Paul Industries designs, builds, starts up and maintains data center cooling in Tennessee, from chilled water plants and cooling tower yards in Memphis to dry cooler fields and computer room air handlers in Middle and East Tennessee. The company is an East Coast contractor headquartered at 256 Shore Drive, Kilmarnock, Virginia, and it takes cooling work across Tennessee, in all 50 states and at plants outside the United States. Tennessee asks a cooling plant to handle two very different climates inside one state line, soft aquifer water in the west and treated river water in the middle and east, and power bought through the Tennessee Valley Authority system.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Memphis summer 399 hours a year at 90 F or above; 840 at a 75 F wet bulb or above (MEM, 2021 to 2024)
Tri-Cities contrast 43% of hours at 55 F or below (TRI, 2021 to 2024)
Memphis makeup water Memphis Sand aquifer, hardness 48 ppm on average (MLGW, 2025)
Commercial power 13.57 cents/kWh in Tennessee vs 14.04 US (EIA, January to August 2026)
Reviewed November 2026

Data center cooling in Tennessee: what the scope covers

Data center cooling in Tennessee covers the full path that moves heat from a server inlet to the outdoor air: chillers and their pumps, cooling towers or dry coolers, chilled water and condenser water piping, computer room air handlers and fan walls, coolant distribution units where racks are liquid cooled, controls, water treatment, and the tests that prove the plant holds design conditions with a unit out of service. Paul Industries designs that path, fabricates pipe spools and pump skids, supplies the equipment, installs it, starts it up and keeps it running under a service agreement.

The national picture of cooling architectures sits on the data center cooling systems page. This page stays with what changes once the site is in Tennessee: how much wet bulb hour pressure a tower sees in Shelby County compared with Sullivan County, what Memphis aquifer water does to a tower’s chemistry, what TVA power prices mean for the chiller selection, and which code office reviews the drawings.

Where Tennessee data center campuses are being built

Tennessee data center construction has concentrated in three corridors: the Memphis area in the southwest corner, the Nashville region and its northern suburbs, and the Clarksville area along the Cumberland River near the Kentucky line. Each corridor brings a different cooling brief.

Memphis now hosts graphics processor clusters whose IT load is measured in hundreds of megawatts. The first Colossus building went into service in 2024 inside a former Electrolux factory in South Memphis, and a second campus followed in the Whitehaven area during 2025 and 2026. Halls built for that kind of training load lean heavily on liquid cooling at the rack, with large chilled water or warm water plants behind it. North of Nashville, Meta’s Gallatin Data Center in Sumner County represents an investment of more than $1.5 billion, with ground broken in 2020 and water and wastewater served by Gallatin Public Utilities. Google operates a data center in Montgomery County, the county that includes Clarksville. Around those hyperscale sites sit enterprise rooms for hospital systems, banks and logistics firms, colocation halls in Nashville and Memphis, and research computing in Oak Ridge.

The result is a market where one contractor sees a 200 MW campus, a 2 MW hospital data room and a university research hall in the same year. Paul Industries builds to the scale in front of it: plant-level work on campuses, and phased upgrades on rooms that stay online.

How hot and humid do Tennessee data center sites get?

Tennessee data center sites face hotter, more humid summers in the west than in the east, and the gap is large enough to change tower selection and economizer savings from one end of the state to the other. We pulled every routine hourly observation from five airport weather stations for 2021 through 2024 and calculated wet bulb temperature from the recorded temperature and humidity.

Cooling weather at five Tennessee airports, hourly data 2021 to 2024
StationHours a year at 90 F or aboveHours a year at a 75 F wet bulb or aboveWet bulb exceeded 0.4% of hoursShare of hours at 55 F or belowShare of hours at 65 F or below
Memphis (MEM)39984081.2 F30%47%
Nashville (BNA)29731478.3 F33%52%
Chattanooga (CHA)24638078.7 F33%51%
Knoxville (TYS)12022177.7 F37%56%
Tri-Cities (TRI)808476.1 F43%62%

For a data center, Memphis, Tennessee is the hardest of the five cases. Memphis logged roughly ten times as many hours above a 75 F wet bulb as the Tri-Cities, and its 0.4% wet bulb sits about five degrees higher. A cooling tower selected for a Nashville summer will run short of capacity in Memphis on the worst afternoons unless the approach is tightened or the cell count goes up. The economizer story runs the other way: a waterside economizer that needs outdoor air at or below 55 F gets about 30% of the year in Memphis and about 43% in the Tri-Cities.

