Paul Industries designs, fabricates, installs, tests and services data center cooling in South Carolina: chilled water plants, cooling towers, dry coolers, pumping and the piping that feeds air handlers and liquid-cooled racks in halls from the Lowcountry to the Upstate. South Carolina asks a lot of a cooling plant: Charleston air stays humid from June into September, Columbia afternoons run hot, and new campuses face fresh scrutiny over water and power. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, takes cooling work across South Carolina as supply-only, design-build or complete installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Charleston wet bulb 80.4 F at the 0.4% level; 1,140 hours a year at 75 F or above (NWS hourly data, 2021 to 2024)
Upstate free cooling 2,299 hours a year at or below 50 F at Greenville-Spartanburg
Water threshold Withdrawals over 3 million gallons in a month are permitted or reported (SC DES)
Industrial power 6.84 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What does data center cooling in South Carolina have to handle?

Data center cooling in South Carolina has to remove server heat through long, humid summers while keeping hall air dry enough for the ASHRAE recommended envelope, and it has to do so with heat rejection equipment that fits the water and power limits of each county. The heat itself is the same everywhere: every kilowatt delivered to IT equipment ends up as a kilowatt of heat the plant carries outdoors. What changes in South Carolina is the outdoor side of that equation, and the change is steep from the coast to the mountains.

A plant in Berkeley or Dorchester County rejects heat into some of the most humid air on the Atlantic seaboard, and its cooling towers run against a high wet bulb for much of June through September. A plant near Greenville or Spartanburg sits close to 1,000 feet above sea level, sees noticeably lower wet bulb peaks and gets far more hours cold enough for economizer cooling. Columbia sits between them with the hottest afternoons of the three. Designers who reuse a plant layout from one part of the state in another tend to oversize in one place and run short in the other, which is why Paul Industries starts every South Carolina cooling job from the weather at the site.

Where are data centers in South Carolina, and why does location set the cooling design?

Data centers in South Carolina cluster in three places: the Berkeley and Dorchester County corridor north of Charleston, the Midlands around Columbia, and the Greenville and Spartanburg Upstate along Interstate 85, with enterprise rooms at hospitals, manufacturers, utilities and universities across the rest of the state. Each cluster has its own climate, its own electric utility and its own water source, and those three facts decide the cooling plant before a single rack is placed.

The Google data center South Carolina residents know best opened in 2007 at Moncks Corner in Berkeley County, and Google has expanded it several times since. In March 2021 the company announced a $500 million expansion at Mount Holly Commerce Park, which it said brought its South Carolina investment to $2.9 billion. Many people search for it as the Google data center, Charleston, SC, although the campus sits in Berkeley County. In September 2024 Google announced $3.3 billion for Berkeley and Dorchester counties, naming sites at the Pine Hill Business Campus in Ridgeville and the Winding Woods Commerce Park in St. George, and on October 13, 2025 it announced a further $9 billion for the Berkeley expansion and the two Dorchester campuses. These are market facts about data center construction in South Carolina, and they explain why cooling contractors, equipment makers and regulators all look hard at the Lowcountry right now.

The Upstate has a different profile: enterprise rooms for manufacturers, hospital systems and colocation halls along the I-85 corridor, plus university research computing at Clemson. Columbia carries state government, insurance and health care loads. Enterprise and colocation halls of the size common in the Upstate and the Midlands often suit packaged air-cooled chillers, dry coolers and modular pumping better than the field-erected towers and large centrifugal machines of a hyperscale campus.

South Carolina data center regions and the cooling decision each one forces first
RegionTypical electric supplierOutdoor condition that drives the plantFirst cooling question
Berkeley, Dorchester and Charleston countiesDominion Energy South Carolina, Santee Cooper and member cooperativesHigh wet bulb and dew point from June to September; salt air near the harborHow much of the heat goes through towers, and how much through dry or adiabatic coolers, given water permits
Columbia and the MidlandsDominion Energy South Carolina and cooperativesHottest afternoons of the three airports, 0.4% dry bulb near 96 FAir-cooled condenser and dry cooler derating on peak days
Greenville, Spartanburg and AndersonDuke Energy Carolinas and cooperativesLower wet bulb peaks, the most economizer hours, colder winter nightsHow to bank free cooling hours and protect outdoor coils from freezing
Rock Hill and York CountyDuke Energy Carolinas, municipal systems and cooperativesPiedmont climate similar to the Charlotte metroPhased plant growth on enterprise and colocation sites
Florence and the Pee DeeDuke Energy Progress and cooperativesHumid coastal plain summersTower water treatment and dehumidification capacity
Aiken and the Savannah River areaDominion Energy South Carolina and cooperativesHot, humid summers similar to ColumbiaRedundancy for government and research loads that run year round

