Paul Industries designs, builds, starts up and services data center cooling in Ohio, from computer room air handlers and containment on the white floor to the chillers, cooling towers, dry coolers and waterside economizers that move the heat outdoors. Ohio cooling plants answer to humid summers that peak near a 78 F wet bulb in Cincinnati, winters that reach 10 below zero around Toledo and Akron, a Central Ohio water system that now serves dozens of data halls, and an Ohio EPA that reviews each blowdown discharge one site at a time. Paul Industries takes cooling projects in Columbus, New Albany, Cincinnati, Dayton, Cleveland, Toledo and across the state, from headquarters at 256 Shore Drive in Kilmarnock, Virginia.
Request a quote or call 201-450-8280
What does data center cooling in Ohio have to handle?
Data center cooling in Ohio has to reject heat through a long, muggy summer, keep running through hard freezes, and do both on water and power that Central Ohio now shares with a fast-growing cluster of halls. The answer engineers reach for is usually a chilled water plant with towers or dry coolers and a waterside economizer, but the right mix changes between the Lake Erie shore and the Ohio River valley, and between a site on city water and one with its own wells.
Four Ohio conditions shape the plant. Summer wet bulb sets the size of the towers and how warm the condenser water returns. Dew point decides how much moisture the air handlers pull out of outside air. Winter lows set freeze protection for every outdoor coil, basin and pipe. And water supply, sewer access and discharge permits decide whether evaporative heat rejection is practical at a given address. The national basics of plant types and redundancy sit on the data center cooling systems page; this page works through the Ohio numbers.
Why are there so many data centers in Columbus, Ohio, and what does that mean for cooling?
Columbus has drawn so many data centers because large industrial parks such as New Albany planned land, water and power for heavy users years ahead, and because Ohio law lets the Tax Credit Authority exempt data center equipment, including equipment cooling systems, from sales and use tax. A January 2026 report from the University of Virginia’s Weldon Cooper Center and the Joyce Foundation projected that Columbus will pass New York City to become the second-largest data center hub in the Great Lakes region, behind Chicago.
For cooling designers, the concentration means three things. Water and sewer capacity in the Columbus service area is now a planning question rather than a given. Neighboring campuses compete for the same heat rejection sites, sound limits and setbacks. And owners comparing data centers in Columbus, Ohio against other markets look hard at cooling energy, because Ohio power prices climbed sharply in 2026. The Columbus Ohio data center market also moves fast enough that a plant designed today will likely serve denser racks within a few years, which argues for chilled water headers and valves sized for a later liquid cooling loop.
Central Ohio campuses in the public record
Public records and trackers give a sense of scale without any private data. The table lists campuses named in published reporting, as market facts only.
| Campus | Published figure | What it tells a cooling designer |
|---|---|---|
| Google New Albany data center | More than 1 billion gallons of water in 2025, per public records reported by WCPO | Evaporative heat rejection at campus scale draws on the same municipal system as neighboring suburbs |
| Google data center, Columbus, Ohio | About 448 million gallons in 2025, roughly 1.2 million gallons a day; about 400 MW operating per Cleanview | Water use per megawatt varies widely with plant design and weather, so per-site modeling matters |
| Meta New Albany data center | About 637 MW operating per the Cleanview tracker, November 2026 | Campus loads now run in the hundreds of megawatts, so cooling efficiency changes the utility bill by millions |
| New Albany International Business Park | About 40 data centers on 12,000 acres; about 9 million gallons a day in late 2025 | The park was using about 56 percent of its 16 million gallon daily allotment |
Ohio weather by the hour, station by station
Ohio weather recorded hour by hour at nine airports from 2021 through 2025 shows a state that is hotter and more humid in the southwest and cooler along the Lake Erie shore, with Columbus and the Licking County sites in between. Paul Industries pulled five years of routine observations for each station and computed the wet bulb for every hour, because published design tables lag and a single design point says nothing about how many hours an economizer can run.
