Paul Industries is a data center mechanical contractor in Illinois, building central chiller plants, heat rejection, chilled water and condenser water piping, liquid cooling distribution, generator fuel systems and prefabricated pipe racks and skids for colocation, hyperscale and enterprise campuses from Elk Grove Village and the O’Hare corridor to Aurora, DeKalb and downstate. Illinois campuses are built under a project labor agreement when they hold a state incentive agreement, inside a municipal code patchwork, and around power deliveries from ComEd or Ameren, and the mechanical plan has to fit all three. Paul Industries works design-build, to the owner’s engineered design, or as supply-only prefabrication.
Request a quote or call 201-450-8280
What does a data center mechanical contractor in Illinois build?
A data center mechanical contractor in Illinois builds everything that moves heat and fluid on the campus: chillers, cooling towers or dry coolers, pumps and plate heat exchangers in the central plant; the mains that carry chilled and condenser water to each building; CRAH galleries, fan walls and the piping that feeds them; CDUs and row manifolds for liquid-cooled racks; fuel oil storage and piping for the generators; and the domestic water, makeup water and drainage that keep the plant running. On most Illinois campuses that work also includes freeze protection, heat tracing and winter enclosures that milder markets can skip.
The national description of the mechanical scope, from yard to rack, is on the data center mechanical contractors page. This page covers what an Illinois campus adds: the state’s incentive program and its labor terms, the way codes are adopted village by village, the plumbing law that governs part of the scope, the power market behind the schedule, and the places the next phases are being built.
Where are data centers in Illinois being built?
Data centers in Illinois cluster in the northwest suburbs around O’Hare, with Elk Grove Village holding more agreements than any other municipality, and spread west along I-88 and north into Lake County, with a growing set of large sites farther out where power is easier to obtain. The state’s own records show the pattern: of the 34 data centers that signed Data Center Investment Program agreements with the Department of Commerce and Economic Opportunity (DCEO) through the end of 2025, 14 are in Elk Grove Village, five in Chicago, three in Northlake and two in Aurora, with one each in Franklin Park, Itasca, Hoffman Estates, DeKalb, Volo, Des Plaines, Wood Dale, Yorkville, Grayslake and Lisle.
| Municipality | Agreements | Years signed | Mechanical setting |
|---|---|---|---|
| Elk Grove Village | 14 | 2020 to 2025 | Dense business park; multi-story halls, tight yards, phased campuses |
| Chicago | 5 | 2020 to 2025 | Existing and converted buildings; roof heat rejection, staged tie-ins |
| Northlake | 3 | 2021 and 2024 | Purpose-built campuses near the O’Hare corridor |
| Aurora | 2 | 2022 and 2024 | I-88 corridor campuses with yards for central plants |
| Franklin Park, Itasca, Wood Dale, Des Plaines | 1 each | 2020 to 2024 | Industrial parks around O’Hare; reused and new buildings |
| Hoffman Estates, Lisle, Yorkville | 1 each | 2021 to 2025 | Larger suburban sites with room for phased plants |
| DeKalb, Volo, Grayslake | 1 each | 2021 to 2025 | Outer sites with space for large yards and dry cooler fields |
Each row in that table is a mechanical market in itself. An Elk Grove Village Illinois data center usually sits on a small parcel with equipment stacked on roofs and in narrow yards, while the DeKalb, Illinois data center agreement, at an $800 million investment commitment the biggest single figure in the DCEO list, covers a campus with room to spread. A Wood Dale, Illinois data center agreement was signed in 2024, and agreements for a Yorkville, Illinois data center the same year and for a Grayslake, Illinois data center and a Lisle, Illinois data center in 2025 show the market moving outward. The earliest agreements, such as the Itasca, Illinois data center signed in 2020, sit in the original O’Hare-area cluster.
