Paul Industries designs, prefabricates and installs data center liquid cooling in Illinois: coolant distribution units, row manifolds, technology cooling loops, facility water connections and the heat rejection that serves them, for colocation suites, hyperscale halls and research computing from the O’Hare corridor and downtown Chicago to the I-88 corridor and Champaign-Urbana. Northern Illinois weather lets warm-water loops reject heat with little or no compressor energy for most of the year, and the state’s incentive program asks large data centers to prove an energy or green building standard, so liquid cooling here is as much an operating cost decision as a density one.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State program DCEO Data Center Investment Program; 34 agreements signed through 2025
Green standard Required within two years of service under that program
Warm hours About 576 hours a year above 80 F at O'Hare
Capacity price PJM 2027/2028 cleared at $333.44 per MW-day
Reviewed November 2026

Why does data center liquid cooling in Illinois start with water temperature?

Data center liquid cooling in Illinois starts with the choice of facility water temperature, because that one number decides how many hours a year dry coolers alone can carry the load in a climate where outdoor air sits above 80 degrees Fahrenheit for only about 576 hours a year at O’Hare. Pick a warm enough supply and the chillers become trim equipment for a few weeks of summer; pick a cold one and the plant runs compressors far more than the weather requires.

ASHRAE names its liquid cooling classes by the upper limit of facility water supply temperature in degrees Celsius: W17, W27, W32, W40, W45 and W+. W32 water, at 89.6 degrees Fahrenheit or below, can come from dry coolers whenever the air is cool enough to leave a working approach, which in northern Illinois covers all but the warmest afternoons. W40 water, at up to 104 degrees, rides through nearly every hour on record, since O’Hare’s weather data show only about 29 hours a year above 93 degrees. The server hardware decides how warm the loop may run, so the class is set with the IT vendor’s cold plate limits in hand.

ASHRAE facility water classes and what each means for heat rejection in northern Illinois
ClassUpper supply temperatureHeat rejection in a northern Illinois year
W1717 C (62.6 F)Chillers needed through much of the warm season; economizer in the cold months
W2727 C (80.6 F)Dry coolers or towers for most hours; chillers for summer and humid spells
W3232 C (89.6 F)Dry coolers for all but the warmest afternoons; adiabatic or chiller trim in summer
W4040 C (104 F)Dry coolers nearly year-round; trim only on rare extreme days
W45 and W+45 C (113 F) and aboveCompressor-free heat rejection; heat recovery becomes practical

Winter flips the problem. A warm-water loop exposed to minus 6 degrees Fahrenheit, O’Hare’s 99.6 percent design condition, needs glycol or an intermediate heat exchanger on the outdoor side, and the technology cooling loop that touches the servers stays on treated water or the coolant the IT vendor specifies. Paul Industries separates those circuits so the cold plates never see glycol they were not qualified for, and so a dry cooler can freeze-protect itself without touching the rack loop.

How does the Illinois data center incentive program touch liquid cooling?

The Illinois data center incentive program touches liquid cooling through its energy requirement: under the Data Center Investment Program run by the Department of Commerce and Economic Opportunity (DCEO), a qualifying data center must show within two years of being placed in service that it is carbon neutral or has attained a recognized green building or energy standard, such as ENERGY STAR, LEED, ISO 50001, Green Globes, BREEAM, Envision or UL 3223. Cooling is a large controllable energy load in most halls, so the cooling design carries much of the weight of that showing.

The program’s other conditions shape how a liquid cooling project is contracted rather than how it is designed: at least $250 million of capital investment between the operator and its tenants, at least 20 new full-time jobs paying at least 120 percent of the county average wage, a project labor agreement approved by DCEO, and contractors that meet the responsible bidder requirements of Section 30-22 of the Illinois Procurement Code. In return, the operator and its tenants receive the Illinois data center sales tax exemption, relief from the state retailers’ occupation and use taxes, the retailers’ occupation taxes imposed by municipalities and counties, and the Chicago non-titled use tax, for up to 20 years, issued in five-year certificates.

