Paul Industries designs, fabricates, installs and tests process piping in Illinois for refineries, corn and soybean processors, pharmaceutical and chemical plants, food and beverage producers and heavy equipment manufacturers, in carbon steel, stainless steel, alloys and plastics. Illinois piping work sits on a legal boundary that other states draw differently: the Illinois Plumbing License Law claims every pipe that supplies water for any purpose inside a workplace, while the process side downstream is built to ASME B31.3 or B31.1. Paul Industries designs the connection between the two so each side passes its own inspection.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Design codes ASME B31.3 process, B31.1 power, B31.5 refrigeration
Plumbing line Water supply for all purposes and drainage, 225 ILCS 320
Backflow testing Before first use and at least once a year (77 IAC 890.1130)
Industrial power 8.83 cents/kWh against a US 8.13 (EIA, 2024)
Reviewed November 2026

What does process piping in Illinois include?

Process piping in Illinois includes the lines that carry raw materials, intermediates, products, solvents, chemicals, steam, condensate, compressed air, gases, refrigerants and cooling water within a plant, designed and built to ASME B31.3 for process service or B31.1 for power and steam service. At a Joliet refinery that means hydrocarbon, hydrogen and sour water lines; at a Decatur wet mill, steam, starch slurry, syrup and acid lines; at a North Chicago API plant, solvent, nitrogen and reactor jacket lines; at a Peoria or Quad Cities equipment plant, compressed air, coolant, hydraulic oil and paint system piping.

Process piping systems are judged by fluid service rather than by building type. B31.3 sorts fluids into Normal, Category D, Category M, High Pressure and High Purity service, and the category decides the examination, the leak test and sometimes the material. Category D fluids, which are nonflammable, nontoxic and within modest pressure and temperature limits, may take an initial service leak test in place of a hydrostatic test, while a Category M toxic line needs more examination and a sensitive leak test. Those are the core process piping requirements behind every Illinois piping specification Paul Industries writes.

Process piping vs plumbing under Illinois law

Process piping vs plumbing is a sharper question in Illinois than in many states, because the Illinois Plumbing License Law (225 ILCS 320) defines plumbing to include all piping, fixtures, appurtenances and appliances for a supply of water for all purposes, from the main or a private source to, within and about any building where people live, work or assemble. That definition reaches the water supply inside a factory, along with the building drain, sanitary drainage and venting out to 5 feet beyond the foundation wall.

What the definition leaves to process piping is everything that carries something other than the building’s water supply and sanitary waste: product, chemicals, steam, gases, refrigerant and process water after it has left the protected supply. The practical boundary is the point where a process system draws water from the building supply. Upstream of that point, including the backflow preventer, the work is plumbing under the Illinois State Plumbing Code (77 Ill. Adm. Code 890) with its permit and inspection; downstream, the work is process piping under the owner’s piping specification and the ASME B31 code it names.

Where Illinois draws the line between plumbing and process piping
SystemIllinois treatmentGoverning codeInspection
Domestic and potable water to fixturesPlumbing, 225 ILCS 320Illinois State Plumbing Code, 77 Ill. Adm. Code 890Plumbing inspector of the authority having jurisdiction
Water supply to process equipment, up to and including the backflow assemblyPlumbing77 Ill. Adm. Code 890.1130 for cross-connection protectionPlumbing inspection; annual backflow test
Process water, CIP and product lines downstream of the backflow assemblyProcess pipingASME B31.3, ASME BPE or 3-A where specifiedOwner’s inspector and the piping specification
Steam and condensate, plant headersProcess or power pipingASME B31.1, or B31.3 inside a process unitOwner’s inspector; boiler inspector at the boiler
Boiler external pipingPart of the boilerASME Section I with B31.1Boiler inspector under 430 ILCS 75
Ammonia refrigerationRefrigeration pipingASME B31.5 and IIAR 2Mechanical code authority and owner
Building drain and sanitary wastePlumbing to 5 feet beyond the foundationIllinois State Plumbing CodePlumbing inspection
Fuel piping on regulated tanksTank pipingOSFM Parts 160, 175 and 180OSFM; aboveground FRP piping not accepted

