Paul Industries designs, builds and services data center cooling in South Dakota, from chilled water and dry cooler plants in Sioux Falls to economizer systems in Rapid City and Aberdeen, sized for the state’s cold winters, short humid summers and its 2026 data center water law. A South Dakota hall gets thousands of hours of cold outdoor air each year, but it also faces minus 20 degree nights, sticky July dew points east of the Missouri River and a statute that asks large data centers to show their water use before they open. Paul Industries supplies, installs, starts up and maintains the plant that handles all three.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Water notice law SB 135 (2026): halls of 10 MW or more notify each water provider before operating
Hours below 50 F Sioux Falls: 4,641 of 8,760 hourly normals (NOAA, 1991-2020)
West River air Rapid City hourly dew point normals peak at 56.7 F (NOAA)
Commercial power 10.61 cents/kWh in 2025, against 13.37 nationally (EIA)
Reviewed November 2026

What shapes data center cooling in South Dakota?

Data center cooling in South Dakota is shaped by four facts a designer meets on the first day: a long cold season that favors free cooling, a dry western half and a humid eastern half, winter extremes that punish any water left standing outdoors, and SB 135, the 2026 law that requires a data center of 10 megawatts or more to give notice of its projected water consumption before it starts operating. Each of those facts points the plant toward a different answer, and the right design weighs them against the owner’s rack density and growth plan.

Methods common to every state, from CRAH galleries to cooling towers, are covered on the national data center cooling systems page. The sections below focus on the South Dakota inputs: climate numbers, water rules, power supply and the cities where halls are being proposed, and how each one moves the cooling plant.

How many economizer hours does a South Dakota site get?

A South Dakota site gets roughly 4,600 to 5,000 hours a year when the normal outdoor temperature sits below 50 degrees Fahrenheit, which is more than half of the 8,760 hours in a year. Those figures come from counting NOAA’s 1991 to 2020 hourly normals at five airport stations. Below 50 degrees, a water-side economizer feeding warm-water supply can carry most or all of the load with the chiller compressors idle, and at a 60 degree threshold the count climbs past 5,700 hours everywhere measured.

Economizer and extreme hours at five South Dakota stations (NOAA hourly and annual normals, 1991 to 2020)
StationHours below 50 FHours below 60 FHours at or above 80 FHours with dew point at or above 60 FDays at 90 F or hotterNights at 0 F or colder
Sioux Falls4,6415,7492341,48015.024.9
Rapid City4,9006,219432032.117.7
Aberdeen4,9176,05819783015.438.5
Huron4,7245,8183941,32521.827.7
Watertown4,9726,123516849.335.4

Normals are averages, so a real year adds hot spells and cold snaps around them. NOAA’s 90th percentile hourly values reach about 92 degrees in Sioux Falls and Aberdeen and 98 degrees in Rapid City, and the plant must hold supply temperature through those afternoons with every economizer hour already spent. Design to the extremes; bank the savings from the averages.

East River humidity and West River dry air

East River and West River South Dakota cool very differently because the Missouri River roughly divides a humid, corn-belt summer from a semi-arid one. Sioux Falls records 1,480 hours a year when the normal dew point sits at 60 degrees or above, and its July normals run from a 63 degree low to an 85 degree high. Rapid City has no hours at all with a normal dew point that high; its hourly dew point normal never climbs past 56.7 degrees, and its annual precipitation of 17.44 inches is well under the 27.85 inches Sioux Falls receives.

Dry air changes the equipment list. In the Black Hills region, an adiabatic cooler or an evaporative pre-cooler on a dry cooler gains a large temperature drop from a small amount of water, because the gap between dry bulb and wet bulb is wide on most summer afternoons. In Sioux Falls, Brookings and the I-29 corridor, the same device gains less on a muggy afternoon, so a dry cooler with a compressor-based trim plant, or a water-cooled plant with a cooling tower, earns its keep there instead. A single standard design copied from one side of the state to the other leaves capacity or water on the table.

Do data centers use a lot of water in South Dakota?

