Paul Industries designs, supplies, installs and starts up data center cooling in Louisiana: chilled water plants, chillers, hybrid air and water heat rejection, pumps, piping and controls for new campuses in north Louisiana and for halls in Baton Rouge, New Orleans, Lafayette and Shreveport. Louisiana pairs industrial power priced well below the national average with heavy, humid summer air and a hurricane coast, and every cooling choice here answers those three facts. Paul Industries carries the plant from design through commissioning under one contract, headquartered at 256 Shore Drive, Kilmarnock, Virginia, and working across Louisiana and all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
New Orleans July normals 91 F high, 77 F low (NOAA, 1991-2020)
Mechanical code 2021 IMC statewide since January 1, 2023; 2024 editions from January 1, 2027
Industrial power 5.61 cents/kWh in Louisiana, 8.13 US average (EIA, 2024)
Largest campus underway Richland Parish, about 5 GW of IT capacity (LED, 2026)
Reviewed November 2026

What does data center cooling in Louisiana have to solve?

Data center cooling in Louisiana has to reject heat into air that is hot and wet for most of the year, keep doing so through tropical storms that can take down the transmission grid, and do it on a water budget that parish governments and utilities now watch closely. Air that is warm and saturated limits both dry and evaporative equipment, so the plant is sized against humidity as much as temperature. The cheap power that draws campuses to the state rewards plants that run reliably more than plants that chase the last tenth of a point in efficiency.

The national guide to plant types, from air-cooled chillers to warm-water loops, is on the data center cooling systems page. What follows covers how those choices land in Louisiana: the climate, the campuses being built, the water, the grid, the code and the storms.

How do data centers cool down in Louisiana’s summer air?

Louisiana data centers cool down by moving heat from the IT equipment into water or refrigerant and then rejecting it outdoors, and the outdoor side is where the state’s climate bites. New Orleans averages a 91 degree Fahrenheit July high and a 77 degree July low (NOAA, 1991 to 2020), and most summer nights there stay above 70. A night that never drops below the high 70s gives an economizer few useful hours, and the moisture in that air is what limits a cooling tower, because a tower can only approach the wet bulb temperature.

The practical result is a long season of mechanical cooling, with chillers carrying load day and night from late spring into autumn. Inside the white space, the ASHRAE recommended envelope of 64.4 to 80.6 degrees Fahrenheit at the server inlet, with an upper moisture limit of a 59 degree dew point, lets the plant run warmer supply water than older halls did. The outdoor air, though, is often above that dew point, so any outside air the building takes in has to be dried first, and the coils that dry it add latent load to the chillers.

North Louisiana and the coast are both humid, in different ways

North Louisiana, around Shreveport, Monroe and Richland Parish, has slightly cooler winter nights than the coast, which opens more hours for economizers between November and March. Summers in the north are just as humid, so the peak design condition that sizes the chillers changes little. On the coast, around New Orleans, Houma and Lake Charles, the season of near-continuous mechanical cooling is longer and salt in the air adds a corrosion load to every outdoor coil and fan.

Where are the new data centers in Louisiana?

The new data centers in Louisiana are concentrated in the north of the state, where large tracts of land, gas-fired generation and transmission capacity met hyperscale demand. Louisiana Economic Development (LED) has announced two programs on a scale new to the state, and both shape what cooling plants in the state will look like for years. Each hyperscale data center Louisiana has announced so far brings gigawatt-scale cooling demand to parishes that had little industrial cooling before.

Hyperscale campuses announced in Louisiana and what LED has published about them
CampusLocationPublished scale and statusCooling and water notes published
Meta Richland Parish Data CenterHolly Ridge, Richland Parish, northeast LouisianaMore than $50 billion, nearly 10 million square feet, 5 GW of IT capacity; construction has begunMeta plans to return 100 percent of the facility’s water consumption to watersheds; the release does not state the cooling method
Amazon campuses developed by STACK InfrastructureCaddo and Bossier parishes, including Resilient Technology Park in Shreveport$18 billion planned across three campuses; no construction dates publishedMainly air cooling, with water cooling only above about 85 degrees Fahrenheit, expected less than 13 percent of the year