Data Center Investment Program terms and where liquid cooling work meets them
Program termRequirementWhere the liquid cooling scope meets it
Capital investmentAt least $250 million, owner and tenants combinedCDUs, manifolds, piping and heat rejection are part of the documented investment
Green building or energy standardCarbon neutral or an approved standard within two years of serviceWarm-water loops and economizer hours lower the cooling energy that the standard measures
LaborProject labor agreement approved by DCEOInstallation follows the agreement that governs the project
Contractor responsibilityCompliance with Procurement Code Section 30-22Contractor records supplied to the operator for its evidence file
Tax benefitSales and use tax exemptions for up to 20 yearsQualifying equipment purchases documented against the exemption certificate

DCEO reports 34 agreements signed from the program’s start in 2019 through the end of 2025, with about $10.7 billion in committed investment. Those agreements continue, along with applications filed before July 1, 2026, the date from which the Governor directed DCEO to pause new agreements.

Illinois data center incentives therefore split current projects into two groups. Operators that hold an agreement keep the Illinois data center tax exemption on qualifying purchases, including cooling equipment bought under the exemption certificate, and still owe the green building or energy showing on schedule. Projects without an agreement plan their budgets on full sales and use tax for equipment until the General Assembly and DCEO settle what replaces the pause. For a liquid cooling package worth tens of millions of dollars in CDUs, manifolds, pumps, heat exchangers and dry coolers, that difference is large enough to change the order in which equipment is bought. Paul Industries keeps purchase records sorted by certificate, tenant and building so the operator can show which items the exemption covers.

What does Illinois data center legislation mean for a liquid cooling plan?

Illinois data center legislation is in motion, and a liquid cooling plan written today should expect rules on power, water and emissions to tighten rather than loosen. In June 2026 the Governor paused new tax incentive agreements and asked the General Assembly to settle a regulatory framework; the POWER Act, an Illinois data center bill that would have required large data centers to supply their own renewable energy, track water use and sign community benefits agreements, did not pass before the spring session ended on May 31, 2026.

One piece is already Illinois data center law. The Clean and Reliable Grid Affordability Act, signed on January 8, 2026, adds emission permitting requirements for diesel and natural gas backup generators serving data centers. That reaches the mechanical scope indirectly: generator run hours during commissioning and outage testing are planned with the air permit in view, and a cooling design that rides through short outages on pumps fed from UPS power asks less of the generators.

For liquid cooling specifically, the trend favors designs that use little water and little compressor energy, which is exactly where a warm-water loop on dry coolers lands in northern Illinois.

Data center liquid cooling vs air cooling on ComEd power

Data center liquid cooling vs air cooling on ComEd power is a comparison of fan and compressor energy against pump energy, priced at Illinois rates that include PJM capacity costs. The PJM capacity price for the 2027/2028 delivery year settled at the auction cap of $333.44 per megawatt-day, so every megawatt a design removes from the summer peak carries a capacity value on top of the energy saved.

As an illustration, a dense hall whose liquid cooling design avoids 2 megawatts of average chiller and air-moving power saves about 17,520 megawatt-hours a year; priced at the 8.83 cents per kilowatt-hour that Illinois industrial customers averaged in 2024 (EIA), that is roughly $1.55 million. Halls in central and southern Illinois on Ameren power work the same arithmetic with MISO capacity prices and Ameren tariffs. Paul Industries builds the comparison from the owner’s rack plan, IT load ramp and tariff before the cooling architecture is fixed.

Data center liquid cooling technologies for Illinois halls

The data center liquid cooling technologies going into Illinois halls fall into three families: direct-to-chip cold plates fed by coolant distribution units, rear-door heat exchangers on air-cooled racks, and immersion tanks. Each draws on the same facility water but asks different things of the building, and many halls end up with two of them side by side.

