Paul Industries designs, installs and tests data center liquid cooling in Massachusetts, from coolant distribution units and rack manifolds to the warm-water loops and dry coolers that reject the heat, for research computing, enterprise halls and colocation floors in Boston, Cambridge, Worcester, the Route 128 corridor and the Pioneer Valley. Paul Industries is an East Coast contractor headquartered at 256 Shore Drive in Kilmarnock, Virginia, and it takes liquid cooling work across Massachusetts and in all 50 states. New England weather makes warm-water cooling unusually efficient here, and high power prices make that efficiency worth money.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Dry cooler weather Boston at or below 80 F for 95% of hours (2021-2024)
Research hub MGHPCC, Holyoke: 15 MW utility connection, 10 MW for computing
Warm-water class ASHRAE W32: facility water up to 32 C (89.6 F)
Commercial power 23.10 cents/kWh in Massachusetts (EIA, 2025)
Reviewed November 2026

Data center liquid cooling in Massachusetts starts with research racks

Data center liquid cooling in Massachusetts started in university research computing, where dense processor and GPU nodes arrived years before most enterprise halls needed them. Harvard’s research computing group put the Cannon cluster, built on Lenovo servers with direct-to-node water cooling and about 30,000 processor cores, into production in 2019 at a shared research facility in Holyoke. Since then, GPU clusters for machine learning research have followed, and the same rack densities now reach biotech computing rooms in Cambridge and enterprise halls along Route 128.

Are data centers liquid cooled across the state today? Most Massachusetts halls still cool with air, using chilled water coils, CRAH galleries and containment. Liquid cooling enters when racks pass the point where air can carry the heat, and owners ask who provides liquid cooling for data centers that were designed for air. For liquid cooling, Massachusetts adds a practical advantage: cool air for most of the year lets warm-water loops reject heat through dry coolers without running chillers. The national data center liquid cooling page explains CDUs, cold plates and loop design; this page covers what changes in Massachusetts.

What is the Massachusetts Green High Performance Computing Center (MGHPCC)?

The Massachusetts Green High Performance Computing Center (MGHPCC) is a shared research data center at 100 Bigelow Street in Holyoke, completed in November 2012 and run for Boston University, Harvard, MIT, Northeastern, the University of Massachusetts system and Yale. The MGHPCC data center has a 15 megawatt utility connection from Holyoke Gas and Electric, about 70 percent of it sourced from hydroelectric plants on the Connecticut River, and 10 megawatts of that capacity is dedicated to computing, according to MIT’s description of the facility.

The MGHPCC, Holyoke’s best-known computing site, was designed around hot-aisle containment with in-row cooling, holding room air around 70 to 75 degrees, and it uses outside air for about eight months of the year, with chillers in the warmer months, according to reporting by WBUR in 2026. The facility reports using 20,000 to 30,000 gallons of water a day. It earned LEED Platinum, and denser clusters inside it, including the water-cooled Cannon cluster, show how liquid-cooled racks sit beside air-cooled rows in one building.

Growth continues inside the existing walls. Harvard’s Kempner Institute added 384 H100 GPUs in 2023 and now runs more than 1,100 GPUs at the center. In May 2025 the state announced a $31 million grant to the center for a shared GPU cluster of 1,500 to 2,000 GPUs, the first phase of a planned $120 million public and private investment under the state’s artificial intelligence hub program, and in December 2025 an integrator was selected to build it. Each new MGHPCC cluster raises rack density and the share of heat that must leave by liquid.

Holyoke research computing in figures (public sources, 2019 to 2026)
ItemFigureWhat it means for liquid cooling
Utility connection15 MW, about 10 MW for computingPower is fixed, so growth comes from denser racks rather than more floor
Power sourceHolyoke Gas and Electric, about 70% hydroLow-carbon power rewards keeping pump and fan energy low
Room air designHot-aisle containment with in-row coolingLiquid-cooled racks must coexist with an air-cooled design
Outside-air coolingAbout eight months a yearThe climate supports warm-water loops with little chiller time
Cannon cluster (2019)About 30,000 cores, direct-to-node water coolingA working precedent for water at the server in Massachusetts
State-funded GPU cluster$31 million grant, 1,500 to 2,000 GPUs plannedGPU densities push heat beyond what room air can carry

The Holyoke data center ban and what it leaves room for

The Holyoke data center ban, a zoning amendment the city council passed 9 to 4 on June 16, 2026, bars new data centers citywide while keeping the existing research center as a permitted use. Reporting tied the vote to a proposed 20 megawatt facility on Water Street, which the ban stopped, and placed the research center’s permitted grid draw at 12 megawatts. Anyone searching for a new data center in Holyoke, MA now faces a closed door; the computing that grows there will grow inside the existing building.

