Paul Industries is a process equipment contractor in New Hampshire that designs, fabricates, installs, qualifies and maintains clean utilities, process piping, steam, chilled water and compressed air systems for biologics producers, medical device makers, food and beverage plants and precision manufacturers. From the Seacoast and the Pease Tradeport to Manchester, Nashua, Concord and the Upper Valley, Paul Industries takes New Hampshire projects under one contract that runs from design and supply through installation, testing, startup and service. The company is headquartered at 256 Shore Drive, Kilmarnock, Virginia.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler law RSA 157-A, with Lab 1200 rules from the NH Department of Labor
Power boilers Certificate inspection every year; most heating boilers every two years
Building code 2024 IBC and IMC, effective July 1, 2026
Industrial power 16.21 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What a process equipment contractor in New Hampshire handles

A process equipment contractor in New Hampshire handles the piping, vessels, skids and plant utilities that sit between a building’s shell and the product line: purified water and clean steam for biologics, compressed air and process gases for device assembly, chilled water and glycol for food and beverage cooling, boiler and steam systems for heat, and the controls and documentation that tie each system to the plant’s quality program. New Hampshire’s mix of industries pushes most of that work toward clean, documented systems, because so much of the state’s growth is in regulated products.

Paul Industries scopes each plant on its own terms. A cell culture suite at Pease, a device cleanroom in Nashua and a brewery cellar in Merrimack share almost nothing beyond the need for good welds and good records, and the engineering, materials and test plan follow the product rather than a standard package.

Which industries in New Hampshire depend on process utilities?

Industries in New Hampshire that depend on process utilities include biologics and biotechnology, regenerative medicine, medical devices and precision components, food and beverage production, and life science tools and materials. Those sectors answer the question of what is manufactured in New Hampshire for a process buyer: monoclonal antibodies and recombinant proteins, engineered tissue, implants and surgical components, chocolate, beer and yogurt, and the filters and reagents other labs rely on.

New Hampshire regions, the industries concentrated there and the systems they buy
RegionIndustry concentrationProcess systems in demandRelated Paul Industries pages
Seacoast and the Pease Tradeport (Portsmouth, Stratham)Biologics manufacturing, biotech start-ups, confectioneryPurified water, clean steam, CIP and SIP, bioreactor utilities, chilled waterBioreactor installation, clean steam, validation
Manchester and the MillyardRegenerative manufacturing, biotech, technology firms in converted mill buildingsLab and cleanroom utilities, process gases, purified water in older structuresCleanrooms and utility piping for New Hampshire
Nashua, Merrimack and SalemMedical device and precision manufacturing, brewing, electronicsCompressed air, process gases, rinse water, glycol cooling, cleanroomsCompressed air piping, process chillers, glycol cooling
Londonderry and the I-93 corridorDairy and food processing, life science suppliersSanitary piping, CIP, refrigeration, wastewater pretreatmentCIP and sanitary piping
Upper Valley and Monadnock (Lebanon, Jaffrey)Pharmaceutical commercial operations, life science materials and filtrationPurified water, clean utilities, process chillersHigh-purity water and passivation

Biotech companies in Portsmouth, NH and the Seacoast

Biotech companies in Portsmouth, NH cluster around the Pease Tradeport, where Lonza has operated its biologics site since acquiring it in 1996 and makes therapeutic monoclonal antibodies and recombinant proteins for drug developers. Biologics plants are built around utilities that run continuously and are qualified: water for injection or purified water loops, clean steam generators and distribution, CIP and SIP systems, process and jacket cooling, and waste inactivation. Every tie-in has to fit around production campaigns and change control.

For these plants Paul Industries installs the connections and support systems for bioreactor installation, builds clean steam systems from generator to point of use, and carries the commissioning and qualification work through validation and commissioning so the turnover package lines up with the plant’s protocols.

Regenerative manufacturing in Manchester’s Millyard

Manchester’s Millyard holds one of the newest groups of biotech companies in New Hampshire, led by ARMI, the regenerative manufacturing institute founded in 2016, with companies working on bioprinting and tissue engineering in the converted mill buildings around it. The state’s biotech workforce passed 11,000 people and has grown about 7 percent a year since 2019, according to a BIO report cited by the Valley News in 2026.