Liquid cooling families compared for Illinois halls
FamilyHeat taken by liquidFacility water it suitsWhat the building must provideTypical Illinois fit
Direct-to-chip cold platesMost of the server heat; residual air load remainsW27 to W45, set by the cold plate limitsCDUs, row manifolds, quick disconnects, water quality program, residual air coolingNew hyperscale halls and dense colocation suites
Rear-door heat exchangersThe rack’s exhaust air heat, captured at the doorCool water held above the room dew pointSupply to each rack, isolation valves, condensation controlColocation suites that keep standard racks
Single-phase immersionNearly all server heat into the dielectric fluidWarm facility water through tank heat exchangersFloor loading, fluid storage and handling, service clearancesDedicated halls and research computing rooms

Direct-to-chip systems are the usual choice for new dense deployments because they keep the server form factor and let the residual air load ride on a smaller CRAH or fan wall system. Rear doors are the gentlest step for an operating colocation suite, since the racks stay where they are and only water is added to the row. Immersion asks the most of the room and is chosen where heat per rack position outruns what cold plates and air together can handle; tank-based systems are covered under data center immersion cooling.

What happens to the air system when liquid cooling arrives?

The air system in an Illinois hall does not disappear when liquid cooling arrives; it shrinks and changes job, because cold plates leave memory, power supplies, storage and network gear rejecting heat to air, and the room still needs filtration, pressurization and humidity limits. In a direct-to-chip hall the residual air load is commonly a minority share of the IT heat, and the CRAHs or fan walls are sized for that share plus the heat from CDUs, piping and lighting.

Existing halls that add liquid-cooled rows face the opposite problem: CRAH units sized for full air cooling now run at very low load, where fan control, valve authority and dehumidification behave poorly. Paul Industries reviews CRAH sequences and setpoints when liquid rows go in, and in Illinois winters checks that dry outdoor air brought in for pressurization does not drive room humidity below the range the IT vendors accept. The facility water feeding both systems may need two temperatures, colder for the remaining air side and warmer for the liquid side, which a mixing station or separate CDU heat exchanger provides.

Building the loops: CDUs, manifolds and data center liquid cooling piping

Data center liquid cooling piping in an Illinois hall runs from the facility water mains to each CDU, and from each CDU through row headers and rack manifolds to the cold plates, with every joint, valve and branch chosen for cleanliness and leak tightness. Facility-side mains are commonly welded or grooved carbon steel or stainless, built to ASME B31.9 or B31.3 as the project specifies, and technology cooling loops are stainless or approved polymer with the fittings the IT vendor accepts.

Paul Industries prefabricates spools and manifolds off site in clean conditions, caps and bags them for delivery, and installs them with the hall’s cleanliness rules in force. Each loop is pressure tested, flushed to a measured particle and water quality standard, filled, vented and chemically treated before any rack is connected. Welding on stainless headers follows the procedures described on industrial welding services in Illinois, and the facility-side mains tie into the plant described on data center cooling in Illinois.

Data center liquid cooling challenges in operating Illinois buildings

The data center liquid cooling challenges in an operating Illinois hall are mostly about working beside running servers: routing new pipe overhead or under a raised floor without disturbing airflow, making hot-tap or cold tie-ins to a live chilled water main, and keeping dust and moisture away from equipment. Older buildings in Chicago add structural checks for heavier liquid-cooled racks and coolant-filled piping, and limited ceiling height can force CDUs into rows rather than gallery rooms. Paul Industries surveys those constraints first and writes a method of procedure for every step that touches an operating system.

Leak detection and response

A data center liquid cooling leak is rare in a loop that was built, tested and filled correctly, but the design still assumes one will happen. Leak detection cable runs under manifolds and CDUs, drip trays sit under quick disconnects where the layout allows, and isolation valves let operators shut down a single rack or row instead of a whole loop. CDU controls watch pressure and flow for the slow loss that signals a weeping fitting before it becomes a puddle.

