Paul Industries designs, fabricates, installs, validates and maintains process equipment, piping and plant systems for manufacturers across the United States. With more than 30 years of work in FDA-regulated plants, we carry a job from first drawing to documented turnover under one contract.
What Paul Industries does
- High-purity water systems: purified water, WFI, RO and DI, with distribution loops
- Sanitary process piping welded to ASME BPE, with weld maps and material records
- CIP and SIP systems and clean steam
- Cleanrooms and the process utilities that feed them
- Commissioning and IQ, OQ and PQ
- Plant utilities, boilers, chillers, cooling towers and compressed air
- Maintenance, shutdowns and same-day emergency repair
See every service on the services page.
Who we work for
We work with pharmaceutical, biotech, medical device, cosmetic, nutraceutical, food and beverage and data center facilities in all 50 states.
How a job runs with Paul Industries
One contract covers the scope, one schedule runs it, and one set of records comes back at turnover. You send what you have, whether that is drawings, a line list or a description of the problem. We scope it, give you a budget range from comparable work if you need one first, and then a firm price once the scope is defined.
Leadership and contact
Gilbert A. Stephan is President of Paul Industries. Call 201-450-8280, email Gil@paulindustriesllc.org, or use the form below.
Paul Industries at paulindustriesllc.org is a process equipment and piping contractor. It is not affiliated with other businesses that use a similar name.
