Paul Industries designs, supplies, installs and services data center cooling in Mississippi: chilled water plants, air-cooled and water-cooled chillers, closed-loop dry coolers, computer room air handlers, pumps, piping and controls for campuses in Madison County, Vicksburg, Clinton, Meridian and Southaven and for enterprise halls in Jackson, Hattiesburg and the Gulf Coast. Mississippi asks a cooling plant to carry long, humid summers with warm nights, to fit a state where groundwater use starts with a permit, and to ride out a hurricane season on the coast. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and carries Mississippi cooling plants from selection through startup and service under one contract.
Request a quote or call 201-450-8280
Data center cooling in Mississippi, from the white space to the heat rejection yard
Data center cooling in Mississippi covers every piece of equipment that moves heat from the servers to the outdoor air: the air handlers or rear doors in the hall, the coolant distribution units serving liquid-cooled racks, the chilled water or condenser water loop, the chillers, and the dry coolers or towers in the yard. A plant for a 30 megawatt building is a utility system, with redundant pumps, isolation valves sized for maintenance without shutdown, and controls that keep supply temperature steady through a utility transfer.
Paul Industries carries that whole path. On a new campus the work starts with heat rejection selection and piping layout and runs through rigging, welding and grooved piping, insulation, controls wiring support, flushing, pressure testing and startup. In an existing hall it is usually a capacity add: another chiller, a new loop to a liquid-cooled row, or replacement of aging computer room units with chilled water air handlers. Owners choose a supply-only order, a design-build package or complete installation, and the same contract can continue into a service agreement after turnover.
Which Mississippi campuses are driving cooling demand?
Mississippi’s cooling demand is concentrated in a handful of announced hyperscale and colocation campuses, most of them along the Interstate 20 and Interstate 55 corridors. The Amazon data center Mississippi officials announced in January 2024 committed at least $10 billion to campuses in Madison County, and in April 2026 the Governor’s office announced an $11 billion expansion of those existing operations along with a $1 billion project in Clinton that retrofits the former Delphi plant. A $3 billion Amazon campus in Vicksburg was announced in November 2025, with construction expected to begin in 2026.
East of Jackson, the Compass data center Mississippi Power will serve is under construction in Meridian’s I-20/59 industrial park: eight buildings planned over eight years, groundwork that began in June 2025, and a first building that began construction in February 2026, with about 500 megawatts of supply from the utility. In DeSoto County, a data center investment exceeding $20 billion was announced for Southaven in January 2026 in a retrofitted building. For any data center, Mississippi Development Authority approval under the Data Center Incentive brings a sales and use tax exemption on qualifying computing equipment and software.
Those projects answer the question of what data centers are in Mississippi for most cooling buyers, and each new data center in Mississippi so far has been planned in phases, building by building. They also set the pattern for smaller work. Enterprise rooms at hospitals, universities, banks and state agencies in Jackson, Hattiesburg, Starkville and Oxford still run on packaged computer room units and small chillers, and many are due for capacity and efficiency upgrades as rack densities rise.
| Location | Announcement | Status stated by the source | What it means for the cooling plant |
|---|---|---|---|
| Madison County (Canton and Ridgeland area) | At least $10 billion (2024) plus an $11 billion expansion (2026) | Existing operations, expanding | Repeating building plants; expansion piping tied into running loops |
| Clinton, Hinds County | $1 billion, former Delphi plant retrofit (2026) | Announced | Cooling fitted into an existing industrial structure and its roof loads |
| Vicksburg, Warren County | $3 billion campus (2025) | Construction expected to begin in 2026 | Greenfield yard; heat rejection choice made at site plan stage |
| Meridian, Lauderdale County | $10 billion, eight buildings over eight years (2025) | Under construction | Closed-loop cooling stated by the developer; phased one building at a time |
| Southaven, DeSoto County | Investment exceeding $20 billion (2026) | Announced; building retrofit | Dense load in a converted building; structural and roof capacity drive the plant layout |
Mississippi climate numbers a cooling plant is sized against
Mississippi’s climate puts a cooling plant under heat for a long season and gives it warm, humid nights that limit how much free cooling the air can offer. NOAA’s 1991 to 2020 normals put Jackson at 84.7 days a year at or above 90 F and Meridian at 86.4, while Gulfport has fewer of those days but more cooling degree days than any other station in the table below. Inland sites such as Tupelo and Greenwood see enough nights at or below freezing that outdoor coils and dry coolers need freeze protection.