New data centers in Illinois follow the power
New data centers in Illinois are following power availability more than proximity to Chicago. CBRE’s first-half 2026 report for the Chicago market describes developers prioritizing power over traditional location factors, notes 1-gigawatt campuses planned in Coal City and Morris, and records a vacancy rate of 2.2 percent, with no contiguous space of 5 megawatts or more expected to be available during the year and large contiguous projects delivering in late 2027 at the earliest. For upcoming data centers in Illinois, that means larger sites, longer yard piping runs, bigger central plants and phasing tied to utility energization dates rather than tenant leases alone.
Gigawatt-scale sites change the mechanical work in kind as well as size. Central plants are split into repeated modules so each building or block of halls gets identical equipment, which shortens design, purchasing and testing for every later phase. Yard mains run hundreds or thousands of feet and need anchoring, expansion provisions, leak detection and freeze protection along their whole length. Water supply, whether from a municipal system, wells or a dedicated treatment plant, becomes a design input in its own right, and many large sites lean toward dry coolers or hybrid heat rejection to limit evaporation. Paul Industries plans these campuses as a series of identical mechanical packages, prefabricated in parallel and set in the order the utility energizes each block, so the first building’s lessons improve every one that follows.
How many data centers in Illinois hold state incentive agreements, and what do the agreements require of contractors?
DCEO counts 34 data centers in Illinois holding Data Center Investment Program agreements as of December 31, 2025, with about $10.7 billion in committed investment and 731 committed jobs. Each agreement brings conditions that reach the construction site: the project is built under a labor agreement that DCEO has approved, and each contractor on it satisfies the Procurement Code’s responsible bidder section, 30-22, with proof filed with the Department.
For a mechanical contractor, those terms decide how crews are staffed and paid, which apprenticeship and safety records must be kept, and what goes into the compliance file the operator submits. Sites in underserved areas can also earn a construction wage credit equal to 20 percent of construction wages, though DCEO reported that no credit certificates had been issued through 2025. In June 2026 the Governor directed DCEO to stop entering new agreements from July 1, 2026 while lawmakers consider data center regulation; existing agreements and earlier applications continue. Paul Industries sets up labor agreement and responsible bidder records for the mechanical scope at the start of the project, before the first shop drawing is released.
Illinois codes on the mechanical scope
Illinois codes reach the mechanical scope of a data center through several separate laws, because the state leaves commercial building codes to each municipality and county while setting the energy code, the plumbing code and licensing, boiler and pressure vessel rules, and fuel tank rules at the state level. A campus in Elk Grove Village and one in Aurora can therefore sit under different building and mechanical code editions while sharing the same state energy and plumbing requirements.
| Rule | Who administers it | What it covers on a data center |
|---|---|---|
| Municipal building and mechanical code | The village, city or county | Edition and amendments vary; permits, inspections and witnessed pressure tests |
| Illinois Energy Conservation Code or Chicago Energy Transformation Code | State (Capital Development Board) or City of Chicago | Equipment efficiency, ASHRAE 90.4 compliance, commissioning reports |
| Illinois Plumbing License Law and Illinois Plumbing Code | Illinois Department of Public Health; many municipalities adopt the code | Domestic water, drainage, makeup water connections and backflow protection |
| Boiler and Pressure Vessel Safety Act | Office of the State Fire Marshal | Boilers and larger pressure vessels; small vessels within set volume and pressure limits are exempt from inspection |
| Underground storage tank rules, 41 Ill. Adm. Code 174 to 177 | Office of the State Fire Marshal | Underground generator fuel tanks, permits and technical requirements |
| Generator emission permitting | Illinois EPA, under the Clean and Reliable Grid Affordability Act and air permits | Run hours and testing of backup generators |
Plumbing law and the data center scope
The Illinois Plumbing License Law requires that all planning and designing of plumbing systems, and all plumbing work, be performed by plumbers holding a license under the Act, and the Illinois Plumbing Code issued by the Department of Public Health sets the technical rules that many municipalities adopt, some with amendments. On a data center the plumbing scope includes domestic water, sanitary and storm drainage, and the potable water connections that feed cooling tower makeup and humidifiers, with backflow prevention between potable supply and process systems. Chilled water, condenser water and fuel piping are process and mechanical systems built to ASME B31.9 or B31.3 and the mechanical code. Paul Industries sets the boundary between the two on the drawings so each part is permitted and inspected under the right rule.
