Paul Industries designs, pipes, fills, tests and maintains data center liquid cooling in Tennessee, from coolant distribution units and rack manifolds inside the hall to the facility water loop, pumps, dry coolers and trim chillers outside it. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries is an East Coast contractor that takes liquid cooling work across Tennessee, in all 50 states and at plants abroad. Tennessee already hosts the first exascale supercomputer, a warm-water machine at Oak Ridge, and the graphics processor halls in Memphis have made liquid at the rack the default for new dense space in the state.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Tennessee precedent Frontier at Oak Ridge: about 6,000 gal/min of water that is not pre-chilled
W32 on dry coolers About 81% of Memphis hours and 92% of Tri-Cities hours (2021 to 2024)
Condensation risk 1,426 hours a year above a 70 F dew point at Memphis (2021 to 2024)
Power price Tennessee commercial average 13.57 cents/kWh, January to August 2026 (EIA)
Reviewed November 2026

Data center liquid cooling in Tennessee: the work from rack to yard

Data center liquid cooling in Tennessee is a chain of four systems that each need to be designed, built and proven: the technology cooling loop that runs through cold plates in the servers, the coolant distribution units that separate that loop from the building, the facility water loop with its pumps and piping, and the heat rejection plant that dumps the heat to air or to a tower. Paul Industries carries all four, under a design-build contract, as a complete installation to an engineer’s drawings, or as a supply-only order for coolant distribution units, manifolds and prefabricated piping.

The general technology, from cold plates to immersion tanks, is described on the national data center liquid cooling page and the immersion cooling page. Here the focus is what Tennessee’s weather, water and power do to those choices, and what a Tennessee owner should ask for when the first liquid-cooled rows go into a hall that was built for air.

Oak Ridge’s Frontier and what it shows about warm water in Tennessee

Frontier, the HPE Cray exascale supercomputer at Oak Ridge National Laboratory, has been cooled by liquid since it entered early operations in 2022, and it shows how much heat a Tennessee site can remove without chilling the water first. Published descriptions put its cooling at four 350 horsepower pumps moving about 6,000 gallons a minute of water that is not pre-chilled, for a machine that draws about 21 MW across 74 cabinets.

The lesson for commercial halls is about temperature, not scale. A loop that accepts warm facility water lets the heat rejection plant run on dry coolers or towers for most of the year in East Tennessee, with compressors held back for the hottest hours. Paul Industries designs commercial loops around the same principle, sized to the rack density and the IT vendor’s allowable inlet temperature rather than to a laboratory’s mission. Frontier is named here as a public example of the technology in Tennessee.

What data centers use liquid cooling in Tennessee today?

Tennessee data centers using liquid cooling today fall into three groups: large graphics processor training halls in Memphis, research computing at national laboratory and university sites, and enterprise or colocation rooms adding dense rows to air-cooled space. Each group brings a different set of constraints.

The Memphis training campuses run rack-scale systems of the GB200 and GB300 class, which are designed around direct-to-chip liquid cooling and arrive with the coolant connections, flow rates and water quality limits written into the vendor’s site requirements. Research halls tend to run custom loops with tight temperature control and long uptime targets. Enterprise and colocation owners in Nashville, Franklin, Chattanooga and Knoxville usually start smaller: a row or two of liquid cooling for racks above what their air handlers can carry, fed from a coolant distribution unit tied into the existing chilled water plant. Data center liquid cooling in Memphis therefore spans both ends of the size range, often within a few miles of each other.

Data center liquid cooling temperature: which ASHRAE class suits Tennessee?

Data center liquid cooling temperature is set by the ASHRAE facility water class the IT equipment accepts, from W17 with supply water at or below 17 C (62.6 F) up to W45 at 45 C (113 F), and in Tennessee the class decides how many hours the plant can run without compressors. To show the effect, we took four years of hourly weather from five Tennessee airports and counted the hours when a dry cooler delivering water about 10 F above the outdoor temperature could meet each class on its own.