South Carolina weather by the hour: Charleston, Columbia and Greenville-Spartanburg

Hourly weather records from the three main South Carolina airports show how much the cooling load shifts across the state: Charleston leads the three on wet bulb and dew point, Columbia on dry bulb, and Greenville-Spartanburg on hours cool enough for free cooling. Paul Industries computed the figures below from National Weather Service hourly observations for 2021 through 2024, calculating wet bulb from temperature and dew point at each station’s elevation. Published ASHRAE design values remain the basis for code sizing; the hourly counts show how a plant actually spends its year.

Cooling-relevant weather at three South Carolina airports, NWS hourly observations 2021 to 2024 (Paul Industries calculation)
MeasureCharleston (CHS)Columbia (CAE)Greenville-Spartanburg (GSP)
Dry bulb exceeded 0.4% of hours93 F96 F93 F
Wet bulb exceeded 0.4% of hours80.4 F79.7 F76.4 F
Hours per year with wet bulb at or above 75 F1,140758138
Hours per year with dew point at or above 65 F3,3362,7241,840
Hours per year at or below 50 F dry bulb1,2681,7952,299
Hours per year at or below 32 F76225314
Lowest temperature in the period18 F12.9 F7 F

Three conclusions follow for a cooling plant. First, a Lowcountry tower has to be selected against a wet bulb near 80 F, and in July Charleston logs about 457 hours at or above 75 F wet bulb, so tower approach and fill condition matter every summer afternoon. Second, outdoor air carries a dew point of 65 F or more for 3,336 hours a year at Charleston, which is well above the 59 F dew point at the top of the ASHRAE recommended envelope; any design that brings outdoor air into the hall needs dehumidification capacity sized for those hours. Third, the Upstate offers nearly twice Charleston’s hours at or below 50 F, so a waterside economizer pays back faster in Greenville than on the coast.

Chilled water, air-cooled or dry coolers: which heat rejection fits a South Carolina site?

The heat rejection choice for a South Carolina data hall depends on three site facts: the wet bulb the equipment must work against, the water the site can draw and discharge, and the chilled water or facility water temperature the IT equipment accepts. Evaporative cooling towers keep compressor energy low in humid heat but consume water continuously. Air-cooled chillers and dry coolers use little or no water but carry more fan and compressor energy on the hottest afternoons. Adiabatic coolers sit between them, spraying or wetting pads only when the dry bulb climbs.

Heat rejection options for a South Carolina data center cooling plant
OptionWater useLowcountry fitUpstate fitWhat Paul Industries checks first
Water-cooled chillers with open cooling towersContinuous evaporation, drift and blowdownLowest energy on humid peaks, but water supply and discharge permits decide feasibilityEfficient, with long waterside economizer seasonsMake-up water source, blowdown route, tower approach at the site wet bulb
Air-cooled chillers with integral free cooling coilsNone for heat rejectionWorks, with condenser derating above 93 F and coil corrosion protection near salt airStrong fit; free cooling coils carry much of the winter loadCondenser coil coating, recirculation between units, sound at the property line
Dry coolers on a warm facility water loopNoneNeeds chiller trim through much of the summerCovers most hours for warm-water liquid coolingFacility water class of the IT equipment, glycol concentration
Adiabatic or hybrid coolersWater only on hot hoursCuts annual water sharply against towers while keeping peak capacityWet mode needed for relatively few hoursWater quality for pads or sprays, freeze drain-down
Closed-circuit fluid coolersSpray water on an external coilKeeps process water clean in dusty or marsh-side airUseful where glycol loops run outdoorsSpray water treatment, coil access for cleaning

Many Lowcountry owners now ask about data center cooling without water, meaning closed loops with dry coolers or air-cooled chillers and no evaporative heat rejection. Paul Industries designs and builds those plants, and in Charleston weather they work best when the IT equipment accepts warm facility water, so that compressors run as trim in summer rather than as the main source of cooling all year. For air-cooled halls on the coast, a water-free plant carries a higher energy bill in exchange for a near-zero water draw, and the owner’s choice usually turns on what the county, the water utility and the electric utility will each allow.