Old brick mill buildings make clean process space harder to build: floor loads, ceiling heights, shafts and structural openings all limit where piping and ductwork can run. Paul Industries plans routing, supports and equipment placement around those constraints and builds clean utilities that can be extended as tenants grow. The cleanrooms for New Hampshire’s medical device and precision manufacturing sector page covers the room side of that work.

Medical device companies in New Hampshire

Medical device companies in New Hampshire, along with precision component makers in Nashua, Salem and the southern tier, rely on clean compressed air, process gases, rinse water and controlled rooms, because whatever touches the part last stays on it. Paul Industries has four New Hampshire pages built around this sector: high-purity water systems for device, electronics and precision manufacturers, compressed air, process gas and utility piping in New Hampshire, precision cleaning and parts washing systems and passivation, electropolishing and surface verification for device makers.

Life science materials and pharmaceutical operations in the Upper Valley and Monadnock region

The Upper Valley and Monadnock region add a different kind of life science plant to the state, with Novo Nordisk operating in Lebanon and MilliporeSigma in Jaffrey, where filtration products, reagents and materials for other laboratories and drug makers are produced. Plants like these run purified water, controlled rooms, process chillers and compressed air, and often operate in rural settings where the plant itself carries its own water treatment and wastewater systems. Paul Industries scopes these sites with that self-sufficiency in mind, treating raw water quality, backup capacity and spare parts as part of the design rather than an afterthought.

Across all of these regions, manufacturing in New Hampshire tends to run in mid-sized plants rather than giant complexes, with lean engineering and maintenance teams. That makes a contractor who carries engineering, fabrication, installation and documentation together especially useful, because the plant’s own engineers can review and approve rather than coordinate several separate firms.

Food manufacturing in New Hampshire

Food manufacturing in New Hampshire includes chocolate production in Stratham, where Lindt and Sprungli employs about 630 people, the Anheuser-Busch brewery in Merrimack, open since 1970, and yogurt production in Londonderry, along with dozens of craft breweries, bakeries and specialty food plants. These factories in New Hampshire run sanitary product piping, CIP, glycol and ammonia cooling, hot water and steam, and wastewater pretreatment. Paul Industries builds and expands those systems, including glycol cooling systems for cellars and process jackets.

What process systems does Paul Industries build for New Hampshire plants?

Process systems Paul Industries builds for New Hampshire plants cover the full path from utility generation to point of use, delivered as supply-only equipment, design-build packages or complete installation of the owner’s design. The routes can be mixed on a single project: a plant may buy a prefabricated skid supply-only, then hand Paul Industries the installation and qualification of the loop it feeds.

  • Purified water, water for injection and clean steam systems, with sanitary distribution built to ASME BPE.
  • Compressed air piping and process gas distribution, with dryers, filtration and dew point monitoring for device and electronics lines.
  • Process chillers, chilled water and glycol loops for jacketed vessels, molding, extrusion and laser equipment.
  • Pressure vessel fabrication for receivers, process tanks, filter housings and separators built to ASME Section VIII.
  • Boiler room piping, steam distribution and steam traps for heating and process steam.
  • CIP and SIP systems, sanitary process piping and passivation for regulated product lines.

New Hampshire boiler code and the inspection schedule

The New Hampshire boiler code is set by RSA 157-A, which directs the Commissioner of Labor to adopt rules consistent with the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code, and by the Department of Labor’s administrative rules in chapter Lab 1200. Boiler and pressure vessel inspectors must carry an active National Board commission and be qualified by the commissioner, and operating a boiler or vessel that needs a certificate without a valid one is unlawful under RSA 157-A:10. Private residences and apartment houses of fewer than three units are exempt; process plants are covered.

How often do boilers need to be inspected in New Hampshire?

How often do boilers need to be inspected depends on the equipment type, and RSA 157-A:8 spells it out. The schedule below is what an owner plans around for the NH state boiler inspection, with a two-month grace period after each interval before the department sends a written warning.

