Paul Industries designs, supplies and installs data center liquid cooling in Louisiana: coolant distribution units, cold plate and rear door loops, facility water piping, dry coolers and trim chillers for dense racks in Baton Rouge, New Orleans, Shreveport and the new north Louisiana campuses. Liquid cooling moves most of a dense rack’s heat into water at temperatures high enough to reject outdoors on all but the hottest Louisiana afternoons, which cuts both chiller hours and water use. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, builds and maintains these systems across Louisiana and all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Summer air July in New Orleans averages 91 F by day and 77 F at night (NOAA normals)
Warm-water classes ASHRAE W17 to W45 and W+, by facility supply temperature
Largest liquid-ready site Richland Parish campus, about 5 GW of IT (LED, 2026)
Industrial power Louisiana 5.61 cents per kWh against 8.13 nationally in 2024 (EIA)
Reviewed November 2026

Why data center liquid cooling in Louisiana is arriving at gigawatt scale

Data center liquid cooling in Louisiana arrived at gigawatt scale when Meta began building its Richland Parish campus in Holly Ridge, which Louisiana Economic Development describes as nearly 10 million square feet with about 5 GW of IT capacity and the home of Hyperion, Meta’s training cluster for artificial intelligence. Training clusters run accelerators at power densities that air alone struggles to cool, so much of the heat in such halls is carried by liquid at the chip.

The same shift is reaching smaller rooms. Enterprise halls in Baton Rouge, university research computing, hospital imaging archives and colocation suites in New Orleans and Shreveport are adding liquid-cooled racks one row at a time. The data center liquid cooling service page explains the technologies in general; this page covers how they behave in Louisiana’s heat, humidity, water and storms. Market facts about named campuses are drawn from public LED releases and do not describe Paul Industries projects.

How does data center liquid cooling work with Louisiana heat rejection?

Data center liquid cooling works by pumping a coolant through cold plates fixed to processors and accelerators, or through rear door coils on the rack, then passing that heat across a heat exchanger in a coolant distribution unit (CDU) to a facility water loop that carries it outdoors. The technology cooling loop on the rack side is small, clean and closed; the facility loop is where the Louisiana climate enters the design, because it decides whether the heat can leave through dry coolers alone or needs a chiller.

Most liquid-cooled halls in the state still carry part of their load on air: power supplies, memory, storage and network gear in a direct-to-chip rack shed some heat to the room, and that share goes to the chilled water plant. A typical Louisiana hall therefore has two loops, a warm facility water loop for CDUs and a cooler chilled water loop for air handling, connected so capacity can move between them.

Direct-to-chip, rear door and immersion

Among data center liquid cooling options, three show up in Louisiana rooms, and each places different demands on the building. For data center liquid cooling direct to chip loops are the usual choice for new accelerator racks because they capture most of the heat at the source and accept warm supply water. Rear door heat exchangers suit existing halls where racks stay air-cooled internally but the room cannot absorb more heat. Immersion tanks remove fans entirely and are covered on the data center immersion cooling page. Paul Industries installs all three, and many Louisiana rooms end up with a mix.

Choosing a data center liquid cooling temperature for Louisiana

The data center liquid cooling temperature that matters most for a Louisiana site is the facility water supply temperature, because it decides how many hours dry coolers can carry the load before trim cooling is needed. ASHRAE groups liquid-cooled equipment into facility water classes from W17 to W45 and W+, named for the maximum supply temperature in Celsius, and the IT vendor’s specification sets which class a rack accepts.

New Orleans temperatures regularly climb into the 90s Fahrenheit from June to September, and the July normal high is 91 degrees. A dry cooler needs the outdoor air to be cooler than the water leaving it by an approach of several degrees, so the higher the facility water class, the more of the Louisiana year the dry coolers can cover on their own.

ASHRAE facility water classes and how each fits Louisiana’s climate
ClassMaximum facility supplyHeat rejection in LouisianaTypical equipment
W1762.6 FChiller needed most of the yearWater-cooled chillers, towers or air-cooled chillers
W2780.6 FChillers through the summer; economizer hours in the cooler monthsChillers with waterside economizer
W3289.6 FDry coolers carry much of the year; trim cooling on hot afternoonsDry coolers or towers with trim chillers
W40104 FDry coolers carry nearly all hours, including most summer peaksDry coolers, adiabatic assist for the hottest days
W45 and W+113 F and aboveDry coolers year-round; heat warm enough for reuseDry coolers, heat recovery to process or building loads

The table describes tendencies, not guarantees: dry cooler approach, fouling, solar gain on the yard and the hours of extreme heat at a given site all move the line. Paul Industries runs an hourly model for the site’s weather before choosing between a dry-only yard and one with trim chillers. The same model shows how many hours adiabatic spray would run, which tells the owner how much water a dry yard with assist would actually use and whether a small trim chiller is the better buy.