Data center, Memphis, TN: towers sized for an 81 F wet bulb

Data center cooling in Memphis starts with the tower selection. A tower rated by the Cooling Technology Institute at a 78 F design wet bulb, a common catalog point, sees that condition exceeded for several hundred hours a year at MEM. Paul Industries sizes Memphis towers against the measured site data, checks the condenser water temperature that the chillers will see at the extreme, and confirms the chiller can carry full load at that lift. Where the owner wants headroom without more cells, the alternatives are a larger fill volume, variable speed fans with more motor power, or a chiller selected for higher entering condenser water.

Knoxville, Oak Ridge and the Tri-Cities: the economizer end of the state

East Tennessee data rooms in Knoxville, Oak Ridge, Kingsport, Johnson City and Bristol get the longest free cooling season in the state and the mildest summer peaks. The Tri-Cities airport topped out at 95 F during the four years, with only about 80 hours a year at or above 90 F, while 62% of all hours fell at or below 65 F. Plants there earn back the cost of a plate heat exchanger economizer or a free cooling coil faster than anywhere else in Tennessee, and the winter design problem is freezing rather than heat: the same station logged about 721 hours a year at or below 32 F, so idle coils, tower basins and exposed condenser water piping need glycol, heat tracing or a drain-down sequence written into the controls.

Data center cooling in Nashville and the Cumberland corridor

Data center cooling in Nashville sits in the middle of the Tennessee range. Nashville recorded about 300 hours a year at or above 90 F, but only about 314 hours above a 75 F wet bulb, so towers there run closer to their catalog ratings than they do in Memphis. Halls in Gallatin, Lebanon, Murfreesboro and Clarksville share that profile and the same need to protect idle tower basins and dry cooler coils through January cold snaps.

Memphis Tennessee data center water: what the aquifer supplies

Memphis Tennessee data center water comes from the Memphis Sand aquifer through Memphis Light, Gas and Water, which draws from more than 142 wells between 350 and 1,100 feet deep and pumps about 120 million gallons a day to 10 pumping stations. The 2025 water quality report puts average hardness at 48 ppm, alkalinity at 57 ppm, chloride at 4.6 ppm and sulfate at 4.8 ppm, with the water leaving the ground at about 66 F all year.

For a cooling tower, soft and low-dissolved-solids makeup water allows more cycles of concentration before calcium carbonate scale becomes the limit, which cuts blowdown and total water use. The same softness makes the water more aggressive toward mild steel and galvanized surfaces once it is concentrated without the right inhibitor program, so Memphis towers need corrosion control matched to the cycles chosen, not a program copied from a hard-water site. MLGW adds orthophosphate for corrosion control in its distribution system, and the tower program has to account for that phosphate as cycles rise.

Nashville’s treated water reads differently. Metro Water Services reported total dissolved solids of 146 mg/L, calcium hardness of 75 mg/L and alkalinity of 65 mg/L for 2025, with a negative Langelier index at the entry point to distribution, and water temperature ranging from about 46 F to 84 F through the year. Towers on Nashville water reach their scaling limit sooner than Memphis towers, and the seasonal makeup temperature swing affects plate heat exchanger approach on waterside economizers.