Water for a data center: South Carolina withdrawal rules and the cooling tower

Water for a data center South Carolina site draws for cooling falls under two state programs run by the South Carolina Department of Environmental Services: surface water withdrawals above 3 million gallons in any month must be permitted or registered and reported, and groundwater withdrawals above the same monthly figure must be reported, with permits required in the coastal Capacity Use Areas. The Department took over these programs on July 1, 2024, when the former DHEC was split into separate environmental and public health agencies.

The 3 million gallon line is lower than many owners expect. A tower plant rejecting 10 MW of heat evaporates roughly 3,900 gallons an hour, about 94,000 gallons a day, before blowdown is counted, so a campus on its own wells or a river intake reaches the threshold within weeks at summer load. Google’s Berkeley County campus is a well documented South Carolina case: in October 2019 state regulators approved its request to withdraw 549 million gallons a year from the McQueen Branch aquifer, up from 182.5 million, after public debate over the aquifer, and in December 2019 Google accepted tighter conditions on that permit. Most new campuses since then have planned around utility water, reclaimed water or lower-water heat rejection from the outset.

For the cooling plant, the water plan affects more than the source. Cycles of concentration, blowdown volume and the chemistry program are set by the make-up water quality, and Lowcountry surface and well water each bring their own hardness, silica and chloride profile. Paul Industries designs tower plants with metered make-up and blowdown, side-stream filtration and treatment injection points, so the owner can report withdrawals and defend cycles of concentration with recorded data rather than estimates.

South Carolina data center legislation and what it could mean for cooling

South Carolina data center legislation debated in 2026 would tie water use and electric service directly to the cooling plant, although as of late 2026 neither of the two main bills had become law. House bill H.5215, introduced in February 2026, would define large load customers at 50 MW of projected peak demand and require data centers among them to report annually the water withdrawn for cooling. Senate bill S.867, the Data Center Development Act, was reported out of the Senate Agriculture and Natural Resources Committee on April 28, 2026; its committee text would cap water use effectiveness at 2.0 liters per kilowatt-hour for smaller tiers and 1.5 for facilities over 50 MW.

A cooling plant that already meters water and power at the right points can report under any of those proposals without rework, so Paul Industries builds that metering into new plants as a matter of course: make-up and blowdown meters on each tower cell group, energy meters on chilled water and facility water headers, and power metering on chillers, pumps and fans. Owners planning a phased campus also benefit from selecting heat rejection that can shift toward lower water use as later phases are permitted.

Electric service, large-load rules and the cooling plant

Electric service in South Carolina comes from three investor-owned utilities and the state-owned Santee Cooper with its member cooperatives: Duke Energy Carolinas serves much of the Upstate, Duke Energy Progress the Pee Dee, and Dominion Energy South Carolina the Midlands and much of the Lowcountry, while Santee Cooper serves direct customers and supplies about 20 cooperatives at wholesale. In April 2025 Santee Cooper’s board adopted an experimental rate for new loads of 50 MW or more, with long-term contracts and minimum payments meant to keep data center infrastructure costs off other customers.

Large-load contracts make cooling efficiency a commercial term rather than an engineering preference, because the contracted demand includes the cooling plant. South Carolina’s 2024 average industrial electricity price was 6.84 cents per kilowatt-hour, against a US average of 8.13 (EIA). At that price, a 30 MW IT load whose cooling plant draws 0.20 kW per kW of IT load uses about 52,560 MWh a year for cooling, roughly $3.6 million; trimming the cooling draw to 0.12 kW per kW saves about $1.4 million a year at a constant full load. The lower price narrows the payback on efficiency upgrades compared with Virginia, but the contracted peak demand still rewards a plant whose compressors and fans run less on the hottest afternoon.