Pressure vessels and fuel tanks
Pressure vessels on a data center, such as expansion tanks, air separators, compressed air receivers and filter housings, come under the Illinois Boiler and Pressure Vessel Safety Act administered by the Office of the State Fire Marshal unless an exemption applies; vessels operating at 15 psig or less, and vessels within 15 cubic feet and 250 psig outside places of public assembly, are exempt from its inspection sections. Larger vessels arrive built to ASME Section VIII with their data reports, and the owner keeps them on the inspection cycle. Underground fuel tanks for generators follow the Fire Marshal’s storage tank rules, while day tanks and aboveground storage follow the fire code the municipality has adopted.
Power, PJM and the mechanical schedule
Power decides the mechanical schedule on most Illinois campuses, because a building cannot run its chillers until the utility energizes the substation that feeds it. ComEd serves northern Illinois inside PJM, whose capacity auction for the 2027/2028 delivery year cleared at its cap of $333.44 per megawatt-day after data centers accounted for about 5,100 of the 5,250 megawatts of forecast load growth; Ameren Illinois serves central and southern Illinois inside MISO.
A mechanical schedule tied to energization dates needs float in the right places. Paul Industries prefabricates and stores pipe racks and skids so field installation can start when the building is ready, plans temporary power for flushing pumps where permanent power lags, and sequences testing so systems that need utility power for full-load tests are ready the day it arrives. Where a utility date slips, prefabrication already complete protects the schedule more than any field acceleration can.
Prefabrication for Illinois campuses
Prefabrication suits Illinois campuses for two reasons beyond speed: winter, which slows field welding and testing for several months a year, and tight suburban sites such as those in Elk Grove Village, where yards and laydown areas are small. Multi-trade pipe racks, pump skids, chiller connection modules and CDU headers built off site in heated, controlled conditions arrive tested and ready to set, and field work shrinks to connections.
Paul Industries builds racks and skids to the project’s coordinated model, hydrostatically tests and cleans them before shipping, caps and labels every opening, and delivers them in the order the erection sequence calls for. The fabrication practices are described under pipe fabrication, and the field welding standards on industrial welding services in Illinois.
Data center mechanical design decisions an Illinois contractor needs early
Data center mechanical design decisions that an Illinois contractor needs early are the ones that set long-lead equipment and prefabrication: supply water temperature and whether liquid cooling is planned, heat rejection type and the water allocation behind it, redundancy level, header sizes for the final build-out, and the freeze protection approach for every outdoor component. Changes after racks and skids are in fabrication cost far more than the same changes on paper.
Paul Industries works in design-assist with the owner’s engineers where the contract allows, pricing alternatives and flagging constructability issues before the design is fixed. The plant-level choices are discussed on data center cooling in Illinois, liquid cooling distribution on data center liquid cooling in Illinois, and yard and process piping on process piping in Illinois.
Building through an Illinois winter
Building through an Illinois winter shapes how data center mechanical systems are installed and tested between November and March. Water-filled piping has to be protected or drained whenever the building is unheated, outdoor welding needs shelter and preheat control, hydrostatic tests need temporary heat or a freeze-safe medium, and concrete pads and yard trenches have to be scheduled around frozen ground. O’Hare’s 99.6 percent winter design temperature is 6 degrees below zero, and construction plans should assume nights near it.
Paul Industries plans the winter months as their own phase: enclosure and temporary heat dates drive test dates, outdoor work moves into prefabrication where possible, and every filled system has a written freeze plan until permanent heat and controls take over. Testing and turnover then follow the program on data center commissioning in Illinois.