South Dakota data centers use as much water as their heat rejection method demands, which ranges from almost none for a closed loop with dry coolers to several hundred gallons an hour per megawatt for an evaporative plant. Evaporating one pound of water removes about 1,000 Btu, and one megawatt of heat is about 3.4 million Btu an hour, so an open tower rejecting a full megawatt by evaporation boils off roughly 3,400 pounds, or about 410 gallons, every hour before blowdown is added. That arithmetic is why South Dakota data center water use became a legislative topic in 2026.

Under SB 135, an operator of a data center with a peak demand of 10 megawatts or greater must, before commencing operation, give notice of its projected water consumption to each water provider in the area. Each provider decides in writing whether the projection is compatible with its supply, the operator presents those notices and determinations to the state Board of Water Management, and the board issues a written statement once every provider agrees. The board may still set limits on the data center’s use after residential and essential public needs are allocated, and the operator files a semi-annual water use report that the board makes public.

Data center cooling water drawn from a private well needs its own permission as well. The Department of Agriculture and Natural Resources states that a water right is needed for every use of water in South Dakota except domestic use, and the Water Management Board grants those appropriations. A cooling plant that will draw groundwater therefore starts with a water right application, and a plant on city supply starts with the provider’s written determination under SB 135. Paul Industries sizes the makeup, blowdown and storage so the projection in that notice is a number the plant can actually hold to.

Which cooling plant fits a South Dakota data hall?

The cooling plant that fits a South Dakota data hall depends on rack density, the site’s side of the river and how much water the owner is prepared to report, and five arrangements cover most projects. The table compares them on the questions South Dakota owners ask first.

Heat rejection options for a South Dakota data hall
ArrangementWater useWhere it fits best in South DakotaWinter care
Air-cooled chillers with integral free cooling coilsClose to zeroSmall and mid-size halls statewide; sites with tight water supplyGlycol in the outdoor coil circuit, control of low ambient head pressure
Dry coolers with a trim chiller plantClose to zeroWarm-water and liquid-cooled halls east of the riverGlycol or an intermediate heat exchanger, fan staging for snow and drift
Adiabatic or hybrid coolersSeasonal, on hot afternoons onlyRapid City and the western counties, where air is dryWet media drained and isolated before the first freeze
Water-cooled chillers, towers and a plate exchangerHighest, evaporation plus blowdownLarge halls with a confirmed water supply and allocationBasin heaters, bypass to the basin, and fan reversal or cycling to clear ice
Direct liquid cooling on a facility loopDepends on the facility loop’s heat rejectionHigh-density racks anywhere in the stateFacility loop protected; technology loop kept indoors

Closed loop data center cooling with dry coolers is the arrangement that keeps a 10 megawatt hall’s water notice smallest, and in a cold state it gives up less efficiency than it would in Virginia or Texas. A data center cooling tower still wins on peak efficiency where water is plentiful and approved, and a hybrid plant can run its towers only on the hottest afternoons. Paul Industries prices more than one arrangement on early projects, so the owner sees the trade between energy, water and first cost before the design is fixed. The adjacent page on data center liquid cooling in South Dakota covers the technology loops and coolant distribution units that pair with these plants.

Designing a cooling plant for minus 20 degree nights

A South Dakota cooling plant has to survive nights well below zero, because NOAA’s 10th percentile hourly values reach minus 8 degrees in Sioux Falls and minus 13 degrees in Aberdeen, and Aberdeen averages 38.5 nights a year at or below zero. Any coil, pipe or basin that holds plain water outdoors on such a night is at risk soon after a pump stops. The plant is safest when nothing outdoors depends on water moving to stay liquid.

Paul Industries designs outdoor circuits on propylene glycol at a concentration matched to the site’s lowest expected temperature, or separates them from the indoor water loop with a plate exchanger so the data hall keeps plain treated water. Towers that operate in winter get basin heaters, a bypass that returns water straight to the basin at low load, and controls that cycle fans to keep ice off the fill. Outdoor isolation valves, drains and instrument taps are placed where a technician can reach them in snow, and heat tracing protects makeup lines and sensing lines that stay full of water. A winter that arrives early in October or a polar outbreak in February then becomes an operating condition rather than an emergency.

Wind matters as well. Open-country wind across the prairie drifts snow against dry cooler intakes and pushes cold air into equipment yards, so fan arrays are laid out with clearances that let wind and snow pass, and screens or louvers keep drifting snow out of coils. Startup in a South Dakota winter also needs care: a dry cooler bank that has sat cold overnight should bring glycol up to temperature before it meets warm return water. The companion page on data center commissioning in South Dakota covers how those winter sequences are tested.

