Paul Industries designs, installs, flushes, tests and services data center liquid cooling in Vermont: coolant distribution units, cold plate and rear door loops, facility water piping, dry coolers and the heat recovery that turns rack heat into building heat. Vermont’s weather lets a warm-water loop reject its heat through dry coolers for more than nine hours in ten, while months of heating demand in the buildings around the racks put that heat to work. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries builds liquid loops throughout Vermont and the other 49 states, and abroad through its international projects.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Dry cooler hours, W32 loop 94% of Burlington hours, 98% of Newport hours (2021-2025)
Heating season 6,493 heating degree days in Burlington, 7,705 in Newport (2021-2025)
Outdoor loop low -23.4 F at Newport; 376 straight hours at or below freezing
Research computing UVM IceCore cluster: 104 NVIDIA H200 GPUs
Reviewed November 2026

How data center liquid cooling in Vermont differs from a southern site

Data center liquid cooling in Vermont differs from a southern site in three ways: the outdoor air is cold enough to cool a warm-water loop with fans alone almost all year, the same cold can freeze any outdoor water that stops moving, and the buildings around the racks need heat for more than half the year. A Virginia or Carolina loop is designed mainly to reject heat; a Vermont loop is designed to reject it cheaply, survive weeks below freezing and, where the host building allows, sell it back as heating.

The general case for cold plates, rear door heat exchangers and immersion is made on the data center liquid cooling page. This page applies it to Vermont: which loop temperatures run chiller-free at six Vermont airports, how glycol and drain-down protect the outdoor side, what humidity does to a cold plate in July, how much heat a liquid-cooled row puts into a Vermont heating season, and what the state’s boiler and plumbing rules ask of a heat recovery loop.

Which Vermont rooms are adding dense racks?

Dense racks in Vermont run mostly inside institutions and companies rather than in large commercial halls: university research clusters, hospital imaging and records systems, engineering and design workstations at manufacturers, and a handful of colocation rooms around Chittenden County. A well-documented example is research computing at the University of Vermont, whose Vermont Advanced Computing Center lists an IceCore GPU cluster of 31 nodes carrying 104 NVIDIA H200 and 48 RTX Pro 6000 GPUs, alongside a BlueMoon CPU cluster of 88 nodes and 12,584 cores.

Rooms like these usually reach liquid cooling one row at a time. The first step is often a rear door heat exchanger on the building’s existing chilled water, the second a coolant distribution unit feeding cold plates, and the third a dedicated warm-water loop with its own dry coolers once enough racks have converted. Paul Industries plans the first row so the later steps connect without rework, with headers, valves and space left for the CDUs and dry coolers to come.

Liquid cooling options for Vermont computer rooms
OptionTypical Vermont fitFacility water it needsWhat Paul Industries builds
Rear door heat exchangersHospital and enterprise rooms adding a few hot racksBuilding chilled water, often 55 F to 65 FBranch piping, isolation valves, flexible connections, condensate and leak detection
CDU with cold platesResearch clusters and GPU rows in Burlington and the Upper ValleyWarm facility water, W27 to W40 classesCDU setting and piping, secondary loop, filtration, fill and treatment, controls
Dedicated warm-water loop on dry coolersRooms with a full row or more of liquid-cooled racksW32 or warmer, rejected outdoors without chillers most of the yearDry coolers, glycol loop, plate exchanger, pumps, freeze controls
Immersion tanksConverted industrial and warehouse spaceWarm facility water through the tank exchangerTank supply and return piping, exchangers, dielectric fluid handling, containment

Dry cooler data center loops from Burlington to the Northeast Kingdom

A dry cooler data center loop in Vermont runs without chillers whenever the outdoor dry bulb sits far enough below the loop’s supply temperature, and the table below shows how often that happened at six airports from 2021 through 2025. Each column assumes a dry cooler approach of about 10 F, so a W32 loop supplied at 89.6 F needs outdoor air at or below 79.6 F.