Cooling tower makeup water in Memphis and Nashville, 2025 utility reports
ParameterMemphis (MLGW, aquifer)Nashville (Metro Water Services)What it means for the tower
Hardness48 ppm average total hardness75 mg/L calcium hardnessLower hardness allows more cycles before scale
Alkalinity57 ppm65 mg/L as CaCO3Sets the carbonate scaling limit with hardness and pH
Dissolved solids and anionsChloride 4.6 ppm, sulfate 4.8 ppmTDS 146 mg/L, sulfate 35.9 mg/LChloride and sulfate concentrate with cycles and drive corrosion
TemperatureAbout 66 F, steadyAbout 46 F to 84 F through the yearAffects economizer heat exchanger and makeup tempering
Disinfectant and additivesAbout 1 ppm chlorine, orthophosphateTreated surface waterBiocide and inhibitor program must account for both

A site that drills its own wells or pulls surface water also falls under Tennessee’s Water Withdrawal Registration Act, T.C.A. 69-7-301, which requires withdrawals to be registered with the Tennessee Department of Environment and Conservation. Paul Industries designs the makeup, softening, filtration and blowdown systems with the withdrawal and discharge paperwork in view, and the water treatment side ties into the process piping scope for the plant.

Data center cooling without water: where Tennessee sites use dry coolers

Data center cooling without water relies on air-cooled chillers, dry coolers and adiabatic coolers that spray only on the hottest hours, and in Tennessee it is a real option wherever the water supply, the permit path or the owner’s policy makes evaporative heat rejection unattractive. The price is power: an air-cooled chiller rejects heat to the dry bulb temperature, which in Memphis reached 102 F during the 2021 to 2024 period, rather than to the lower wet bulb.

Warm-water liquid cooling changes that trade. A direct-to-chip loop that accepts facility water in the high 80s or 90s F can reject most of its heat through dry coolers for most of the year in Knoxville or the Tri-Cities, and for a smaller share in Memphis. The hour-by-hour comparison for liquid loops is set out on the data center liquid cooling in Tennessee page.

Heat rejection choices and how they fit Tennessee regions
ApproachRejects heat toWest Tennessee fitMiddle Tennessee fitEast Tennessee fit
Water-cooled chillers with open towersWet bulbLowest kW per ton; towers sized for about 81 F wet bulb extremesStrong fit; catalog towers close to site conditionsStrong fit; long economizer season
Water-cooled chillers with closed-circuit coolersWet bulb, with a clean loopProtects chiller tubes; larger footprintCommon on enterprise roomsFreeze protection planning for winter
Air-cooled chillers with free cooling coilsDry bulbHighest summer power; no tower waterBalanced choice where water use is cappedFree cooling coil carries much of the winter
Dry coolers on a warm-water liquid loopDry bulbNeeds chiller trim on hot afternoonsCovers most hoursCovers the large majority of hours
Adiabatic coolersNear wet bulb when sprayingSpray hours concentrated June to AugustModerate water useFew spray hours

TVA power and the energy budget of a cooling plant

Tennessee cooling plants buy electricity through the Tennessee Valley Authority system, in which TVA sells power to 153 distributor utilities and 58 directly served customers, and Memphis Light, Gas and Water is TVA’s largest customer. A Nashville data center buys through Nashville Electric Service, a Chattanooga site through EPB and a Memphis site through MLGW, unless the load is served directly by TVA.

The U.S. Energy Information Administration put Tennessee’s average commercial price at 13.57 cents per kWh for January through August 2026, against 14.04 cents nationally, and the industrial average at 6.84 cents against 9.09. Every 100 kW of chiller, pump and fan power that runs all year costs about $118,900 at the commercial average. That figure is why the kW per ton of the chiller, the static pressure of the air handlers and the pump head on the chilled water loop each deserve a lifecycle check before selection rather than a first-cost comparison alone. ASHRAE 90.4 sets the energy performance method that many owners use to compare mechanical designs for data centers.

Data center cooling regulations and permits in Tennessee

Data center cooling regulations in Tennessee start with the 2021 International Mechanical Code, which the State Fire Marshal’s Office adopted with the 2021 building, fire, plumbing, fuel gas and commercial energy codes effective April 17, 2025. Large cities and counties run their own plans review and inspections as exempt jurisdictions, including Memphis, Shelby County, Nashville and Davidson County, Knoxville, Knox County, Chattanooga, Clarksville, Gallatin and Murfreesboro, and state law requires each exempt jurisdiction to adopt codes within seven years of the latest published edition. A cooling plant in Sumner County is therefore reviewed by Gallatin if it sits inside the city, and the edition in force there is the edition Gallatin adopted.