Refrigerant rules for new data center cooling equipment

New data center cooling equipment installed in South Dakota from January 1, 2027 must use a refrigerant with a global warming potential below 700, under the EPA’s Technology Transitions rule for data centers, computer room air conditioning and information technology equipment cooling. Stand-alone comfort cooling chillers have carried the same 700 limit since January 1, 2025. Equipment ordered for a 2027 hall must meet that limit when installed, so the purchase specification should name it now.

Existing machines keep running on their current refrigerant, but the EPA’s 2026 leak repair rule applies to appliances holding 15 pounds or more of an HFC: a leak rate calculation each time refrigerant is added, repair within 30 days once the applicable threshold is exceeded, and verification tests afterward. Paul Industries builds those records into the maintenance program for every chiller and CRAC unit it services, and the chiller repair in South Dakota page sets out the repair side in detail.

Power, utilities and the cost of the cooling overhead

Power for a South Dakota data center comes from one of six investor-owned utilities listed by the Public Utilities Commission, from a rural electric cooperative, or from a municipal system. The investor-owned companies are Black Hills Energy, MidAmerican Energy, Montana-Dakota Utilities, NorthWestern Energy, Otter Tail Power and Xcel Energy, and the cooperative network includes generation and transmission cooperatives such as East River Electric Power Cooperative and Basin Electric. The EIA lists wind as the state’s primary energy source for electricity generation in 2024.

The 2026 Legislature tied large halls to their own tariffs. SB 135 requires every provider of electricity to keep separate terms and conditions for data centers of 10 megawatts or more and to recover the costs fairly attributed to serving them, including costs left behind if the data center leaves or shrinks. HB 1038 lets the Public Utilities Commission charge such a data center the actual cost of reviewing its electric service agreement. A bill for a sales and use tax exemption on data center equipment was deferred in committee in February 2026, so cooling equipment purchases carry ordinary tax treatment.

The cooling overhead is where design pays back. South Dakota’s commercial electricity averaged 10.61 cents per kilowatt-hour in 2025, against 13.37 cents nationally, according to the EIA. At that statewide average, trimming a 10 megawatt hall’s power usage effectiveness by 0.1 saves one megawatt continuously, which is 8,760,000 kilowatt-hours and about $929,000 a year. Large customers buy power under negotiated contracts rather than the average rate, so the owner’s own tariff replaces the average in a real calculation, but the scale of the result holds.

Data center cooling in Sioux Falls, Rapid City and Aberdeen

Data center cooling in Sioux Falls, Rapid City and Aberdeen differs as much as the three cities’ weather and water do. In Sioux Falls, municipal water comes from the city’s own treatment plant and from the Lewis and Clark Regional Water System, with 2025 average total hardness of 250 parts per million from the city plant and 168 from Lewis and Clark, and sulfate near 200 parts per million or higher. Any tower makeup on that water runs at modest cycles of concentration unless it is softened or pretreated, which raises blowdown and the volume in the SB 135 notice.

Whether a large data center Sioux Falls officials approve will look the same as the next one depends partly on the city’s own rules. The City of Sioux Falls convened a Regulatory Oversight Committee that is due to deliver its report or ordinance recommendations on data centers to the City Council on or before January 12, 2027, after a joint meeting with the Lincoln County Commission in October 2026. SB 135 confirms that counties and cities keep their authority to regulate data center construction and operation, so a cooling design should be checked against the ordinance in force when the permit is filed.

A data center in Rapid City, South Dakota sits at the edge of the Black Hills with summer dew points well below those of Sioux Falls, about 32 days a year at 90 degrees or hotter, roughly twice the Sioux Falls count, and almost no humid hours, which makes data center cooling in Rapid City a strong candidate for adiabatic assistance and air-side or water-side economizers. Aberdeen, Watertown and the northeast counties bring long subzero stretches, so freeze protection and glycol management lead the design there, while Huron, Mitchell and Pierre fall between the two with long, hot afternoons and real humidity in July.

