and layout response
No buried oil storageUnderground or partially buried oil tanks prohibitedAll oil tanks set on grade or on ring walls with visible bottoms
MaterialsResistant to produced fluids or chemicalsCoated interiors, corrosion allowance, stainless or fiberglass-lined parts where needed
Dike capacityLargest tank plus one day’s fluid productionTank count and size chosen with the dike, liner and base designed as one
Process vessel dikesTotal capacity of the vesselSeparators and treaters set inside their own contained area
Perimeter bermAt least 6 inches where throughput exceeds 100 barrels a dayLoad lines and pumps placed inside containment or the berm
Security sealsNumbered weather-resistant seals on oil access valvesValve handles and thief hatches arranged for sealing
Idle tanksRemoved or returned to service within one yearRepair, relocation or removal planned with the operator

What does the North Dakota underground storage tank rule require of a new tank?

The North Dakota underground storage tank rule, NDAC 33.1-24-08, requires tanks and piping installed or replaced after January 1, 2009 to be secondarily contained and monitored interstitially, so a leak from the inner wall is caught before it reaches soil or groundwater. When piping is replaced, the whole piping run is secondarily contained. The owner notifies the Department of Environmental Quality within 30 days of bringing a system into use, spill prevention equipment and containment sumps used for piping monitoring are tested at least every three years unless double walled and monitored, overfill prevention is inspected at least every three years, and periodic walkthrough inspections are recorded.

Paul Industries supplies and installs double-wall underground tanks and the secondarily contained piping, sumps and monitoring that go with them, and builds aboveground alternatives where an owner prefers tanks that can be inspected from outside. The North Dakota date of January 1, 2009 comes more than seven years before the federal rule’s April 11, 2016 date for secondary containment of new tanks and piping, so double walls are already the North Dakota norm for replacement tanks.

Storage tank fabrication for crush, ethanol and sugar plants

Storage tank fabrication for North Dakota’s agricultural processing plants covers vegetable oil, ethanol, denaturant, molasses, juice, syrup, water and chemical tanks, often in large field-erected sizes. Green Bison Soy Processing at Spiritwood was designed to produce up to 600 million pounds of refined soybean oil a year for the Dickinson renewable diesel refinery, and North Dakota Soybean Processors at Casselton was expected to process up to 42.5 million bushels of soybeans in its first year; plants of that scale need oil storage, meal handling and solvent tanks. Ethanol plants store fuel ethanol, denaturant and process water, and the sugar factories of the Red River Valley store juice, syrup, molasses and condensate through the beet campaign.

Field-erected tanks for those plants are built to API 650 when they hold petroleum or similar liquids at atmospheric pressure, and to AWWA D100 for water storage. On site tank fabrication of a large API 650 tank means welding courses in place on a prepared foundation, with the weather window planned around North Dakota’s short building season. Tanks holding ethanol, gasoline blendstock or solvents may need floating roofs or vapor controls, and the Department of Environmental Quality’s Permit to Construct must be in hand before construction of an emitting unit begins. Paul Industries designs, erects and tests those tanks and connects them to the plant’s process piping in North Dakota. The fuels side of this market is covered on the biofuels and renewable gas page.

Stainless steel tank fabrication for food and sugar service

Stainless steel tank fabrication for North Dakota food, sugar, dairy and crush plants covers process tanks, mixing tanks, CIP tanks and holding tanks with sanitary finishes, sloped bottoms and drainable outlets. Stainless tanks are passivated after welding so the surface resists corrosion, and the cleaning circuits that serve them are part of the design; see CIP and SIP systems in North Dakota and passivation in North Dakota. Process tanks with agitators, jackets and instrumentation are covered on the process tanks page.

Building tanks for a North Dakota winter

Tanks in North Dakota are built for a winter in which Fargo averages about 92 days a year with a high at or below freezing and Grand Forks about 101, by NOAA’s 1991 to 2020 normals. The cold affects tanks in four places: contents that thicken or freeze, nozzles and valves that freeze shut, containment that fills with snow and ice, and foundations that heave with frost. Paul Industries designs for each one from the start of the tank fabrication drawing.

Winter design points for North Dakota tanks
ConcernWhat goes wrongDesign response
Viscous or freezing contentsCrude, vegetable oil, molasses and water stop flowing or freezeInternal coils or external heating, insulation, mixers and heated suction
Nozzles, valves and gaugesWater in dead legs freezes and splits valvesDrainable nozzles, heat tracing, insulated valve boxes
Vents and roof fittingsFrost closes breather vents and flame arrestorsVents sized and placed to stay clear, heated where needed
ContainmentSnow and ice take up dike volume; meltwater carries sheenDike volume with margin, drain valves kept closed and accessible
FoundationFrost heave tilts tanks and stresses bottom weldsFoundations below frost depth or insulated, settlement monitored
Fire water storageIce in tank and risersWater tank fabrication with heaters and insulation sized for the coldest month

Construction itself also follows the season. Welding outside in cold weather calls for preheat and wind protection, coatings have minimum application temperatures, and hydrostatic testing with water in winter needs heated water and a plan to drain and dry the tank afterward. Paul Industries moves as much welding as it can into a heated fabrication bay, ships shop-built tanks complete, and schedules field-erected tanks for the warmer months wherever the project allows. The welding side is covered on industrial welding services in North Dakota.