| Station | July normal high / low | Days at or above 90 F | Days at or below 32 F | Cooling degree days |
|---|---|---|---|---|
| Jackson International Airport | 92.1 F / 72.2 F | 84.7 | 39.6 | 2,402 |
| Meridian Key Field | 93.3 F / 72.0 F | 86.4 | 48.4 | 2,478 |
| Gulfport-Biloxi Airport | 90.4 F / 74.9 F | 69.2 | 15.8 | 2,749 |
| Tupelo Regional Airport | 92.3 F / 72.4 F | 70.2 | 53.9 | 2,234 |
| Greenwood Leflore Airport | 91.5 F / 71.6 F | 84.8 | 49.3 | 2,243 |
The July low temperatures matter as much as the highs. A Gulfport night that bottoms out near 75 F, and a Jackson July whose hourly dew point averages about 71 F, leave little room for an air-side economizer and a narrow window for water-side economizing on a conventional 55 F chilled water loop. Plants that raise supply water to 65 F or above, or that serve liquid-cooled racks with warm facility water, recover far more of the year.
How are data centers kept cool through a Mississippi summer?
Data centers in Mississippi are kept cool by moving server heat into water, carrying that water to chillers or dry coolers, and rejecting the heat outdoors, with the chillers doing most of the work from late spring to early fall. How does data center cooling work in practice? Air handlers or fan walls push air across chilled water coils into the cold aisle, the servers exhaust warm air into a contained hot aisle, and the warm air returns to the coils. Liquid-cooled racks skip the air step and hand heat straight to a coolant distribution unit.
In a Mississippi summer the outdoor dry bulb often sits above the return water temperature, so the compressors carry the load and the heat rejection equipment is selected for peak afternoon conditions. In winter and on cool spring and fall nights, an integrated economizer lets dry coolers or a water-side heat exchanger carry part or all of the load. The control sequence that blends those modes without a temperature swing in the hall is where most commissioning time is spent, and the related data center commissioning in Mississippi page covers how those sequences are proven.
Data center cooling methods compared for Mississippi sites
Data center cooling methods in Mississippi fall into four families: air-cooled chiller plants, water-cooled chiller plants with towers, closed-loop dry cooler plants, and direct liquid cooling to the rack, often combined. The table compares them against the conditions in this state.
| Method | How it rejects heat | Water use | Fit in Mississippi |
|---|---|---|---|
| Air-cooled chillers with integrated free cooling coils | Refrigerant condenser and fans; dry coil carries load in cool weather | Very low | Common for phased campuses; high summer head pressure means generous condenser sizing |
| Water-cooled chillers and cooling towers | Evaporation in open towers | High, with blowdown | Lowest compressor energy; needs a water source, treatment and any MDEQ permit for wells or surface intakes |
| Closed-loop dry coolers with trim chillers | Sensible heat to air through finned coils | Near zero after fill | Suits warm-water liquid cooling; glycol or drain-down protection for inland freezes |
| Adiabatic or hybrid coolers | Dry coils, with evaporative pre-cooling on the hottest hours | Seasonal | Trims peak afternoons; humid air limits the evaporative gain |
| Direct-to-chip liquid cooling | Cold plates to a CDU, then to the facility loop | Set by the facility plant | Raises loop temperature so the yard runs without compressors for more hours |
Data center cooling without water is a real design choice here, and the developer in Meridian has said its buildings use a closed loop cooling system with no continuous draw on municipal water. The trade is electricity: closed-loop plants run compressors more of the year in Mississippi’s humid heat. Water-cooled plants spend less electricity but need a reliable source, chemical treatment, and a plan for blowdown. Paul Industries prices both on the same load profile so the owner compares life-cycle cost as well as first cost.