Cross-connections: where a process line meets the water supply

Cross-connection control is where most Illinois process piping projects meet the plumbing code, because a CIP skid, a chemical make-up tank, a cooling loop or a hose station all draw from the potable supply and could push contaminated water back into it. Section 890.1130 of the Illinois State Plumbing Code requires an inlet to a vat, tank or receptacle containing a high hazard substance to be protected by a fixed air gap, a reduced pressure principle backflow preventer assembly or an atmospheric vacuum breaker, matched to the connection.

The assemblies are tested before initial operation and at least once a year after that, with testing records kept at the site. Illinois EPA’s community water supply rules in 35 Ill. Adm. Code 604 require those tests to be made by a person the Agency or its designee has approved as a cross-connection control device inspector, and require the water supplier to keep records of every backflow preventer that needs annual testing. Paul Industries designs process tie-ins with the air gap or RPZ assembly placed for testing access and drainage, and includes the first test record in the turnover package.

Illinois plants and the piping they run

Illinois plants span four piping worlds: refineries and chemical plants, corn and oilseed processing, pharmaceutical and food manufacturing, and heavy equipment and metalworking. Each has its own materials, codes and outage pattern.

  • Refining and chemicals. EIA’s January 1, 2026 capacity data puts Wood River at 345,000 barrels per calendar day, Joliet at 267,000, Robinson at 253,000 and Lemont at 188,023. Piping there runs under B31.3 and the OSHA process safety management standard, whose mechanical integrity element covers piping inspection and testing; in-service inspection follows API 570.
  • Corn and oilseed processing. Decatur, Peoria and central Illinois wet mills and crush plants run steam, starch, syrup, oil, solvent and acid lines in carbon and stainless steel. ADM’s June 2026 Decatur plan of more than $103 million covers its west and east soybean plants and the replacement of aging control systems at its corn wet mill.
  • Pharmaceutical and food. North Shore API plants and Chicago-area food and beverage producers run stainless process piping, with orbital-welded sanitary tubing on product contact covered on sanitary process piping in Illinois.
  • Heavy equipment and metalworking. Caterpillar reported more than 17,000 Illinois employees in July 2026, and Deere’s Quad Cities factories include Harvester Works in East Moline and its Seeding and Cylinder Operations in Moline. Those plants run large compressed air, coolant, hydraulic and paint line piping networks.

Writing process piping specifications for an Illinois plant

Process piping specifications for an Illinois plant set the material, rating, wall thickness, joint type, gaskets, bolting, valves, examination and leak test for each fluid service class, and they are the document every weld and every test on the job answers to. A good specification names the code edition, the corrosion allowance, the minimum design metal temperature for outdoor lines and the examination percentage for each class, so the fabricator and the inspector work from the same numbers.

Typical Illinois piping classes by service
ServiceTypical materialCode and fluid categoryLeak test
Hydrocarbon and hydrogen, refinery unitsCarbon steel, chrome-moly at high temperatureB31.3 Normal or High PressureHydrostatic at 1.5 times design pressure, or pneumatic where water is barred
Plant steam and condensateCarbon steel, A106 Grade B typicalB31.1Hydrostatic per B31.1
Starch slurry and syrup304 or 316 stainlessB31.3 Normal, Category D where it qualifiesHydrostatic, or initial service for Category D
Solvents, API plants316L stainless, alloy where chlorides demandB31.3 Normal or Category MHydrostatic plus sensitive leak test for Category M
Ammonia refrigerationCarbon steel, low-temperature gradesB31.5 and IIAR 2Pneumatic per IIAR 2
Compressed air and coolantCarbon steel, stainless or aluminumB31.3 Category D or B31.9Initial service or pneumatic
Acids and causticLined steel, CPVC, PVDF or alloyB31.3 Normal, Chapter VII for nonmetallicHydrostatic at the material’s limits

Spool fabrication, tie-ins and Illinois turnarounds

Spool fabrication for Illinois plants is planned around the outage that will receive it, because refineries, wet mills and continuous food plants open their lines only during scheduled turnarounds. Paul Industries surveys tie-in points with the plant running, builds and examines spools off site, hydrotests them before delivery where the design allows, and stages them by tie-in so the outage is spent fitting and welding closures rather than measuring.