Refrigerant machinery rooms follow the mechanical code’s refrigeration chapter and ASHRAE 15, which drive refrigerant detection, ventilation, relief piping and the emergency shutoff. Pressure vessels on the plant belong to the Tennessee Boiler Unit’s world: Tennessee’s boiler rules define a boiler to include unfired pressure vessels, the unit inspects unfired vessels along with high and low pressure boilers, and the statute lists the exemptions. Paul Industries checks each expansion tank, air separator and filter housing against those rules before it ships, and the full permit and test sequence is covered on the data center commissioning in Tennessee page.

Data center cooling requirements inside the hall

Data center cooling requirements inside the hall are set by the IT equipment, and most enterprise and colocation rooms in Tennessee still design to the ASHRAE recommended inlet range of 64.4 F to 80.6 F. Raising supply air toward the top of that range lifts the chilled water temperature the plant can run, which in Tennessee adds economizer hours and lowers compressor lift on every summer day.

Humidity is the Tennessee wrinkle. Summer dew points in Memphis and Chattanooga stay high for long stretches, so outdoor air brought in for pressurization and make-up carries real latent load, and chilled water that runs warm for efficiency still has to dry that air somewhere. Paul Industries handles that with dedicated outdoor air units sized for the measured dew point, so the main air handlers can run dry coils at elevated water temperatures. Rack-level liquid cooling removes most of the heat from the air path entirely and shrinks the air handler duty to what is left.

Adding cooling to a running Tennessee data hall

Adding cooling to a running Tennessee data hall means tying new chillers, pumps or coolant distribution units into piping that is carrying load, without dropping the room below its redundancy level. Paul Industries writes a method of procedure for every tie-in, confirms the spare capacity on the day, isolates with line stops or hot taps where valves are missing, and stages temporary chillers when a header has to be drained.

Timing matters more in Memphis than in the east. The 2021 to 2024 data put most of Memphis’s 95 F hours between June and August, so cutovers that reduce plant capacity belong in spring or autumn. Prefabricated pipe racks and pump skids shorten the time a hall runs with reduced redundancy, and the same approach serves the chiller repair work that follows once the plant is in service.

What drives the cost of data center cooling in Tennessee?

Data center cooling in Tennessee costs what the heat load, redundancy level, heat rejection method and site conditions make it cost, and the owner gets a reliable figure only once those are pinned down. The biggest drivers are the IT load and its growth path, N+1 or 2N redundancy on chillers and pumps, towers or dry coolers, the share of racks on liquid cooling, the length and size of the chilled water headers, the water treatment and makeup system, and the phasing needed to keep an existing hall online.

Operating cost is where Tennessee’s numbers help. At the 2026 commercial average of 13.57 cents per kWh, each 100 kW of continuous cooling power costs about $118,900 a year, so a design that saves 0.1 kW per ton on a 2,000 ton plant cuts about 200 kW whenever the plant runs at full load, worth about $238,000 a year if it ran that way around the clock. Paul Industries prices the plant from the drawings and load data, gives a budget range from comparable scope first, and then a firm price once the scope is defined.

Who installs data center cooling in Tennessee?

Paul Industries installs data center cooling in Tennessee as a design-build contractor, a complete installation contractor working to an engineer’s drawings, or a supplier of chillers, pump skids, coolant distribution units and prefabricated piping. Who installs data center cooling matters most on the day a plant is first loaded, so Paul Industries sets the equipment and also flushes and pressure tests the loops, starts the chillers, balances the water side and hands over the records.

A Tennessee contractor’s license is a legal requirement for cooling plant contracts of $25,000 or more, issued by the Board for Licensing Contractors under classifications that include mechanical and HVAC work. Paul Industries scopes the work, carries it through startup, and stays on after turnover with preventive maintenance. Owners looking at the whole mechanical package, from generators and fuel to plumbing and fire protection interfaces, will find that scope on the data center mechanical contractor in Tennessee page, and the Virginia version of this work, in Paul’s headquarters state, shows how the same plant decisions play out in Northern Virginia. Neighboring markets are covered for North Carolina data center cooling and across the Southeast.