Chicago data center construction inside existing buildings
Chicago data center construction often happens inside existing buildings: carrier hotels, former printing plants and warehouses converted to data halls. Mechanical work there contends with structural limits for roof equipment, crane permits and street closures for rigging, freight elevator sizes for pipe and equipment, and operating tenants who need cooling every hour of the project. The Chicago data center market, with five DCEO agreements inside the city and many smaller halls outside the program, keeps a steady volume of that retrofit and expansion work.
Paul Industries plans Chicago projects around access first: equipment sizes are checked against openings and elevators, pipe is prefabricated in lengths the building can take, and tie-ins to operating plants are staged under methods of procedure the operator approves.
Data center mechanical systems on an Illinois campus, from yard to rack
The data center mechanical systems on an Illinois campus run in a chain from the yard to the rack, and each link carries an Illinois detail that a warm-climate campus can leave out. The table follows that chain and notes what Paul Industries builds at each link.
| System | Illinois detail | Paul Industries scope |
|---|---|---|
| Heat rejection yard | Freeze protection, snow and wind loading, water allocation for towers | Tower or dry cooler setting, basin heat, heat tracing, yard piping |
| Central chiller plant | Economizer heat exchangers for a long free cooling season; low condenser water protection | Chillers, pumps, plate exchangers, headers, valves and controls connections |
| Campus mains | Underground runs below frost or heat-traced overhead racks | Welded or grooved mains, expansion, anchors, isolation for future phases |
| Building distribution | Multi-story halls on tight suburban parcels | Risers, gallery piping, CRAH and fan wall connections |
| Liquid cooling | Warm-water loops that dry coolers can serve most of the year | CDUs, row manifolds, technology cooling loops, fill and treatment |
| Fuel systems | State tank rules and generator emission permits | Day tanks, transfer pumps, fuel piping, leak detection |
| Plumbing and makeup water | State plumbing law and municipal code adoption | Domestic water, drainage, backflow protection, tower makeup connections |
Working inside operating Illinois halls
Working inside operating Illinois halls is a large share of mechanical work on the state’s established campuses, since many of the earliest agreement holders around O’Hare are now adding capacity, changing cooling architecture or replacing first-generation equipment. Every task near live IT equipment runs under the operator’s change control, with a method of procedure that names the systems affected, the redundancy confirmed before work starts, the steps, the readings to watch and the rollback.
Hot work beside running servers needs fire watch, spark containment and smoke detection plans agreed with the operator; grooved or press connections replace welding where the risk is too high; and dust control keeps construction debris away from air intakes. Paul Industries schedules the noisiest and riskiest steps into the operator’s maintenance windows and leaves each area clean and tested before handing it back.
Service after turnover on an Illinois campus
Service after turnover keeps an Illinois campus plant reliable through the seasons it was designed for: autumn freeze readiness checks, spring tower and chiller startups, water treatment oversight, glycol testing, pump and valve maintenance, and repairs when equipment fails. The team that built the plant knows where every valve and test port sits, which shortens every later visit. Paul Industries offers service agreements that cover central plants, building systems and liquid cooling loops together, with chiller work described on the chiller repair pages for the state.
How much does a data center mechanical package cost in Illinois?
The cost of a data center mechanical package in Illinois depends on plant capacity and redundancy, the heat rejection choice, liquid cooling scope, the length of yard and building mains, the share prefabricated, winter conditions during installation, site access, and labor terms under the project labor agreement or prevailing wage where they apply. A phase that adds equipment to an existing central plant costs less per megawatt than a first phase that builds the plant’s backbone for the full campus.
Paul Industries prices from the design documents and the phasing plan, giving a budget range from comparable scope at schematic design and a firm price when drawings are complete. Supply-only prefabrication packages, installation to the owner’s design, and design-build scopes are each priced on the same basis so the owner can compare routes.
Who builds the mechanical scope on Illinois data center campuses?
Paul Industries builds the mechanical scope on Illinois data center campuses. Formerly based in northern New Jersey and later in Pennsylvania, the company now has its headquarters at 256 Shore Drive in Kilmarnock, Virginia, and the East Coast contractor takes data center mechanical work throughout Illinois, every other state and abroad. Its scope runs from central plants and yard piping through building mechanical systems and liquid cooling to fuel systems, testing and service.