| Station | 0.4% dry bulb | 0.4% wet bulb | Hours a year at 90 F or more | Hours a year above 59 F dew point | Share of hours at or below 55 F wet bulb |
|---|---|---|---|---|---|
| Columbus (John Glenn) | 91 F | 77.2 F | 68 | 2,267 | 57.0% |
| Newark-Heath (Licking County) | 91 F | 77.2 F | 63 | 2,214 | 56.9% |
| Cincinnati (Lunken) | 92 F | 78.3 F | 100 | 2,608 | 54.7% |
| Dayton | 90 F | 77.2 F | 55 | 2,091 | 58.0% |
| Lima | 90 F | 77.1 F | 39 | 2,041 | 60.3% |
| Toledo | 91 F | 76.7 F | 70 | 1,811 | 61.9% |
| Cleveland (Hopkins) | 89 F | 76.2 F | 27 | 1,787 | 61.5% |
| Akron-Canton | 89 F | 75.5 F | 22 | 1,818 | 61.7% |
| Youngstown-Warren | 88 F | 75.2 F | 16 | 1,782 | 63.2% |
The spread inside one state is wide. Cincinnati logged about 100 hours a year at or above 90 F, six times the Youngstown figure, and spent about 2,600 hours a year with dew points above the ASHRAE recommended 59 F ceiling for IT inlet air. Year to year swings are just as real: Columbus saw 23 hours at 90 F or more in 2023 and 140 in 2024. A plant sized from an average year runs short in a 2024 summer, which is why Paul Industries checks capacity against the 0.4 percent wet bulb and the worst recent year, not the mean.
Planning a new data center: Columbus, Ohio weather in practice
A 77.2 F design wet bulb at the Columbus airport means a cooling tower selected for a 7 F approach returns condenser water near 84 F on the worst afternoons. Chillers sized for that lift run comfortably the rest of the year. For a new data center, Columbus, Ohio figures also argue for chilled water supply in the 60s rather than the low 40s, because warmer water adds economizer hours and trims compressor energy without costing the white floor anything when containment is tight.
How many free cooling hours does an Ohio plant get?
An Ohio cooling plant with a waterside economizer can carry the full load on towers and a plate exchanger for roughly half the hours in a year, and part of the load for many more, depending on the chilled water temperature it accepts. Taking an assumed 7 F tower approach plus a 3 F exchanger approach, a 55 F wet bulb produces water near 65 F. Columbus sat at or below that wet bulb for 57 percent of all hours between 2021 and 2025, Cleveland for 61.5 percent and Youngstown for 63.2 percent.
Two design choices decide how much of that time the plant actually uses. The first is supply temperature: every few degrees of warmer chilled water moves a slice of spring and autumn into full free cooling. The second is the changeover sequence. Plants that switch in steps, with partial economizing while chillers trim, capture far more hours than plants that wait for the economizer to carry everything. Paul Industries writes the sequence, sets the valve logic, and proves the changeover in both directions before turnover, as part of data center commissioning in Ohio.
Air-side economizers also work in Ohio, but they bring outdoor dew points straight into the conversation. With Columbus above a 59 F dew point for more than 2,200 hours a year, an air-side plant spends much of the summer conditioning outside air or closing its dampers. Most Ohio halls get more from a waterside economizer feeding warm chilled water.
Dew point, humidity and the white floor in an Ohio summer
Ohio summer humidity matters to a data hall because outdoor dew points sit above the ASHRAE recommended upper limit of 59 F for about 1,800 to 2,600 hours a year, and above 70 F for about 260 hours in Cleveland and more than 700 in Cincinnati. Moisture enters with ventilation air, through door traffic at loading docks and through leaky envelopes, and it lands on any coil or pipe colder than the dew point.