Share of hours a dry cooler alone meets each facility water class, Tennessee airports 2021 to 2024 (10 F approach assumed)
StationW27, about 80.6 F supplyW32, about 89.6 F supplyW40, about 104 F supplyW45, about 113 F supply
Memphis (MEM)58%81%99%All hours
Nashville (BNA)62%85%99%All hours
Chattanooga (CHA)62%86%99%All hours
Knoxville (TYS)67%89%All hoursAll hours
Tri-Cities (TRI)74%92%All hoursAll hours

A W32 loop, a common target for direct-to-chip systems, covers about four hours in five on dry coolers in Memphis and better than nine in ten in the Tri-Cities. The hours left over cluster in June, July and August afternoons, so a Tennessee plant built around W32 needs a data center liquid cooling chiller or an adiabatic boost sized for a few hundred hours a year, not a full chiller plant running all year. At W40 and above, dry coolers carry practically every hour in the state, which is why owners who can choose the class should press their IT vendors for the warmest supply temperature the hardware allows.

Condensation and Tennessee dew points

Condensation is the Tennessee risk that air-cooled designers underrate when they move to liquid, because summer dew points in the west and southeast of the state stay above 70 F for long stretches. Memphis logged about 1,426 hours a year with a dew point at or above 70 F in 2021 to 2024, Chattanooga about 1,004 and Nashville about 636. Any facility water pipe, coolant distribution unit or manifold running below the dew point of the air around it will sweat.

Inside a conditioned hall the room dew point governs, and warm-water loops sit well above it. The risk is in the places that are not conditioned: pipe runs through mechanical yards, corridors, ceiling spaces and loading areas, and loops that are temporarily run cold during commissioning or on a chiller-only day. Paul Industries insulates and vapor-seals facility water piping wherever the water can run below the dew point of the space it passes through, sets the coolant distribution unit controls to hold supply temperature above the room dew point, and alarms the loop before condensation can form on rack connections.

Freeze protection and glycol on Tennessee loops

Freeze protection on Tennessee liquid cooling loops matters because every major station in the state dropped to single digits or below in the 2021 to 2024 record, even though cold hours are few. Nashville reached about -1 F and logged about 74 hours a year at or below 20 F; the Tri-Cities logged about 84 such hours and Chattanooga about 29.

Freeze exposure for dry coolers and outdoor piping, Tennessee airports 2021 to 2024
StationHours a year at or below 20 FLowest hourly readingTypical protection choice
Tri-Cities (TRI)841 FGlycol on the dry cooler loop, isolated from the hall by a heat exchanger
Nashville (BNA)74-0.9 FGlycol outdoors or drain-down with heat-traced dead legs
Memphis (MEM)681 FGlycol outdoors; water indoors to keep heat transfer high
Knoxville (TYS)463 FGlycol outdoors or freeze-protection controls with fan staging
Chattanooga (CHA)297 FControls-based protection with heat tracing on exposed headers

Glycol costs heat transfer and pump power, so Paul Industries usually confines it to the outdoor dry cooler circuit and keeps treated water on the facility side, separated by a plate heat exchanger. Where an owner prefers one loop, a 25% propylene glycol mix is the common compromise, and the pumps, coolant distribution units and dry coolers are selected for its higher viscosity from the start.

Data center liquid cooling vs air cooling in a Tennessee retrofit

Data center liquid cooling vs air cooling in a Tennessee retrofit is rarely an either-or choice: most halls end up running both, with liquid taking the dense racks and the existing air handlers carrying the rest of the room and the residual heat that cold plates leave behind. The questions are where the liquid-cooled rows go, how the coolant distribution units connect to the chilled water plant, and what happens to the air side once half the heat leaves through pipes.

