Paul Industries designs, builds and services ultrapure water systems in North Dakota, from pretreatment and reverse osmosis through electrodeionization, polishing and distribution loops, for biomanufacturing and research labs in Fargo and Grand Forks, high-pressure boiler plants, hospitals and data centers that fill liquid cooling loops. North Dakota feed water is hard, cold for much of the year and, in the cities, treated with chloramine, and each of those traits shapes the front end of an ultrapure train. Paul Industries builds the whole system, from the city connection or well to the point of use, and documents it for the quality standard each user works to.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Fargo feed water Hard Red River supply, softened by the city from about 17 to 7 grains per gallon
Disinfectant in city water Chloramine, added by Fargo before distribution
Reject water rules Pretreatment programs in Bismarck, Fargo, Grand Forks, Mandan and West Fargo (NDDEQ)
Industrial power 7.59 cents/kWh in 2025, US 8.51 (EIA)
Reviewed November 2026

Where are ultrapure water systems in North Dakota used?

Ultrapure water systems in North Dakota serve four groups of users: biomanufacturing and life science labs, high-pressure steam and power plants, hospital and university laboratories, and data centers that fill and top off liquid cooling loops. One example of the biomanufacturing demand is in Fargo, where Aldevron’s Breakthrough Campus manufactures plasmid DNA, RNA and proteins at cGMP quality and a second campus handles research and process development. Biomanufacturing of that kind relies on purified water and water for molecular work that is free of ions, organics, bacteria and nucleases.

The national picture of ultrapure water quality grades and equipment is on the ultrapure water systems page. This page goes into North Dakota: the rivers and wells that feed the systems, what chloramine and hardness do to the train, how a cold winter changes membrane output, where reject water goes, and how the main users in the state differ in what they need. Plants whose main concern is steam, condensate and boiler feed on a crush plant can see the separate high-purity water systems in North Dakota page.

Ultrapure water users in North Dakota and what they need
UserTypical quality targetMain concernSystem Paul Industries builds
Biomanufacturing (plasmid DNA, RNA, proteins)USP Purified Water feeding Water for Injection, plus ultrapure water at the benchBacteria, endotoxin, TOC and nucleases; GMP documentationPretreatment, double-pass RO, EDI, sanitizable stainless loops, point-of-use polishers
University and hospital laboratoriesType 1 ultrapure water at the point of use, Type 2 or 3 for general useResistivity, TOC and bacteria at the tapCentral RO and EDI with a lab loop, plus Type 1 polishers at instruments
High-pressure boilers and steam plantsDemineralized makeup with very low silica and conductivitySilica and hardness carryover to turbines and superheatersRO followed by EDI or mixed bed polishing, with monitoring on each stage
Data centers with liquid coolingLow-conductivity fill water to the cold plate maker’s limitsScaling and corrosion in fine cold plate channelsRO and deionization skids or portable fill stations with logged output

What is ultrapure water used for in North Dakota plants and labs?

Ultrapure water in North Dakota is used to make biologics and genetic medicines, to run laboratory instruments and cell work, to feed high-pressure boilers and to fill closed cooling loops, and in each case it is water with almost all dissolved ions, organics, particles, gases and microbes removed. People asking what is ultrapure water usually mean water treated to the point where its resistivity approaches the theoretical limit for pure water, about 18.2 megohm-centimeters at 25 degrees Celsius, with organic carbon measured in parts per billion.

Ultrapure water for molecular biology and ultrapure water for cell culture add further demands: very low endotoxin and bacteria, and freedom from nucleases that would degrade DNA and RNA. A Type 1 polisher at the bench uses ultrafiltration or a final filter to deliver that. Production water for cGMP manufacture is held to USP monographs instead, tested for conductivity and total organic carbon under USP 645 and 643, and the loop is sanitized on a schedule. The biotech industry page covers the wider plant those systems serve.