The fix is to separate dehumidification from sensible cooling. A dedicated outdoor air unit dries ventilation air before it reaches the hall, so the CRAH coils can run warm and dry instead of wringing water from the room. Paul Industries measures infiltration on existing halls, sizes the outdoor air unit to the station’s dew point record, and insulates chilled water piping with continuous vapor retarders, which matters most in Cincinnati and the Ohio River valley where muggy hours run longest.
Data center water usage in Central Ohio: what the public figures show
Data center water usage in Central Ohio is large in total but still a small share of the regional supply. Columbus’s water administrator put data centers at roughly 3 percent of consumption in the service area, which delivered about 156 million gallons a day against a capacity of 245 million. The New Albany International Business Park used about 9 million gallons a day in late 2025, about 56 percent of the 16 million gallons a day its 2015 service plan allows.
Those numbers set the planning frame for any new New Albany data center or Columbus area hall. Water-cooled plants with towers use the least electricity in Ohio’s climate but consume water through evaporation and blowdown. Air-cooled chillers and dry coolers use little or no water but more power on hot afternoons. Hybrid towers and adiabatic coolers sit between the two, evaporating water only above a set dry bulb. Columbus is also studying recycled wastewater for cooling in an industrial area south of the city, which would change the math for sites that can connect to it.
Data center cooling without water is practical in Ohio for halls that accept warm chilled water or run liquid-cooled racks. The station data show dry bulb temperatures above 85 F for only about 140 to 400 hours a year across the state, so dry coolers carry most of the year and a trim chiller covers the rest. Paul Industries models water and power for each option on the site’s own utility rates before an owner commits.
| Heat rejection option | Water use | Power on a hot Ohio afternoon | Ohio permit and supply questions |
|---|---|---|---|
| Water-cooled chillers with open cooling towers | Highest: evaporation plus blowdown | Lowest | Sewer capacity for blowdown, or an individual NPDES permit for a stream discharge; city supply allotment |
| Closed-circuit fluid coolers | Moderate, spray water in warm months | Low to moderate | Spray water blowdown and treatment chemicals still need a discharge path |
| Hybrid or adiabatic dry coolers | Low, wetted only above a dry bulb setpoint | Moderate | Small blowdown volume; drift and noise limits near neighbors |
| Air-cooled chillers with free cooling coils | Near zero | Highest | Larger electrical service and sound control; no cooling water allotment needed |
| Dry coolers serving warm-water liquid cooling | Near zero | Low, with a small trim chiller | Glycol handling and freeze protection for Ohio winters |
Cooling tower blowdown and Ohio EPA discharge permits
Cooling tower blowdown from an Ohio data center goes either to a public sanitary sewer under the sewer authority’s rules or to a stream under an individual National Pollutant Discharge Elimination System (NPDES) permit from Ohio EPA. Ohio EPA lists cooling systems, boilers, air compressors and water treatment systems as the usual sources of data center wastewater, and its permits set monitoring and limits so a discharge does not harm fish, recreation or drinking water sources.
In October 2025 Ohio EPA proposed a statewide general NPDES permit for data centers that would have covered cooling tower blowdown, non-contact cooling water and similar streams. After more than 7,000 public comments, the agency said in July 2026 that it had decided not to finalize the general permit and would keep writing individual permits fitted to each site. For a cooling design, that makes the discharge route a schedule item: a site without sewer capacity needs time for an individual permit, and the tower’s cycles of concentration, biocide program and blowdown volume become permit numbers.
Sites that draw their own water face a second rule. Under Ohio Revised Code 1521.16, a facility able to withdraw more than 100,000 gallons a day from all sources registers with the chief of the Division of Water Resources within three months of completion and reports withdrawals every year. A data center cooling tower fed by on-site wells easily crosses that line. Paul Industries designs blowdown metering, conductivity control and sampling points so the permit data come straight from the plant, and coordinates the cooling tower water treatment program with the discharge limits.