The headquarters-state version of this work is on data center mechanical contractor in Virginia, a comparison market with its own labor and water rules on data center mechanical contractor in Pennsylvania, and the regional overview on the Midwest page.
Data center mechanical work from Paul Industries across Illinois
Paul Industries delivers data center mechanical systems across Illinois: design-assist, prefabricated racks and skids, central plants, building and yard piping, liquid cooling distribution, fuel systems, testing and commissioning support, and service after turnover. Send the drawings or design narrative, the phasing plan with utility dates, the labor terms and the site location. Other Illinois plant services appear on the Illinois page. Call 201-450-8280 or request a quote.
Standards referenced: ASME B31.9 · ASME B31.3 · ASME Boiler and Pressure Vessel Code, Section VIII · Illinois Plumbing License Law (225 ILCS 320) · Illinois Plumbing Code (77 Ill. Adm. Code 890) · Illinois Boiler and Pressure Vessel Safety Act (430 ILCS 75) · 41 Ill. Adm. Code 174-177 (underground storage tanks) · Illinois Energy Conservation Code (2024 IECC) · Illinois Prevailing Wage Act (820 ILCS 130)
Frequently asked questions
Which contractor builds data center mechanical systems in Elk Grove Village?
Paul Industries builds data center mechanical systems in Elk Grove Village, home to 14 of the 34 data centers with state incentive agreements through 2025. Parcels there are small, so central plants often go on roofs or in narrow yards, and prefabricated racks and skids reduce the field work. Paul Industries plans phases so new equipment connects to operating plants under written procedures.
Does Paul Industries take data center mechanical work in Chicago?
Paul Industries takes data center mechanical work in Chicago, from converted industrial buildings to carrier hotels near the Loop. Projects there are shaped by rigging permits, roof structure, freight elevator sizes and tenants who need cooling throughout the work. Paul Industries prefabricates pipe in lengths the building can take and stages each tie-in to operating systems with the operator’s approval.
Who builds data center plants in Aurora, Lisle, Yorkville and the I-88 corridor?
Paul Industries builds data center central plants, yard piping and building mechanical systems in Aurora, Lisle, Yorkville and along the I-88 corridor, where sites tend to be larger and campuses grow in phases. Headers and valves are sized for the final build-out, with capped branches for future equipment. Paul Industries ties each phase to utility energization dates so the plant is ready when power arrives.
Does Paul Industries build data center mechanical systems in DeKalb, Grayslake and outer northern Illinois?
Paul Industries builds mechanical systems for data centers in DeKalb, Grayslake, Volo and other outer northern Illinois sites, where large parcels allow wide yards, long mains and dry cooler fields. Wind exposure and snow drifting affect outdoor equipment layout there. Paul Industries designs supports, enclosures and freeze protection for open sites as part of the mechanical scope.
Can Paul Industries work on data centers in central and southern Illinois?
Paul Industries takes data center mechanical work downstate, in Springfield, Peoria, Champaign-Urbana and the Metro East, on Ameren Illinois power inside the MISO market. The state energy and plumbing rules are the same as in the north, while building code editions vary by municipality or county. Paul Industries confirms the adopted codes before submitting drawings.
Does a project labor agreement apply to an Illinois data center?
An Illinois data center holding a Data Center Investment Program agreement is built under a DCEO-approved project labor agreement, and its contractors satisfy the responsible bidder section of the Procurement Code, Section 30-22. Projects outside the program follow whatever labor terms the owner sets. Paul Industries keeps the records each set of terms requires.
Is a privately funded Illinois data center covered by the Prevailing Wage Act?
The Illinois Prevailing Wage Act applies to public works, so a privately funded data center is generally outside it unless public funding or a public body makes the project public works. Program sites carry the project labor agreement condition instead. University and state agency computing facilities are public works. Paul Industries sets up wage and payroll reporting to fit each project’s status.