Hot taps and line stops let some tie-ins happen with the process running, subject to the plant’s hot work and isolation programs and to a calculation of the wall’s capacity at the tap. Where a tie-in must wait for the outage, Paul Industries prepares the isolation list, the blind list and the weld map for each tie-in in advance, and lines up the examination and testing so the system returns to service on schedule. Welding procedures and welders are qualified to ASME Section IX, the edition Illinois adopted for boilers and vessels in April 2026, and the welding side of the job is detailed on industrial welding services in Illinois.

Tie-in methods at operating Illinois plants
MethodWhen it fitsWhat has to be settled firstRecords produced
Outage tie-inAny line the turnaround drains and isolatesIsolation and blind lists, spool fit-up dimensions, examination and test planWeld map, examination reports, leak test record
Hot tapBranch onto a live line that cannot be emptiedWall thickness and remaining strength at the tap, fluid and temperature limits, hot work permitThickness readings, fitting weld examination, tap test
Line stopSection of a live line to replace or rerouteTwo hot taps and stopping fitting rating; bypass if flow must continueAs above, plus completion plug records
Flanged spool swapLines with existing flanges near the workGasket and bolting specification, flange face condition, torque valuesBolt torque records, leak test
Closure weld without full hydrotestWhere the code allows a closure weld to be examined in place of a testOwner’s acceptance and the code paragraph relied onVolumetric examination of the closure weld

Pipe racks, supports and expansion on Illinois sites

Pipe racks and supports on Illinois sites carry loads that a drawing of the pipe alone does not show: snow and ice on outdoor racks, wind across open prairie sites, thermal growth of steam and hot oil lines, and the vibration of reciprocating compressors and pumps. Paul Industries runs a stress analysis on hot, large or vibration-prone lines, places anchors, guides and expansion loops from the results, and checks that nozzle loads on pumps, exchangers and vessels stay inside the equipment makers’ allowables.

Older Illinois plants add a second problem. Older processing plants and factories in Illinois include multi-story buildings with decades of piping added to the same steel, so new lines often need new support steel, verified floor capacity and fire-rated penetrations. Paul Industries surveys the existing structure, designs supports to carry the new load without leaning on old pipe, and fabricates the steel with the spools so both arrive together.

Piping on Illinois public works and campus plants

Piping on Illinois public works, including state facilities, public universities, school districts and municipal water and wastewater plants, comes with the Illinois Prevailing Wage Act (820 ILCS 130) whenever the contract is a public works contract. Wages follow the rates the Illinois Department of Labor publishes by county and trade, and contractors file payroll transcripts each month through the Department’s online portal by the 15th for the prior month. Paul Industries prices public piping work to those rates and keeps the monthly filings current through closeout.

Campus central plants in Champaign-Urbana, Springfield and the Chicago area carry steam, condensate, chilled water and heating hot water distribution that blends B31.1 power piping with B31.9 building services piping. Paul Industries replaces condensate returns, steam mains and valve stations in those plants during the shoulder seasons, when heating and cooling loads both run low.

Winter, insulation and heat tracing on Illinois racks

Winter sets the outdoor piping design in Illinois, because pipe racks from Rockford to the Metro East see subfreezing weeks every year and a wet line left uninsulated or undrained can split. Paul Industries specifies freeze protection for every outdoor water, condensate, slurry and instrument line: heat tracing with controls and monitoring, insulation with sealed jacketing, low-point drains and high-point vents, and winter drain-down procedures for seasonal services.