How Fargo and Red River water shape the front of the train

Fargo and Red River water shape the front of an ultrapure train through hardness, chloramine and changing quality with the seasons. Fargo pulls from both the Red and the Sheyenne, and its utility describes the Red as a hard river whose water arrives at around 17 grains per gallon and leaves the softening basins near 7. After softening, the water treatment plant Fargo ND operates disinfects with ozone, filters the water and adds chloramine before it enters the mains. In dry years the city can call on stored water in Lake Ashtabula released down the Sheyenne, and the Red River Valley Water Supply Project is planned to bring Missouri River water from the McClusky Canal to the Sheyenne River.

For an ultrapure system, that means a feed with residual hardness, a stable chloramine dose and a source blend that can change. The front end usually includes multimedia or ultrafiltration for particles and organics, a softener or antiscalant for the remaining hardness, and activated carbon or sodium bisulfite to remove chloramine before the membranes. Chloramine breaks down to ammonia, which passes through reverse osmosis and shows up as conductivity downstream, so the design either removes it with a second pass and pH adjustment or lets the EDI stage handle the load. Paul Industries designs the front end with enough margin to handle a change in source water without a redesign.

Groundwater feeds outside the cities

Groundwater feeds outside the cities vary far more than the river supplies in Fargo, Grand Forks or Bismarck, so every ultrapure project on a well starts with a full water analysis taken across seasons. Iron, manganese, hardness, sulfate, silica and total dissolved solids drive the pretreatment design, and silica in particular limits how far a reverse osmosis system can push recovery before scaling. A site that draws its own groundwater for industrial use falls under NDCC 61-04-02, so it applies to the Department of Water Resources for an appropriation permit and files a yearly use report each spring.

How is ultrapure water made in a North Dakota system?

Ultrapure water in a North Dakota system is made in three stages: pretreatment that removes particles, hardness and chloramine; a primary stage of reverse osmosis and electrodeionization that removes most dissolved ions and organics; and a polishing stage that brings the water to final quality and keeps it there in a recirculating loop. The table follows a typical train for a Fargo or Grand Forks feed.

Ultrapure water production train for a North Dakota city feed
StageEquipmentWhat it removesNorth Dakota note
Feed temperingHeat exchanger or blending valveNothing; raises winter feed temperatureRestores membrane output when river water runs near freezing
Particle and organic removalMultimedia filter or ultrafiltrationSuspended solids, colloids, some organicsRiver feeds change with spring runoff; size for the worst month
Hardness controlSoftener or antiscalant dosingCalcium and magnesiumFargo water still carries about 7 grains after city softening
Chloramine removalActivated carbon or sodium bisulfiteChloramine and free chlorineAmmonia released downstream must be handled by RO pH control or EDI
Primary demineralizationSingle or double-pass reverse osmosisAbout 95 to 99 percent of dissolved ions, most organics, bacteriaRecovery limited by silica on well feeds
DeionizationElectrodeionization or mixed bed ion exchangeRemaining ions, silica, carbon dioxideEDI avoids regenerant chemicals and their discharge
Polishing and distributionUV, polishing resin, final filtration or ultrafiltration, recirculating loopOrganics, trace ions, particles, bacteriaLoop kept moving and warm enough to avoid stagnation in cold mechanical rooms

Ultrapure water production also needs monitoring at each stage: conductivity or resistivity after RO and EDI, total organic carbon at the loop, and particle and bacteria counts where the user requires them. Paul Industries builds instrumentation into the skids and loops so the operator sees each stage’s performance alongside the final number.

Sizing reverse osmosis for a February feed

Reverse osmosis sized for a February feed in North Dakota has to deliver full output from water that may sit only a few degrees above freezing, because membrane permeability falls as water cools. A common rule of thumb puts the loss at roughly 3 percent of permeate flow for each degree Celsius drop, so a system sized on 20 degree summer water can lose a third of its output when the feed runs at 5 degrees. Fargo averages 92.7 days a year when the air stays below freezing all day and Grand Forks averages 101.3, and river feeds follow that cold.