Closed-loop plants, wells and Mississippi’s water use permits
Mississippi requires a water use permit before anyone who is not exempt begins using groundwater or surface water, under the Mississippi Department of Environmental Quality’s rule at 11 Miss. Admin. Code Part 7, Chapter 1. Wells with a surface casing diameter under six inches are exempt from that permit, so a campus planning a large-diameter well for tower makeup files with MDEQ’s Office of Land and Water Resources before drilling. Permits are normally issued for ten years, and MDEQ stopped charging fees for withdrawal permits on July 1, 2026.
That rule shapes the cooling decision early. A water-cooled plant on municipal supply depends on the city’s capacity and pricing; a plant on its own well depends on the permit and the aquifer; a closed-loop plant needs water only to fill and top up its loops. Paul Industries works through the makeup demand, blowdown volume and treatment chemistry for each option, and designs the water piping, softening and filtration that a tower plant needs. Treatment equipment for higher-purity fill water is covered on the ultrapure water systems in Mississippi page.
Power price, utility territory and the cooling budget
Electricity in Mississippi is priced below the national average for large users, which shapes how far a cooling plant should go to save energy. The U.S. Energy Information Administration reports Mississippi’s 2025 industrial average at 7.28 cents per kilowatt-hour against 8.51 nationally, and the commercial average at 13.20 cents against 13.37. Each 1,000 kilowatts of cooling load running all year uses 8.76 million kilowatt-hours, about $638,000 at the state industrial average.
Utility territory matters for schedule. Entergy Mississippi serves about 459,000 customers in 45 of the state’s 82 counties, including Madison, Hinds, Warren and DeSoto, and has been a member of the MISO regional transmission organization since December 2013; the Governor’s office cited Entergy Mississippi’s power commitment as a factor in Amazon’s expansion. Mississippi Power is supplying the Meridian campus. The date permanent power arrives sets when chillers can run under real load, so Paul Industries sequences the cooling plant against the utility energization date and plans temporary power or load banks for early testing.
Supply air, humidity and the ASHRAE envelope in Mississippi halls
Data center cooling requirements inside the hall come from ASHRAE’s thermal guidelines, which recommend server inlet air of 18 to 27 C (64.4 to 80.6 F) for most equipment classes, with a dew point limit that keeps moisture in check. The heat outside is only half the Mississippi problem; the other half is the moisture that comes in with ventilation air and through the building envelope. Outside air for a Mississippi hall is dried by a dedicated outdoor air unit before it reaches the white space, so the main cooling coils run sensible and stay dry.
Chilled water supply temperature follows from those limits. Coils serving a contained hot aisle at an 80 F return can run with 60 to 68 F water, which keeps the coils above the room dew point and opens more economizer hours. Pipe, valves and pump casings carrying chilled water need closed-cell insulation with a continuous vapor barrier, because a summer with a 71 F average dew point will find any gap. Paul Industries details insulation and supports together so the vapor barrier survives hanger penetrations.
Chillers, towers and vessels: what the state inspects
Mississippi’s boiler and pressure vessel rules, administered by the State Department of Health, require unfired pressure vessels installed in the state to be built and stamped to the ASME Boiler and Pressure Vessel Code. The manufacturer’s data report is filed with the Chief Inspector before the vessel operates, and vessels then receive a certificate inspection every two years. On a cooling plant that list can include chiller shells, expansion tanks, air and dirt separators and filter housings above the statutory size and pressure exemptions.
Paul Industries assembles data reports and nameplate records for each vessel as equipment arrives, so the registration step does not hold up startup. A data center cooling tower carries no pressure vessel paperwork, but its basin, fill and drift eliminators need access for cleaning and treatment, and a tower yard in Mississippi is laid out for Legionella control from day one. Fabricated tanks and separators for these plants are covered on pressure vessel fabrication in Mississippi.