Condensation on liquid cooling pipe in Louisiana’s humid air

Condensation forms on liquid cooling pipe whenever its surface is colder than the dew point of the air around it, and in Louisiana that dew point sits above 70 degrees Fahrenheit outdoors for much of the summer. Inside a well-controlled hall the room dew point is far lower, usually held near or below the ASHRAE recommended 59 degree limit, so the warm facility water in most liquid loops is safe there. The risk is in the spaces between: mechanical rooms, corridors, ceiling voids and pipe runs that pass through areas conditioned less tightly than the white space.

Paul Industries handles this in three ways. Facility water supply is set above the worst-case dew point of every space the pipe crosses, or the pipe is insulated with a continuous vapor retarder through those spaces; the mechanical insulation is sealed at every hanger and valve, where gaps let moisture in. Chilled water lines feeding rear doors or trim coils, which run colder, get the same treatment. Building pressurization and dehumidification keep outside air from bypassing the controls through doors and loading docks.

Data center liquid cooling CDU selection and power

Each data center liquid cooling CDU sets the technology loop’s supply temperature, flow and pressure, filters the coolant and isolates the rack loop from the facility water. In-row CDUs serve a few racks and sit in the white space; larger floor-standing units serve rows or a whole hall from a gallery. The choice depends on rack count, redundancy, floor loading and how much of the hall will be liquid-cooled at full buildout.

CDU pumps are the most important liquid cooling load to keep running after a power disturbance. A cold plate loop holds very little thermal mass, so if coolant stops, accelerator temperatures rise within seconds. Hurricane Ida in 2021 cut all power in Lafourche and Jefferson parishes and caused widespread outages in the River Parishes, and a Louisiana hall has to assume it will transfer to generators during a storm. Paul Industries puts data center liquid cooling pumps and their controls on UPS power, sizes the ride-through to cover the generator transfer, and tests the sequence before turnover.

Data center liquid cooling piping, manifolds and leak control

Data center liquid cooling piping runs from the facility water mains to each CDU and from each CDU through row manifolds and hoses to the racks, and every joint along that path is a potential leak above or beside powered equipment. Material choices are stainless steel or copper for the technology loop, with carbon steel or stainless for the larger facility water mains, and all wetted materials have to be compatible with the coolant.

  • Welded or pressed joints on mains, with isolation valves at every branch so one rack or row can be taken out of service.
  • Drip trays and leak detection cable under manifolds, valves and CDUs, wired to alarm and, where the owner chooses, to automatic isolation.
  • Pressure tests to the mechanical code before any coolant goes in; the 2021 IMC, in force statewide in Louisiana, requires hydronic piping to be tested at 1.5 times the maximum design pressure and at least 100 psi for 15 minutes.
  • Flushing and particulate filtration before racks connect, because debris in a cold plate’s fine channels blocks flow.

A data center liquid cooling leak is usually traced to a joint disturbed during installation, a hose or quick connector damaged in handling, or a fitting with incompatible elastomer. Clean installation practice, compatibility review and documented testing prevent most of them, and leak detection catches the rest early.

Data center cooling water quality for Louisiana liquid loops

Data center cooling water quality decides how long a liquid loop runs before its cold plates foul or corrode, and in south Louisiana the source water starts out unsuitable for direct use. New Orleans, for example, draws from the Mississippi River and disinfects with chloramine, made by adding chlorine and ammonia, and adds lime to raise pH; city water also carries hardness, silica and dissolved solids that deposit on hot surfaces.

The data center liquid cooling coolant in a technology loop is usually treated water with corrosion inhibitors and biocide, or a propylene glycol solution where the vendor specifies it. Fill water is deionized or produced by reverse osmosis before inhibitors are added, and the CDU filters circulate it continuously. Paul Industries supplies the fill water treatment and sets the sampling schedule; larger halls draw on systems described on the ultrapure water systems in Louisiana page.

What goes into a Louisiana liquid cooling loop, and how it is checked
ItemRequirementWhy it matters in LouisianaHow it is checked
Fill waterDeionized or RO water, never straight city supplyRiver-sourced supply carries chloramine, hardness and organicsConductivity and chemistry on each fill batch
Inhibitor and biocidePackage approved by the cold plate vendorWarm loops in a warm building favor microbial growthInhibitor level and bacteria counts on a set schedule
FiltrationFine filtration in the CDU, as the vendor specifiesConstruction debris from large phased sitesDifferential pressure across filters, strainer inspection
Wetted materialsCompatible metals, hoses and seals throughoutMixed metals from phased installationsSubmittal review before purchase
Facility waterClosed loop with its own treatment programDry coolers and heat exchangers foul if chemistry driftsMonthly chemistry, annual exchanger inspection

Is data center water cooling closed loop in Louisiana?