The Meta data center Louisiana Economic Development first announced in December 2024 has grown about fivefold since, and LED describes the Holly Ridge site as the home of a training cluster Meta calls Hyperion. That makes the Hyperion data center Louisiana’s clearest signal of where rack densities are heading: the hall is built for artificial intelligence training, which pushes much of the heat into liquid loops. The Amazon data center Louisiana program in Caddo and Bossier parishes is described differently, with air cooling for most of the year. Both are a data center under construction in Louisiana or planned for it as of late 2026, and both are market facts for owners planning their own sites, not projects of Paul Industries.

Data center cooling without water most of the year

Data center cooling without water most of the year is possible in Louisiana when the plant is designed as a hybrid: dry heat rejection carries the load until the outdoor temperature crosses a set point, and evaporative assist or a cooling tower takes over above it. The approach Amazon published for its northwest Louisiana campuses, air cooling with water only above about 85 degrees for less than 13 percent of the year, is a hybrid of this kind, and it shows how a Louisiana owner can cut water use without giving up capacity on the worst afternoons.

The trade-off is equipment size and power. Dry coolers and air-cooled chillers need more surface and fan energy than a tower to reject the same heat at the same water temperature, and they lose capacity just when the air is hottest. At 5.61 cents per kilowatt-hour for industrial power in Louisiana in 2024, against a national average of 8.13 (EIA), the extra fan and compressor energy costs less here than in most states, which is one reason hybrid plants pencil out in Louisiana.

Heat rejection options for a Louisiana data center and how each behaves in the state’s climate
Heat rejectionWater useBehavior on a humid Louisiana afternoonWhere it fits
Air-cooled chillersNone for heat rejectionCapacity and efficiency fall as dry bulb climbs; coils need coating near the coastSmaller halls, sites with tight water allocations
Water-cooled chillers with towersEvaporation, drift and blowdownTower approach limited by a high wet bulb, so condenser water stays warmLarge plants where water is available and permitted
Dry coolers with trim chillersNone, or adiabatic spray on peak daysCarry warm-water loops most of the year; trim chillers take the peakLiquid-cooled halls with warm facility water
Hybrid dry and evaporative unitsOnly above a set pointRun dry through mild months, switch to evaporative on hot afternoonsOwners balancing water budget and peak capacity
Thermal energy storageDepends on the chiller plant behind itShifts chiller run time and bridges a chiller restart after a power transferCampuses that need ride-through for storms and grid events

Data center cooling water in Louisiana: sources, treatment and discharge

Louisiana data center water usage depends almost entirely on the heat rejection choice: a tower plant evaporates water every hour it runs, a dry plant uses almost none, and a hybrid plant sits between them according to its set point. Cooling makeup in south Louisiana usually starts as river water; New Orleans, for example, draws its supply from the Mississippi River, treats about 135 million gallons a day at its Carrollton plant for the East Bank, and disinfects with chloramine.

Chloramine and river organics matter to the cooling plant. Makeup water for towers is treated for scale, corrosion and biological growth, and the chemistry program has to account for ammonia from chloramine, which feeds nitrifying bacteria in a warm tower basin. Closed chilled water and liquid cooling loops are filled with treated water instead of straight city supply. Tower blowdown that goes anywhere other than a sanitary sewer is a point-source discharge, which in Louisiana falls under the LPDES permit program that LDEQ has administered since 1996 under LAC 33:IX. Paul Industries designs makeup, filtration and blowdown into the plant and sets up the cooling tower water treatment program at startup; demineralized fill for liquid loops is covered on the ultrapure water systems in Louisiana page.

Louisiana data center electricity and the cooling plant

Louisiana data center electricity is cheap by national standards and is being built out at a scale the state has never seen, and both facts reach the cooling plant. Entergy Louisiana serves the Richland Parish campus, where LED reports that Meta will fund seven new natural gas-fueled generating plants and three grid-scale batteries; SWEPCO serves the Amazon campuses in Caddo and Bossier parishes.