Winter in an Ohio data center cooling plant
Winter in an Ohio data center cooling plant brings the longest economizer runs of the year and the worst freeze risk, often in the same week. Toledo and Akron-Canton each reached 10 F below zero between 2021 and 2025, Lima averaged about 92 hours a year at or below 10 F, and Columbus stayed at or below freezing for 393 straight hours, about 16 days, in February 2021.
Every outdoor component needs a plan for that stretch. Tower basins need heaters or remote sumps, fan controls that avoid icing, and bypass valves that keep water moving. Dry coolers and economizer coils need glycol at a concentration matched to the station’s record low, or a drain-down sequence that actually empties the coil. Exposed chilled water and condenser piping needs heat tracing and insulation, and the controls need to keep the economizer running without dropping the return water so far that chillers trip on low lift when they restage. Paul Industries designs these details, sets the alarms that warn before a freeze, and tests the winter sequences during the first cold snap after startup.
How much cooling does a data center need in Ohio?
A data center needs cooling capacity equal to its IT load plus lighting, power conversion losses and envelope gains, with spare capacity for the redundancy level the owner chooses. One ton of cooling removes 3.517 kW of heat, so a 10 MW IT hall needs roughly 2,850 tons of net capacity before losses and redundancy. The Ohio part of the answer is the weather margin: chillers and towers selected at the 0.4 percent wet bulb for the site’s own station, 78.3 F in Cincinnati against 75.2 F in Youngstown, plus allowance for a summer like 2024.
Data center cooling requirements to settle first
The data center cooling requirements that a buyer should set early are the IT load and its growth path, the inlet temperature range under ASHRAE’s thermal guidelines, the redundancy target such as N+1 or 2N, any liquid cooling planned for the next refresh, and the water and discharge route for the site. Paul Industries turns those into a plant layout, an equipment schedule and a sequence of operation.
How do data center cooling systems work in an Ohio chilled water plant?
Data center cooling systems in a typical Ohio chilled water plant work in three loops. Air handlers or fan walls on the white floor move room air across chilled water coils. Chillers take that heat out of the chilled water with a refrigeration cycle and reject it to condenser water. Cooling towers or dry coolers then reject the condenser heat to outdoor air. A plate heat exchanger between the tower water and the chilled water lets the towers cool the hall directly on cold days, which is the waterside economizer described above.
Each data center cooling tower in Ohio also needs freeze protection, drift eliminators and a water treatment program, and each chiller needs a refrigerant chosen under the current Ohio Mechanical Code. Plants that serve liquid-cooled racks add coolant distribution units on a warm-water loop, covered on the data center liquid cooling in Ohio page.
Data center cooling cost in Ohio: power prices and plant choices
Data center cooling in Ohio costs more to run in 2026 than it did a year earlier, because the average Ohio commercial electricity price for January through August rose to 13.61 cents per kWh from 11.17 cents in the same months of 2025, and the industrial average rose to 10.23 cents from 8.10, according to the EIA. Ohio’s industrial average now sits above the US figure of 9.09 cents.
At those rates a continuous 100 kW cooling load costs about $119,224 a year at the commercial average and about $89,615 at the industrial average. A plant improvement worth 0.1 kW per ton on a 1,000 ton plant running around the clock saves that same 100 kW, which is why economizer hours, warmer chilled water and efficient pumping are worth real money in Ohio now. Real bills add demand charges and riders from AEP Ohio, AES Ohio, Duke Energy Ohio or the FirstEnergy utilities, so Paul Industries works from the site’s own bills and interval data.
Capital cost follows the plant choice, the redundancy level, the building and the schedule. A firm price comes from a defined scope: IT load, redundancy, heat rejection type, water and discharge route, and the outage windows an operating hall can give. Paul Industries offers design-build, complete installation to an owner’s drawings, and supply of fabricated pump skids, headers and economizer packages for owners who already have an installer. Owners with sales tax agreements under Ohio Revised Code 122.175 should note that the statute names equipment cooling systems among exempt data center equipment.
Who engineers and installs data center cooling plants in Ohio?