Viscous products add a second reason to trace. Corn syrup, vegetable oils and heavy fuel oils thicken as they cool, so their lines are traced and insulated to hold a pumping temperature, sized against Illinois industrial power that averaged 8.83 cents per kilowatt-hour in 2024 against a national 8.13 (EIA). The Illinois Energy Conservation Code, now the 2024 IECC as amended and effective November 30, 2025, sets pipe insulation thickness for heating and cooling piping in commercial buildings, which governs the building service side of a mixed project. Paul Industries designs heat tracing and insulation with the piping rather than after it.

Tank, boiler and refrigeration piping in Illinois

Tank, boiler and refrigeration piping in Illinois each meets its own regulator at the connection. Fuel piping on aboveground tanks regulated by the State Fire Marshal runs in steel, because OSFM does not accept aboveground fiberglass piping on those tanks, and pipe and flexible connector work on underground systems needs an OSFM permit under Part 175, with OSFM inspecting the primary and secondary air tests before backfill. Tank installations themselves are covered on tank fabrication in Illinois.

Boiler external piping, from the boiler to the stop valves, is part of the boiler under ASME Section I and the Illinois boiler rules, so repairs there run through the boiler inspector, as described on boiler repair in Illinois. Pressure vessels on the same skid fall under the vessel rules on pressure vessel fabrication in Illinois. Ammonia refrigeration piping in Chicago-area food and cold storage plants follows ASME B31.5 and IIAR 2, with chilled water and glycol loops tied to the chillers covered on chiller repair in Illinois.

Testing, turnover and in-service inspection

Testing on an Illinois piping job follows the code the specification names: B31.3 calls for a hydrostatic leak test at 1.5 times design pressure, adjusted for temperature, unless a pneumatic or initial service test is allowed, and B31.1 sets its own hydrostatic rules for power piping. Paul Industries prepares a test package for each system with the boundaries, test medium, pressure, hold time, gauges and witness sign-offs, and keeps the records with the weld map and examination reports.

Pneumatic testing needs extra care. Where water would damage a catalyst, a refractory lining or a dry product line, B31.3 allows a pneumatic test at 110 percent of design pressure, but compressed gas stores far more energy than water at the same pressure, so the test needs a calculated exclusion zone, a staged pressure rise with leak checks at each step, and relief protection on the test source. Paul Industries writes the pneumatic test procedure as a separate document, reviews it with the plant’s safety staff and posts the boundary before pressurizing.

So how often do pipes need to be replaced? Piping lasts as long as its wall thickness stays above the minimum the code allows for its pressure and temperature, which makes corrosion rate the deciding number. Refineries and chemical plants measure it under API 570 at condition monitoring locations and set inspection and replacement intervals from the remaining life; food and ingredient plants usually replace on leaks, failed inspections or process changes. Paul Industries takes thickness readings, calculates remaining life and replaces the sections that need it during the next planned outage.

Illinois EPA treats threaded connections, flanges, valves, pump seals and relief devices as exempt from state construction permits under 35 Ill. Adm. Code 201.146(o), so adding or replacing a valve does not by itself call for a state air permit, although the plant’s leak detection program and federal rules may still log the new components.

What does process piping in Illinois cost?

The cost of process piping in Illinois is driven by pipe size and length, material and schedule, the fluid service and its examination level, the number of welds and fittings, supports and racks, insulation and tracing, and the outage conditions in which the work is installed. Stainless and alloy systems cost several times carbon steel, Category M and high pressure service add examination and testing, and work inside an operating plant adds permits, isolations and standby time.

Paul Industries prices Illinois piping from the P&IDs or isometrics, the piping specification, the tie-in list and the outage window, and gives a budget range from comparable systems before a firm price once the drawings and scope are fixed. Owners can choose supply-only prefabricated spools, design-build systems engineered from the process data, or complete installation with testing and turnover.