That pattern repeats across the state. Lowell, Westfield and other towns limited new projects in 2026, so dense computing in Massachusetts tends to arrive by densifying rooms that already exist. Liquid cooling is the tool for that: it moves more heat per rack and per square foot than air, and it can share a building’s existing power and heat rejection if the facility water side is planned well. The wider market and the state rules are covered on the data center cooling in Massachusetts page.

Dry cooler hours at Boston, Worcester and Chicopee

Dry coolers in Massachusetts can carry a warm-water liquid cooling loop with no chiller for 90 percent or more of the year, because outdoor air is cooler than a W32 facility water supply almost all the time. Paul Industries computed the share of hours at or below several dry bulb temperatures from four years of hourly airport observations (2021 to 2024). Facility water can typically be produced a set number of degrees above the outdoor dry bulb, the cooler’s approach, so the relevant column depends on the target supply temperature and the selected approach.

Share of hours at or below each dry bulb temperature, 2021 to 2024 (NWS ASOS observations, Paul Industries analysis)
Dry bulbBoston (BOS)Worcester (ORH)Chicopee (CEF)
At or below 70 F80.7%85.0%81.2%
At or below 75 F89.7%92.7%89.2%
At or below 80 F95.2%97.1%94.5%
At or below 85 F98.2%99.2%97.9%
Hours per year above 80 F418254473
Lowest hourly reading-9 F-13 F-10.5 F

ASHRAE’s liquid cooling classes set the upper facility water temperature a server is built to accept: W17 (17 degrees C, 62.6 F), W27 (80.6 F), W32 (89.6 F), W40 (104 F), W45 (113 F) and W+ above that. A W32 loop with a dry cooler approach of about 10 degrees F can run on dry coolers alone whenever outdoor air is at or below about 80 F, roughly 95 percent of Boston hours and 97 percent of Worcester hours. A W27 loop at the same approach needs air at or below about 70 F, still more than 80 percent of hours. The remaining warm afternoons are covered by a trim chiller, an adiabatic assist or a tie-in to the building’s chilled water.

How does data center liquid cooling work in a Massachusetts winter?

Data center liquid cooling in a Massachusetts winter works by keeping the rack-side loop sealed indoors and letting only the facility water or glycol loop meet the cold. The technology cooling system, the loop between the CDU and the cold plates, carries treated water or a premixed propylene glycol solution at a stable temperature. A plate exchanger in the CDU passes the heat to the facility water loop, and that loop runs out to dry coolers on the roof or in a yard.

Outdoor coils see the cold. With hourly lows of -9 F in Boston and -13 F in Worcester in the 2021 to 2024 record, the outdoor loop carries glycol at a strength chosen for the record low and for whether freeze or only burst protection is needed. A plate exchanger between the outdoor glycol and an indoor water loop keeps glycol out of the building, which helps heat transfer and simplifies leak response. Controls hold facility water above the dew point of the white space, so cold winter water never condenses on manifolds when someone opens a door.

Liquid cooling in Cambridge and Boston lab and office buildings

Liquid cooling in Cambridge usually means fitting dense racks into a building designed for laboratories or offices, not for a data hall. Computing rooms for biotech, research and finance occupy a floor or part of one, with structural capacity, riser space and ceiling height set long before liquid cooling existed. Data center liquid cooling in Boston faces the same limits in converted commercial buildings, plus crane and street access for any rooftop equipment.

Three routes fit these buildings. Rear-door heat exchangers attach to existing racks and use the building’s chilled water through a CDU, which suits rooms that need moderate density gains. Direct to chip cooling in Massachusetts lab buildings uses in-row or in-rack CDUs fed from building chilled water or a dedicated warm-water loop. Immersion tanks are heavy and suit ground floors with floor loading to match. The data center liquid cooling options are compared below for Massachusetts building types.