The liquid loops that touch the IT equipment are closed: the technology loop and the facility water loop circulate the same treated water for years, losing almost nothing. Whether the site as a whole uses water depends on how the facility loop rejects heat. Dry coolers use none; adiabatic assist sprays water on the hottest days; a tower or evaporative cooler consumes water whenever it runs. The planned Amazon campuses in Caddo and Bossier parishes, for example, were described by LED as air-cooled for most of the year and water-cooled only above about 85 degrees Fahrenheit.

Data center liquid cooling vs air cooling in a Louisiana hall

Data center liquid cooling vs air cooling in Louisiana comes down to rack density and climate. Air cooling remains the simpler and cheaper choice for racks of modest density, but humid Louisiana air means every air-cooled hall carries latent load and needs chilled water cold enough to dehumidify. Liquid cooling moves most of the heat at temperatures high enough for dry coolers, which shrinks the chiller plant and its water use.

Liquid and air cooling compared for a Louisiana data hall
FactorAir coolingLiquid cooling
Rack density it suitsLow to moderateHigh and very high, including accelerator racks
Supply water temperatureCool enough to dehumidify room airWarm, often in the W32 to W45 range
Chiller hours in LouisianaMost of the yearHot afternoons only, or none with high classes
Water useDepends on chiller heat rejectionLow with dry coolers
Power disturbance riskRoom air buffers a short interruptionLittle thermal mass; pumps need UPS power
Installation in an existing hallFamiliar workNew piping, CDUs and leak protection in the white space

What data centers use liquid cooling in Louisiana today?

Louisiana sites that use liquid cooling today include training and inference halls built for artificial intelligence, university and research computing, and colocation suites that lease high-density cages. Owners in Baton Rouge and New Orleans are adding liquid for racks for data center refreshes that outgrew air, and new campuses in north Louisiana plan for it from the start. Paul Industries installs liquid cooling for data center racks in each of these settings, from a single row to a full hall.

Retrofitting liquid cooling into an operating Louisiana hall

Retrofits begin by choosing where facility water will come from, whether a heat exchanger off the existing chilled water plant, a new warm-water loop with its own dry coolers, or both. Paul Industries surveys floor loading for CDUs and filled racks, routes piping around live equipment, installs isolation valves on running mains under a method of procedure, and connects racks row by row with each section tested before it carries load.

Phasing liquid cooling across a north Louisiana campus

Phasing liquid cooling across a north Louisiana campus means building facility water mains, valves and heat rejection for halls that will not exist for a year or more, while keeping the halls already running untouched. Campuses in Richland, Caddo and Bossier parishes are planned in buildings and phases, and the liquid cooling side has to grow with them without a shutdown of the loops already carrying racks.

Paul Industries plans that growth into the first phase. Mains are sized for the final flow, with capped and valved branches at each future hall; dry cooler yards are laid out with pads, piping stubs and electrical capacity for later units; and controls are configured so new CDUs and dry coolers join the sequence without reprogramming the running plant. Prefabricated pipe spools and pump skids built off site shorten the time each tie-in takes on a live campus, and each new branch is pressure tested and flushed on its own before the isolation valve to the live main is opened.

Commissioning a data center liquid cooling loop in Louisiana

Commissioning a data center liquid cooling loop in Louisiana proves that the loop holds pressure, carries clean coolant, controls temperature and flow at every load, and keeps the racks cool through a pump failure or a power transfer. The order matters, because each step depends on the one before it.

  1. Pressure test each section to the mechanical code and record the result before insulation.
  2. Flush with temporary strainers and cold plate bypasses until particulate limits are met.
  3. Fill with treated water, verify chemistry and conductivity, and vent air from high points.
  4. Run each CDU through its startup checks, then test pump failover and filter switchover.
  5. Test leak detection by wetting each sensor zone and confirming the alarm and any automatic isolation.
  6. Load the loop with heat load units or the first racks and confirm supply temperature, flow and pressure at the design point.
  7. Transfer the hall to generator power and confirm that pumps and controls ride through without a flow interruption.

The full startup plan for halls and plants is set out on the data center commissioning in Louisiana page, and Paul Industries hands over the records from each step at turnover.