Share of hours a dry cooler alone could carry each ASHRAE water class, 2021 to 2025
StationW17, air at or below 52.6 FW27, air at or below 70.6 FW32, air at or below 79.6 FW40, air at or below 94 FHours per year above the W32 limit
Burlington52.8%82.3%94.4%99.96%487
Barre-Montpelier58.6%88.3%97.0%100%267
Rutland54.4%86.2%96.6%100%301
Springfield57.4%85.9%95.2%99.97%421
Bennington55.4%85.5%96.2%100%333
Newport59.5%89.6%97.6%100%210

The pattern is clear. A W40 loop never needed a chiller at four of the six stations and needed one for a handful of hours a year in Burlington and Springfield, where the hottest hour reached 98 F and 97 F. A W32 loop needs mechanical help for roughly 200 to 500 hours a year, which an adiabatic assist or a small trim chiller covers. A W17 loop, cold enough for many older air-to-liquid designs, still needs a chiller for close to half the year, which is why Paul Industries steers Vermont owners toward the warmest water class their server vendor supports.

Adiabatic dry cooler data center upgrades for the hot hours

An adiabatic dry cooler data center loop wets pads or sprays the inlet air on the hottest afternoons, cooling the air toward its wet bulb before it reaches the coil. In Vermont the summer wet bulb design point sits between about 73 F and 75 F, well below the 90 F dry bulb peaks in Burlington and Springfield, so a short burst of water use lets a W32 loop stay chiller-free through the few hundred hot hours. The pads and spray lines are drained and isolated before the first frost, and Paul Industries builds that seasonal routine into the controls and the maintenance plan.

Dry cooler vs chiller: what the trade is worth on Vermont power

The dry cooler vs chiller trade on a Vermont liquid loop comes down to compressor energy, and Vermont prices make it large. Assume 400 kilowatts of liquid-cooled racks served through chillers at 0.6 kW per ton around the clock: that is about 68 kilowatts of compressor power, or about 597,800 kWh a year, costing about $124,757 at the 20.87-cent average Vermont commercial rate for 2026 and about $77,114 at the industrial average of 12.90 cents, according to EIA figures for January through August 2026.

A dry cooler loop carrying the same racks spends its energy on pumps and fans instead. If those draw about 20 kilowatts continuously, the loop uses about 175,200 kWh, or about $36,564 a year at the commercial price. The difference, roughly $88,000 a year on commercial power under those assumptions, is the budget that pays for larger dry coolers, warmer-rated servers and the controls to run them. Paul Industries rebuilds the comparison on the owner’s own load, tariff and equipment selections before anything is purchased.

Keeping the outdoor loop liquid at minus 23 F

Freeze protection on a Vermont liquid loop starts from the station record: the coldest hour in the 2021 to 2025 readings was minus 15 F in Burlington, minus 18 F in Barre-Montpelier, Springfield and Bennington, minus 20.9 F in Rutland and minus 23.4 F in Newport, where temperatures stayed at or below freezing for 376 hours straight. Any outdoor coil, pipe or valve that holds water through those stretches is protected by glycol, by drain-down, or by design that keeps it out of the cold.

Paul Industries usually separates the loops. The outdoor dry cooler circuit runs propylene glycol at a strength set to the site’s coldest hour, and a plate heat exchanger transfers heat to a water-only secondary that feeds the CDUs, so the racks never see glycol and the pumps inside never carry its viscosity penalty. Propylene glycol at about 40 percent by volume freezes near minus 8 F, which is warmer than every Vermont station’s coldest hour, so outdoor circuits here usually run near 50 percent, which freezes near minus 29 F. Heat tracing and insulation cover exposed piping, and controls hold a minimum flow through the coils so glycol never sits still in subzero wind.

A winter power outage is the real test. When the utility feeder drops, pumps on UPS keep the outdoor loop moving until generators pick up, and if the room itself goes dark, the controls close the outdoor isolation valves and the indoor water stays warm inside the building. Paul Industries proves that sequence with a pull-the-plug test in cold weather before turnover.