Liquid cooling methods for Massachusetts building types
MethodFacility water sourceBuilding demandsBest Massachusetts fit
Rear-door heat exchangerBuilding chilled water through a CDULight; door weight on existing racks, piping to each rackCambridge and Boston rooms adding density in place
Direct-to-chip, in-row CDUBuilding chilled water or a warm-water loopFloor space for CDUs, overhead or underfloor manifoldsRoute 128 enterprise halls, university rooms
Direct-to-chip, facility CDU with dry coolersDedicated warm-water loopRoof or yard space for dry coolers, a mechanical room for CDUsI-495 halls and Pioneer Valley research space
Single-phase immersionWarm-water loop through a tank exchangerHigh floor loading, fluid handling and containmentGround-floor rooms in converted industrial buildings

Tying a liquid-cooled row into an existing Massachusetts plant

A liquid-cooled row in an existing Massachusetts hall usually draws on the building’s chilled water plant first, because that plant is already there. The CDU’s primary side connects to the chilled water main through isolation valves and a strainer, and the CDU’s exchanger raises the rack-side supply to the temperature the servers want. The drawback is efficiency: making 45 degree water to cool racks that accept 80 or 89 degree water wastes chiller energy at 23.10 cents per kilowatt-hour, Massachusetts’ 2025 average commercial rate.

A better long-term layout separates the loops. Liquid cooling data center design for a growing Massachusetts room often starts with a branch from building chilled water, then adds a dedicated warm-water loop and dry coolers as the liquid load grows, moving the CDUs over without disturbing the racks. Paul Industries designs the first phase with valved connections and space reserved for that second step, so the move does not need a shutdown.

Leak detection, water quality and testing before racks connect

Leak detection for a Massachusetts liquid cooling installation starts with fewer joints: shop-prefabricated manifolds and headers, pressure-tested before delivery, cut the number of field connections in a live room. Sensing cable runs under manifolds and CDUs, drip trays sit under quick disconnects, and CDU controls close isolation valves when pressure or flow changes outside set limits. Rack-side coolant is filled from a premixed supply or treated water, filtered, sampled and logged before the first server connects.

Coolant care continues after turnover. Rack-side coolant is sampled on a schedule for conductivity, pH, inhibitor level, particulates and biological growth, and the results are trended so a slow change is caught before it fouls cold plates. Filters are checked by pressure drop, and makeup volume is logged, because a loop that keeps taking water has a leak somewhere even if no sensor has tripped. Paul Industries sets up that sampling and logging plan with the operations team as part of every installation, and can carry it out under a service agreement.

Before the first liquid-cooled rack arrives, a Massachusetts owner should settle five questions: which facility water class the servers require, where the CDUs will sit, how the loop will reject heat on the hottest afternoon of the year, how pumps ride through a power transfer, and who on the operations team will own coolant sampling. Answering them early keeps hardware delivery from setting the design by default.

Testing follows a fixed order: pressure test each section, flush to a clean, documented finish, fill and vent, run the CDUs on bypass, then bring racks online in groups while watching temperatures and flows. The data center commissioning in Massachusetts page covers how these tests fit the state’s inspection and turnover steps.

Heat reuse from warm-water loops in a Massachusetts climate

Heat reuse is more attractive in Massachusetts than in warmer states because buildings here need heat for much of the year: outdoor air was at or below 50 F in about 45 percent of Boston hours and 48 percent of Worcester hours in 2021 to 2024. A warm-water loop leaving the racks at 100 F or more can preheat ventilation air, feed a heat pump that lifts it to building heating temperatures, or warm domestic water in an adjacent lab or office.

The engineering questions are simple to state. Is there a heat user close enough to justify the piping? Does the user need heat when the racks produce it, which for constant IT load is always? Can the heat pump or exchanger be isolated so a heating problem never limits cooling? Paul Industries designs reuse connections with a full-capacity dry cooler path, so the data center keeps cooling even when the heating side is shut down for service.