Tank fabrication standards and the tank fabrication process

Tank fabrication standards for North Dakota projects are chosen by size, contents and pressure: API 650 for welded atmospheric storage tanks built in the field, API 12F for shop-welded oilfield tanks, UL 142 for shop-built aboveground tanks for flammable and combustible liquids, AWWA D100 for welded water storage, and ASME Section VIII when the tank operates under pressure. API 653 and STI SP001 then govern inspection and repair of tanks in service.

The tank fabrication process follows the same path on every job: design calculations and the drawing for approval, material ordered with mill certificates, plates cut, rolled and welded, nozzles and manways installed, welds examined, the tank tested by water fill or air and soap, coated and insulated, delivered or erected, set, anchored and piped. For API tank fabrication, the records include the design sheet, material certificates, weld maps, examination results and the hydrostatic test, which become the baseline for every later API 653 inspection. UL142 tank fabrication adds the listing mark on the finished tank.

When does pressure tank fabrication fall under the vessel rule?

Pressure tank fabrication falls under North Dakota’s unfired pressure vessel rule whenever the tank operates under internal pressure inside the scope of ASME Section VIII and exceeds the small-vessel limits of 4 cubic feet at 250 psig or 1.5 cubic feet at 600 psig. Those tanks are built to Section VIII, stamped and registered with the National Board before installation. Propane, ammonia, compressed air and process pressure tanks are all in this group; see pressure vessel fabrication in North Dakota.

Coatings, linings and insulation that hold up in North Dakota

Coatings, linings and insulation decide how long a North Dakota storage vessel lasts, because produced water, brine, fertilizer solutions and condensate attack bare steel, and the climate swings from humid summers to dry subzero winters. Interior linings are chosen from the contents: epoxy and novolac systems for produced water and crude, food-grade linings or stainless steel for edible oils and syrups, and bare carbon steel with corrosion allowance where the product protects the metal. Exterior coatings are chosen for ultraviolet exposure in summer and for application temperature, since most coating systems need the steel and air above a minimum temperature and the steel above the dew point while they cure.

Insulation and cladding keep heated contents warm and keep valves and nozzles from freezing, and their details matter as much as their thickness. Water that gets under cladding at a roof joint or nozzle freezes, opens the joint further and wets the insulation, which then loses most of its value and holds moisture against the steel. Paul Industries designs cladding with sealed laps, shedding roof details and removable boxes at manways and valves, and applies coatings in heated enclosures or during the warmer months so each coat cures to its specification. Heating is matched to the insulation: steam coils where the plant has steam, electric heat tracing or immersion heaters where it does not, with temperature control so viscous contents stay pumpable without overheating the lining.

Ammonia, fertilizer and chemical tanks

Ammonia, fertilizer and chemical tanks make up a large share of North Dakota storage outside the oil patch, because the state’s farms draw on fertilizer stored at retail and processing sites across the countryside. Refrigerated or pressurized anhydrous ammonia storage is pressure equipment and follows the vessel rule, while liquid fertilizer solutions such as urea ammonium nitrate are held in atmospheric steel tanks that need coatings or inhibitors suited to the solution and containment around the tank. Caustic, acid and water treatment chemicals at plants and municipal systems call for carbon steel with linings, stainless steel or alloy, chosen from the chemical, concentration and temperature. Paul Industries selects material and lining from those three facts, designs venting and overfill protection for each, and sets chemical tanks inside containment sized for the largest tank.

Fertilizer and chemical tanks also face the same cold as oil tanks. Fertilizer solutions salt out or thicken at low temperatures, so outdoor tanks are often insulated or heated, and transfer lines are traced and drained. Containment for chemical tanks is kept clear of snow so its volume stays available, and drains stay closed and locked except when rainwater is released after a check for contamination.

Repairing, relocating and returning tanks to service

Repairing, relocating and returning tanks to service is a large part of tank work in North Dakota, because production sites change hands, idle tanks must be removed or used within a year, and plants expand around tanks that are still sound. A welded atmospheric tank in petroleum service is repaired and altered under API 653, which covers shell and bottom repairs, nozzle additions, bottom replacement, reconstruction and relocation, with examination and testing after the work. Shop-built tanks inspected under STI SP001 are repaired to their original construction standard. Pressure tanks follow the National Board Inspection Code and the vessel rule.