Data center cooling from Paul Industries, Memphis to the Tri-Cities

Paul Industries designs, fabricates, supplies, installs, starts up and maintains data center cooling plants across Tennessee: chillers, cooling towers and dry coolers, chilled water and condenser water piping, air handlers, coolant distribution units and the water treatment that keeps them clean. Headquartered in Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, the company works for owners in Memphis, Nashville, Clarksville, Knoxville, Chattanooga and the Tri-Cities, with the Tennessee page listing the rest of its services in the state. Send the load, the site and the drawings you have, and request a quote for the cooling plant.

Standards referenced: 2021 International Mechanical Code as adopted in Tennessee (effective April 17, 2025) · 2021 International Energy Conservation Code with Tennessee amendments · Tennessee Water Withdrawal Registration Act, T.C.A. 69-7-301 · Tennessee boiler and pressure vessel rules, Chapter 0800-03-03 · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE 15 · ASHRAE 90.4 · CTI ATC-105

Frequently asked questions

Who builds data center cooling plants in Memphis and Shelby County?

Paul Industries builds data center cooling plants in Memphis and Shelby County, including chilled water plants, cooling tower yards, dry cooler fields and the piping that ties them to the hall. Memphis has the hottest and most humid design case in Tennessee, so towers are selected against a wet bulb near 81 F and chillers are checked for the condenser water they will see at that extreme. Send the IT load and site plan to start.

Does Paul Industries handle data center cooling around Nashville, Gallatin and Sumner County?

Yes. Paul Industries designs and installs data center cooling around Nashville, Gallatin, Hendersonville, Lebanon and the rest of Sumner, Wilson and Davidson counties. Middle Tennessee sees about 300 hours a year at or above 90 F at the Nashville airport, so towers run near catalog ratings, and the northern counties need freeze protection on idle basins and dry cooler coils in January cold snaps.

Who handles cooling for data halls in Clarksville and Montgomery County?

Paul Industries handles cooling for data halls in Clarksville and Montgomery County, from the chilled water plant to the air handlers and liquid cooling loops. The Clarksville area shares Middle Tennessee’s weather profile, and sites there draw treated water from the city system, so the tower water program and the makeup softening are designed around the utility’s water report rather than assumed.

Does Paul Industries work on cooling for research computing in Oak Ridge and Knoxville?

Paul Industries works on cooling for research computing rooms and enterprise data centers in Oak Ridge, Knoxville and the rest of East Tennessee. Knoxville logged only about 120 hours a year at or above 90 F from 2021 to 2024, and about 37% of hours at or below 55 F, which gives waterside economizers and warm-water liquid loops a long season there.

Who installs cooling for data rooms in Chattanooga?

Paul Industries installs cooling for data rooms in Chattanooga and Hamilton County, covering chillers, towers, dry coolers, computer room air handlers and the controls that sequence them. Chattanooga recorded about 380 hours a year above a 75 F wet bulb, more than Nashville, so tower approach and chiller lift deserve a closer look there than a Middle Tennessee rule of thumb would suggest.

Is Memphis aquifer water good makeup for a data center cooling tower?

Memphis aquifer water makes good cooling tower makeup because it is soft and low in dissolved solids, with 2025 averages of 48 ppm hardness, 4.6 ppm chloride and 4.8 ppm sulfate. Towers can run more cycles before scaling, which reduces blowdown. The trade is corrosion: concentrated soft water attacks steel and galvanized surfaces without a matched inhibitor program, so the treatment plan is set for the cycles the plant will run.

What wet bulb should a Tennessee cooling tower be selected for?

A Tennessee cooling tower should be selected for the measured wet bulb at its own site, and the range across the state is about five degrees. From 2021 to 2024 the wet bulb exceeded 0.4% of hours was about 81 F at Memphis, 78 F at Nashville and Chattanooga, and 76 F in the Tri-Cities. Paul Industries checks the tower against those figures and the chiller’s allowable entering condenser water.

How many hours a year can a Tennessee data center use free cooling?