Where the CDUs go in a Massachusetts room

CDU placement in a Massachusetts computing room is decided by floor space, the route to facility water and how much redundancy the racks need. Facility-scale CDUs in a mechanical room serve many rows through large headers and keep pumps and exchangers out of the white space, which suits halls with a dedicated mechanical gallery. In-row CDUs sit at the end of a row or between racks and fit rooms where mechanical space is scarce, as in many Cambridge and Boston buildings. Rack-level units suit a handful of dense racks in an otherwise air-cooled room.

Redundancy follows the hardware. A GPU rack that throttles within seconds of losing flow needs either two CDUs on a common header, so one can carry the load, or a CDU with redundant pumps and exchangers. Headers are looped where space allows so a valve or section can be isolated without starving a row. Paul Industries lays out headers, isolation valves and future taps together, so adding a CDU later means opening two valves rather than cutting live pipe.

Keeping coolant moving through a utility event

Coolant flow through a utility event matters more for liquid-cooled racks than for air-cooled ones, because a cold plate holds little thermal mass and a processor can reach its limit soon after flow stops. CDU pumps should be on the same protected power as the servers they cool, and controls should restart pumps automatically and in sequence after any transfer. The facility water side needs the same attention: dry cooler fans and facility pumps must come back on generator power, or a buffer volume must carry the loop until they do.

Massachusetts adds a policy angle. The state’s 2026 framework asks data center developers to use alternatives to diesel backup where they can, and new generator capacity is harder to permit in several cities. Warm-water loops help here: a dry cooler loop with no chiller to restart recovers faster after a transfer than a chilled water plant, and a modest buffer tank can bridge the gap. Paul Industries tests pump restart, valve positions and alarm response as part of turnover.

Phasing a liquid cooling program as rack counts grow

Phasing a liquid cooling program lets a Massachusetts owner spend on infrastructure as racks arrive rather than all at once, provided the first phase leaves room for the later ones. The sequence below is typical for an existing air-cooled room growing into liquid cooling over several hardware refreshes.

A typical phased path from air cooling to a warm-water loop in an existing Massachusetts room
PhaseRacks servedFacility water sourceWork that protects later phases
1. First dense racksA few racks, rear-door or in-row CDUsBuilding chilled waterValved taps on the chilled water main, header sized for the next phase
2. Liquid-cooled rowsOne or more rows, direct-to-chipBuilding chilled water through larger CDUsSpace and structure reserved for dry coolers, a tie-in point for a warm-water loop
3. Dedicated warm-water loopAll liquid-cooled rowsDry coolers with trim cooling for hot afternoonsCDUs moved to the new loop one at a time, chilled water kept as backup
4. Heat reuse and expansionNew rows added on spare headersWarm-water loop with a heat recovery branchIsolation so heating demand never limits cooling

Each phase ends with pressure testing, flushing and documented startup of the new section before racks connect, and the records carry forward so the owner has one set of drawings for the whole system.

What drives data center liquid cooling cost in Massachusetts?

Data center liquid cooling cost in Massachusetts is driven by the number of racks and CDUs, the piping route from the mechanical room to each row, the facility water source (building chilled water, a new warm-water loop or dry coolers), structural and crane work for outdoor equipment, leak detection, and the phasing needed to work around live equipment. Operating cost adds pump energy: 20 kilowatts of CDU pump power running all year uses 175,200 kilowatt-hours, about $40,471 at the 2025 Massachusetts average commercial rate.

Paul Industries gives a budget range from comparable scope once it has the rack count, densities and building drawings, then a firm price when the design is set. Owners can buy CDUs, manifolds, dry coolers and pump skids supply-only, choose design-build for the whole liquid cooling system, or take complete installation of an engineer’s design with testing and turnover.

Who installs and tests data center liquid cooling in Massachusetts?

Paul Industries installs and tests data center liquid cooling in Massachusetts, covering design, CDU and dry cooler supply, prefabricated manifolds and headers, piping installation, leak detection, flushing, filling, testing and ongoing service. The firm brings the methods described on its data center liquid cooling in Virginia page for its headquarters state and its data center liquid cooling in New York page to Massachusetts rooms, adjusted for New England weather and the state’s limits on new campuses.