The answer is either more membrane area, higher feed pressure or a feed tempering exchanger that warms the water before the membranes, often using waste heat from a boiler, compressor or process. Paul Industries runs the membrane projection at the coldest expected feed temperature and the warmest, then selects pumps, membranes and tempering so the system makes design flow in February without overrunning flux limits in August.

Ways to hold reverse osmosis output through a North Dakota winter
ApproachHow it worksAdvantagesTrade-offs
Extra membrane areaMore elements sized so cold-water flux still meets demandNo added heat source; simple controlsHigher capital cost; summer operation needs flow or pressure control to avoid overrunning flux
Higher feed pressureVariable-speed high-pressure pump raises pressure as water coolsUses existing membranes; responds automaticallyMore pump energy in winter; pressure limits of vessels and membranes
Feed tempering exchangerWaste heat from boilers, compressors or process warms the feed before the membranesRestores output and lowers pump energy; uses heat that would be wastedNeeds a reliable heat source and temperature control to protect the membranes
Storage and run-timeLarger product tank and longer operating hours carry the user through peak demandLow cost where demand is unevenLonger storage needs loop sanitization and recirculation to hold quality

Most North Dakota systems combine two of these, typically a variable-speed pump with a modest tempering exchanger, which keeps the membrane count reasonable and uses heat already present in the building or plant.

Type 1 ultrapure water for North Dakota laboratories

Type 1 ultrapure water for North Dakota laboratories is usually produced at the point of use by a polisher fed from a central RO and EDI loop, rather than by distributing Type 1 water through a building. University labs in Fargo and Grand Forks, hospital labs and instrument rooms use it for chromatography, mass spectrometry, molecular biology and cell work. The central loop supplies Type 2 or Type 3 water for glassware washers, autoclaves, humidifiers and general bench use.

Ultrapure water specifications for those labs usually follow ASTM D1193 or ISO 3696 grade definitions, with resistivity, total organic carbon, particles, bacteria and endotoxin as the key measures. The conductivity of ultrapure water at 25 degrees is about 0.055 microsiemens per centimeter, the reciprocal of the 18.2 megohm-centimeter ultrapure water resistivity, and on-line meters compensate for temperature to report it. Paul Industries sizes the central loop for the lab’s peak draw and installs point-of-use polishers with the final filters each application needs. That is how ultrapure water for laboratory benches is delivered across a whole building.

DI water vs ultrapure water, and distilled water

The difference between DI water vs ultrapure water is one of degree: deionized water has had most ions removed by ion exchange, while ultrapure water has also had organics, particles, gases and microbes removed and is held at the limit of purity in a recirculating loop. Owners asking is ultrapure water deionized are right that deionization is part of the process, but deionization alone leaves organics and bacteria behind. The comparison of ultrapure water vs distilled water runs the same way: distillation removes most ions and many organics, but distilled water picks up carbon dioxide and contaminants in storage and rarely matches the resistivity of a polished loop.

For most North Dakota users the practical question is which grade each use needs. Boiler makeup and liquid cooling fill need deionized water with low silica and conductivity; laboratory instruments need Type 1 at the point of use; cGMP production needs compendial water with its own testing. Paul Industries designs one central treatment train with separate loops or polishers so each user gets the grade it needs without paying to polish every gallon to laboratory grade.

Demineralized makeup for North Dakota boilers and data centers

Demineralized makeup for North Dakota boilers and data centers comes from the same reverse osmosis and deionization equipment used for laboratory water, sized and finished differently. High-pressure boilers at power, ethanol, oilseed and sugar plants need very low silica and conductivity to protect superheaters and turbines; RO followed by EDI or a mixed bed polisher provides it, and the boiler repair in North Dakota page covers the boilers themselves. Data centers with liquid cooling need smaller volumes of low-conductivity water to fill technology loops, then top-off water that matches the original fill.

Several North Dakota campuses run closed-loop liquid cooling that uses almost no water once filled, so the fill and top-off water matters more than the volume. Paul Industries builds fixed RO and deionization skids or portable fill stations for data halls, with conductivity logging so each fill is recorded, and the data center liquid cooling in North Dakota page explains how those loops are filled and protected.