Hurricane season and the Gulf Coast cooling yard
Hurricane season, which runs from June 1 to November 30, is a design condition for any cooling yard in Harrison, Hancock and Jackson counties and for inland sites that lose utility power when storms pass. Rooftop and yard equipment needs anchorage engineered for the site wind speed, and chillers on the coast need coil coatings and fasteners chosen for salt air.
Restart after an outage is the other half of storm planning. A chilled water plant loses its thermal inertia within minutes when pumps stop, so a hall that rides through a generator transfer needs pumps and controls on uninterruptible power and chillers with a fast restart sequence. Paul Industries designs storm shutdown and restart procedures into the plant, adds thermal storage where the owner wants more ride-through, and stores critical spare parts on the site.
Expanding cooling capacity while a Mississippi hall stays live
Adding cooling capacity to an operating Mississippi hall is done with hot taps, line stops and pre-installed valves, so the existing loop never drains and the servers never see a supply temperature change. The work is planned as a method of procedure: which pump runs, which valves close, where temporary cooling sits and how the change is reversed if a reading goes out of range.
Most expansions on the campuses described above are designed for this from the start, with capped branch connections and spare chiller pads. Older enterprise halls in Jackson and on the coast were built before that practice, so Paul Industries surveys the existing plant first, adds isolation valves during a planned low-load window, and then brings new chillers, air handlers or liquid cooling branches online in steps. The data center liquid cooling in Mississippi page covers the rack-level side of those upgrades.
Controls carry the risk in a live expansion. New chillers and pumps are added to the plant controller with their sequences tested on a simulator first, then commissioned one at a time with the existing equipment still in charge. Alarm points for the new equipment are mapped into the building management system and the owner’s monitoring platform before the equipment carries load, so operators see the new plant the same way they see the old one.
How much does data center cooling in Mississippi cost, and what moves the price?
The price of a data center cooling plant in Mississippi is set by the heat load and redundancy level, the heat rejection method, the piping distance between yard and hall, and whether the hall uses air, liquid or both. A water-cooled plant costs less to run but more to build and permit than a closed-loop plant of the same capacity; a liquid-cooled hall needs less airside equipment but more piping and CDUs. Schedule pressure, equipment lead times and the date of permanent power also move the number.
Paul Industries gives a budget range from a load profile and a site plan, then a firm price once the plant layout and redundancy level are fixed. Equipment can be supplied alone, with Paul Industries shipping chillers, pumps and prefabricated pipe skids to the site, or as a complete installation through startup and testing. Energy cost belongs in the comparison: at 7.28 cents per kilowatt-hour, a plant design that saves 0.1 kilowatt per ton across 5,000 tons of continuous load saves about $319,000 a year.
Who designs and installs data center cooling systems in Mississippi?
Paul Industries designs, supplies, installs, starts up and maintains data center cooling systems in Mississippi, from a single chiller replacement in a Jackson enterprise room to the full mechanical plant for a phased campus. Buyers comparing data center cooling companies look for one firm that can carry design, fabrication, installation, testing and service without gaps between them, and that is how Paul Industries delivers the work.
For the full mechanical scope on a new campus, including generator fuel piping, plumbing and fire protection interfaces, see data center mechanical contractor in Mississippi. Chiller service after turnover is covered on chiller repair in Mississippi. Owners with sites in more than one state can compare this page with data center cooling in Virginia, the headquarters state, and with data center cooling in Louisiana, where the same Gulf humidity applies.