Related Massachusetts work includes data center mechanical contractors in Massachusetts for the wider mechanical scope, process piping in Massachusetts for headers and mains, and industrial welding services in Massachusetts for stainless and carbon steel joints. For closed loops in general, see closed loop cooling systems; for research facilities, see research labs and universities.

Liquid cooling from Paul Industries for Massachusetts rooms

Paul Industries provides data center liquid cooling services across Boston, Cambridge, Route 128, the I-495 belt, Worcester, Lowell and the Pioneer Valley, including Holyoke and Springfield. It designs, supplies, fabricates, installs, tests and maintains data center liquid cooling systems, from a first row of rear-door exchangers to a facility-wide warm-water loop with dry coolers. More on work across the state is on the Massachusetts page and across the region on the New England page. Send rack counts, densities and drawings, then request a quote.

Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments, 5th edition (W17 to W+ classes) · ASHRAE 90.4 · ASME B31.9 · ASME B31.3 · OCP Advanced Cooling Solutions guidance for TCS loops · 780 CMR Massachusetts State Building Code, 10th edition

Frequently asked questions

Who installs liquid cooling for computing rooms in Cambridge and Kendall Square?

Paul Industries installs CDUs, rear-door exchangers, manifolds and the facility water connections for computing rooms in Cambridge lab and office buildings. Work in Kendall Square buildings is planned around riser space, floor loading and the tenant’s lab operations, with prefabricated piping to keep field joints and hot work to a minimum. Call 201-450-8280 to review a room.

Does Paul Industries handle data center liquid cooling in Worcester and Central Massachusetts?

Paul Industries takes data center liquid cooling in Worcester and across Central Massachusetts, where higher elevation gives the coolest summers of the three Massachusetts airport records reviewed here: outdoor air was at or below 80 F for about 97 percent of hours in 2021 to 2024. That favors dry coolers for warm-water loops, while hourly lows near -13 F call for careful glycol and freeze protection on outdoor equipment.

Can Paul Industries pipe liquid-cooled racks in Holyoke, Springfield and the Pioneer Valley?

Paul Industries takes liquid cooling work in Holyoke, Springfield, Chicopee and the rest of the Pioneer Valley, mostly inside existing buildings since several valley cities restricted new data centers in 2026. Dense racks in existing research and enterprise rooms are the typical scope, with CDUs, rack manifolds and connections to the building’s chilled water or a new dry cooler loop.

Who handles data center liquid cooling on Route 128 in Waltham, Burlington and Lexington?

Paul Industries handles liquid cooling for enterprise and colocation halls along Route 128. Many of these halls sit in office or flex buildings with an existing chilled water plant, so the first phase often feeds in-row CDUs from that plant, with valved connections reserved for a dedicated warm-water loop and dry coolers when the liquid load grows.

What is the MGHPCC cluster arrangement, and who uses the Holyoke center?

The center in Holyoke is shared by Boston University, Harvard, MIT, Northeastern, the University of Massachusetts system and Yale, each running its own clusters in the common building. Examples include Harvard’s water-cooled Cannon cluster and the Kempner Institute’s GPU cluster. A state-funded shared GPU cluster of 1,500 to 2,000 GPUs was announced in 2025.

Is there high performance computing in Massachusetts outside Holyoke?

High performance computing in Massachusetts also runs in university buildings in Boston and Cambridge, in biotech and finance computing rooms, and in colocation halls in Boston, Lowell and along Route 128 and I-495. Many of these rooms were built for air cooling and are adding liquid-cooled racks as densities rise, which is where most Massachusetts liquid cooling work now happens.

What facility water temperature suits a Massachusetts liquid cooling loop?

Many current GPU platforms accept facility water in the W27 to W32 range (up to 80.6 or 89.6 F), and Massachusetts weather lets dry coolers deliver W32 water for roughly 95 percent of Boston hours at a 10 degree approach. The server vendor’s class and warranty conditions set the limit. Paul Industries designs the loop for the class the owner’s hardware requires and leaves margin for the next generation.

Does a Massachusetts liquid cooling loop need glycol?