Data center liquid cooling maintenance after startup

Data center liquid cooling maintenance is regular and measurable: coolant chemistry and inhibitor levels, filter differential pressure, pump vibration and seal condition, leak detection tests, and quick connector inspection whenever racks are swapped. Dry coolers need fin cleaning and coating inspection, more often on sites with pollen, dust or salt air. Paul Industries maintains liquid loops it installs under service agreements, keeping the chemistry and test records that IT vendors ask for when a warranty question comes up.

What is the data center liquid cooling cost in Louisiana?

The data center liquid cooling cost in Louisiana is driven by the number and size of CDUs, the length and material of facility and technology piping, the heat rejection choice, the amount of UPS-backed pump power, leak detection, fill water treatment and, in retrofits, the work needed to install around live equipment. The heat rejection side is where Louisiana’s climate shows up: a W27 hall needs a large data center liquid cooling chiller plant, while a W40 hall can lean on dry coolers.

Running cost is easier to estimate. At Louisiana’s 2024 industrial average of 5.61 cents per kilowatt-hour (EIA), 50 kilowatts of continuous pump and fan power costs about $24,572 a year, against about $35,609 at the national average of 8.13 cents. Paul Industries prices from the rack count and density, the IT vendor’s facility water class, the site plan and the phasing, giving a budget range from comparable scope and then a firm price.

Who installs data center liquid cooling in Louisiana?

Paul Industries installs data center liquid cooling in Louisiana, covering CDUs, manifolds, facility water mains, dry coolers, trim chillers, controls, fill water treatment and leak detection, and the testing and flushing before racks connect. The work is offered as design-build, as supply-only packages of CDUs, prefabricated pipe spools and skids, or as complete installation of an owner’s design, all under one contract.

The facility side connects to the plants described on the data center cooling in Louisiana page and the campus scope on the data center mechanical contractor in Louisiana page, and startup follows the steps above. Comparable work in the headquarters state is on the data center liquid cooling in Virginia page, and for a hurricane-coast neighbor see data center liquid cooling in Florida.

Liquid cooling work Paul Industries delivers in Louisiana

Paul Industries designs, fabricates, supplies, installs, tests, starts up and maintains liquid cooling for Louisiana data centers, along with the closed-loop cooling systems that feed it. For the state picture see Louisiana and the Gulf Coast page. Send the rack count, density, IT vendor’s coolant specification and hall layout, and request a quote.

Standards referenced: ASHRAE Liquid Cooling Guidelines for Datacom Equipment Centers · ASHRAE Thermal Guidelines for Data Processing Environments · 2021 International Mechanical Code (Louisiana), Section 1208.1 · ASME B31.9 · 2021 International Energy Conservation Code (Louisiana)

Frequently asked questions

Who installs liquid cooling for data halls in Baton Rouge and the river parishes?

Paul Industries installs liquid cooling for data halls in Baton Rouge, Ascension, Iberville and the other river parishes, from CDUs and manifolds to facility water piping and dry coolers. Many rooms there sit near industrial plants, so outdoor dry coolers get coatings and inspection intervals suited to corrosive air, and the facility loop is protected with filtration and a treatment program.

Does Paul Industries add liquid-cooled racks to colocation and enterprise halls in New Orleans and Jefferson Parish?

Yes. Paul Industries adds liquid-cooled rows to operating halls in New Orleans, Metairie, Kenner and the rest of Jefferson Parish. Retrofits there usually take facility water from a heat exchanger on the existing chilled water plant, with new CDUs, manifolds and leak detection installed around live racks under a written method of procedure and pumps placed on UPS power for storm-season transfers.

Who builds liquid cooling for campuses in Shreveport, Bossier City and north Louisiana?

Paul Industries builds liquid cooling for campuses in Shreveport, Bossier City, Monroe and Richland Parish, including warm-water facility loops, dry cooler yards, trim chillers and CDU galleries. North Louisiana campuses are large and phased, so facility headers, valves and tie-ins are sized for the halls still to come, and each phase is flushed and tested before racks connect.

Can Paul Industries pipe liquid cooling for research computing in Lafayette or Lake Charles?

Yes. Paul Industries pipes liquid cooling for university, research and enterprise computing in Lafayette, Lake Charles and across Acadiana and Calcasieu Parish. Smaller rooms often use in-row CDUs fed from the building’s chilled water plant, and the work includes floor loading checks, condensation control on pipe that crosses mechanical spaces, and leak detection under every manifold.

Are halls built for artificial intelligence in Louisiana liquid cooled?