Who installs generator fuel systems for Illinois data centers?
Paul Industries installs generator fuel systems for Illinois data centers, including day tanks, transfer pumps, piping and controls, with underground tanks built to the Office of the State Fire Marshal’s storage tank rules and aboveground storage to the municipality’s fire code. Generator emission permitting under the 2026 grid law affects testing. Paul Industries schedules fuel system tests within the permit’s run-hour limits.
Do expansion tanks and air receivers on an Illinois data center need state pressure vessel inspection?
Pressure vessels on an Illinois data center fall under the Boiler and Pressure Vessel Safety Act unless exempt; vessels at 15 psig or less, and vessels within 15 cubic feet and 250 psig outside places of public assembly, are exempt from inspection. Larger vessels arrive built to ASME Section VIII with data reports. Paul Industries lists each vessel’s status in the turnover records.
Which plumbing rules apply to an Illinois data center?
The Illinois Plumbing License Law requires plumbing design and work to be performed by plumbers holding a license under the Act, and the Illinois Plumbing Code sets technical rules many municipalities adopt. On a data center that covers domestic water, drainage and potable connections to tower makeup and humidifiers. Paul Industries marks the plumbing and process piping boundary on the drawings for permitting.
What does the Illinois pause on data center incentives mean for projects already under way?
The Governor’s directive pauses new Data Center Investment Program agreements from July 1, 2026; agreements signed earlier and applications filed before that date continue. Projects under way keep their exemptions and their labor and green building obligations. Projects without an agreement budget for full sales and use tax until the rules change. Paul Industries prices mechanical packages to either case.
How do PJM capacity prices affect a data center mechanical plan in northern Illinois?
PJM’s 2027/2028 capacity auction cleared at its $333.44 per megawatt-day cap, so every megawatt of summer peak a cooling plant avoids carries capacity value on ComEd service. That favors higher supply temperatures, more economizer hours, liquid cooling and efficient chillers. Paul Industries prices alternatives during design-assist so the owner can weigh first cost against peak demand.
Which parts of an Illinois data center campus are prefabricated?
Much of the mechanical scope can be prefabricated: multi-trade pipe racks, pump skids, chiller and CDU connection modules, header assemblies and many yard piping spools. The share depends on how early the design is fixed and how repetitive the buildings are. Paul Industries prefabricates in heated conditions year-round, which is especially useful for winter installation in northern Illinois.
How is a new hall tied into an Illinois campus loop that is already carrying load?
A new building can connect to an operating campus loop when isolation valves, capped branches or hot-tap points were planned for it, and the tie-in is staged under a method of procedure with redundancy confirmed first. Where provisions are missing, Paul Industries plans hot taps or temporary bypasses. New systems are flushed and tested before any valve to the live loop opens.
How should an Illinois owner compare data center mechanical contractors?
An Illinois owner comparing data center mechanical contractors should look at prefabrication capacity, winter construction planning, records for the labor agreement and responsible bidder file, testing and flushing practice, and service after turnover. Paul Industries answers all five under one contract and prices design-build, installation and supply-only routes. Call 201-450-8280 to discuss a campus.
What does the mechanical turnover file on an Illinois data center contain?
Mechanical turnover on an Illinois data center includes pressure test and flushing records, water treatment results, startup reports, commissioning results, pressure vessel data reports, plumbing inspection sign-offs, fuel system test records, as-built drawings, valve charts, manuals, training records and the labor and payroll records the project terms require. Paul Industries assembles them by building and phase.
What does Paul Industries need to price mechanical work on an Illinois data center?
Useful inputs are the drawings or design narrative, the IT load and phasing plan with utility energization dates, the labor terms that apply, the municipality and site plan, and any owner-furnished equipment lists. For expansions, add as-built drawings of the existing plant. Paul Industries returns a budget range, a phasing plan and a prefabrication strategy.
Building a data center campus or hall in Illinois?
Tell us where the campus is, how it will be phased, which labor terms apply and what design documents exist. Call 201-450-8280 or request a quote.