The outdoor loop to dry coolers needs glycol, because Massachusetts sees sub-zero hours most winters. The rack-side loop does not see outdoor air and usually runs treated water or a premixed propylene glycol coolant chosen by the server vendor. A plate exchanger between the outdoor glycol and the indoor water keeps the building side simpler and improves heat transfer.

Can liquid cooling run from a building's existing chilled water plant?

Many Massachusetts rooms start that way: the CDU’s primary side connects to the chilled water main and the CDU exchanger delivers warmer water to the racks. It works, but making cold water for racks that accept warm water costs chiller energy at high Massachusetts power prices. A later dedicated warm-water loop with dry coolers recovers that energy, and Paul Industries plans the first phase so the change needs no shutdown.

How is leak risk managed when liquid cooling enters a live Boston hall?

Leak risk is managed by design and by testing. Prefabricated, pressure-tested manifolds reduce field joints; drip trays and sensing cable sit under connections; CDUs close isolation valves on abnormal pressure or flow; and each section is pressure tested, flushed and filled before servers connect. Work in a live hall proceeds row by row with isolation points so a problem stays confined to one row.

How much does data center liquid cooling cost to run in Massachusetts?

Running cost is mostly pump energy plus any chiller energy on warm days. As a reference, 20 kilowatts of CDU pumps running all year uses 175,200 kilowatt-hours, about $40,471 at Massachusetts’ 2025 average commercial rate of 23.10 cents. Warm-water loops on dry coolers avoid most chiller energy, which is usually the larger saving in this climate.

Can rack heat be reused to heat Massachusetts buildings?

Rack heat can preheat ventilation air, feed heat pumps or warm domestic water, and Massachusetts buildings need heat for a large share of the year. Reuse works best when a heat user sits close to the computing room and the heating connection is isolated so it never limits cooling. Paul Industries designs reuse with a full-capacity dry cooler path as the fallback.

Does the Holyoke ban affect liquid cooling in existing buildings?

The 2026 Holyoke zoning amendment bars new data centers but kept the existing research center as a permitted use, and reporting put its permitted grid draw at 12 megawatts. Densifying existing equipment within existing limits is a different question from building a new facility, though each change should be checked against the ordinance and any permit conditions before work starts.

What changes when liquid cooling goes into a converted mill or industrial building?

Converted mills and industrial buildings, common in Lowell, Holyoke and the Merrimack Valley, often have strong floors and high ceilings that suit immersion tanks and overhead manifolds, but older structures may need new supports, fire separation and penetrations through heavy masonry. Paul Industries surveys the structure, utility capacity and routes for piping before choosing between direct-to-chip and immersion.

How long does a liquid cooling retrofit take in a Massachusetts room?

Duration depends on scope: adding rear-door exchangers to a few racks can take weeks, while a facility-wide warm-water loop with dry coolers, rooftop structure and crane picks takes months, set largely by equipment lead times and permit review. Prefabricating manifolds while equipment is on order shortens field time. Paul Industries builds the schedule around the owner’s hardware delivery dates.

Can Massachusetts owners buy CDUs and manifolds without an installation contract?

Paul Industries supplies CDUs, dry coolers, pump skids, prefabricated manifolds and headers on a supply-only basis, with fabrication drawings and test records. Owners can also choose design-build for the complete liquid cooling system or complete installation of an engineer’s design. Many start with supply of long-lead CDUs and add installation once the room design is settled.

What records does a Massachusetts owner receive after a liquid cooling installation?

Records include pressure test reports by section, flushing and cleanliness results, fill water or coolant analysis, CDU startup sheets, alarm and isolation valve test results, as-built piping drawings with valve tags, and the operating setpoints. Those records support server warranty conditions and give the operations team a baseline for coolant sampling and trending.

What should be sent to scope liquid cooling for a Massachusetts data hall?

Send the rack count and densities by phase, the server platforms and their facility water class, drawings of the room and mechanical spaces, the existing chilled water plant capacity and temperatures, roof or yard space for dry coolers, and the target date for the first racks. Paul Industries then gives a budget range and a phased plan.

Bringing liquid-cooled racks into a Massachusetts room?

Send rack counts and densities by phase, the server platforms and their water class, and drawings of the room and existing plant. Call 201-450-8280 or request a quote.