Condensation on cold plates in a Vermont July

Condensation on cold plates and manifolds is a summer risk in Vermont, because the July mean dew point ran between 59.5 F and 62.6 F at the six stations, and Rutland, Bennington and Burlington each logged 150 or more hours a year with a dew point at or above 70 F. Facility water supplied colder than the room’s dew point will sweat on any surface it touches, and water on server boards is the failure liquid cooling is meant to avoid.

The practical answer is to keep secondary loop supply above the room’s dew point with margin, which warm-water classes do naturally, and to control room humidity so the dew point stays within the ASHRAE range. Where a rear door or an older CDU must run colder, Paul Industries insulates supply piping and manifolds, adds dew point sensors at the racks, and programs the CDU to reset its supply temperature upward when room dew point rises.

Can data center waste heat recovery pay in a Vermont heating season?

Data center waste heat recovery pays best where the heat has a long season of use, and Vermont has one: the 2021 to 2025 hourly record works out to about 6,493 heating degree days a year in Burlington and 7,705 in Newport, with monthly mean temperatures below 50 F from November through April in Burlington and from October through April in Newport. Every kilowatt of IT load becomes about 3,412 Btu per hour of heat, so a 400-kilowatt liquid-cooled row produces about 1.36 million Btu per hour all year.

How much heat does a data center produce for a host building, then? Close to all of its electrical load, every hour, which for a Vermont hospital, college or plant means a steady heat source running beside a heating demand that lasts half the year or more. The obstacle is temperature, not quantity, and that is where liquid cooling changes the picture.

What data center waste heat temperature does each loop class deliver?

Data center waste heat temperature follows the loop class: air-cooled rooms return water too cool to heat a building directly, while warm-water cold plate loops return water warm enough for low-temperature uses without a heat pump. The ranges below are typical design values; the actual return temperature depends on the rack flow rate and temperature rise the server vendor specifies.

Typical loop return temperatures and Vermont heat reuse options
SourceTypical return waterDirect uses in a Vermont buildingWith a water-to-water heat pump
Air-cooled room, chilled water plant55 F to 65 FVentilation air preheat in deep winterSpace heating and domestic hot water preheat
Rear door heat exchangers65 F to 75 FVentilation preheat, snow melt slabsHydronic heating at moderate temperatures
W32 cold plate loopAbout 95 F to 105 FRadiant floors, ventilation preheat, greenhouse bedsHot water heating loops and domestic water preheat
W40 and W45 cold plate loopsAbout 110 F to 125 FLow-temperature hydronic heating, radiant systemsHigher-temperature heating mains in older buildings

Data center waste heat reuse works best when the heat user sits in the same building or on the same campus, the user’s loop runs at low temperature, and the heat has a backup for the day the racks are idle. A data center heat recovery system on a Vermont campus therefore typically includes a plate exchanger or heat pump on the rack loop, a buffer tank, controls that give the racks priority over the heating load, and the existing boilers kept as the backup. Paul Industries designs that system, prices it as an option beside the base cooling plant, and installs it with metering so the owner can see the fuel it displaces.

Boiler and pressure vessel rules on a Vermont heat recovery loop

The 2025 Vermont Fire and Building Safety Code, in force since November 4, 2025, brings parts of a heat recovery loop under its boiler and pressure vessel section. An electric boiler added to back up recovered heat counts as a boiler, since the code covers water heated by electricity as well as by fuel, and it is inspected by a commissioned inspector before being placed in service, then externally every two years if it is a low-pressure hot water heating boiler. An unfired pressure vessel is one pressurized from an outside source above 15 psi, and vessels larger than 5 cubic feet with a relieving pressure above 125 psi are inspected every three years. The code treats buffer tanks as a component of piping, and all regulated equipment is built to the ASME code and installed to the National Board Inspection Code, both in their 2021 editions. Paul Industries designs the loop, supplies vessels with their code paperwork, and schedules the inspection the code requires before startup; deeper boiler work is covered under boiler repair in Vermont.