Who builds and installs process piping in Illinois?

Paul Industries builds and installs process piping in Illinois for refineries, wet mills, oilseed plants, pharmaceutical and chemical plants, food and beverage producers and equipment manufacturers, from Chicago and Cook County, Lake County and the North Shore to Aurora and the Fox Valley, Joliet and Will County, Decatur, Peoria, the Quad Cities and the Metro East. Paul Industries began in northern New Jersey, moved to Pennsylvania and now keeps its headquarters at 256 Shore Drive in Kilmarnock, Virginia; from there it accepts piping projects throughout Illinois, the Midwest and every other state.

Process piping from Paul Industries for Illinois plants

Paul Industries designs piping systems, writes the specification, fabricates spools, installs and supports the piping, makes the tie-ins, tests and turns over the system with its records, and inspects and repairs piping already in service. The national scope is on the process piping page. Readers comparing states can see process piping in Virginia, the headquarters state, and process piping in New York; every Illinois service is on the Illinois hub. Send the P&IDs, the line list and the outage dates and request a quote.

Standards referenced: ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME B31.5 Refrigeration Piping · ASME B31.9 Building Services Piping · ASME Boiler and Pressure Vessel Code, Sections I and IX (2025 Edition, adopted in 41 Ill. Adm. Code 2120.20) · ASME BPE · API 570 · IIAR 2 · OSHA 29 CFR 1910.119 · Illinois Plumbing License Law, 225 ILCS 320 · Illinois State Plumbing Code, 77 Ill. Adm. Code 890 · 35 Ill. Adm. Code 604 (cross-connection control) · 41 Ill. Adm. Code 175 (OSFM UST piping) · Illinois Energy Conservation Code (2024 IECC as amended)

Frequently asked questions

How do process piping contractors, Chicago area included, work inside an operating plant?

Process piping contractors in the Chicago area work inside operating plants by surveying tie-ins while the plant runs, prefabricating and testing spools off site, and using hot taps or planned outages for the connections. Paul Industries follows that sequence at Chicago, Cook County and suburban plants, with isolation lists, hot work permits and weld maps prepared before the first cut.

What should a plant ask industrial piping contractors, Illinois or elsewhere, to show?

A plant should ask industrial piping contractors to show the piping specification they will build to, the welding procedures and welder qualifications under ASME Section IX, the examination and leak test plan for each fluid service, and the turnover records they deliver. Paul Industries provides all four with its quote for Illinois work, under one contract and one schedule.

Who installs piping for refineries in Joliet, Lemont and Wood River?

Paul Industries installs and repairs B31.3 process piping for refineries and chemical plants in Joliet, Lemont, Wood River and the Metro East, including unit piping, utility headers, tank farm piping and turnaround tie-ins. That work runs under the plant’s process safety management program and API 570 inspection, and Paul Industries delivers the test and examination records each program expects.

Who handles steam and syrup piping at Decatur and Peoria ingredient plants?

Paul Industries handles steam, condensate, starch, syrup, oil and acid piping for corn wet mills, sweetener plants and oilseed processors in Decatur, Peoria and central Illinois. Spools are prefabricated and tested before the plant’s turnaround, viscous lines are traced and insulated to hold pumping temperature, and stainless lines are passivated before service.

Does a process piping job in Illinois need a plumbing permit?

A process piping job needs a plumbing permit in Illinois where it touches plumbing as the Plumbing License Law defines it: the water supply for any purpose inside a workplace, including the backflow protection at a process connection, and the building drain and sanitary system. The process lines downstream of the backflow assembly follow the ASME B31 code in the piping specification. Paul Industries designs the boundary so each side is permitted and inspected correctly.

How often are backflow preventers on Illinois process connections tested?

The Illinois State Plumbing Code requires backflow prevention assemblies to be tested before initial operation and at least once a year after that, with records kept at the site, and Illinois EPA rules require the tester to be approved as a cross-connection control device inspector. Paul Industries places assemblies where they can be tested and drained and includes the first test record at turnover.