Paul Industries starts a retrofit with the existing plant: chilled water temperature, spare capacity, pump head, header sizes and valve locations. A coolant distribution unit fed from chilled water lets dense rows go in without new heat rejection, but it ties the liquid loop to the chiller plant’s temperature. A separate warm-water loop with its own dry coolers costs more up front and pays back in the economizer hours shown above. Liquid cooling for data center racks also changes the floor: heavier racks, manifolds overhead or under the floor, drip trays and leak detection, and new floor loading checks in older buildings.

Data center liquid cooling piping and pumps

Data center liquid cooling piping carries facility water from the plant to each coolant distribution unit and, in the technology loop, from the unit to the rack manifolds, and its cleanliness matters as much as its pressure rating. Cold plates have fine internal channels, and debris, weld slag or scale left in the piping clogs them. Paul Industries builds stainless steel facility and technology loops with clean welding practice, flushes every section to a written particle limit before connection, and installs strainers and filters at the coolant distribution units.

Data center liquid cooling pumps follow the same discipline. Facility water pumps are sized for the full flow at the strongest glycol mix the loop may carry and the longest run, and redundancy is matched to the hall’s tier: N+1 pumps with automatic changeover at minimum, and pumps fed from uninterruptible power where the IT load cannot ride through a flow interruption. Piping prefabrication shortens field time and keeps welding out of live data halls; the welding and spool work is described on the industrial welding in Tennessee and process piping in Tennessee pages.

Coolant fill and water quality

Coolant fill water for a Tennessee liquid cooling loop comes from a controlled source, not straight from the city tap, because the IT vendor’s water specification limits conductivity, chloride, hardness and particles in the technology loop. Memphis tap water is soft but carries about 1 ppm of chlorine and added orthophosphate, and Nashville’s carries 146 mg/L of dissolved solids, so either needs treatment before it meets a typical technology loop specification.

Paul Industries fills technology loops with treated water or premixed coolant to the vendor’s specification, adds the specified inhibitor and biocide, and records the fill chemistry as a baseline. The facility side gets its own treatment program and sampling points. Sites that want a permanent fill and makeup source on campus can tie it to a reverse osmosis and deionization skid from the ultrapure water systems in Tennessee scope.

Data center liquid cooling leak prevention and maintenance

A data center liquid cooling leak is far less likely when the loop is pressure tested, flushed and filled correctly at the start, and most of the failures that do occur trace to connections, quick disconnect couplings and hoses rather than welded pipe. Paul Industries tests every loop hydrostatically before fill, checks each rack connection under pressure, and installs leak detection cable under manifolds and at coolant distribution units with alarms into the building management system.

Data center liquid cooling maintenance after turnover covers coolant sampling on a fixed schedule, filter and strainer changes, pump and motor checks, coolant distribution unit calibration, inspection of hoses and couplings, glycol concentration checks on outdoor loops before winter, and dry cooler coil cleaning before summer. Paul Industries carries that work under a service agreement so the loop data, chemistry history and repairs stay in one record.

Where coolant distribution units go, and how many

Coolant distribution unit placement decides how far the technology loop runs, how much floor the hall gives up, and how a single unit failure affects the racks it serves. In-row units sit beside the racks and keep technology loops short, which suits retrofits of a few rows in an existing Nashville or Chattanooga hall. Larger floor-mounted or perimeter units serve whole rows or pods from a gallery outside the white space, which keeps water-carrying equipment and its maintenance out of the server aisles on new Memphis-scale halls.