Leak sensors, water treatment and the fall glycol check

Leak detection and coolant care decide whether a liquid-cooled room stays trouble-free after the first year, and Vermont adds a seasonal twist: the outdoor glycol strength drifts as makeup water is added, and an under-strength loop is found out on the first subzero night. Paul Industries installs rope or spot leak sensors under CDUs, manifolds and rack connections, drip trays where piping crosses over equipment, and automatic isolation valves that close a branch when a sensor trips. The indoor water loop gets a treatment program matched to the wetted materials, with filtration sized to the cold plate vendor’s limit and quarterly sampling for conductivity, pH, inhibitor level and bacteria. The outdoor loop is tested for glycol concentration and inhibitor every fall before the first freeze and topped up with premixed fluid, never plain water. Those checks go into a written maintenance plan the owner keeps, and Paul Industries performs them under a service agreement where the owner prefers.

Data center cooling without water: the Vermont case

Data center cooling without water at the heat rejection plant is practical in Vermont because the climate lets dry coolers carry a warm-water loop for nearly all hours, and waterless data center cooling answers a question several Vermont towns and the vetoed 2026 statewide bill both raised. A closed dry cooler loop uses no makeup water and produces no blowdown, so there is no draw on a town water system or a stream, and no treated discharge to permit.

Warm water cooling for data centers is what makes this work. A loop supplied at W32 or warmer can run dry for roughly 95 percent of Vermont hours and use a small adiabatic assist or trim chiller for the rest, while a cold W17 loop needs evaporative cooling or chillers for much of the summer. The town and legislative background is covered on the data center mechanical contractors in Vermont page, and air-cooled plants are covered under data center cooling in Vermont.

Filling, flushing and testing a Vermont liquid loop

Filling, flushing and testing a Vermont liquid loop follows a set sequence, because the narrow passages in cold plates clog on debris that an ordinary hydronic system would ignore. New piping is cleaned and flushed through temporary bypasses so the CDUs and racks are never in the flushing path, then pressure tested to the engineer’s specification and ASME B31.9 practice, then filled with treated water or coolant through filtration down to the server vendor’s limit.

Two Vermont rules touch the fill. Construction permits from the Division of Fire Safety cover the installation of fixed building equipment in public buildings, and a computer room in a building where two or more people work falls within that definition. Makeup connections from potable water pass through backflow protection selected under the 2025 Vermont Plumbing Rules, which adopt the 2024 International Plumbing Code. Paul Industries records every flush, test pressure, hold time, water analysis and filter change, and hands those records to the commissioning team covered under data center commissioning in Vermont.

Data center liquid cooling cost in Vermont: what moves the price

Data center liquid cooling cost in Vermont depends on the number of racks and their heat load, the water class the servers accept, whether the loop runs on building chilled water or its own dry coolers, how much heat recovery the owner wants, and how much of the work happens inside an occupied room. Paul Industries prices each project from the rack schedule and a site survey, quoting a budget figure drawn from similar Vermont loops first and a fixed price when the loop design is settled.

The larger cost items are usually the CDUs, the dry coolers and their structural support, the stainless or copper secondary piping, the freeze protection package, the controls, and any heat pump and buffer tank for heat recovery. On the other side of the ledger sits the compressor energy a warm loop avoids, worth tens of thousands of dollars a year per few hundred kilowatts at Vermont commercial prices. Supply-only CDU and dry cooler packages, design-build and complete installation are each available and priced separately where the owner wants to compare.

Who installs data center liquid cooling in Vermont?

Paul Industries installs data center liquid cooling in Vermont, from rear doors and first CDUs in Burlington hospital and university rooms to warm-water loops with dry coolers in Rutland, Montpelier, Brattleboro and the Northeast Kingdom. The work covers design, prefabricated piping and skids, installation, flushing and testing, glycol and freeze protection, heat recovery, controls and ongoing service.

Formerly based in northern New Jersey, then Pennsylvania, Paul Industries now has its headquarters in Kilmarnock, Virginia, where data center liquid cooling in Virginia serves the home state. Cold-climate loop design carries over to data center liquid cooling in Massachusetts and across New England, and the Vermont page lists every Paul Industries service in the state.