A Tennessee data center that needs outdoor air at or below 55 F for full waterside economizing gets about 30% of the year in Memphis, 33% in Nashville and Chattanooga, 37% in Knoxville and 43% in the Tri-Cities, based on 2021 to 2024 hourly data. Raising the chilled water temperature widens that window, and partial economizing adds many more hours in spring and autumn.

Is a well or river intake for Tennessee data center cooling registered with the state?

A Tennessee data center that pumps its own wells or draws surface water must register that withdrawal with the Tennessee Department of Environment and Conservation under T.C.A. 69-7-301. Sites on a utility supply buy water through the utility’s agreement instead. Paul Industries designs the makeup and metering so the volumes needed for either route are recorded.

How do TVA power prices change a cooling plant decision in Tennessee?

TVA-system power prices make Tennessee’s commercial average about 13.57 cents per kWh for January through August 2026, a little under the national 14.04. At that rate 100 kW of cooling power running all year costs about $118,900, so efficiency differences between chillers, pumps and fans pay back quickly. Paul Industries runs the lifecycle numbers with the owner’s actual tariff before equipment is selected.

Which code edition governs a new Tennessee data center cooling plant?

The State Fire Marshal’s Office adopted the 2021 International Mechanical Code and companion 2021 codes effective April 17, 2025, and that edition applies where the state reviews plans. Memphis, Nashville, Knoxville, Chattanooga, Clarksville, Gallatin and other exempt jurisdictions enforce the editions they have adopted by ordinance, which state law requires to be within seven years of the latest edition.

Do expansion tanks on a Tennessee chilled water plant need a state inspection?

Tennessee’s boiler rules define a boiler to include unfired pressure vessels, and the Boiler Unit inspects unfired vessels as well as boilers, with exemptions set out in T.C.A. 68-122-105. Each expansion tank, air separator and filter housing is checked against those rules and its ASME nameplate data, and Paul Industries files the paperwork the rules require for vessels that fall inside them.

When should cooling be cut over in a Memphis data hall?

Cooling in a Memphis data hall is best cut over in spring or autumn. Memphis recorded about 100 hours a year at or above 95 F from 2021 to 2024, almost all between June and August, and those are the hours when a plant with one chiller out of service has the least margin. Paul Industries schedules capacity-reducing tie-ins around that window and stages temporary chillers when a header must be drained.

Will Paul Industries ship chillers and skids to a Tennessee data hall as an equipment order?

Yes. Paul Industries supplies chillers, pump skids, coolant distribution units, prefabricated pipe racks and cooling tower packages for Tennessee data centers on a supply-only basis, as well as under design-build and complete installation contracts. Supply-only orders ship with submittals, test reports and startup support, and the same equipment can move into a service agreement once it is running.

How is humidity handled when a Tennessee hall runs warm chilled water?

Humidity in a Tennessee hall running warm chilled water is handled by drying the outdoor air separately. A dedicated outdoor air unit with its own colder coil removes the summer moisture brought in for pressurization, so the main air handlers can run dry coils at higher water temperatures. Memphis and Chattanooga need the larger units because their dew points stay high longest.

What data does Paul Industries need to price a Tennessee data center cooling plant?

To price a Tennessee data center cooling plant, Paul Industries needs the IT load today and at build-out, the redundancy target, the share of racks on liquid cooling, the site address, the utility and water supplier, any drawings or a one-line of the existing plant, and the dates the hall must stay online. A budget range comes first, then a firm price once the scope is defined.

How is data center cooling in Tennessee different than in Virginia?

Data center cooling in Tennessee differs from Northern Virginia in two big ways: climate and power. Memphis summers carry more wet bulb hours than Loudoun County, East Tennessee runs cooler, and Tennessee sites buy power through the TVA system rather than an investor-owned utility. Paul Industries applies the same plant design discipline in both states and adjusts tower sizing, economizer setpoints and lifecycle math to each site.

Planning a cooling plant for a Tennessee data hall?

Send the IT load and growth plan, the redundancy target, the site and utility, and any existing plant drawings. Call 201-450-8280 or request a quote.