Proving a new loop: pressure, flush and fill records

A new liquid cooling loop in an Illinois hall is proven in three steps before any server connects: a pressure test of every joint at the value the design specifies, a flush that runs until particle counts and water clarity meet the acceptance limit written into the specification, and a controlled fill with treated water or the specified coolant, followed by venting and sampling. Skipping or shortening any step shows up later as blocked cold plate channels, air-locked manifolds or early corrosion.

Winter adds two Illinois details. Hydrostatic tests in an unheated shell need temporary heat or a test medium that will not freeze, and a loop filled with water during construction has to be kept warm or drained before a cold snap reaches it. Paul Industries schedules testing and filling around building enclosure and heat, records each test with gauge serial numbers and hold times, and keeps flush and fill samples on file as the baseline for the operator’s coolant program.

Can server heat from an Illinois hall be put to use?

Server heat from an Illinois hall can be put to use when the liquid cooling loop runs warm enough, because water leaving cold plates at W40 or W45 temperatures carries heat at a level useful for space heating, domestic water preheat or process loads on the same campus. Northern Illinois has a long heating season, so an adjoining office wing, warehouse or greenhouse can absorb recovered heat for much of the year.

Heat recovery needs a buyer for the heat at the right time and temperature, a heat exchanger that keeps the IT loop isolated from the heating system, and controls that put cooling of the IT load ahead of the heating demand. Where recovered water is too cool for direct use, a heat pump can lift it to heating temperatures. Paul Industries designs the exchanger, piping and controls so the data center keeps full cooling whether or not the heat customer is drawing.

Data center liquid cooling system maintenance after turnover

Data center liquid cooling system maintenance centers on coolant quality, filtration and the moving parts of the CDUs. Coolant is sampled on a schedule for pH, conductivity, inhibitor level, microbial growth and particles; filters and strainers are changed on differential pressure; CDU pumps, valves and controls are inspected; and quick disconnects are checked for wear when racks move. In northern Illinois the outdoor glycol side adds an autumn freeze point test and a check of dry cooler fans and controls before the first deep cold.

Paul Industries offers that program under a service agreement that can also cover the chillers, dry coolers and pumps on the facility side, so a coolant problem is traced through both loops by the same team. Testing and turnover records from the original installation are the baseline for every later sample.

Liquid cooling cost in Illinois: rows, loops and plant changes

Liquid cooling cost in Illinois is driven by the number of racks and their heat load, the choice of CDU arrangement, the length and material of the facility and row piping, the work needed to bring facility water to the right temperature, and the conditions of the building, new hall or operating retrofit. A new hall designed for liquid cooling from the start avoids most retrofit costs; an operating hall pays for staged work, temporary connections and protection of running equipment.

Data center liquid cooling solutions are usually priced in two parts: the row-side scope of CDUs, manifolds and technology cooling loops, and the facility-side scope of mains, heat exchangers, dry coolers and controls. A budget figure from comparable Paul Industries scope follows as soon as the rack plan and water temperature are settled, and the firm figure follows the finished design. Equipment can be supplied alone, installed to an owner’s design, or delivered design-build.

Who builds liquid cooling loops for Illinois data centers?

Paul Industries builds liquid cooling loops for Illinois data centers; headquartered at 256 Shore Drive in Kilmarnock, Virginia, the East Coast contractor takes row-side and facility-side liquid cooling work across Illinois, in every state and at sites outside the United States. The scope runs from CDU and manifold installation through facility water mains, heat exchangers and dry coolers to flushing, filling, testing and service.

Testing and turnover follow the program on data center commissioning in Illinois, campus-scale mechanical work is covered on data center mechanical contractor in Illinois, and loops outside the white space are described on closed loop cooling systems. The national picture is on data center liquid cooling; the headquarters-state retrofit view is on data center liquid cooling in Virginia, and owners with halls in more than one state can compare data center liquid cooling in Pennsylvania and the regional view on the Midwest page.