Data center cooling regulations a South Dakota owner meets

Data center cooling regulations in South Dakota come from state statute, the 2024 International Building Code as adopted by cities and counties, water law and federal refrigerant rules, and each one leaves a mark on the mechanical plant. The table lists the ones a cooling plant touches.

Rules that reach a South Dakota data center cooling plant
RuleWhat it requiresEffect on the cooling plant
SB 135 (2026), water sectionsNotice of projected water consumption to each water provider before operation; Board of Water Management statement; possible allocation limits; semi-annual public water use reportsHeat rejection choice and cycles of concentration set the projection; metering on makeup and blowdown supports the reports
SB 135 (2026), electric, county and city sectionsSeparate data center terms and conditions; full cost recovery; no state preemption of county or city regulationEfficiency and demand of the plant feed the service agreement; the ordinance in force governs noise, setbacks and siting
HB 1038 (2026)Public Utilities Commission may assess actual review costs for data centers of 10 MW or morePlant load data go into the utility contract review
SDCL 11-10-5 and 11-10-6Non-residential codes follow the 2024 International Building Code; buildings commenced after July 1, 2026 without a county or city ordinance use it as the design standardStructural support, roof loads and equipment anchorage for cooling equipment follow the 2024 edition
Water rights, SDCL 46-1-3A water right is needed for every use except domesticWell-supplied makeup water starts with an appropriation permit
EPA Technology TransitionsData center and IT cooling equipment below 700 GWP from January 1, 2027Refrigerant named in every chiller and CRAC specification
EPA leak repair, 40 CFR 84.106Leak rate calculations and repair on HFC appliances of 15 lb or more from January 1, 2026Service records and leak repair deadlines in the maintenance program

How are data centers kept cool through a South Dakota year?

Data centers in South Dakota are kept cool by a plant that changes mode with the season, running on outdoor air or dry coolers for most of the year and calling on compressors or evaporation only when the weather demands it. In a typical year the modes fall into four seasons, and the controls must move between them without a temperature swing in the hall.

From November through March, a water-side economizer or dry cooler bank carries the full load, glycol temperature is watched against the freeze point, and the risk is overcooling: fans and valves must throttle smoothly so supply water holds at its setpoint. In April, May, September and October, the plant runs in partial economizer mode, with the economizer precooling return water and the chillers trimming the rest; this is where poorly tuned controls waste the most energy, because they flip between modes several times a day. From June through August, chillers or evaporative assistance carry the peak, and in Sioux Falls the latent load from humid air entering through any outside air path adds to the burden. Paul Industries sets up the transitions with deadbands and staging timers so the plant changes mode a few times a season rather than a few times an hour.

What does data center cooling cost in South Dakota?

Data center cooling in South Dakota costs what its heat rejection method, redundancy level, rack density and winter protection add up to, and the data center cooling system cost for a given hall is set by six drivers that Paul Industries prices one by one. The first is capacity and redundancy, N+1 or 2N on chillers, pumps and coolers. The second is the heat rejection method, since dry coolers need more coil area than towers and adiabatic units add water treatment. The third is freeze protection: glycol, plate exchangers, heat tracing and basin heaters. The fourth is the water side, meaning metering, softening or pretreatment of makeup, and the records SB 135 asks for. The fifth is controls and the sequences that move the plant between modes, and the sixth is the delivery route, supply-only, design-build or complete installation.

Paul Industries prices early from comparable plants once it knows the IT load, density and site, and fixes the price when the design is complete. Energy cost runs alongside first cost, and with commercial power averaging 10.61 cents per kilowatt-hour statewide, a plant that holds an extra few hundred economizer hours each year pays for its added controls quickly. Owners comparing data center cooling contractors should compare the energy model and winter details in each proposal as closely as the bid total.

Who installs data center cooling in South Dakota?

Paul Industries installs data center cooling in South Dakota: chillers, dry coolers, adiabatic coolers, cooling towers, pumps, plate exchangers, chilled water and glycol piping, CRAH and fan wall connections, coolant distribution unit tie-ins and the controls that run them. The work covers new halls and expansions in operating ones, with tie-ins planned around the redundancy the hall already has. Paul Industries prefabricates pump skids and pipe spools off site, pressure tests them, and sets them during defined windows, so the time spent inside a running facility is short and predictable.