Every new data center Louisiana adds to the Entergy and SWEPCO systems brings a cooling load that runs around the clock, and the cooling plant is usually the main non-IT load on the campus. Low tariffs lengthen the payback on efficiency upgrades, as the table shows, but they do not change the value of a plant that keeps running through a utility disturbance.

Annual energy cost of continuous cooling plant power at 2024 industrial averages (EIA)
Continuous cooling plant powerEnergy per yearCost at Louisiana average, 5.61 cents/kWhCost at US average, 8.13 cents/kWh
100 kW876,000 kWh$49,144$71,219
1 MW8,760,000 kWh$491,436$712,188
5 MW43,800,000 kWh$2,457,180$3,560,940

The figures are arithmetic on the EIA state and national averages; a campus with its own supply contract pays a different rate. The point for design is relative: a 10 percent cut in plant power is worth about a third less in Louisiana than at the national average, so redundancy, maintainability and storm resilience often win the budget argument over a marginal efficiency gain.

Which chilled water plant designs suit Louisiana data halls?

Chilled water plant designs that suit Louisiana data halls share three traits: they carry the full load with the largest unit out of service on the hottest, most humid afternoon, they deliver supply water warm enough to avoid condensation on cold surfaces in the white space, and they keep running when one utility feed or one pump header is lost. The rest of the design follows from the hall’s density and the owner’s water position.

Primary-variable plants with warm supply water

Variable primary flow with supply water around the middle 60s Fahrenheit is a common starting point for air-cooled halls. Warmer supply water raises chiller efficiency, widens the window for waterside economizer hours in the cooler months, and keeps coil surfaces above the dew point of the room air. In Louisiana, where the outdoor dew point sits above 70 degrees for much of the summer, any surface in contact with outside air has to be insulated and vapor sealed, and the supply temperature is set with that in mind.

Split loops for mixed air and liquid cooling

Halls that mix air-cooled racks with liquid-cooled racks often run two loops: a cooler chilled water loop for air handlers and fan walls, and a warmer facility water loop for coolant distribution units. The warmer loop can reject heat through dry coolers for most of the year, with trim chillers or heat exchangers to the chilled water plant on the hottest days. Paul Industries sizes the heat exchangers, valves and controls that let the two loops share capacity without fighting each other.

Redundancy that survives maintenance

N+1 chillers on a single header protect against an equipment failure but not against a header or valve that must be isolated for repair. Ring headers, dual feeds to each hall and isolation valves placed for maintenance let a Louisiana plant keep cooling while a section of pipe is out of service, which matters in a state where storm recovery can leave parts of the plant waiting on replacement components.

Keeping halls cool through Louisiana hurricanes and grid failures

Hurricane Ida, which made landfall at Port Fourchon on August 29, 2021 as a category 4 storm, cut all power in Lafourche and Jefferson parishes, helped by the collapse of a large transmission tower along the Mississippi River west of New Orleans, and caused widespread outages in the River Parishes. For a data center cooling plant, the lesson is that the utility feed and the cooling plant fail together, and the plant has to ride through the transfer to generators and restart cleanly.

Paul Industries designs for that sequence. Chillers with fast-restart controls, pumps and controls on UPS power, and chilled water storage sized to cover the gap between a power transfer and full chiller restart keep supply temperature inside limits. Outdoor equipment is anchored for the wind loads the building code assigns to the site, and chillers, pumps and electrical gear in flood-prone parishes sit above the design flood elevation. Fuel for generators, makeup water for towers and chemical supplies are sized for the days after a storm, when deliveries are uncertain.

  • Restart sequences tested on a full power transfer before the hall goes live.
  • Makeup water storage or a dry operating mode that carries the plant if the water supply is interrupted.
  • Coated coils and sealed enclosures on outdoor units within reach of salt air.
  • Spare parts for pumps, drives and controls held on site for the storm season.