Data center cooling systems in Mississippi from Paul Industries
Paul Industries provides data center cooling systems in Mississippi from design through service: heat rejection selection, chillers, dry coolers and towers, CRAH units and fan walls, chilled water and condenser water piping, coolant distribution for liquid-cooled racks, controls integration, flushing, testing and startup. Data center cooling technologies change fast, and the plants we build leave room for warmer water, denser racks and the next phase. The company was formerly based in northern New Jersey, then Pennsylvania, and today takes data center cooling work across Mississippi, in all 50 states and at plants outside the United States. The national overview is on data center cooling systems, and other Mississippi services are listed on the Mississippi page and the Southeast page. Send a load profile, site plan and target redundancy, and call 201-450-8280 or request a quote.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments (TC 9.9) · ASHRAE 90.4 · ASHRAE 15 · ASME Boiler and Pressure Vessel Code, Section VIII · ASME B31.9 Building Services Piping · Mississippi Boiler and Pressure Vessel Safety rules (Title 15, Part 10) · MDEQ water use permitting, 11 Miss. Admin. Code Pt. 7, Ch. 1 · NFPA 75
Frequently asked questions
Who builds cooling plants for data halls in Jackson, Madison and Ridgeland?
Paul Industries designs and installs cooling plants for data halls across the Jackson metro, including Madison County campuses near Canton and Ridgeland and enterprise rooms in Jackson and Flowood. Work ranges from chiller and air handler replacements to full yard plants with redundant pumps and controls. Send the load, redundancy level and existing plant drawings and Paul Industries scopes the job.
Does Paul Industries handle data center cooling around Meridian and Lauderdale County?
Paul Industries takes data center cooling work in Meridian and across east Mississippi, from closed-loop dry cooler plants to chilled water distribution and computer room air handlers. The developer of the Meridian campus has described a closed loop cooling system, and Paul Industries designs and installs that type of plant, including freeze protection for the roughly 48 nights a year Meridian reaches 32 F.
Who installs data center cooling on the Mississippi Gulf Coast?
Paul Industries installs and services data center cooling in Gulfport, Biloxi, Pascagoula and the rest of the coast. Coastal plants get coated condenser coils, stainless or coated fasteners and wind-rated anchorage, and each hall gets a written storm shutdown and restart plan. Gulfport averages about 2,749 cooling degree days a year, so chillers there carry a long season.
What data center cooling does a Southaven or DeSoto County hall need?
A hall in Southaven or elsewhere in DeSoto County needs a plant sized for the summers recorded at Memphis International Airport just to the north, about 72 days a year at 90 F or above in NOAA normals, freeze protection for winter, and, in a converted building, careful checks of roof and floor capacity before chillers and dry coolers are placed. Paul Industries surveys the structure, selects equipment for the load and builds the piping and controls.
How is data center cooling in Mississippi different from Louisiana or Tennessee?
Mississippi sits between the two climatically, with Gulf humidity in the south and more freeze nights in the north, and its water use rule requires an MDEQ permit before using water from wells with a casing of six inches or more. Utility territory also differs: Entergy Mississippi serves 45 counties and is a MISO member, while Mississippi Power is supplying the Meridian campus, which changes energization planning.
Can a Mississippi data center run a tower plant on well water?
A Mississippi campus can run a cooling tower plant on well water when the well is permitted by MDEQ, since wells with a surface casing of six inches or more need a water use permit before drilling. The water then needs analysis for hardness, iron and silica so the treatment program and cycles of concentration are set correctly. Paul Industries designs the makeup, softening and blowdown piping.
Is a closed-loop plant worth the extra electricity in Mississippi?
A closed-loop plant saves water and simplifies permitting, but in Mississippi’s humid summers its compressors run more hours than a tower plant’s. The decision turns on water availability and price, the electricity rate, and whether the hall uses warm-water liquid cooling. At the 2025 industrial average of 7.28 cents per kilowatt-hour, the energy penalty is smaller here than in many states.
How many free cooling hours does a Jackson data center get?
Free cooling hours in Jackson depend almost entirely on the loop temperature. A conventional 55 F chilled water loop gets limited economizer time because winter is short and nights stay warm much of the year. Raising supply water to the mid 60s, or running liquid-cooled racks on warm facility water, adds a large share of the year. Paul Industries models hours against NOAA data for the specific site.