The same firm stays with the plant after startup, servicing chillers, testing glycol, cleaning towers and tuning economizer sequences as the IT load grows. Owners planning a full campus will also find the data center mechanical contractor in South Dakota page useful, since it covers the yard, the piping mains and the construction sequence around the cooling plant, and the data center cooling towers and glycol cooling systems pages explain those two pieces of equipment in depth.

Data center cooling solutions from Paul Industries in South Dakota

Paul Industries delivers data center cooling solutions in South Dakota as supply-only equipment and prefabricated skids, as a design-build package, or as complete installation of the owner’s engineered design, followed by service and maintenance for the life of the plant. Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, where its data center cooling in Virginia work is based, and it takes data center work across South Dakota, in all 50 states and at sites abroad. Cold-climate experience from projects such as data center cooling in Wisconsin carries straight into South Dakota designs, and the Midwest and South Dakota pages show the wider range of plant work Paul Industries handles in the region.

Clean water for a liquid-cooled hall’s fill and makeup is covered on the ultrapure water systems in South Dakota page. To price a cooling plant, send the IT load and density, the site, the water source and the redundancy target, or request a quote and Paul Industries will set out the options.

Standards referenced: South Dakota SB 135 (2026), Data Center Bill of Rights for Citizens · South Dakota HB 1038 (2026), SDCL chapter 49-34A · SDCL 11-10-5 and 11-10-6, 2024 International Building Code · SDCL 46-1-3 and the DANR Water Rights Program · EPA Technology Transitions rule (40 CFR Part 84) · EPA Emissions Reduction and Reclamation rule, 40 CFR 84.106 · ASHRAE TC 9.9 thermal guidelines · ASME B31.9

Frequently asked questions

Who installs data center cooling for halls in Sioux Falls and Lincoln County?

Paul Industries installs data center cooling for halls in Sioux Falls, Lincoln County and Minnehaha County: chilled water plants, dry coolers, glycol loops, towers and the controls that run them. Sioux Falls sees about 1,480 humid hours a year, so plants there are sized for a real July latent load as well as for winter free cooling. Send the IT load and site plan, and Paul Industries prices the plant.

Does Paul Industries build data center cooling plants in Rapid City and the Black Hills?

Paul Industries builds data center cooling plants in Rapid City and across the Black Hills region. Rapid City’s dry air, with hourly dew point normals that peak at 56.7 degrees, makes adiabatic coolers and economizers unusually effective there, while its 32 days a year at 90 degrees or hotter set the peak design case. Plants are designed to drain or protect every wet component before the first hard freeze.

Who handles data center cooling in Aberdeen, Watertown and Brookings?

Paul Industries handles data center cooling in Aberdeen, Watertown, Brookings and the rest of northeastern South Dakota. Aberdeen averages 38.5 nights a year at or below zero and Watertown 35.4, so outdoor circuits there run on glycol or behind a plate exchanger, and every outdoor valve and drain is placed for winter access. Server rooms at campuses and enterprise halls receive the same freeze-proof detailing.

Are there data centers in South Dakota today?

Data centers already operate in South Dakota, and in 2026 the Legislature passed SB 135 and HB 1038 to set rules for data centers of 10 megawatts or more. Sioux Falls has a council committee studying data center ordinances, due to report by January 12, 2027. Paul Industries builds and services cooling plants for halls of every size in the state.

Is Sioux Falls getting a data center, and how would one be cooled?

Data center development in Sioux Falls is active enough that the city formed a Regulatory Oversight Committee to recommend data center ordinances by January 12, 2027. Any hall of 10 megawatts or more must give water providers notice of projected water use under SB 135, which pushes designs toward dry coolers and closed loops. Paul Industries designs plants that fit those water and noise rules.

How much data center cooling water does a South Dakota hall use?

A hall cooled by dry coolers and a closed loop uses almost no water beyond the initial fill and small top-ups. An evaporative plant uses roughly 410 gallons an hour for each megawatt rejected by evaporation, plus blowdown, which depends on water hardness. On Sioux Falls water with 250 parts per million of hardness, blowdown is significant unless makeup is pretreated. Paul Industries calculates the figure for the SB 135 notice.

Is closed loop data center cooling required for a South Dakota data center?