Is ammonia refrigeration piping process piping in Illinois?

Ammonia refrigeration piping is built to ASME B31.5 and IIAR 2 rather than B31.3, and it is common in Chicago-area food processing, cold storage and beverage plants. Its design covers relief, isolation, machinery room ventilation and labeling as well as the pipe itself. Paul Industries installs and repairs ammonia piping and pressure tests it under IIAR 2 before charging.

When does B31.1 apply instead of B31.3 at an Illinois plant?

ASME B31.1 applies to power piping, such as plant steam headers, boiler feedwater and condensate systems in central utility plants, while B31.3 applies to piping within process units and to chemical, product and utility lines serving them. Boiler external piping falls under ASME Section I with B31.1. Paul Industries names the governing code for each line in the line list so testing and records follow the right book.

Can a Category D line skip the hydrostatic test?

Under ASME B31.3, piping in Category D fluid service, which is nonflammable, nontoxic and within set pressure and temperature limits, may be tested with an initial service leak test at the owner’s option instead of a hydrostatic test. Compressed air, cooling water and many utility lines qualify. Paul Industries confirms the classification in the specification before planning the test.

What piping does an Illinois API or pharmaceutical expansion need?

An API or pharmaceutical expansion in Illinois needs solvent, nitrogen, vacuum, reactor jacket and utility piping under B31.3, sanitary product and water piping under ASME BPE, and clean utilities such as purified water and clean steam. Each system needs weld records and test packages that feed qualification. Paul Industries builds the piping and hands over the records the validation team uses.

How do Illinois winters change piping design?

Illinois winters require freeze protection on every outdoor water, condensate, slurry and instrument line, through heat tracing, sealed insulation, low-point drains and winter drain-down procedures. Carbon steel lines that may see cold pressurization need material selected for the minimum design metal temperature. Paul Industries designs tracing and insulation with the piping layout.

Does adding valves to a process line need an Illinois EPA permit?

Illinois EPA lists threaded connections, flanges, valves, pump seals and pressure relief devices among the emission units exempt from state construction permits under 35 Ill. Adm. Code 201.146(o), so adding a valve does not by itself require a state permit. The plant’s leak detection and repair program may still need the new components tagged. Paul Industries provides the component list for that program at turnover.

What records come with a finished Illinois piping system?

A finished piping system comes with as-built isometrics, the weld map, welder and procedure qualifications, material test reports, examination reports, leak test records with gauge calibrations, and, for sanitary systems, passivation and borescope records. Paul Industries assembles the package by system and line number so maintenance and inspection staff can find each record.

How much notice does Paul Industries need before an Illinois turnaround?

Turnaround piping is best planned as soon as the outage scope is known, so tie-ins can be surveyed, materials ordered and spools fabricated and tested before the window opens. Alloy materials, large valves and special fittings set the longest lead. Paul Industries builds a schedule from the outage date backward and confirms material dates with the quote.

Does fuel piping on Illinois storage tanks have special rules?

Fuel piping on aboveground tanks regulated by the Illinois State Fire Marshal must avoid aboveground fiberglass piping, because fire and some liquids attack it. Underground fuel piping work needs an OSFM permit under Part 175, and OSFM inspects the primary and secondary air tests before backfill. Paul Industries designs and installs fuel piping to those rules.

Who builds compressed air and coolant piping for Peoria and Quad Cities manufacturers?

Paul Industries builds compressed air, coolant, hydraulic and paint system piping for heavy equipment and metalworking plants in Peoria, East Peoria, Moline, East Moline and Rockford. Loops are sized for pressure drop and future demand, with drains, isolation valves and drop legs placed for maintenance. Send the plant layout and demand data to start.

Planning new lines or a turnaround tie-in at an Illinois plant?

Send the P&IDs or isometrics, the piping specification, the tie-in list and the outage dates. Call 201-450-8280 or request a quote.