Reject water, regeneration waste and North Dakota discharge rules

Reject water from reverse osmosis and regeneration waste from softeners and ion exchange are industrial discharges, and North Dakota assigns their oversight by location. Five cities hold delegated pretreatment authority from the state (Fargo, West Fargo, Grand Forks, Bismarck and Mandan), and a plant inside one of them answers to that city’s discharge rules; elsewhere the Department of Environmental Quality regulates industrial discharges to municipal sewer systems. RO reject is mostly the feed’s own minerals concentrated, while regenerant waste carries salt or acid and caustic that must be neutralized.

Recovery reduces the volume. A double-pass system can return second-pass reject to the first-pass feed, and EDI concentrate can be recycled to the RO inlet. Electrodeionization in place of regenerated ion exchange removes acid and caustic handling entirely. Paul Industries designs reject and waste streams with sampling points and neutralization so the discharge permit is simple to meet.

Loops, materials and sanitization

Ultrapure loops in North Dakota are built from materials that suit the user: polypropylene, PVDF or high-purity PVC for laboratory and electronics-grade water, and orbital-welded 316L stainless steel to ASME BPE for pharmaceutical and biomanufacturing loops that are sanitized with hot water or ozone. Loops are designed for continuous flow with no dead legs, sloped to drain, and kept away from cold outside walls where stagnant sections could chill. Stainless loops are passivated after welding, and sanitary distribution practice is covered on sanitary process piping in North Dakota.

Sanitization keeps bacteria out of the loop. Hot water sanitization at elevated temperature, ozone with UV destruction before the point of use, or chemical sanitization are chosen with the user’s quality program. Paul Industries builds the loop to suit the chosen method and verifies it during start-up, and pharmaceutical users can add the qualification protocols described on validation and commissioning in North Dakota.

Start-up, testing and turnover for a North Dakota ultrapure system

Start-up of a North Dakota ultrapure system follows a set order: pretreatment is commissioned first and proven to remove hardness and chloramine, the RO is started with its first membranes flushed of preservative, EDI or polishing resin is brought online once RO permeate is stable, and only then is the distribution loop filled, sanitized and sampled. Each stage gets a performance record at the feed temperature on the day, with a projection to the coldest and warmest expected feed.

The turnover file includes the water analysis the design was based on, membrane projections, instrument calibration certificates, sanitization records, loop drawings with slope and drain points, sample results and the operating and maintenance procedures. Pharmaceutical users add qualification protocols; laboratories add point-of-use test results. Paul Industries hands over that file with operator training on the actual system.

What does an ultrapure water purification system cost in North Dakota?

An ultrapure water purification system in North Dakota costs what the flow rate, the quality grade, the feed water, the loop length and material, and the documentation level require. Ultrapure water cost has two parts: the capital cost of the equipment and loop, and the operating cost of power, membranes, resin, filters, chemicals, sanitization and the reject water sent to sewer. Pumps and EDI stacks use electricity continuously, and North Dakota’s average industrial price was 7.59 cents per kilowatt-hour in 2025 against 8.51 nationally.

The North Dakota-specific cost drivers are the feed tempering or extra membrane area for cold winter feed, chloramine and ammonia handling on city water, pretreatment for well water chemistry, and the discharge arrangement for reject and waste. Paul Industries gives a budget range from comparable scope once the flow, grade and feed water are known, then a firm price once the design is set. Ultrapure water equipment can be bought supply-only as skids, as a design-build system or with complete installation of the loop and polishers.

Who builds ultrapure water systems in North Dakota?