Most are, at least in part. Accelerator racks for training and inference reach densities that air alone handles poorly, so they use direct-to-chip cold plates, rear doors or immersion, with the remaining heat going to air handlers. The Richland Parish campus that LED describes as home to Meta’s Hyperion training cluster is the example of that kind now under construction in Louisiana.

Can dry coolers alone carry a liquid cooling loop through a Louisiana summer?

They can when the IT equipment accepts a high facility water class, such as W40 or W45, because the water leaving the dry cooler can stay warmer than Louisiana’s summer afternoons. At W32 and below, dry coolers carry most of the year but need trim chillers or adiabatic assist on the hottest days. Paul Industries checks this against hourly weather for the specific site.

Why does liquid cooling pipe sweat in Louisiana buildings, and how is it stopped?

Pipe sweats when its surface is colder than the dew point of the surrounding air, and Louisiana’s summer dew points often exceed 70 degrees Fahrenheit. Pipe crossing loosely conditioned spaces is the usual culprit. Paul Industries raises supply temperature above the dew point where the IT allows, insulates with a continuous vapor retarder where it does not, and seals insulation at hangers and valves.

What water fills a new Louisiana technology cooling loop?

Deionized or reverse osmosis water, dosed with the inhibitor and biocide package the cold plate vendor approves, or a propylene glycol solution where specified. City water in south Louisiana is commonly river-sourced and chloraminated and carries hardness and silica, none of which belong in cold plates. Paul Industries supplies treated fill water and records conductivity and chemistry for every fill.

Does a Louisiana liquid cooling loop need glycol?

Indoor technology loops in Louisiana rarely need glycol for freeze protection, though some vendors specify a glycol mix for biological control. Outdoor dry cooler circuits are a different case: north Louisiana sees occasional hard freezes, so dry cooler loops either carry glycol or run through a heat exchanger with a glycol-filled outdoor side. Paul Industries sets the mix from the site’s winter extremes and the vendor’s requirements.

How long must CDU pumps ride through a power transfer in a Louisiana hall?

Long enough to cover the transfer from utility to generator and back, including any failed start and retry. A cold plate loop has very little thermal mass, so even a short interruption in flow can drive accelerators to thermal limits. Paul Industries puts CDU pumps and controls on UPS power, sizes ride-through for the site’s transfer sequence, and tests it on a full transfer before turnover.

What pressure test does Louisiana's mechanical code require on liquid cooling piping?

Louisiana enforces the 2021 International Mechanical Code statewide, and its hydronic test holds the piping at one and a half times its highest design pressure, with a 100 psi floor, for a minimum of 15 minutes. Paul Industries tests each section before insulation or coolant goes in, documents the result, and repeats the test on any section modified during a later phase.

Can an existing Louisiana chilled water plant feed coolant distribution units?

Often, yes. A heat exchanger or CDU can take heat from the technology loop into the chilled water plant, though that wastes the warm-water advantage and adds load to chillers. Many owners start that way for a first row and later add a dedicated warm-water loop with dry coolers. Paul Industries checks spare plant capacity, pumping and controls before connecting CDUs.

How heavy are liquid-cooled racks and CDUs for an older Louisiana raised floor?

Filled accelerator racks and floor-standing CDUs are far heavier than the racks most older raised floors were designed for, and point loads at the rack feet matter as much as the average. Paul Industries checks floor ratings with the building’s structural information before installation and, where needed, adds floor supports or places CDUs on slab in a service gallery.

Does Paul Industries supply CDUs and manifolds for a Louisiana project without installing them?

Yes. Paul Industries supplies CDUs, row manifolds, prefabricated stainless pipe spools, dry coolers and pump skids as a supply-only package with submittals, test records and startup support. Design-build and complete installation of an owner’s design are also offered, priced from the same rack and hall information.

What information starts a Louisiana liquid cooling estimate?

The rack count and power per rack, the IT vendor’s facility water class and coolant specification, the hall layout and floor ratings, the existing chilled water plant data, the site’s heat rejection space, and the phasing. Paul Industries turns that into a budget range drawn from comparable halls, followed by a fixed price when the coolant class and layout are settled.

How is a new liquid loop cleaned before servers connect?

The loop is flushed at velocities high enough to lift debris, with temporary strainers and bypasses around CDUs and cold plates, then drained and refilled with treated water until particulate counts and chemistry meet the vendor’s acceptance limits. Paul Industries records each flush and the final water analysis, and the commissioning plan holds rack connections until those records are signed.

Bringing liquid-cooled racks into a Louisiana data hall?

Send the rack count, power per rack, the IT vendor’s coolant specification and the hall layout. Call 201-450-8280 or request a quote.