Inside the hall: air handling, containment and liquid cooling in humid air

Inside a South Carolina data hall, the cooling plant serves computer room air handlers, fan walls or in-row coolers that move air through contained aisles, and a growing share of halls also pipe facility water to coolant distribution units for liquid-cooled racks. Humidity control is the part that changes most with the state. A hall built tight and run with recirculated air keeps its dew point steady; a hall that brings in large volumes of outdoor air for economizer cooling has to dry it first during the Lowcountry summer, which turns the economizer into a dehumidification problem for months at a time.

Most South Carolina designs therefore use waterside rather than airside economizers, with a plate heat exchanger between the condenser water and chilled water loops or free cooling coils on air-cooled chillers. Chilled water supply temperatures in the mid 60s F keep coils above the hall dew point and let the economizer run more hours. For halls taking dense racks, Paul Industries pipes the facility water loop to coolant distribution units, flushes and tests it, and coordinates the facility water temperature with the heat rejection plant so that the warmer return temperature becomes extra economizer hours rather than wasted capacity. The data center liquid cooling in South Carolina page covers that rack-side work in detail.

Adding cooling to an operating hall in Columbia, Greenville or the Lowcountry

Adding cooling capacity to a South Carolina data center that stays online is a sequence of hot taps, temporary connections and staged cutovers, planned so that redundancy never drops below what the operator has agreed to for each step. Typical scopes include a new chiller and tower cell added beside an existing plant, a second chilled water main to make a ring header, pump replacement with variable speed drives, or a facility water branch for the first liquid-cooled rows.

Paul Industries surveys the existing plant first: valve condition and isolation points, header sizes, pump curves, control sequences and the water treatment history. New pipe is prefabricated off site in spool pieces wherever possible, so the time spent in the live building is short. Tie-ins use line stops or hot taps where existing isolation valves are doubtful, and every new section is pressure tested and flushed before it is opened to the live loop. Summer work in Charleston and Columbia is scheduled away from the hottest weeks, since the margin in an operating plant is smallest when wet bulb peaks; Upstate sites have a longer cool season in which cutovers carry less risk.

What does data center cooling cost in South Carolina?

The cost of data center cooling in South Carolina is set by the IT load and redundancy, the heat rejection type, the water source and permitting, the distance between the plant and the hall, and whether the work is a new campus or a cutover in an operating building. Published dollar figures for complete plants vary too widely with these factors to quote one honestly, so Paul Industries prices each job from its scope and gives a budget range from comparable work once the basics are known, followed by a firm price when the scope is defined.

Cost drivers for a South Carolina data center cooling plant
DriverWhy it moves the priceWhat to send for a firm quote
IT load per phase and redundancy levelSets chiller, tower and pump counts and header sizesPhase plan in MW, N+1 or 2N requirement
Heat rejection typeTowers, air-cooled chillers, dry coolers and adiabatic units differ in equipment, structure and pipingWater source, any water limits, preferred heat rejection
Site wet bulb and dry bulbCharleston selections need more tower or condenser capacity than Upstate onesSite location and design conditions on the basis of design
Facility water temperatureWarmer water cuts compressor size and lengthens economizer hoursIT vendor facility water class or chilled water setpoints
Operating building or new buildHot taps, temporary cooling and night work add cost and timeSingle line diagrams, existing plant drawings, outage windows
Metering and controlsWater and energy metering supports reporting and large-load contractsOwner reporting needs and building automation platform

Who builds and services data center cooling in South Carolina?

Paul Industries builds and services data center cooling in South Carolina, from heat rejection yards and central plants to the piping that feeds air handlers and coolant distribution units in the hall. Paul Industries designs the plant or works from the engineer of record’s design, fabricates pipe spools and equipment skids, supplies chillers, towers, dry coolers, pumps and heat exchangers, installs and tests the piping to ASME B31.9 and the 2021 South Carolina Mechanical Code, flushes and fills the loops, starts up the equipment and supports commissioning through integrated testing. After turnover, Paul Industries maintains and repairs the plant under a service agreement.

Owners choose the route that fits: supply-only for a contractor team already on site, design-build when the owner wants one contract from concept to turnover, or complete installation against a finished design. Related South Carolina work includes chiller repair in South Carolina for existing plants, data center commissioning in South Carolina for testing and turnover, data center mechanical contractors in South Carolina for the full mechanical package, and process piping in South Carolina for plant utilities. The national data center cooling systems page covers equipment types and design principles that apply in every state.