New Hampshire boiler inspection intervals under RSA 157-A:8
EquipmentCertificate inspectionInternal or external inspectionPlanning note for the plant
Power boilers and high pressure, high temperature boilersEvery yearExternal inspection under pressure every year where possiblePlan repairs into the annual outage so the boiler is open when the inspector arrives
Low pressure steam or vapor heating boilers (not cast iron)Every two yearsInternal at least every four years where construction permitsSchedule the internal inspection in the non-heating season
Hot water heating and supply boilers, water heaters, storage tanksEvery two yearsInternal at the inspector’s discretionKeep isolation valves and drains working so the unit can be opened
Cast iron heating and hot water supply boilersEvery two yearsAs the inspector directsSection leaks and cracked sections are typical findings
Pressure vessels subject to internal corrosionEvery two yearsInternal inspection as part of the certificate inspectionReceivers and process vessels need manways and drain points that open easily
Pressure vessels with non-corrosive contentsAt intervals the commissioner setsInternal inspection waived where contents are shown to be non-corrosiveKeep water treatment or contents records to support the waiver

A New Hampshire boiler inspection goes faster when the boiler, its relief valves and its controls match the records on file. Paul Industries repairs and replaces boiler room piping, feedwater and blowdown systems, safety valves and controls, and documents repairs and alterations under the National Board Inspection Code so the certificate can be renewed without a second visit. Owners comparing New Hampshire boiler regulations with those of neighboring states will find the same ASME and NBIC foundation with different intervals; the RSA 157-A schedule is the one that counts for a New Hampshire site, and any new hampshire boiler going into service needs its certificate before it operates.

The 2024 New Hampshire State Building Code

On July 1, 2026 the New Hampshire State Building Code took up the 2024 editions of four International codes (building, residential, existing building and mechanical), with a transition period after which new permit applications from January 1, 2027 must follow the 2024 code. The State Building Code Review Board reviews and amends the code. Process piping inside a plant follows ASME B31.3, hygienic systems follow ASME BPE and controlled rooms are classified to ISO 14644; Paul Industries prepares the drawings and test records each of those requires.

Why do New Hampshire electricity prices change the payback on utility upgrades?

Electricity prices in New Hampshire make utility efficiency a stronger case than in most states: industrial customers paid an average of 16.21 cents per kWh in 2024, roughly twice the US industrial average of 8.13 cents, according to the EIA. Every kilowatt saved on compressors, chillers, pumps and fans is worth about double what it would be in an average state, so upgrades that look marginal elsewhere often pay back well here.

Utility upgrades that New Hampshire electricity prices tend to favor
UpgradeWhere the energy goes nowWhat changesWhat Paul Industries delivers
Compressed air leak repair and pressure reductionLeaks, high header pressure, artificial demandLower compressor run time and powerLeak survey, piping repair, header redesign, regulator stations
Variable speed drives on pumps and fansThrottled valves and constant-speed motorsFlow matched to loadPump and piping changes, drive installation, controls
Chiller plant optimizationFixed setpoints, poor staging, fouled tubesLower kW per ton across the yearTube cleaning, condenser water reset, staging changes, free cooling piping
Heat recovery from compressors and process coolingHeat rejected to air or towersRecovered heat preheats water or makeup airHeat exchangers, piping, controls
Steam trap and condensate return repairFailed traps and dumped condensateLower boiler fuel and water treatment costTrap survey, replacement, condensate return piping

Project cost in New Hampshire follows scope, pipe size and alloy, pressure and cleanliness class, the documentation the product requires, and how much of the work happens inside occupied or validated space. To turn a budget range into a firm price, Paul Industries needs the process and instrumentation diagrams or a sketch, the service conditions and flows, the material and finish specifications, the quality and qualification requirements, utility data for the energy case, and the shutdown windows production can give. With those in hand, the price, the schedule and the energy savings can be weighed together in one proposal, which is how most New Hampshire owners present an upgrade to their finance team.

How does work proceed inside validated and clean space in New Hampshire?