Louisiana codes for a data center cooling system

A data center cooling system in Louisiana is built to the codes adopted statewide by the Louisiana Uniform Construction Code Commission: the 2021 International Mechanical Code and International Building Code since January 1, 2023, and the 2021 International Energy Conservation Code since July 1, 2023, each with Louisiana amendments. Under the 2021 IECC, data center cooling is judged against the ASHRAE 90.4 mechanical load component, a ratio of cooling plant energy to IT energy. The commission’s next cycle moves to the 2024 ICC codes on January 1, 2027, so a project in design now should confirm which edition its permit date falls under.

Louisiana’s contractor licensing law also reaches the work: commercial projects of $50,000 or more and mechanical work over $10,000 fall under the State Licensing Board for Contractors. Piping inside the plant is typically designed and tested to ASME B31.9 for building services, with hydrostatic tests documented before insulation. The data center commissioning in Louisiana page covers the tests that follow installation.

Data center cooling Baton Rouge, New Orleans and Shreveport owners plan for

Data center cooling Baton Rouge owners plan for is shaped by the chemical corridor around them: enterprise and colocation halls sit near plants with corrosive atmospheres, so outdoor coils, fans and electrical enclosures get protective coatings and closer inspection. For data center cooling New Orleans sites face the most humid air and the most direct storm exposure in the state, which puts elevation, anchoring and ride-through first. A data center Shreveport Louisiana owners build sits in the northwest, where the new hyperscale demand has arrived and where cooler winter nights reward economizer hours.

For any data center north Louisiana campus, the scale is the issue: chiller and dry cooler counts in the dozens, kilometers of large-bore piping, and phased turnovers in which new halls connect to running plants. That work is described on the data center mechanical contractor in Louisiana page, and the rack-level side on the data center liquid cooling in Louisiana page.

Maintaining a Louisiana data center cooling plant after turnover

Maintaining a Louisiana data center cooling plant after turnover is a year-round job, because the plant never gets the long winter rest that northern plants use for overhauls. Chiller overhauls, tube cleaning and tower work are scheduled one unit at a time in the cooler months, with redundancy confirmed before each machine is isolated. Coil cleaning and coating inspection on outdoor units come before each storm season, and water treatment is checked against the seasonal swings in river water quality that reach towers through makeup.

Paul Industries maintains the plants it builds under service contracts that set inspection intervals, refrigerant leak records, vibration and oil analysis, and the spare parts held on site. The same records support repair-or-replace decisions years later, when a chiller’s tube condition, leak history and efficiency all point one way or the other.

What drives the cost of data center cooling in Louisiana?

The cost of data center cooling in Louisiana is driven by the IT load and its redundancy level, the share of the load carried by liquid cooling, the heat rejection choice and its water supply, the wind and flood design of the equipment yard, and how much ride-through the owner wants after a power transfer. Phasing also matters: a plant built for the final load on day one costs more up front but avoids tie-ins later, while a phased plant needs valved connections and headers sized for the future.

Published per-megawatt figures vary too widely to quote without a defined scope. Paul Industries prices from the load profile, the redundancy target, the site plan and the water and power arrangements, gives a budget range from comparable scope, and then a firm price once the design basis is set.

Who installs data center cooling in Louisiana?

Paul Industries installs data center cooling in Louisiana, from the chiller plant and heat rejection yard to the pumps, headers, controls and the connections into each hall. The work covers design-build plants, supply-only packages of chillers, dry coolers, pumps and prefabricated pipe spools, and complete installation for owners who already have a design. Paul Industries also repairs and services the plant after turnover, so the firm that built it maintains it.

Owners comparing approaches across states can read how the headquarters state handles water and grid limits on the data center cooling in Virginia page, and how a neighboring Gulf state deals with its own grid on the data center cooling in Texas page. Gulf-wide context for industrial work is on the Gulf Coast page.

Data center cooling in Louisiana from Paul Industries

Paul Industries designs, fabricates, supplies, installs, tests and maintains cooling plants for data centers in Louisiana, including data center chillers, heat rejection, chilled water and warm-water distribution, and the controls that run them. For chiller service on existing halls, see chiller repair in Louisiana, and for the state overview see Louisiana. To start, send the IT load, redundancy target and site location, and request a quote.

Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · 2021 International Mechanical Code as adopted by the Louisiana Uniform Construction Code Commission · 2021 International Energy Conservation Code (Louisiana, effective July 1, 2023) · 2021 International Building Code (Louisiana) · LAC 33:IX (LPDES) · ASME B31.9

Frequently asked questions

Who installs data center cooling at campuses in Shreveport, Bossier City and the rest of northwest Louisiana?

Paul Industries installs chiller plants, dry coolers, pumps and piping for data centers in Shreveport, Bossier City and across Caddo and Bossier parishes. Northwest Louisiana is where SWEPCO serves the new hyperscale campuses, and the cooler winter nights there give hybrid plants more dry operating hours than the coast. Send the load, redundancy and site plan, and Paul Industries scopes the plant.

Does Paul Industries build cooling plants for data centers in Monroe, Richland Parish and northeast Louisiana?

Yes. Paul Industries builds cooling plants for data centers in Monroe, Ruston, Richland Parish and the rest of northeast Louisiana, from chiller and heat rejection yards to distribution headers and hall connections. Campuses there are large and phased, so headers, valves and tie-in points are sized for the halls that come later, and each phase is commissioned without interrupting cooling to the halls already running.

Who provides data center cooling in New Orleans, Jefferson Parish and the river parishes?

Paul Industries provides data center cooling in New Orleans, Metairie, Kenner and the river parishes, for enterprise, hospital and colocation halls. These sites face the most humid air and the most direct hurricane exposure in Louisiana, so equipment elevation, anchoring for wind, coated coils and ride-through after a power transfer come first in the design, followed by water treatment for chloraminated river supply.

Can Paul Industries cool data halls in Baton Rouge, Lafayette and Lake Charles?

Yes. Paul Industries designs and installs cooling for data halls in Baton Rouge, Lafayette, Lake Charles and across Acadiana. Many of these rooms sit inside or beside industrial sites, where corrosive atmospheres attack outdoor coils and electrical enclosures, so coil coatings, enclosure ratings and inspection intervals are set for the environment as well as the load.

What data centers are in Louisiana?

Louisiana has long had enterprise, government, university and colocation data centers in its larger cities, and in 2024 to 2026 it gained two hyperscale programs announced by Louisiana Economic Development: Meta’s campus in Holly Ridge, Richland Parish, with about 5 GW of IT capacity planned and construction underway, and Amazon’s planned campuses in Caddo and Bossier parishes. Paul Industries designs and builds cooling plants for halls of every size in the state.

How many data centers are coming to Louisiana, and what does that mean for cooling?

The count matters less than the scale: two announced programs alone account for more than $68 billion of planned investment, according to LED releases from 2026. For cooling, that means chiller, dry cooler and pump orders in volumes that set equipment lead times, and phased plants that keep growing for years. Paul Industries plans procurement, prefabrication and phasing so each hall’s cooling arrives when its IT equipment does.

What is the Meta data center Louisiana is building in Richland Parish, and how is it cooled?

Louisiana Economic Development describes the Meta Richland Parish Data Center in Holly Ridge as a campus of nearly 10 million square feet and about 5 GW of IT capacity, with construction underway and a training cluster Meta calls Hyperion. The release does not state the cooling method; it does say Meta plans to return all of the facility’s water consumption to watersheds. Paul Industries cites it as a market fact, not as its own project.

How will the Amazon data center Louisiana officials announced for Caddo and Bossier parishes be cooled?

According to Louisiana Economic Development, the three planned campuses will mainly use air cooling and switch to water cooling only when temperatures exceed about 85 degrees Fahrenheit, which Amazon expects for less than 13 percent of the year. That hybrid approach trades extra equipment and fan energy for lower water use, a trade that Louisiana’s low industrial power price makes easier to justify.

Is a cooling tower plant or a dry plant better for a Louisiana data center?

The choice depends on water availability, the share of liquid-cooled load and the owner’s water commitments. Tower plants use less power but evaporate water every hour they run; dry and hybrid plants use little water but need more equipment and fan energy, which Louisiana’s low industrial power price makes cheaper to carry. Paul Industries models both against the site’s climate and tariff before the design is fixed.

Why does humidity matter more than temperature for a Louisiana cooling plant?