Paul Industries is an East Coast contractor, formerly based in northern New Jersey and then Pennsylvania, and now headquartered in Kilmarnock, Virginia, where it also builds data center cooling in Virginia, its headquarters state. The same team carries this work across the Southeast, including data center cooling in North Carolina and data center cooling in Georgia, and in every other state.

Paul Industries cooling plants for South Carolina data halls

Paul Industries designs, supplies, installs, tests, starts up and maintains data center cooling plants across South Carolina, sized for Charleston humidity, Columbia heat and Upstate winters, with water and energy metering built in. Send the IT load by phase, redundancy level, site location, water source and any existing plant drawings, and Paul Industries will return a budget range and a plan for the work. The South Carolina page lists the other process and utility systems Paul Industries builds in the state, and the next step is to request a quote.

Standards referenced: ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments, 5th edition · 2021 South Carolina Mechanical Code (2021 IMC with SC modifications) · 2009 International Energy Conservation Code (South Carolina Energy Standard Act) · South Carolina Surface Water Withdrawal, Permitting, Use and Reporting Act · South Carolina Groundwater Use and Reporting Act · ASME B31.9

Frequently asked questions

What cooling water does the Google data center, South Carolina's Berkeley County campus, use?

The Google data center Moncks Corner campus drew public attention in 2019, when state regulators approved its request to withdraw up to 549 million gallons a year from the McQueen Branch aquifer, up from 182.5 million, and Google later agreed to tighter permit conditions. The case shows how closely South Carolina now watches cooling water. Paul Industries designs tower plants with metered make-up and blowdown so any owner can document its withdrawals under state reporting rules.

Who installs data center cooling for sites in Summerville, Ridgeville and the rest of Dorchester County?

Paul Industries installs chilled water plants, towers, dry coolers and facility water piping for data halls in Dorchester County, including the corridor around Summerville and the business parks at Ridgeville and St. George. For a data center in Summerville, South Carolina, the plant is sized for the Charleston area wet bulb near 80 F and protected against coastal corrosion. Call 201-450-8280 or request a quote with the IT load and site location.

Does Paul Industries build cooling for a data center, Greenville SC or Spartanburg, in the Upstate?

Paul Industries builds and services cooling plants for data halls in Greenville, Spartanburg and Anderson, where the weather offers about 2,299 hours a year at or below 50 F at the airport. That makes waterside economizers and free cooling coils pay back quickly, and it calls for freeze protection on outdoor coils and piping during January cold snaps. Paul Industries lays out the plant to bank those free cooling hours.

Can Paul Industries cool a data center in Columbia, SC and the Midlands?

Paul Industries designs and installs cooling for any data center, Columbia SC or elsewhere in the Midlands, including halls serving state agencies, insurers, health systems and colocation clients. Columbia records the hottest afternoons of the three main South Carolina airports, with the 0.4 percent dry bulb near 96 F and 103 F reached in the 2021 to 2024 record, so air-cooled condensers and dry coolers are selected with that derating in mind.

Who handles cooling plants for a data center in York County, South Carolina, or around Aiken?

Paul Industries handles cooling plant design, installation and service for a data center in York County, South Carolina, around Rock Hill and Fort Mill, and for a data center in Aiken, South Carolina, near the Savannah River area. York County halls share the Charlotte metro’s Piedmont climate, while Aiken sites see hot, humid summers. Paul Industries sizes each plant to the site’s own weather and redundancy needs.

Where are data centers in South Carolina being built, and does location change the cooling plant?

Google’s announced campuses are in Berkeley and Dorchester counties north of Charleston, with enterprise and colocation halls in the Midlands and along I-85 in the Upstate. Location changes the plant considerably: Charleston logs about 1,140 hours a year at or above 75 F wet bulb, Greenville-Spartanburg about 138. A tower selection that suits the Upstate runs short on the coast.

Are data centers in upstate South Carolina cheaper to cool than coastal ones?

Generally yes, per kilowatt of IT load, because Upstate air is drier and cooler for more of the year. Greenville-Spartanburg’s 0.4 percent wet bulb is about 76.4 F against 80.4 F at Charleston, and it has nearly twice as many hours at or below 50 F. Compressors run fewer hours and towers work against a lower wet bulb. Electric rates, water costs and land still vary by site, so the full comparison needs those numbers too.