Working inside validated and clean space in New Hampshire plants means every change follows the site’s change control: an impact assessment before work starts, controlled materials and procedures during it, and documented testing and requalification after it. Paul Industries plans gowning, material transfer, cleaning and isolation of the work zone with the quality group, fabricates as much as possible outside the clean area, and makes final connections in short, scheduled windows. Weld logs, borescope records, pressure tests, cleaning and passivation records, calibration certificates and as-built drawings are assembled as the work proceeds, so the turnover package is ready when the system is.

Wastewater from these plants gets the same attention. Biologics and food plants discharge cleaning chemicals, high-strength organics and pH swings that a municipal sewer use ordinance or pretreatment permit limits, so neutralization, equalization and monitoring are part of many New Hampshire projects. Paul Industries designs and installs pretreatment skids, tanks and the piping that feeds them, sized from the plant’s actual cleaning and production cycles.

The same discipline applies in device plants, where a compressed air or rinse water change can affect a validated cleaning or assembly process, and in food plants, where sanitary design and allergen controls govern what can be opened and when.

What does a New Hampshire winter mean for plant utilities?

A New Hampshire winter means months of sub-freezing nights across the state and deep cold in the North Country, so plant utilities are designed for a hard cold snap rather than an average January day. Outdoor cooling towers, air-cooled chillers, dry coolers and condensers need freeze protection or glycol, makeup water and drain lines need heat tracing and insulation, and compressed air lines running through unheated space need dryers sized to hold the dew point under any temperature the pipe will reach, or condensate freezes inside the header.

Cold weather also opens an opportunity that New Hampshire plants often underuse: free cooling. A plate heat exchanger between the tower or dry cooler loop and the chilled water loop can carry much of a process cooling load through the winter with the chillers off, which makes a strong case at New Hampshire power prices. Paul Industries designs and installs free cooling piping, glycol conversions, heat tracing and winterization so the systems run through January without surprises.

How should a New Hampshire plant choose a process contractor?

A New Hampshire plant should choose a process contractor on five points: experience with the product and its regulations, the quality of the documentation, the ability to prefabricate and test before arriving in the plant, the discipline of the safety and change control program, and accountability for the whole system rather than one trade’s piece of it. Paul Industries meets each of those under one contract.

  • Product and regulation. Biologics, devices and food each carry their own rules; Paul Industries designs to ASME BPE, ISO 14644, sanitary design practice and the plant’s own standards.
  • Documentation. Weld logs, inspection records, test reports and qualification documents are built as the work proceeds, so the package is ready at mechanical completion.
  • Prefabrication. Skids, spools and headers are fabricated and tested before they reach the plant, which shortens shutdowns and keeps hot work out of production areas.
  • Safety and change control. Lockout, hot work, confined space and change control procedures are followed as written, with the plant’s own permits.
  • Single accountability. One contract carries design, supply, installation, testing and startup, so there is one party to call when a question comes up.

Who builds process systems in New Hampshire?

Paul Industries builds process systems in New Hampshire for biologics producers, biotech start-ups, medical device and precision manufacturers, food and beverage plants and life science suppliers. Headquarters are at 256 Shore Drive, Kilmarnock, Virginia. The company was formerly based in northern New Jersey, later moved to Pennsylvania, and has worked for Northeast plants at every stage. For New Hampshire owners, the scope covers design, fabrication, supply, installation, testing, startup, service, repair and maintenance of every system described here, carried under one contract, one schedule and one record set.

New Hampshire manufacturing companies and pharmaceutical companies in New Hampshire choose the delivery route that suits them, and the same team carries the job from the first walk-down through startup and service.

Beyond New Hampshire: New England, the East Coast and all 50 states

Paul Industries is an East Coast contractor that takes work across New Hampshire, every New England state and all 50 states. Owners with plants on both sides of the state line can keep one contractor through the Maine and Massachusetts hubs, and companies building or upgrading plants outside the United States can carry the same scope and documentation standards through international projects.