Paul Industries inspects a tank before it moves, measures shell and bottom thickness, repairs corrosion and weld defects, adds or relocates nozzles, recoats the interior where the contents call for it, and tests the tank again before it returns to service on its new foundation. Relocating a tank from a depleted production site to an active one saves the cost of a new tank only when the tank is in condition to pass that testing, so the inspection decides the plan. Tanks that are not worth repairing are cleaned, cut and removed so the site meets the one-year rule for idle equipment.

How a North Dakota tank project runs from data sheet to first fill

A North Dakota tank project runs in five stages: definition, design and approval, fabrication or erection, testing, and connection to the process. Definition settles the contents, volume, temperature, site and rule. Design produces the calculations, the drawing, the foundation loads and the containment layout, and the owner approves the drawing before any material is ordered. Fabrication happens in a heated bay for shop-built tanks, and on the foundation for field-erected tanks, with welding procedures and examinations matched to the standard. Testing proves the tank tight and strong, and the records go into the owner’s file. Connection brings piping, valves, instruments, heating and insulation, and the tank is filled for the first time with Paul Industries present.

Schedules in North Dakota turn on weather and shipping. A shop-built tank ordered in winter can be built indoors and set as soon as frost leaves the ground, while a field-erected tank is best started in spring so welding, testing and coating finish before the first hard freeze. Paul Industries plans the sequence with the owner so the foundation, containment and permits are ready when the tank arrives.

What does tank fabrication cost in North Dakota?

Tank fabrication cost in North Dakota is set by capacity, diameter and height, material and thickness, roof type, nozzles and internals, coatings and insulation, heating, the foundation, the containment, and whether the tank is shop-built and shipped or field-erected. Shop-built tanks are limited by what can be shipped by road, which favors them for smaller volumes, while larger tanks are erected on site. Stainless steel, heating coils and insulation each add cost, and winter construction adds heated enclosures. Paul Industries gives a budget range from comparable tanks once it knows the volume, contents and site, then a fixed price once the design is set.

Who fabricates tanks in North Dakota?

Paul Industries fabricates tanks for North Dakota sites and installs them, working from its headquarters at 256 Shore Drive in Kilmarnock, Virginia, as an East Coast company that builds for owners across North Dakota and the rest of the country. As a tank fabrication company, Paul Industries designs, builds, delivers, erects, coats, tests and connects tanks under one contract, and offers supply-only tanks, design-build tank farms and complete installation. Industrial tank fabrication and custom tank fabrication both fall within its tank fabrication services, from a single day tank to a field-erected tank farm. The same work in Paul’s home state is described on tank fabrication in Virginia, and a neighboring Midwest market on tank fabrication in Wisconsin. Cleaning and inspection of tanks already in service are covered on industrial tank cleaning, and regional work on the Midwest page.

Storage and process tanks from Paul Industries for North Dakota

Paul Industries builds production tanks for the Bakken, oil and ethanol storage for crush and biofuel plants, stainless process tanks for food and sugar plants, water and fire water tanks, and pressure tanks, all designed for the North Dakota winter and the rule that applies to the contents. Each tank arrives or is erected with its drawing, material records, test results and the containment and piping it needs to go into service. Send the contents, volume, site location and any dimensional limits, and request a quote or call 201-450-8280.

Standards referenced: API 650 · API 12F · UL 142 · API 653 · STI SP001 · ASME Section VIII · AWWA D100 · NFPA 30 · NDAC 43-02-03-49 (oil production equipment, dikes and seals) · NDAC 33.1-24-08 (underground storage tanks) · NDAC 45-18-01 (State Fire Code) · 40 CFR Part 112 (SPCC)

Frequently asked questions

Who handles tank fabrication in Williston and the Bakken counties?

Paul Industries handles tank fabrication in Williston, Watford City, Tioga and Dickinson, building oil, produced water and fresh water tanks and laying out tank batteries to the Industrial Commission’s dike and berm rule. Tanks are coated for produced fluids, sealed at every oil access valve and fitted with heating where paraffin or water would otherwise freeze. Call 201-450-8280 or request a quote.

Does Paul Industries take tank fabrication in Fargo and the Red River Valley?

Paul Industries takes tank fabrication in Fargo, Casselton, Wahpeton, Grand Forks and the rest of the Red River Valley for crush plants, sugar factories, food plants, water systems and buildings. Stainless process tanks are built with sanitary finishes and passivated, and outdoor storage tanks are insulated and heated for valley winters, when Grand Forks averages about 101 days a year with a high at or below freezing.

Can oil be stored in a buried tank at a North Dakota well site?

Oil at a North Dakota production site is stored aboveground, because NDAC 43-02-03-49 prohibits storing oil in underground or partially buried tanks or containers. Surface tanks must be leak free, resistant to the produced fluids, and diked. Paul Industries designs production tank batteries with tanks on grade, visible bottoms and dikes sized to the rule.