Paul Industries warm-water loops for Vermont racks

Paul Industries builds Vermont liquid loops to run warm, reject heat through dry coolers for nearly the whole year, ride through the coldest week on record, stay dry in a humid July and hand their heat to the buildings around them where that pays. From a single rear door in Burlington to a dedicated GPU row in the Upper Valley, Paul Industries carries the work from design through startup and service. Call 201-450-8280 or request a quote.

Standards referenced: ASHRAE TC 9.9 liquid cooling guidelines (W17 to W45 facility water classes) · ASME B31.9 Building Services Piping · 2025 Vermont Fire and Building Safety Code, Section 7 (Boiler and Pressure Vessel) · National Board Inspection Code (2021) · ASME Boiler and Pressure Vessel Code, Section VIII (2021) · 2025 Vermont Plumbing Rules (2024 International Plumbing Code)

Frequently asked questions

Who installs liquid cooling for research computing in Burlington?

Paul Industries installs liquid cooling for research and university computing in Burlington, South Burlington and Colchester, including CDUs, cold plate loops, rear door heat exchangers and the facility water that feeds them. Burlington’s dry bulb stayed at or below 79.6 F for 94.4 percent of hours in the 2021 to 2025 record, so a W32 loop there runs on dry coolers nearly all year. Call 201-450-8280 or request a quote.

Does Paul Industries add liquid-cooled racks to hospital rooms in the Upper Valley and White River Junction?

Paul Industries adds liquid-cooled racks to hospital, research and enterprise rooms in White River Junction, Hartford and the rest of the Upper Valley, starting with rear doors on existing chilled water or a first CDU. Springfield’s station in the same Connecticut River valley logged 45 hours a year at or above 90 F, so loops there are checked against valley heat as well as winter cold.

Who handles liquid cooling for computer rooms in Montpelier, Barre and Waterbury?

Paul Industries handles liquid cooling for state, insurance and college computer rooms in Montpelier, Barre and Waterbury. Barre-Montpelier’s airport recorded dry bulb at or below 79.6 F for 97 percent of hours and a coldest hour of minus 18 F, so a W32 loop there runs on dry coolers nearly year-round with a glycol outdoor circuit and a water-only secondary indoors.

Can Paul Industries build a warm-water loop for a site in St. Johnsbury or Newport?

Paul Industries builds warm-water loops for sites in St. Johnsbury, Newport and the Northeast Kingdom, where the cold works in the loop’s favor for most of the year. Newport needed outdoor air above 79.6 F for only about 210 hours a year, but its coldest hour of minus 23.4 F and a 376-hour freezing run set the glycol strength, heat tracing and outage sequence.

Which water class should a new Vermont liquid-cooled room target?

A new Vermont liquid-cooled room gains most from the warmest water class its servers support, usually W32 or W40. At those temperatures dry coolers carried the load for 94 to 100 percent of hours at the six Vermont stations reviewed, while a W17 loop needed chillers for close to half the year. Paul Industries confirms the class with the server vendor’s requirements before sizing the plant.

Does a Vermont liquid-cooled room need a chiller at all?

A Vermont liquid-cooled room on a W40 loop rarely needs a chiller, since outdoor air exceeded 94 F for only a few hours a year in Burlington and Springfield and never at the other four stations. W32 loops face a few hundred hot hours, covered by an adiabatic assist or a small trim chiller. Rooms that also hold air-cooled racks still need chilled water for those racks.

Is data center waste heat reuse practical for a Vermont campus?

Data center waste heat reuse is practical on a Vermont campus where a heating load sits close to the racks and runs at low temperature, such as radiant floors, ventilation preheat or domestic water preheat. In Burlington the average temperature of every month from November to April falls under 50 F, which gives recovered heat a long season of use. Paul Industries prices recovery as an option beside the cooling plant, with the payback shown on the owner’s fuel costs.

Can data center waste heat warm a greenhouse or snow melt slab in Vermont?