Start a New Hampshire project with Paul Industries

Paul Industries designs, builds, installs, qualifies and maintains clean utilities, process piping, steam and cooling systems for New Hampshire plants. Send the site, the system, the service conditions, any drawings and your shutdown windows. Call 201-450-8280 or request a quote.

Standards referenced: RSA 157-A (New Hampshire boilers and pressure vessels) · New Hampshire Code of Administrative Rules, Lab 1200 · ASME Boiler and Pressure Vessel Code · National Board Inspection Code · ASME BPE · ASME B31.3 · ISO 14644 · New Hampshire State Building Code (2024 IBC and IMC)

Frequently asked questions

What are the major industries in New Hampshire that buy process equipment?

The major industries in New Hampshire that buy process equipment are biologics and biotechnology, regenerative manufacturing, medical devices and precision components, food and beverage production, and life science tools and materials. Each depends on clean utilities, process piping, cooling and steam. Paul Industries designs, installs and maintains those systems for plants on the Seacoast, in Manchester and Nashua, along the I-93 corridor and in the Upper Valley.

Who installs clean steam and purified water for biologics plants at the Pease Tradeport in Portsmouth?

Paul Industries installs clean steam generators and distribution, purified water and water for injection loops, CIP and SIP piping and bioreactor utility connections for biologics plants at the Pease Tradeport and elsewhere in Portsmouth. Systems are built to ASME BPE with orbital welding, borescope inspection, slope verification and passivation, and the turnover package is written to support the plant’s qualification protocols and change control.

Does Paul Industries build utilities for biotech tenants in Manchester's Millyard?

Yes. Paul Industries builds lab and cleanroom utilities, purified water, process gases and chilled water for biotech and regenerative manufacturing tenants in Manchester’s Millyard. Converted mill buildings limit floor loads, shaft space and ceiling heights, so routing and supports are designed around the structure, and the systems are laid out so the next tenant fit-out can extend them rather than replace them.

Which manufacturing companies in New Hampshire need compressed air and process gas piping in Nashua and Merrimack?

Medical device makers, precision machining and component plants, electronics manufacturers and breweries in Nashua, Merrimack and Salem all run compressed air and often nitrogen or other process gases. Paul Industries designs and installs the distribution, drying and filtration to the purity class each use point needs, adds dew point and pressure monitoring, and repairs leaks that cost twice as much in New Hampshire as at the US average power price.

How often does a NH state boiler inspection happen for a power boiler?

Power boilers and high pressure, high temperature boilers in New Hampshire receive a certificate inspection every year, plus an external inspection under pressure every year where possible, under RSA 157-A:8. Most heating and hot water boilers and pressure vessels subject to internal corrosion are inspected every two years. A two-month grace period follows each interval before the Department of Labor sends a written warning.

Who may inspect boilers and pressure vessels in New Hampshire?

Inspectors in New Hampshire must carry an active National Board commission and be qualified by the Commissioner of Labor, who issues the inspector a license for one year at a time under RSA 157-A:7. Inspections establish whether the equipment’s construction, installation and condition meet the ASME code and the state rules. Paul Industries prepares equipment and records for those inspections and makes the repairs inspectors call for.

Which building code applies to process projects in New Hampshire in 2026 and 2027?

The New Hampshire State Building Code adopted the 2024 International Building Code, Mechanical Code, Existing Building Code and Residential Code effective July 1, 2026, and new permit applications from January 1, 2027 must follow the 2024 code. Inside the plant, process piping follows ASME B31.3 and hygienic piping ASME BPE. Paul Industries prepares submittals for the building official and for the plant’s own engineering review.

How much does a process utility project cost in New Hampshire?

Cost follows scope, materials, pressure and cleanliness class, documentation and the amount of work inside operating or validated space. New Hampshire’s industrial electricity price, 16.21 cents per kWh in 2024 against 8.13 nationally, also changes the economics, because efficient equipment and heat recovery pay back faster. Paul Industries prices from a budget range on comparable scope, then a firm price once drawings, tie-ins and shutdown windows are fixed.

Does Paul Industries work on brewery and food plant expansions in New Hampshire?