Liquid cooling from Paul Industries for Illinois data halls

Paul Industries delivers data center liquid cooling in Illinois from design through service: water temperature studies, CDU and manifold supply, prefabricated piping, installation in new and operating halls, flushing and filling, testing, and maintenance of both the rack and facility loops. Send the rack count and heat load per rack, the IT vendor’s coolant and temperature limits, the existing plant data and the building drawings. Call 201-450-8280 or request a quote; the Illinois page lists the rest of the work Paul Industries delivers in the state.

Standards referenced: ASHRAE TC 9.9 liquid cooling classes (W17 to W+) · ASHRAE Standard 90.4 · ASME B31.9 · ASME B31.3 · Illinois Data Center Investment Program (20 ILCS 605/605-1025) · Illinois Procurement Code Section 30-22 · ISO 50001 · UL 3223

Frequently asked questions

Which contractor adds liquid cooling to colocation suites around Elk Grove Village?

Paul Industries adds liquid cooling to colocation suites and cloud halls around Elk Grove Village, Itasca, Wood Dale and Franklin Park, from CDU and manifold work inside colocation suites to facility water and dry cooler additions in the yard. Many of those halls were built for air cooling, so the first step is a survey of plant capacity, supply temperature and routing space. Paul Industries prices the work from that survey.

Does Paul Industries handle data center liquid cooling in Chicago buildings?

Paul Industries handles data center liquid cooling in Chicago buildings, including carrier hotels and converted industrial buildings where ceiling height, floor loading and access for equipment set the design. Pipe is prefabricated off site, delivered in sections sized for freight elevators and stairwells, and installed in stages beside operating racks. Every tie-in to a live chilled water system follows a written procedure approved by the operator.

Who handles liquid cooling for research computing rooms in Champaign-Urbana and near Argonne in Lemont?

Paul Industries pipes liquid cooling for university and research computing rooms in Champaign-Urbana, the Lemont area and elsewhere in Illinois, where dense clusters often outgrow the air cooling of the original room. Argonne National Laboratory’s Aurora exascale system, opened to researchers in January 2025, shows the scale of research computing in the state. Paul Industries plans each loop around the cluster’s coolant and temperature limits.

Is there an Illinois data center moratorium?

Illinois has no statewide moratorium on building data centers. In June 2026 the Governor directed DCEO to stop entering new Data Center Investment Program agreements from July 1, 2026, which pauses the state tax exemptions for new applicants while lawmakers consider regulation. Agreements signed earlier continue, and municipal zoning decisions still govern individual sites. Paul Industries plans cooling work to the rules in force for each project.

What are the Illinois data center tax incentives, and do cooling purchases qualify?

The Illinois data center tax incentives under the Data Center Investment Program exempt qualifying operators and tenants from state, municipal and county retailers’ occupation and use taxes, and from the Chicago non-titled use tax, for up to 20 years, with a construction wage credit in underserved areas. Equipment bought under a valid exemption certificate, which can include cooling equipment, is covered. Paul Industries documents equipment purchases to support the operator’s certificate.

Which green building standard can an Illinois data center use to keep its exemption?

The Illinois data center investment program accepts carbon neutrality or a green building standard reached within two years of being placed in service, including ENERGY STAR, LEED, ISO 50001, Green Globes, BREEAM, Envision and UL 3223, or an equivalent DCEO approves. Cooling energy weighs heavily in most of them. Paul Industries provides the metered data, equipment efficiencies and test records that support the operator’s submission.

Where does glycol belong in a northern Illinois liquid cooling system?

The outdoor side of a liquid cooling system in northern Illinois needs glycol or another freeze protection method, since O’Hare’s 99.6 percent design temperature is 6 degrees below zero. The technology cooling loop inside the building usually stays on treated water or the vendor-specified coolant, separated from the glycol by a heat exchanger in the CDU or plant. Paul Industries keeps those circuits apart so each gets the right fluid.

How is the ASHRAE water class chosen for a new Illinois liquid-cooled hall?