Humidity sets the wet bulb temperature, which is the limit a cooling tower works against, and it sets the dew point, which decides whether outside air and cold surfaces will condense. On a humid Louisiana night the dry bulb may drop while the wet bulb barely moves, so tower water stays warm and economizer hours stay scarce. Paul Industries sizes towers, coils and dehumidification on wet bulb and dew point data.

Does Louisiana require ASHRAE 90.4 for data center cooling?

Louisiana adopted the 2021 International Energy Conservation Code statewide, effective July 1, 2023, with Louisiana amendments, and that code points data center plants to ASHRAE 90.4, whose mechanical load component caps the energy the cooling plant may use per unit of IT energy. Paul Industries designs plants to show compliance with that cap and documents the calculation for the permit set, and checks the edition that applies when the 2024 codes take effect on January 1, 2027.

What does chloramine in city water do to a data center cooling plant?

Chloramine, used by New Orleans and other river-supplied systems, carries ammonia into cooling tower makeup, where it can feed nitrifying bacteria and upset the tower’s pH and biocide program. It also damages some reverse osmosis membranes if fill water for closed loops is treated without removing it. Paul Industries sets up tower chemistry and closed-loop fill treatment with the supply water’s disinfectant in mind.

Does tower blowdown from a Louisiana data center need a permit?

Blowdown sent to a sanitary sewer is governed by the receiving utility’s pretreatment rules. Blowdown discharged to a ditch, canal or water body is a point-source discharge, which in Louisiana requires an LPDES permit from LDEQ under LAC 33:IX. Paul Industries designs blowdown metering, sampling points and chemistry so the plant meets whichever route the site uses.

How should a Louisiana data center cooling yard be protected from hurricanes?

Chillers, dry coolers and towers are anchored for the wind loads assigned under the building code for the site, pumps and electrical gear sit above the design flood elevation, coils near the coast get protective coatings, and controls and pumps run on UPS power through a generator transfer. Paul Industries also plans makeup water, chemicals and spare parts for the days after a storm.

How long can a Louisiana data hall ride through a chiller restart?

Ride-through depends on the volume of chilled water in the loop, any storage tanks, the hall’s heat load and the allowed rise in supply temperature. Without storage, a dense hall can exceed its limits in minutes, so many plants add a chilled water tank sized to bridge the time from power transfer to full chiller restart. Paul Industries calculates that window and tests it on a full transfer before turnover.

Does cheap Louisiana power change how a data center cooling plant should be designed?

It changes the economics of efficiency, not the engineering of reliability. At 5.61 cents per kilowatt-hour for industrial power in 2024 against 8.13 nationally (EIA), each kilowatt saved is worth less, so the payback on premium efficiency stretches. Redundancy, storm resilience and maintainable layouts keep their full value, and Paul Industries weighs each upgrade against the site’s actual tariff.

Can cooling capacity be added to an operating Louisiana data hall?

Yes. Paul Industries adds chillers, heat rejection and distribution to operating halls through pre-installed valves, hot taps or planned shutdowns of redundant equipment, under a written method of procedure for each step. Redundancy is confirmed before anything is isolated, temporary cooling is staged where the margin is thin, and every new connection is flushed and tested before it carries live load.

Does Paul Industries supply cooling equipment for a Louisiana data center without installing it?

Yes. Paul Industries supplies chillers, dry coolers, pumps, heat exchangers, valves and prefabricated pipe spools and skids as a supply-only package, with the submittals, test records and startup support the installer needs. Owners can also take a design-build route or complete installation of an existing design, and all three routes are priced from the same load and site information.

What does data center cooling in Louisiana cost to price, and what should an owner send?

Send the IT load by phase, the redundancy target, the split between air and liquid cooling, the site location and utility, the water source and any discharge constraints, and the target dates for each hall. With that, Paul Industries prepares a budget range from comparable scope and then a firm price once the design basis is agreed. Call 201-450-8280 or request a quote.

Planning a cooling plant for a Louisiana data center?

Send the IT load by phase, redundancy target, site location and water source. Call 201-450-8280 or request a quote.