Data center waste heat can warm a greenhouse bed or a snow melt slab in Vermont, because both run at low temperatures that a W32 or warmer cold plate loop supplies directly through a plate exchanger. Snow melt demand peaks in exactly the months when the loop’s heat has the fewest other uses. Paul Industries designs the exchanger, buffer tank, controls and glycol separation for those systems.

Does an electric backup boiler on a heat recovery loop need a Vermont inspection?

An electric backup boiler on a heat recovery loop is a boiler under the 2025 Vermont Fire and Building Safety Code, which covers water heated by electricity as well as by fuel. It is inspected by a commissioned inspector before being placed in service, receives an identification number and inspection certificate, and is then inspected at the intervals the code sets. Paul Industries schedules that inspection as part of startup.

How is a new Vermont liquid loop pressure tested and flushed?

A new Vermont liquid loop is cleaned and flushed through temporary bypasses so debris never reaches the CDUs or cold plates, then pressure tested to the engineer’s specification under ASME B31.9 practice, then filled through filtration with treated water or coolant. Paul Industries records test pressures, hold times, water analysis and filter changes and passes them to the commissioning team at turnover.

How does an outdoor glycol loop ride out a Vermont ice storm outage?

During a Vermont ice storm outage, pumps on UPS keep the outdoor glycol loop moving until generators carry the load, so no coil sits still in the cold. If the whole room shuts down, controls close the outdoor isolation valves and the indoor water-only loop stays inside the warm building. Paul Industries proves this sequence with a cold-weather pull-the-plug test before turnover.

Why keep glycol out of the rack-side loop in Vermont?

Keeping glycol out of the rack-side loop protects heat transfer and pump energy, because a 50 percent glycol mix carries less heat per gallon and is thicker to pump than water. In Vermont the outdoor circuit needs that strength for minus 20 F nights, but a plate heat exchanger lets the indoor loop run treated water. Paul Industries designs that separation into most Vermont liquid cooling plants.

How does Vermont summer humidity affect cold plates and rear doors?

Vermont summer humidity affects cold plates and rear doors when facility water runs colder than the room’s dew point, which can top 70 F on muggy days: Rutland logged about 238 such hours a year and Bennington about 206. Warm-water loops stay well above that, while colder rear door supply needs insulation, dew point sensors and a CDU that raises its supply temperature as room humidity climbs.

What does a warm-water loop save on Vermont electricity compared with chillers?

Under the assumptions shown on this page, 400 kilowatts of liquid-cooled racks on chillers at 0.6 kW per ton use about $124,757 of electricity a year at Vermont’s 2026 commercial average, against about $36,564 for a dry cooler loop drawing 20 kilowatts of pumps and fans, a difference near $88,000 a year. Paul Industries rebuilds that comparison on each owner’s own load and tariff.

Can immersion tanks go into a converted Vermont mill or warehouse?

Immersion tanks can go into a converted Vermont mill or warehouse once the floor is checked for the loaded tank weight, the dielectric fluid has containment and fire protection reviewed under the Vermont Fire and Building Safety Code, and warm facility water reaches each tank exchanger. Paul Industries designs and installs the facility water piping, exchangers, dry coolers and fluid handling, and coordinates the permit drawings with the owner’s engineer.

Which contract routes cover liquid cooling equipment in Vermont?

Paul Industries offers three routes in Vermont: supply-only CDU, dry cooler and pump skid packages delivered to the owner’s schedule, complete installation to an owner’s engineered design, and design-build with engineering, equipment, installation, flushing, testing and startup under one contract. Each route includes the flush, test and water treatment records the server warranty depends on.

Which details start a Vermont liquid cooling quote?

A Vermont liquid cooling quote starts from how many racks are planned and how many kilowatts each one draws, the facility water limits in the server vendor’s documents, a floor plan with the existing chilled water and electrical service, roof or pad space for dry coolers, and any heating load that could use recovered heat. With that, Paul Industries returns a scope, a price and an energy comparison on your tariff. Call 201-450-8280 or request a quote.