Coolant distribution unit arrangements for Tennessee halls
ArrangementWhere it fitsRedundancy approachWhat to check first
In-rack or rear-of-rack unitsA few dense racks in an air-cooled enterprise roomDual pumps inside the unit; spare unit on the shelfChilled water branch size and valve access at the rack
In-row unitsRetrofit rows in colocation and enterprise hallsN+1 units on a shared technology headerFloor space, drip containment and overhead clearance
Floor-mounted units in a galleryNew halls built for liquid from the startN+1 or 2N units with ring headers to the rowsGallery layout, header routing and isolation valves
Facility-scale liquid-to-liquid exchangersCampus halls with a dedicated warm-water plantMultiple exchangers with automatic changeoverPressure ratings, flushing connections and spare capacity

Whatever the arrangement, Paul Industries designs the technology header so a unit can be isolated and serviced while its neighbors carry the load, and checks that the remaining units can hold supply temperature at full rack power with one unit out. Units are fed from two power sources where the IT equipment cannot tolerate a flow interruption, and the controls are set so the loop rides through a utility transfer without a temperature spike at the cold plates.

Building a liquid cooling backbone for later Tennessee phases

Phasing liquid cooling on a growing Tennessee campus means building the facility water backbone once and adding coolant distribution units, manifolds and heat rejection modules as each hall or row fills. The backbone is the expensive part to change later: header sizes, pipe routes through walls and galleries, valve locations, and the connections where future dry coolers or trim chillers will tie in.

Paul Industries sizes headers for the planned build-out, installs capped and valved branches for future units, and places flanged tie-in points where the next phase will connect so it can go in without draining live loops. On Memphis campuses that fill quickly, prefabricated skids and pipe racks let each phase arrive tested and ready for connection. On smaller Middle and East Tennessee sites, the same approach lets an owner start with one coolant distribution unit fed from chilled water and later move the liquid rows onto their own warm-water plant without disturbing the racks.

Controls, monitoring and the first load test

Controls on a Tennessee liquid cooling loop have one job above the others: keep the supply temperature and differential pressure at each rack steady while the IT load swings from idle to full in seconds. Graphics processor training jobs ramp hard, and a loop tuned for a slow-moving air-cooled room overshoots. Paul Industries sets the coolant distribution unit and pump controls for fast load steps, puts temperature, pressure and flow sensors where the IT vendor’s limits apply rather than only at the plant, and trends the data into the building management system from the first day of fill.

Before racks go live, the loop is run against load banks or the vendor’s burn-in load at design flow and temperature, with one coolant distribution unit and one pump deliberately taken out of service to prove redundancy. In Memphis that test is worth running on a summer afternoon if the schedule allows, because it shows how the dry coolers and trim chiller share the load at the condition the plant was sized for. The results, together with the fill chemistry and pressure test records, form the baseline for later service, and the full test sequence is set out on the commissioning page linked below.

Data center liquid cooling cost in Tennessee

Data center liquid cooling cost in Tennessee depends on rack density and count, the facility water class, the number and size of coolant distribution units, piping length and material, the heat rejection plant, redundancy, and how much of the work happens inside a live hall. Retrofits inside operating space cost more per kW than new halls because of phasing, temporary protection and night or weekend work.

Pump energy is the running cost liquid adds, and Tennessee’s 2026 commercial average of 13.57 cents per kWh puts a 75 kW pump set running all year at about $89,000. A warm loop that keeps compressors off for most hours usually saves far more than that in chiller energy, which is why the class selection deserves an owner decision early. Paul Industries prices liquid cooling from the rack layout and load data, gives a budget range from comparable scope, then a firm price once the scope is set.

Who provides liquid cooling for data centers in Tennessee?

Paul Industries provides liquid cooling for data centers in Tennessee as one contractor for the coolant distribution units, technology and facility loops, pumps, dry coolers, trim chillers, controls, flushing, testing and maintenance. Who provides liquid cooling for data centers matters most at the seams between those systems, and keeping them under one contract keeps the seams inside one schedule and one set of test records.

Under Tennessee contractor law, a project of $25,000 or more, or a mechanical or HVAC portion of that size, calls for a Board for Licensing Contractors license, and the 2021 International Mechanical Code adopted in 2025 governs the piping and equipment where the state reviews plans. The air-side plant behind the liquid rows is covered on the data center cooling in Tennessee page, startup and integrated testing on the data center commissioning in Tennessee page, and the work in Paul’s headquarters state of Virginia and in Georgia on their own pages.