Paul Industries builds ultrapure water systems in North Dakota: pretreatment, reverse osmosis, electrodeionization, polishing, storage, distribution loops, point-of-use polishers, instrumentation and the controls that tie them together, with ultrapure water treatment designed around the feed water at each site. That covers ultrapure water in Fargo for biomanufacturing and university labs, ultrapure water in Grand Forks for research and hospital labs, and ultrapure water in Bismarck for hospitals, state labs and plant boilers. Paul Industries is an East Coast contractor with its headquarters at 256 Shore Drive, Kilmarnock, Virginia; it was once based in northern New Jersey and later Pennsylvania, and its North Dakota water systems sit alongside projects in all 50 states and at international plants.

The ultrapure water systems in Virginia page covers microelectronics and semiconductor water in a coastal setting, and ultrapure water systems in Wisconsin covers hard groundwater in another northern state. The wider regional picture is on the Midwest and North Dakota hubs.

Ultrapure water from Paul Industries in North Dakota

Paul Industries designs, fabricates, installs, starts up and services ultrapure water systems for North Dakota labs, biomanufacturing plants, boiler plants and data centers, from a single polisher to a complete central plant and loop. Send the flow rate, the quality grade each user needs, a recent feed water analysis and the space available, and request a quote to start the design.

Standards referenced: ASTM D1193 · ISO 3696 · USP <643> and <645> · USP Purified Water and Water for Injection monographs · ASME BPE · NDCC 61-04-02 water appropriation permits · 40 CFR Part 403 pretreatment (North Dakota delegated programs)

Frequently asked questions

Who builds ultrapure water systems for Fargo biomanufacturing and university labs?

Paul Industries builds ultrapure water systems for biomanufacturing plants and university labs in Fargo, from pretreatment on chloraminated city water through double-pass RO, EDI, sanitizable loops and point-of-use polishers. Fargo’s Red River supply is softened to about 7 grains per gallon and carries chloramine, so the front end includes hardness control, chloramine removal and ammonia handling ahead of the deionization stage.

Does Paul Industries install ultrapure water systems in Grand Forks and Bismarck?

Paul Industries installs ultrapure water systems in Grand Forks for research and hospital labs and in Bismarck for hospitals, state laboratories and plant boilers. Each city runs its own treatment and its own industrial pretreatment program, so Paul Industries starts with the city’s water data, sizes the train for the coldest feed and designs reject discharge to the city’s rules.

Who provides ultrapure water treatment for plants on wells in rural North Dakota?

Paul Industries provides ultrapure water treatment for plants on private wells across North Dakota, including ethanol, oilseed and food plants and power and steam users. Well water varies widely in iron, manganese, hardness, sulfate and silica, so each design starts with a seasonal water analysis. Plants drawing their own groundwater for industrial use also hold a state water appropriation permit and report annual use.

What is ultrapure water?

Ultrapure water is water treated to remove nearly all dissolved ions, organics, particles, gases and microbes, so its resistivity approaches the theoretical limit of about 18.2 megohm-centimeters at 25 degrees Celsius and its organic carbon is measured in parts per billion. It is produced by reverse osmosis, deionization and polishing, and held in a recirculating loop to keep it pure.

How is ultrapure water made?

Ultrapure water is made by pretreating the feed to remove particles, hardness and disinfectant, passing it through reverse osmosis to remove most dissolved ions and organics, then electrodeionization or mixed bed resin for the remaining ions, and finally UV, polishing resin and fine filtration in a recirculating loop. Each stage is monitored so the operator can see where performance changes.

What is the difference between DI water vs ultrapure water for a North Dakota lab?

Deionized water has had most ions removed by ion exchange, while ultrapure water has also had organics, particles, gases and bacteria removed and is kept at near-theoretical resistivity in a loop. Many North Dakota labs use DI or Type 2 water for washers and general use and Type 1 ultrapure water from a polisher at instruments and molecular work.

Why does chloramine in city water matter to an ultrapure water system?

Chloramine damages reverse osmosis membranes, so it is removed by activated carbon or sodium bisulfite before them. When chloramine breaks down it releases ammonia, which passes through RO and raises conductivity downstream. Fargo adds chloramine before distribution, so systems on that supply handle ammonia with a second RO pass and pH adjustment or let the EDI stage remove it.