Paul Industries installs data center cooling in Ohio, taking projects from the first load study through equipment selection, piping, controls, startup and service. Work covers chilled water plants, cooling towers, dry coolers, CRAH galleries and fan walls, containment, dehumidification and the economizer controls that tie them together, for new halls and for operating rooms that cannot go down.
One contract covers design, installation and startup, so the sequence written on paper is the sequence proven on the floor. Paul Industries also supplies and sets data center chillers, builds the central plant piping and the campus loops described on the data center mechanical contractor in Ohio page, and repairs existing machines through chiller repair in Ohio. Ohio projects sit within the firm’s Midwest work, alongside cooling plants for halls in Pennsylvania and in the headquarters state through data center cooling in Virginia.
Ohio data hall cooling from Paul Industries
Paul Industries engineers, builds and maintains cooling for Ohio data halls of every size, from a single enterprise room in Dayton to multi-building campuses in Licking and Franklin counties. Each plant starts from the station weather, the site’s water and discharge route and its power rates, and ends with tested sequences, trained operators and a service plan. The firm takes work across Ohio, in all 50 states and abroad. For a plant review, a retrofit or a new hall, see the Ohio page or request a quote.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · Ohio Mechanical Code (2021 International Mechanical Code with Ohio amendments) · Ohio Building Code · Ohio EPA NPDES permit program · Ohio Revised Code 1521.16 (water withdrawal registration) · Ohio Revised Code 122.175
Frequently asked questions
Who handles cooling for a New Albany data center and the rest of Licking County?
Paul Industries designs and installs data center cooling in New Albany, Johnstown, Heath and across Licking County, where the Newark-Heath airport recorded a 77.2 F design wet bulb and lows of 8 F below zero from 2021 to 2025. Work covers chilled water plants, towers, dry coolers and economizer controls, planned around the water allotment and discharge route for each parcel in the business parks.
Does Paul Industries take cooling projects in Cincinnati and Southwest Ohio?
Paul Industries takes cooling projects in Cincinnati, Mason, West Chester and across Southwest Ohio, the most humid part of the state. Lunken airport logged about 100 hours a year at or above 90 F and a 78.3 F design wet bulb, so towers and chillers there are selected with more margin, and dehumidification of outside air gets extra attention. Paul Industries sizes, installs and services the full plant.
Who handles data center cooling in Cleveland and Northeast Ohio?
Paul Industries handles data center cooling in Cleveland, Akron, Canton and Youngstown. Northeast Ohio has the coolest summers in the state, with Youngstown at 90 F or more for only about 16 hours a year, so waterside economizers carry a larger share of the year there. Winters still reach 10 below zero at Akron-Canton, so Paul Industries designs freeze protection into every outdoor coil and basin.
Can a Toledo or Lima data center rely on dry coolers?
Dry coolers carry most of the year at Toledo and Lima sites, especially for halls running warm chilled water or liquid-cooled racks. Toledo averaged about 70 hours a year at or above 90 F, so a trim chiller or adiabatic stage covers the peak. Lima had the most hours at or below 10 F of the stations studied, about 92 a year, so Paul Industries sizes glycol to the record low.
Is Columbus water supply a limit for a new evaporative cooling plant?
Columbus water supply is a planning item rather than a hard limit for most sites today. The Columbus system delivered about 156 million gallons a day against 245 million of capacity, and data centers used roughly 3 percent of consumption. Large campuses should still confirm their allotment early. Paul Industries models evaporation and blowdown for each heat rejection option so the owner sees water and power side by side.
How much water does a cooling tower on an Ohio data center evaporate?
A cooling tower evaporates roughly 1 percent of its circulating flow for every 10 F of range, so a plant rejecting heat from a large hall evaporates tens of thousands of gallons a day in an Ohio summer, more in Cincinnati’s longer hot season. Blowdown adds to that, set by the cycles of concentration the water chemistry allows. Paul Industries estimates both from the station weather and the city water analysis.