Liquid cooling from Paul Industries for Tennessee halls

Paul Industries designs, fabricates, supplies, installs, flushes, fills, tests, starts up and maintains data center liquid cooling across Tennessee, from Memphis and Nashville to Oak Ridge, Knoxville, Chattanooga and the Tri-Cities. The company is headquartered in Kilmarnock, Virginia, and lists its other Tennessee services on the Tennessee page and its regional work on the Southeast page. Send the rack layout, the IT vendor’s facility water requirements and the existing plant data, and request a quote.

Standards referenced: ASHRAE TC 9.9 liquid cooling classes W17 to W45 · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · 2021 International Mechanical Code as adopted in Tennessee · ASME B31.9 Building Services Piping · ASME B31.3 Process Piping · OCP Advanced Cooling Solutions guidance for coolant distribution units

Frequently asked questions

Who installs liquid cooling for GPU halls in Memphis and Whitehaven?

Paul Industries installs liquid cooling for graphics processor halls in Memphis, Whitehaven and the rest of Shelby County, covering coolant distribution units, rack manifolds, facility water loops, dry coolers and trim chillers. Memphis has the hottest summers of the five Tennessee airports studied, so a W32 loop there meets its supply temperature on dry coolers for about 81% of hours, and the trim plant is sized for the remaining summer afternoons.

Who builds warm-water loops for research rooms at Oak Ridge and in Knox County?

Paul Industries builds warm-water liquid cooling loops for research computing rooms and data halls in Oak Ridge, Knoxville and across East Tennessee. Knoxville’s weather lets a dry cooler meet W32 supply water for about 89% of hours, and a W40 loop for every hour in the 2021 to 2024 record, so warm-water designs there can run almost entirely without compressors.

Who adds liquid-cooled rows to colocation halls in Nashville and Franklin?

Paul Industries adds liquid-cooled rows to colocation and enterprise halls in Nashville, Franklin, Brentwood and the rest of Middle Tennessee. Most start with coolant distribution units fed from the existing chilled water plant, with work phased around live tenants under a method of procedure. A separate warm-water loop on dry coolers can follow once the dense rows grow.

Can Paul Industries handle liquid cooling for data rooms in Chattanooga and Murfreesboro?

Yes. Paul Industries handles liquid cooling for data rooms in Chattanooga, Hamilton County, Murfreesboro and Rutherford County, from the first coolant distribution unit to a full warm-water plant. Chattanooga has the fewest freezing hours of the five stations studied, about 29 a year at or below 20 F, so controls-based freeze protection with heat tracing often replaces glycol there.

What data centers use liquid cooling in Tennessee?

Tennessee data centers using liquid cooling include the large graphics processor training campuses in Memphis, research computing such as Frontier at Oak Ridge National Laboratory, and a growing number of enterprise and colocation halls adding dense rows. Any rack above what the room’s air handlers can carry, often a few tens of kilowatts, is a candidate for direct-to-chip cooling.

Which facility water class should a Tennessee owner ask the IT vendor for?

A Tennessee owner should ask the IT vendor for the warmest facility water class the hardware accepts. Based on 2021 to 2024 hourly data, a W32 loop meets its supply temperature on dry coolers for 81% to 92% of hours depending on the city, while W40 and W45 loops cover practically every hour, cutting chiller size and energy.

Should Tennessee liquid loops carry propylene glycol or plain treated water?

A Tennessee liquid cooling loop needs glycol, or another freeze protection method, on any circuit that runs outdoors, because every major station recorded single-digit or sub-zero temperatures from 2021 to 2024. Paul Industries usually limits glycol to the dry cooler circuit and keeps water on the facility side behind a heat exchanger, which keeps heat transfer and pump power where they belong.

How does a Memphis building keep liquid cooling pipes from sweating?