Many new Illinois liquid-cooled halls target W32 or warmer facility water where the IT hardware allows it, because dry coolers can deliver that temperature for nearly all of a northern Illinois year. Colder classes such as W17 keep options open for older hardware but need chillers more often. Paul Industries models compressor hours and energy for each class against northern Illinois weather data before the choice is made.

Which data center liquid cooling companies can build both the CDU loop and the facility plant in Illinois?

Paul Industries builds both sides of a data center liquid cooling system in Illinois: CDUs, row manifolds and technology cooling loops inside the hall, and facility water mains, heat exchangers, dry coolers and controls outside it. One contract for both sides means one test program, one set of records and one team tracing any later problem across the loops. Call 201-450-8280 to discuss a project.

What sets the timeline for adding liquid cooling to a live Illinois hall?

A retrofit in an operating hall usually runs in stages over weeks to months, depending on the number of rows, the facility water work and how often the operator allows tie-ins. Prefabricated spools and manifolds shorten the time spent inside the hall. Paul Industries builds a phase plan with the operator so each stage is tested and in service before the next begins.

Can liquid cooling help an Illinois data center lower its summer peak demand?

Liquid cooling lowers summer peak demand by moving heat into warm water that dry coolers can reject with little or no compressor energy, which cuts the chiller power that peaks on hot afternoons. On ComEd service inside PJM, where the 2027/2028 capacity auction cleared at its cap, that peak reduction has value beyond the energy saved. Paul Industries quantifies it from the owner’s load and tariff.

How do Illinois generator emission rules affect liquid cooling commissioning?

The Clean and Reliable Grid Affordability Act, signed in January 2026, adds emission permitting requirements for backup generators serving data centers, so generator run time during commissioning and outage tests is planned with the air permit in view. Liquid cooling pumps and CDUs fed from UPS power ride through short outages without waiting for generators. Paul Industries plans test sequences that prove ride-through with the fewest generator hours.

What water quality does a technology cooling loop need in an Illinois hall?

A technology cooling loop needs clean, treated water or the coolant the IT vendor specifies, with conductivity, pH, inhibitor, microbial and particle limits set by the cold plate manufacturer. Fill water is treated before it enters the loop, and filtration removes particles that could block fine cold plate channels. Paul Industries fills, samples and documents the loop before any server connects.

Can rear-door heat exchangers work with an existing chilled water plant in a Chicago-area colocation hall?

Rear-door heat exchangers can use an existing chilled water plant in a Chicago-area colocation hall when the plant has spare capacity and the supply temperature stays above the room dew point. A dedicated CDU or mixing station often sets that temperature for the doors. Paul Industries checks plant capacity, pressure and dew point margin, then pipes the doors to the row with isolation for each rack.

How is liquid cooling cost per rack estimated for an Illinois hall?

Cost per rack depends on the heat load per rack, the CDU arrangement, piping lengths, whether facility water needs new heat exchangers or dry coolers, and whether the hall is new or operating. Retrofits in running halls cost more per rack than new construction. With the rack plan in hand, Paul Industries sets a budget range drawn from comparable scope, then fixes the price when the design is complete.

Which documents make up the turnover package for an Illinois liquid cooling job?

An Illinois owner receives pressure test reports, flushing and cleanliness results, fill water and coolant analyses, valve and instrument lists, CDU startup reports, as-built drawings and the functional test results for controls and alarms. Those records also support warranty claims with the CDU and cold plate makers. Paul Industries assembles them in one turnover package for the operator.

What should an Illinois operator send to price a liquid cooling project?

Helpful inputs are the rack count and heat load per rack, the IT vendor’s coolant and temperature limits, drawings of the hall and plant, current chilled water temperatures and spare capacity, and the phasing the operator expects. For an operating hall, add any limits on work hours and tie-ins. Paul Industries returns a design basis, budget range and phase plan.

Bringing liquid-cooled racks into an Illinois hall?

Send the rack count and heat load, the IT vendor’s coolant and temperature limits, and drawings of the hall and plant. Call 201-450-8280 or request a quote.