How large must a dike be around oil tanks in North Dakota?

A dike around oil tanks at a North Dakota production facility must hold the total capacity of the largest tank plus one day’s fluid production, and the dike and the base inside it must be made of sufficiently impermeable material. A dike around a flowthrough process vessel must hold that vessel’s capacity. Paul Industries sizes tanks and dikes together so the battery meets both.

Does a North Dakota aboveground fuel tank need a UL 142 listing?

A shop-built aboveground tank for flammable or combustible liquids in North Dakota is typically built and listed to UL 142, since the State Fire Code, based on the International Fire Code, calls for tanks built to recognized standards. Larger field-erected tanks follow API 650. Paul Industries supplies UL 142 tanks for generators, fleets and plant fuel and API 650 tanks for bulk storage.

When do North Dakota underground tank owners have to notify the state?

Owners notify the North Dakota Department of Environmental Quality within 30 days of bringing an underground storage tank system into use, using the department’s notification form. The installer’s statement on the form covers the methods used to install the tanks and piping. Paul Industries provides the installation records the owner needs to complete it.

Do North Dakota tank owners need an SPCC plan?

A facility needs a federal Spill Prevention, Control and Countermeasure plan when its aggregate aboveground oil storage exceeds 1,320 gallons or its completely buried storage exceeds 42,000 gallons, along with the other federal conditions. The plan sets containment and integrity testing for each tank. Paul Industries builds tanks and containment that fit the plan and supplies the records its inspections use.

What does water tank fabrication involve for a North Dakota plant or town?

Water tank fabrication for a North Dakota plant or town covers welded steel tanks to AWWA D100 for potable, process and fire water, with coatings suited to the water, tank heating and insulation to keep ice out of the tank and risers, and overflow and drain lines protected from freezing. Paul Industries designs, erects and tests water tanks and connects them to the pumps and piping.

How much does custom tank fabrication cost compared with a standard tank?

Custom tank fabrication costs more than a standard catalog tank when it adds stainless steel, special nozzles, jackets, agitators, internal coils or unusual dimensions, and less when it avoids site rework by fitting the space and process on the first try. Paul Industries prices both routes from the same data sheet so the owner can compare them before ordering.

Are API 653 inspections required on North Dakota storage tanks?

API 653 is the inspection standard written for welded aboveground petroleum tanks built to API 650, and STI SP001 covers shop-built tanks; SPCC plans name one of them as the integrity testing standard for each tank. The inspection compares shell and bottom thickness with the original records. Paul Industries provides baseline records with every new tank and repairs what later inspections find.

Do ethanol and solvent tanks in North Dakota need an air permit?

Tanks that emit volatile organic compounds, such as ethanol, gasoline blendstock and hexane storage, can be part of a stationary source that needs a Permit to Construct from the North Dakota Department of Environmental Quality before construction begins. The permit can require a floating roof or vapor control. Paul Industries designs tanks to the controls the permit sets.

Can an idle tank stay on a North Dakota production site?

An unused tank at a North Dakota production site must be removed or placed back into service within a reasonable time not exceeding one year, under NDAC 43-02-03-49. Paul Industries inspects idle tanks, repairs and recoats the ones worth keeping, relocates tanks to other sites where they fit, and removes the rest so the site stays within the rule.

Should a North Dakota tank be shop-built or field-erected?

A North Dakota tank is shop-built when its diameter and length fit road shipping limits, which keeps welding indoors and shortens site time in a cold climate, and field-erected when the capacity needs a larger diameter. Field erection is scheduled for the warmer months where possible. Paul Industries recommends the route from the volume, site access and schedule.

How are tank foundations protected from frost heave in North Dakota?

Tank foundations in North Dakota are protected from frost heave by carrying ring walls or piers below the frost depth set by the jurisdiction’s building code, by using insulated foundations under heated tanks, or both, and by draining water away from the base. Paul Industries designs the foundation with the tank and checks settlement after the hydrostatic test.

What does an oil storage tank fabrication package include?

An oil storage tank fabrication package includes the design calculations and approved drawing, material certificates, weld maps, examination and hydrostatic test records, coating records, nameplate data and venting calculations, plus anchor and foundation details. Those records become the baseline for every later inspection. Paul Industries delivers the package with the tank.

What should a North Dakota site send to get a tank priced?

Send the contents and temperature, the volume, any limits on diameter or height, whether the tank sits indoors or out, the site location, the nozzle list, heating and insulation needs, and the containment already in place. Photos of the site help. Paul Industries returns a budget range from comparable tanks, then a fixed price once the design is confirmed.

Planning a new or replacement tank in North Dakota?

Send the contents, volume, site location and any size limits, and Paul Industries will design and price the tank with its containment and freeze protection. Call 201-450-8280 or request a quote.