Paul Industries performs passivation and corrosion work across Arizona. The equipment that corrodes here is rarely the equipment handling fresh water. It is the recovery train. Every reuse stage concentrates what it did not remove, so a plant recovering 80 or 90 percent of its water is running the residual stream at many times the dissolved concentration of its feed, and equipment selected against a feed water analysis is operating in a duty nobody specified it for.

Request a quote or call 201-450-8280

The mechanism Recovery concentrates everything it does not remove
Who feels it Equipment at the concentrated end of the train
The specific enemy Chloride, which concentrates along with everything else
The design error Selecting materials against the feed analysis
Industrial power 7.90 cents/kWh, 0.97x the US average of 8.13 (EIA, 2024)
Reviewed September 2026, against current state code and EIA 2024 energy data

Concentration factor is a materials specification

A water reuse scheme is a concentration machine. Remove water and return it to service, and everything dissolved that was not removed with it stays behind in a smaller volume. Do that repeatedly and the residual stream climbs steadily in dissolved solids, hardness, silica and, critically for stainless steel, chloride.

The arithmetic is worth stating because it is frequently not done. A system operating at high recovery concentrates the rejected stream by a large factor. Feed water with a modest chloride content becomes a reject stream with a chloride content that is no longer modest, and chloride is the specific agent that breaks down the passive film on austenitic stainless and initiates pitting.

What follows is a predictable failure pattern in Arizona plants. Equipment at the clean end performs indefinitely. Equipment at the concentrated end, meaning reject handling, concentrate storage, evaporator feed, brine circuits and the associated pumps, valves and instrumentation, develops pitting that nobody anticipated because nobody ran the numbers for that location.

Three practical consequences follow.

Specify by position in the train, not by plant. A single material specification applied across a recovery system is wrong at one end or over-specified at the other. Materials should be selected against the water each item actually sees, which means the concentration factor at that point has to be calculated during design.

Expect the answer to change at the concentrated end. Where 316 is adequate for feed and early stages, the concentrated end may need a more resistant grade. That is a normal outcome rather than a sign that something is wrong, and it is far cheaper decided at design than discovered through failure.

Temperature compounds it. Chloride attack becomes more aggressive as temperature rises, so anything combining a concentrated stream with heat, which describes evaporative stages, sits at the hardest point in the system and deserves the most attention.

Where in the train the duty changes

Corrosion duty along an Arizona recovery train
PositionRelative concentrationDuty
Incoming feedBaselineMild; conventional selection
Treated product waterBelow feedMildest in the plant
First-stage rejectElevatedNoticeably more aggressive
Second-stage and beyondSubstantially elevatedMaterial selection should change
Evaporator feed and circuitsHigh, plus heatThe hardest duty in the system
Cooling circuit at high cyclesElevated, plus heat and oxygenScaling and corrosion together
Solution heating electricity at Arizona’s 7.90 cents/kWh
Heating loadPer 8-hour treatmentPer 20 treatments
30 kW$18.96$379
60 kW$37.92$758
120 kW$75.84$1,517

What passivation can and cannot do about it

This is the limit worth being explicit about, because it determines whether treatment is the right purchase.

Cleaning to ASTM A380 and passivating to ASTM A967 gives a correctly selected stainless the best passive film it is capable of forming, removes free iron embedded during fabrication, and addresses the surface effects of weld heat tint when combined with proper tint removal. On a recovery train that is genuinely worthwhile, because a compromised surface in a concentrated chloride stream fails considerably faster than a sound one.

What it cannot do is change the alloy. If 316 is installed where the concentration factor demands something more resistant, passivation improves the surface of a material that is still unsuited to the duty, and the pitting returns. Where our survey finds that situation, Paul replaces the component at the concentrated end rather than running a treatment program, and says so at quotation instead of selling a cycle of repeat treatments.

The diagnostic that separates the two cases is position combined with pattern. Free iron contamination produces scattered rust spotting anywhere in the plant and responds permanently to treatment. Chloride pitting concentrated specifically at the high-concentration end of the train, and returning after treatment, is telling you about material selection rather than about surface condition.

Standards referenced: ASTM A967 · ASTM A380 · EIA electricity price data · ASME BPE

Frequently asked questions

Do you provide passivation and corrosion work in Arizona?

Yes, across Phoenix, Tucson, Chandler and statewide, on process equipment, water treatment and recovery plant. Work is to ASTM A967 with cleaning per ASTM A380, and the record carries measured values. On recovery trains we establish the concentration factor at each position before recommending anything.

Why does water reuse cause corrosion?

Because recovery concentrates everything it does not remove. Feed water with modest chloride becomes a reject stream with chloride at many times that level, and chloride is the specific agent that breaks down the passive film on austenitic stainless and initiates pitting. The higher the recovery rate, the more concentrated the residual stream.

Why does equipment at one end fail and not the other?

Because they are in different duties despite being in the same system. Product water is the mildest stream in the plant and equipment there performs indefinitely. Reject handling, concentrate storage, evaporator feed and brine circuits see many times the concentration, and if everything was specified against the feed analysis, only that end is under-specified.

How should materials be selected?

By position in the train, against the water each item actually sees, with the concentration factor calculated during design. A single specification across a recovery system is either wrong at the concentrated end or over-specified at the clean end. Expect the answer to change along the train; that is a normal outcome, not a design failure.

Does temperature make it worse?

Yes. Chloride attack becomes more aggressive as temperature rises, so anything combining a concentrated stream with heat sits at the hardest point in the system. Evaporative stages are the clearest example and deserve the most attention in both material selection and inspection.

Will passivation solve pitting on our reject equipment?