What changed when Ohio EPA dropped its general permit for data centers?
Ohio EPA decided in July 2026 not to finalize the statewide general NPDES permit it proposed for data centers in October 2025, so each data center that discharges cooling water to a stream still needs an individual permit written for its site. Sites on a public sanitary sewer follow the sewer authority’s rules instead. Paul Industries plans the discharge route and the metering early so permitting does not hold up startup.
Does an Ohio data center with its own wells need to register them?
An Ohio data center able to withdraw more than 100,000 gallons a day from all sources registers the facility with the chief of the Division of Water Resources under Ohio Revised Code 1521.16, within three months after completion, and files an annual withdrawal report. Paul Industries installs the flow meters and data logging that make those reports simple and accurate.
What chilled water temperature suits an Ohio data hall?
Most Ohio data halls with good containment run well on chilled water between 60 F and 68 F, well above the 42 F to 45 F that many older plants still deliver. Warmer water adds waterside economizer hours, since Columbus spends 57 percent of its hours at or below a 55 F wet bulb. Dehumidification then moves to a dedicated outdoor air unit. Paul Industries raises setpoints in steps while logging rack inlet temperatures.
How cold does a glycol loop need to be protected for in Ohio?
A glycol loop in Ohio should be protected well below the record lows seen at the nearest station, which reached minus 10 F at Toledo and Akron-Canton and minus 7 F at Columbus between 2021 and 2025. Designers usually choose a freeze point 10 F to 15 F under the station record and check burst protection as well. Paul Industries tests concentration at startup and at each annual service.
Does the Ohio data center sales tax exemption cover cooling equipment?
Ohio Revised Code 122.175 defines computer data center equipment to include equipment cooling systems, and the exemption extends to charges for delivering, installing and repairing exempt equipment. Each project’s terms come from its agreement with the Tax Credit Authority. Governor DeWine paused new exemption requests in May 2026 while lawmakers study data centers; agreements already approved stay in force.
How does the serving Ohio electric utility change a data center cooling budget?
The serving utility, whether AEP Ohio, AES Ohio, Duke Energy Ohio or one of the FirstEnergy companies, sets the delivery rates, demand charges and riders that ride on top of the energy price. Those charges decide how much a lower peak cooling demand is worth. Paul Industries prices efficiency options against the actual tariff, using a year of bills and interval data from the site.
Can an operating Ohio data hall get a new chiller without losing cooling?
An operating Ohio data hall can take a new chiller without losing cooling when the work is planned around redundancy, a written method of procedure and, where margin is thin, a temporary chiller. Paul Industries schedules swaps for spring or autumn, when economizer hours are high and loads on the remaining machines are low, and proves each step before the next valve moves.
How long does a data center cooling plant take to build in Ohio?
A data center cooling plant in Ohio usually takes many months from approved design to startup, and long-lead items such as chillers, switchgear and large towers often set the pace. Winter weather affects outdoor work, piping tests and tower fill, so Paul Industries prefabricates headers, pump skids and pipe racks off site and sequences outdoor work around the cold months.
What should an Ohio owner send to get data center cooling priced?
An Ohio owner should send the IT load today and in five years, the redundancy target, the site address and electric utility, drawings or photos of the hall and plant spaces, nameplate data for existing equipment, a year of utility bills and the planned water and sewer route. Paul Industries returns a defined scope, a budget range and an energy comparison on the site’s own rates.
Should an Ohio data hall use air-side or water-side economizers?
Most Ohio data halls get more from water-side economizers, because outdoor dew points sit above 59 F for 1,800 to 2,600 hours a year and air-side systems must then dry or shut out the outside air. Water-side economizers use the same cold, dry months without bringing outside moisture onto the white floor. Paul Industries compares both on the station data before recommending a plant.
Planning cooling for an Ohio data hall?
Send the IT load, redundancy target, site address, electric utility and water source, plus any drawings on hand. Call 201-450-8280 or request a quote.