What chilled water temperature should a new Mississippi hall use?
Most new Mississippi halls with contained aisles run chilled water supply between 60 and 68 F, which keeps coils dry, cuts chiller energy and lengthens economizer operation. Halls with liquid-cooled racks often split the plant, with warm water to the CDUs and cooler water to air handlers. The right value follows from the server inlet limit, coil selection and room dew point.
Are chiller shells and expansion tanks inspected by the state in Mississippi?
Pressure vessels on a Mississippi cooling plant fall under the State Department of Health’s boiler and pressure vessel rules unless the statute exempts them by size or pressure. Covered vessels are built and stamped to the ASME code, their data reports are filed with the Chief Inspector before operation, and they receive a certificate inspection every two years. Paul Industries collects those records during installation.
How does hurricane season change a Mississippi cooling yard design?
Coastal Mississippi cooling yards need anchorage designed for the site wind speed, corrosion-resistant coils and fasteners, raised electrical gear where flooding is possible, and a restart plan for generator power. Inland halls also see storm outages, so pumps and controls on uninterruptible power and fast-restart chillers are standard. Paul Industries builds those details into the plant before turnover.
Can cooling capacity be added to a running Mississippi data hall?
Cooling capacity is added to running Mississippi halls with hot taps, line stops, temporary cooling and a written method of procedure for each step. Pre-installed valves and capped branches make the work faster on newer campuses; older rooms get isolation valves first during a low-load window. Paul Industries plans and performs the tie-ins so the supply temperature to the servers holds steady.
Does Paul Industries supply chillers and skids for a Mississippi project without installing them?
Paul Industries supplies chillers, dry coolers, pumps, CDUs and prefabricated pipe skids for Mississippi projects as equipment-only orders, with submittals, factory test records and shipping coordinated to the site schedule. The same equipment is also offered with complete installation, startup and testing. Owners pick the route that fits their procurement plan.
What maintenance does a Mississippi data center cooling plant need?
A Mississippi cooling plant needs quarterly chiller inspections, annual condenser tube or coil cleaning before the summer peak, water treatment testing on open and closed loops, strainer and filter changes, valve exercising, and seasonal checks of freeze protection on inland sites. Refrigerant leak records follow the EPA leak repair rule. Paul Industries provides that work under a service agreement.
How long does it take to build a cooling plant for a Mississippi data center?
The schedule for a Mississippi data center cooling plant is usually set by chiller and switchgear lead times and the utility energization date rather than by installation labor. Prefabricated pipe racks and pump skids shorten field time, and phased campuses repeat a proven plant building after building. Paul Industries builds a schedule from the equipment list and the power date.
What does a cooling plant use in electricity at Mississippi rates?
Every 1,000 kilowatts of cooling plant load running all year uses about 8.76 million kilowatt-hours, roughly $638,000 at Mississippi’s 2025 industrial average of 7.28 cents per kilowatt-hour reported by EIA. Efficiency gains of a tenth of a kilowatt per ton across a large plant are worth hundreds of thousands of dollars a year, which justifies variable-speed drives and warmer water.
What data centers are in Mississippi today, and how are their halls cooled?
Mississippi’s announced campuses include Amazon’s existing and expanding operations in Madison County, its planned Vicksburg and Clinton projects, a Compass campus under construction in Meridian, and a project announced for Southaven. Developers describe chilled water and closed-loop designs, and enterprise rooms across the state still run on packaged computer room units. Paul Industries builds and services each type.
What should an owner send to price data center cooling in Mississippi?
Send the IT load by phase, the redundancy level, the share of liquid-cooled racks, a site plan with the yard location, the water source, and the utility and its energization date. For an existing hall, add the current plant drawings, equipment list and trend data. Paul Industries returns a budget range and then a firm price once the layout is set.
Planning a cooling plant for a Mississippi data hall?
Send the IT load by phase, redundancy level, site plan, water source and utility details. Call 201-450-8280 or request a quote.