Yes. Paul Industries works on cellar tank additions, glycol loops, hygienic transfer piping, CIP systems, hot water and steam, refrigeration piping and wastewater pretreatment for breweries, confectioners, dairies and specialty food plants across New Hampshire. Work in operating food plants follows sanitary design, allergen and hygiene zoning rules, and new lines are cleaned, tested and released with the plant’s quality team before product runs.

Who handles projects for pharmaceutical and life science sites in Lebanon and Jaffrey?

Paul Industries handles purified water, clean utilities, process chillers, compressed air and process piping projects for pharmaceutical and life science sites in Lebanon, the Upper Valley, Jaffrey and the Monadnock region. Projects are scoped with the site’s engineering and quality groups, prefabricated where possible to limit time in production space, and turned over with the testing and qualification records the site’s procedures require.

What is manufactured in New Hampshire that needs validated water systems?

Biologic drugs such as monoclonal antibodies, engineered tissue products, pharmaceuticals, life science reagents and filtration products, and medical devices that are rinsed or cleaned before packaging all depend on validated or tightly controlled water in New Hampshire. The water grade differs by product, from purified water and water for injection to device rinse grades. Paul Industries designs, installs and qualifies the system to the grade the product needs.

Can Paul Industries install equipment and piping without shutting down a validated New Hampshire suite?

Paul Industries plans work in validated suites so the area stays in its qualified state for as long as possible: equipment and spools are built and tested outside, the work zone is isolated and cleaned under the site’s procedures, and final tie-ins are grouped into short, scheduled windows agreed with production. Change control, impact assessments and requalification testing are written into the plan from the start.

Does a pressure vessel in New Hampshire always need an internal inspection?

Vessels whose contents are known to be non-corrosive to their shell, heads and fittings can be excused from internal inspection under RSA 157-A:8, provided they are built to the commissioner’s rules, and the commissioner sets their certificate interval. Vessels subject to internal corrosion are inspected every two years. Paul Industries supplies vessels with manways, drains and nameplate data that make either path simple to document.

Do medical device companies in New Hampshire need a cleanroom and a clean compressed air system together?

Many do, because a controlled room protects the part from airborne particles while compressed air and process gases touch the part directly through blow-off, actuation and drying. Air quality is specified by purity class for particles, water and oil, and the room by ISO 14644 class. Paul Industries designs and installs both so the air system’s filtration and dew point match the cleanliness the room is built to hold.

Can Paul Industries supply equipment only, or design and build a full system in New Hampshire?

Paul Industries offers all three routes in New Hampshire: supply-only for skids, vessels and prefabricated spools; design-build where Paul Industries carries the engineering, fabrication and installation under one price; and complete installation of a design the owner’s engineer has already produced. Projects can combine routes, and the turnover documentation is the same whichever route the plant chooses.

What records come with a finished New Hampshire process project?

A finished New Hampshire project comes with as-built drawings, material certificates, weld maps and logs, borescope and inspection records, pressure test reports, cleaning and passivation records, instrument calibration certificates, equipment manuals and spare parts lists. For regulated systems the package adds commissioning and qualification documents, and for boilers and vessels the National Board repair or alteration forms that support the certificate inspection.

Does Paul Industries treat New Hampshire as part of a wider region?

New Hampshire sits inside Paul Industries’ East Coast, Northeast coverage. Those regional pages compare the codes, industries and project patterns across neighboring states, so a New Hampshire owner with plants in several states sees one contractor and one approach for all of them, from the Kilmarnock, Virginia headquarters to sites across the region. Call 201-450-8280 or request a quote.

Which neighboring states does Paul Industries group with New Hampshire?

Paul Industries groups New Hampshire on its New England page, which sets the state beside its neighbors: the industries that cluster there, how boiler, building and tank rules differ across the line, and how one contract carries a multi-state program from the Kilmarnock, Virginia headquarters. Owners with plants in several states use it to plan work as one program. Call 201-450-8280 or request a quote.

Planning clean utility or process work in New Hampshire?

Send the site, the system and its service conditions, the drawings you have and your shutdown windows. Call 201-450-8280 or request a quote.