Why does an RO system in North Dakota make less water in winter?

Membrane permeability falls as water cools, with a common rule of thumb of roughly 3 percent less permeate for each degree Celsius drop. River and well feeds in North Dakota can run only a few degrees above freezing in winter. Paul Industries sizes membranes and pumps at the coldest feed temperature or adds a tempering exchanger, often using waste heat, so the system makes design flow in February.

Is Type 1 ultrapure water piped through a whole building or made at the bench?

Type 1 ultrapure water is usually made at the point of use by a polisher fed from a central RO and EDI loop, because distributing Type 1 water through long building loops makes it hard to hold resistivity and TOC at the tap. The central loop carries Type 2 or Type 3 water, and each lab’s polisher finishes it for its instruments and molecular or cell work.

What ultrapure water specifications do North Dakota labs use?

North Dakota labs usually specify ultrapure water to ASTM D1193 or ISO 3696 grades, with resistivity, total organic carbon, particles, bacteria and endotoxin as the key measures, and some applications add nuclease-free requirements. cGMP production instead follows USP monographs, tested for conductivity and TOC under USP 645 and 643. Paul Industries designs each loop and polisher to the specification the user names.

Where does RO reject water go in North Dakota?

RO reject and regeneration waste are industrial discharges. In the five cities with delegated pretreatment programs (Fargo, West Fargo, Grand Forks, Bismarck and Mandan) the city sets the discharge rules, while the Department of Environmental Quality regulates discharges to sewer elsewhere. Paul Industries recycles second-pass reject and EDI concentrate where it can and designs sampling and neutralization into the waste stream.

Can one system supply a boiler, a lab and a data center on the same North Dakota site?

One pretreatment and RO train can supply several users on a site, with separate polishing for each. Boiler makeup takes RO and EDI water with low silica, laboratories take Type 1 water from point-of-use polishers, and liquid cooling fill takes low-conductivity water logged at each fill. Paul Industries sizes the shared train for the combined draw and keeps each user’s loop separate.

Which loop materials suit an ultrapure water system in North Dakota?

Laboratory and electronics-grade loops use polypropylene, PVDF or high-purity PVC, while pharmaceutical and biomanufacturing loops use orbital-welded 316L stainless steel to ASME BPE so they can be sanitized with hot water or ozone. Loops run continuously with no dead legs and are routed away from cold outer walls in North Dakota buildings so no section stagnates or chills.

How will the Red River Valley Water Supply Project affect ultrapure water plants in Fargo?

The Red River Valley Water Supply Project is planned to bring Missouri River water from the McClusky Canal to the Sheyenne River, one of Fargo’s sources. A change in source blend can shift hardness, organics and other feed chemistry. Paul Industries designs pretreatment with margin for a changed feed and recommends updated water analyses whenever the city reports a change in supply.

What does an ultrapure water service contract cover in North Dakota?

A service contract covers membrane cleaning and replacement, resin and filter changes, UV lamp replacement, EDI checks, instrument calibration, loop sanitization, water quality testing and a winter review of feed temperature and output. Paul Industries sets the schedule from the system’s own trends and the user’s quality program, and keeps the records the lab or plant needs for audits.

Can Paul Industries supply ultrapure water skids without installing them in North Dakota?

Paul Industries supplies pretreatment, RO, EDI and polishing skids for North Dakota projects as supply-only packages, factory tested and delivered with documentation. Owners can also choose design-build or complete installation including loops, polishers and start-up. Every route ends with the same turnover records for the operators and the quality team.

What should a North Dakota site send to price an ultrapure water system?

Send the flow rate and peak draw, the quality grade each user needs, a recent feed water analysis with seasonal data if available, the space and utilities available, and any quality or documentation standard the system must meet. With those in hand, Paul Industries prepares a budget figure from similar systems and then a fixed price when the design is complete.

Planning ultrapure water for a North Dakota lab or plant?

Send the flow rate, the quality grade each user needs and a recent feed water analysis. Call 201-450-8280 or request a quote.