Why does Charleston humidity matter for a data hall's air handlers?

Outdoor air at Charleston carries a dew point of 65 F or more for about 3,336 hours a year, while the ASHRAE recommended envelope tops out at a 59 F dew point. Any outdoor air brought into the hall must be dried first, and cooling coils running below the hall dew point condense water that must drain properly. Most Lowcountry halls use waterside economizers and tight envelopes so the hall dew point stays steady.

Is data center cooling without water practical in South Carolina?

Water-free cooling with air-cooled chillers or dry coolers works throughout the state, but its energy cost depends on where it runs. In the Upstate, dry coolers carry much of the year on their own. On the coast, compressors run as trim through most of the summer. Liquid-cooled IT equipment that accepts warm facility water makes a water-free plant far more efficient, and Paul Industries designs plants on that basis where owners want minimal water use.

How do South Carolina water withdrawal rules affect a new cooling tower plant?

Surface water withdrawals above 3 million gallons in any month must be permitted or registered and reported to the South Carolina Department of Environmental Services, and groundwater withdrawals above that figure must be reported, with permits needed in coastal Capacity Use Areas. A large tower plant can reach that threshold in days during summer. Utility-supplied water shifts the permit to the water utility, but the owner still needs reliable metering.

What would South Carolina data center legislation change for cooling plants?

Bills debated in 2026 would have required large data centers to report water withdrawn for cooling each year and, in the Senate version, would have capped water use effectiveness at 1.5 to 2.0 liters per kilowatt-hour depending on size. Neither had become law by late 2026, but both point toward metered, lower-water plants. Paul Industries builds water and energy metering into new South Carolina cooling plants so owners can report under whatever rules follow.

How does the Santee Cooper large-load rate affect cooling plant decisions?

Santee Cooper’s 2025 experimental rate for new loads of 50 MW or more relies on long-term contracts with minimum payments, so the contracted demand, which includes cooling, becomes a fixed commercial commitment. Every kilowatt the cooling plant draws at peak raises the demand an owner must contract for. Efficient chillers, variable speed pumps and fans, and higher chilled water temperatures reduce that peak and the contract that goes with it.

What chilled water temperature suits a South Carolina data hall?

Supply temperatures in the mid 60s F are common for air-cooled halls running within the ASHRAE recommended envelope, and they keep coils above the hall dew point while lengthening economizer hours. Halls with liquid-cooled racks often run a separate warmer facility water loop for the coolant distribution units. Paul Industries sets the temperatures with the owner’s IT requirements, then sizes chillers and heat rejection for the site’s weather.

How is a South Carolina cooling plant protected during a hurricane or coastal storm?

Coastal plants are protected by anchoring rooftop and yard equipment for the design wind speed in the building code, elevating electrical gear above flood levels, and keeping enough on-site water and chemical storage for tower plants to run through a supply interruption. Dry coolers and air-cooled chillers avoid the water dependency altogether. Paul Industries reviews storm resilience with the owner during design and before each hurricane season on plants under service.

Can an existing cooling plant be expanded without taking the data center down?

Yes, with the work staged so redundancy stays at the agreed level for each step. Paul Industries adds chillers, towers and pumps beside the existing plant, prefabricates spool pieces off site, uses hot taps or line stops where isolation valves are doubtful, and pressure tests and flushes new sections before opening them to the live loop. In Charleston and Columbia, cutovers are scheduled outside the peak wet bulb weeks.

Which delivery routes does Paul Industries offer for South Carolina cooling work?

Paul Industries offers supply-only equipment and prefabricated skids, design-build from concept through commissioning, and complete installation against an engineer’s design. Many owners combine routes over a campus: design-build for the first phase, then installation of repeat phases from the same design. After turnover, a service agreement covers maintenance, water treatment checks and repairs.

What does Paul Industries need to price data center cooling in South Carolina?

Send the IT load for each phase, the redundancy level, the site location, the intended heat rejection and water source, and any drawings of an existing plant. For an operating hall, add the outage windows and current operating data. Paul Industries returns a budget range from comparable work, then a firm price once the scope is set. Call 201-450-8280 or request a quote.

Planning a cooling plant for a South Carolina data hall?

Send the IT load by phase, redundancy level, site location and water source, with drawings of any existing plant. Call 201-450-8280 or request a quote.