It will give a correctly selected material the best surface it can form, which genuinely helps. It cannot change the alloy. If the installed grade is unsuited to the concentration at that position, passivation improves the surface of an unsuitable material and the pitting returns. In that case the answer is replacement at the concentrated end.

How do we tell the two cases apart?

By position and pattern. Free iron contamination shows as scattered rust spotting anywhere in the plant and responds permanently to cleaning and passivation. Chloride pitting concentrated specifically at the high-concentration end, and returning after treatment, is a material selection message rather than a surface condition one.

Does raising recovery make this worse?

Necessarily, yes, and it should be part of the decision. Pushing recovery higher concentrates the residual stream further, so a scheme that raises recovery without revisiting materials at the concentrated end is creating a corrosion problem as a by-product of a water saving. Both belong in the same analysis.

Does Arizona energy cost affect this work?

Barely. At 7.90 cents per kilowatt-hour against a national average of 8.13 (EIA, 2024), heating a treatment solution is a few hundred dollars. The cost that matters is downtime on a water system the plant depends on, which is why this work is normally sequenced around planned outages rather than run reactively.

How do I get a quote for Arizona corrosion work?

Use the form on this page or call 201-450-8280. Useful inputs are where in the system the corrosion appears, your recovery rate and the concentration factor at that point if known, a feed water analysis, the installed materials, and whether the attack has returned after previous treatment. Photographs and position together are usually diagnostic.

How do antiscalant and biocide chemistries affect stainless in a recovery train?

Antiscalants are largely benign, but oxidising biocides such as chlorine and bromine attack stainless in the concentrated reject, and dechlorination ahead of the membranes has to be complete for the membranes and for the downstream metal. Treatment chemistry is reviewed for the metal as well as for the membranes.

What materials are used for membrane housings and vessels in a recovery train?

Fibreglass pressure vessels for the membranes themselves, with stainless or duplex for the manifolds and headers on the concentrate side, and thermoplastics where pressure allows. The vessels avoid the corrosion question; the manifolds between them do not.

How are pumps and valves specified for concentrate service?

In duplex or super duplex for high-pressure concentrate pumps and valves, with seals and trims chosen for the chloride level, and with thermoplastic or lined components where pressure permits. Pumps see the concentrate at velocity and temperature, and they fail before the pipe.

How does high-cycle cooling tower water attack stainless?

Cooling towers running at high cycles concentrate chloride and sulfate, and the warm, aerated basin water attacks stainless at welds and crevices in the basin, piping and heat exchangers. Tower water is a recovery-style concentrate at lower pressure.

What inspection interval suits a recovery train?

A short interval on the concentrate end, set from the observed pitting rate, with pit depth measurement at known locations, and a longer interval on the feed end, because the corrosion rate rises along the train. The interval is not uniform, and the concentrate end sets it.

What is the pitting resistance equivalent number and how is it used?

A figure calculated from chromium, molybdenum and nitrogen content that ranks alloys for chloride pitting resistance. It is used to compare candidate alloys against the chloride and temperature of the duty, and to explain why 316 fails where a duplex survives.

What role does dissolved oxygen play in reject stream pitting?

Oxygen sustains the cathodic reaction that drives pitting, and the reject in an open or aerated system carries it, so deaerated or closed sections corrode more slowly than open tanks and vented lines at the same chloride level. Oxygen is one of the variables, alongside chloride and temperature.

How is a recovery train passivated?

Section by section, with the alloy of each section confirmed and the chemistry matched, and with the treatment following cleaning that removes scale and biofilm. Passivation on a scaled surface treats the scale.

What about scaling and corrosion together?

Scale deposits create crevices under which chloride concentrates and the surface cannot repassivate, so scaled equipment pits under the scale. Descaling and passivation are done together, and scale control is part of corrosion control.

How is corrosion monitored in a recovery train?

With coupons and probes in the concentrate streams, inspection of the highest-risk locations at intervals, and tracking of concentrate chemistry. Monitoring shows whether the materials are keeping up with the recovery rate.

Do semiconductor and food plants in Arizona see the same problem?

Yes, wherever water is reused to high recovery. The product is irrelevant; the concentrate chemistry is what attacks the equipment.

How does dry heat affect external corrosion?

Arizona's dry climate is mild on external surfaces compared with coastal states, so atmospheric corrosion is a smaller concern. The internal duty in the recovery train is the problem.

What about corrosion in evaporators and brine concentrators?

Thermal concentrators see the most concentrated chloride in the plant at the highest temperature, so they are built in titanium, high-nickel alloys or duplex depending on the brine, and inspected on a short interval. They are the end of the recovery train and its most demanding equipment.

Can equipment be lined or coated instead of re-alloyed?

For tanks and some piping, linings and coatings are effective where temperature and mechanical exposure allow. Heat exchangers and pumps generally need the right alloy.

What is the first step when a recovery train starts corroding?

Analyse the concentrate at the point of failure and compare it with what the alloy can resist. That comparison tells the plant whether it has a passivation job or a materials job, and they cost very different amounts.

Citric or nitric passivation on a water recovery train?

Citric is usually the better fit on a recovery train. It chelates the metal ions a concentrated reuse stream leaves behind as well as removing free iron, and its spent solution neutralises to a discharge the plant can handle. Nitric passivation to ASTM A967 works chemically, and in a water-constrained state the rinse volume and the disposal route are what decide it.

Does citric passivation use less water than nitric?

The chemical stage uses comparable volume. The difference is the rinse: nitric needs rinsing to a low residual and its effluent needs more neutralising capacity, while citric neutralises more simply. On an Arizona site where rinse water is metered and the concentrate has nowhere cheap to go, that difference is a real number.

Corrosion on an Arizona recovery train?

Tell us where in the system it appears and what your recovery rate is. Call 201-450-8280 or use the form below.

Service needed *