Condensation is kept off liquid cooling pipe in a Memphis building by insulating and vapor-sealing every run that can sit below the surrounding dew point and by holding supply water above the room dew point. Memphis logged about 1,426 hours a year above a 70 F dew point from 2021 to 2024, so unconditioned corridors and yards need the most attention.

Will an existing Tennessee air-side chiller plant carry new liquid-cooled rows?

A Tennessee chilled water plant built for air handlers can feed coolant distribution units when it has spare capacity, enough pump head and a header with room for new connections. Paul Industries checks those against the new load before design. The trade is temperature: the liquid loop then runs as cold as the chillers, which gives up economizer hours a separate warm loop would gain.

Which tasks keep a Tennessee liquid cooling loop healthy year after year?

Data center liquid cooling maintenance in Tennessee involves coolant sampling, filter and strainer changes, pump checks, coolant distribution unit calibration, hose and coupling inspection, glycol checks on outdoor loops each autumn and dry cooler coil cleaning each spring. Paul Industries carries that work under a service agreement and keeps the chemistry history with the repair records.

Where do leaks start on direct-to-chip systems, and how are they caught?

A liquid cooling leak in a data hall is uncommon when the loop is pressure tested, flushed and filled correctly, and most leaks that do occur start at quick disconnect couplings, hoses or threaded fittings. Paul Industries tests each loop hydrostatically, checks every rack connection under pressure and installs leak detection under manifolds with alarms to the building management system.

What water should fill a liquid cooling loop in Tennessee?

A liquid cooling loop in Tennessee should be filled with treated water or premixed coolant that meets the IT vendor’s specification for conductivity, chloride and particles, not raw tap water. Memphis tap water carries chlorine and orthophosphate, and Nashville’s carries 146 mg/L of dissolved solids, so both are treated first. The fill chemistry is recorded as the loop’s baseline.

Is it practical to pipe a Tennessee hall for liquid cooling ahead of rack delivery?

Liquid cooling piping can go in before the racks arrive at a Tennessee site, and on large campuses it usually does. Paul Industries installs and pressure tests the facility headers, coolant distribution units and capped manifold connections first, keeps the loops filled and circulating with treated water, and makes the final rack connections and flushes as each row is delivered.

How much power do liquid cooling pumps use in a Tennessee hall?

Liquid cooling pumps in a Tennessee hall use power in proportion to flow and head, and a 75 kW pump set running all year costs about $89,000 at Tennessee’s 2026 commercial average of 13.57 cents per kWh. Larger pipe, lower-pressure-drop coolant distribution units and variable speed control cut that figure, and Paul Industries checks those trades during design.

Which contract routes does Paul Industries offer for Tennessee liquid cooling?

Paul Industries offers design-build liquid cooling in Tennessee, along with complete installation to an engineer’s drawings and supply-only orders for coolant distribution units, manifolds and prefabricated piping. Design-build suits owners who want the facility water class, heat rejection and phasing settled in one package, with one contract responsible from design through testing.

When does immersion make sense for a Tennessee operator instead of cold plates?

Immersion cooling fits Tennessee data halls where racks are very dense, the hardware is approved for immersion and the floor can carry the tank weight. The heat leaves through a fluid-to-water heat exchanger, so the facility water loop, dry coolers and freeze protection look much like a direct-to-chip plant. Paul Industries pipes both and helps owners compare them for the same load.

Which documents start a liquid cooling estimate for a Tennessee hall?

To scope liquid cooling for a Tennessee data hall, send the rack layout and densities, the IT vendor’s facility water requirements, existing chilled water plant data, floor and ceiling drawings, the target dates and the redundancy goal. Paul Industries returns a budget range from comparable scope, then a firm price once the scope is defined.

Bringing liquid-cooled racks into a Tennessee hall?

Send the rack layout, the IT vendor’s water requirements and your existing plant data. Call 201-450-8280 or request a quote.