State law sets no single cooling method, but SB 135 requires halls of 10 megawatts or more to give water providers notice of projected use and lets the Board of Water Management set limits after residential and essential needs. City rules can add more. Closed loops with dry coolers keep that projection smallest, and South Dakota’s long cold season keeps their energy penalty low. Paul Industries prices both approaches.

Does a data center cooling tower in Aberdeen or Watertown freeze in winter?

A tower in northeastern South Dakota will ice if it runs at low load on a subzero night without protection. Basin heaters, a bypass to the basin, fan cycling or reversal and heat-traced makeup lines keep it working, and many owners drain the tower and switch to a dry cooler or plate exchanger for the winter. Paul Industries designs the plant so winter mode needs no outdoor water at all.

What does the SB 135 water notice ask a data center operator to provide?

Before operating, the operator gives each water provider serving the area a notice of projected water consumption. Each provider issues a written determination of whether that use is compatible with its supply, the operator presents the notices and determinations to the Board of Water Management, and the board issues a written statement. Semi-annual reports of average water use follow and are made public.

Does a data center well in South Dakota need a water right?

South Dakota’s Department of Agriculture and Natural Resources requires a water right for every use of water except domestic use, and the Water Management Board grants those appropriations. A data center that plans to draw groundwater for tower makeup or humidification applies for a permit before construction. Paul Industries provides the flow, peak demand and annual use figures the application needs.

Which refrigerants can new data center chillers in South Dakota use from 2027?

From January 1, 2027, new data center, computer room air conditioning and IT cooling equipment must use a refrigerant with a global warming potential below 700 under the EPA Technology Transitions rule. Comfort cooling chillers already carry that limit. Paul Industries writes the refrigerant into every equipment specification so delivered machines comply when they are installed in a South Dakota hall.

How does South Dakota's electricity price affect cooling design?

Commercial electricity in South Dakota averaged 10.61 cents per kilowatt-hour in 2025, against 13.37 nationally, and large data centers buy under their own contracts. Lower power prices narrow the payback on some efficiency measures, but economizer hours are so plentiful that free cooling still pays quickly. Paul Industries runs the energy model on the owner’s actual tariff before recommending an option.

What does the Data Center Bill of Rights mean for a cooling plant?

SB 135, titled the Data Center Bill of Rights for Citizens, applies to data centers with a peak demand of 10 megawatts or more. It requires separate electric terms and full cost recovery, keeps county and city authority to regulate data centers, and adds water notices and semi-annual water use reports. For the cooling plant, that means metered makeup and blowdown and a heat rejection choice the owner can defend publicly.

Can an existing South Dakota server room add free cooling without new chillers?

Many existing rooms can. A dry cooler or plate exchanger piped in series ahead of the existing chillers precools return water whenever outdoor air is cold enough, and South Dakota offers thousands of such hours. The work needs isolation valves, controls changes and glycol or an intermediate exchanger on the outdoor side. Paul Industries plans the tie-ins around the room’s redundancy so cooling continues throughout.

How warm can chilled water run in a South Dakota data hall?

Supply water can often run in the mid 60s Fahrenheit for air-cooled racks with good containment, and warmer still for liquid-cooled racks, within ASHRAE’s thermal guidelines. Each degree of warmer supply adds economizer hours, and in South Dakota the gain is large because so many hours sit between 40 and 60 degrees. Paul Industries confirms the IT equipment’s limits before setting the supply temperature.

Can Paul Industries supply data center cooling equipment for a South Dakota project without installing it?

Paul Industries supplies chillers, dry coolers, pumps, plate exchangers, prefabricated pump skids and pipe spools for South Dakota projects on a supply-only basis, delivered with drawings, test records and startup support documents. Owners can also choose design-build or complete installation. Every route uses the same fabrication and testing standard.

What should a South Dakota owner send for a data center cooling quote?

Send the IT load and expected growth, rack density, redundancy target, site location and water source, any utility or city conditions already known, and drawings if they exist. Paul Industries replies with an early budget built from similar plants and a firm figure when the drawings are final. Phone 201-450-8280 or request a quote.

Sizing a cooling plant for a South Dakota hall?

Send the IT load, density, site, water source and redundancy target for your hall. Call 201-450-8280 or request a quote.