Paul Industries is a process equipment contractor in Wyoming that engineers, fabricates, installs, tests and maintains process piping, boilers and steam systems, pressure vessels, tanks, heat exchangers, evaporators and water treatment for soda ash plants, refineries, gas processing plants, mines and data center campuses. Wyoming’s plants work at elevation, in wind and cold, with brines, caustic, sour gas and slurries that punish ordinary equipment. Paul Industries builds for those conditions and takes a Wyoming project from design through startup under one contract, or delivers the equipment ready to install.
Request a quote or call 201-450-8280
Which Wyoming industries need process systems?
Wyoming industries that need process systems are built on minerals and energy: soda ash from trona, petroleum refining and renewable diesel, natural gas processing with helium and carbon dioxide recovery, coal, uranium, and a new wave of data centers around Cheyenne. Ask about the main industry in Wyoming and the answer is mining and energy, and Wyoming manufacturing follows the same path, turning raw minerals and hydrocarbons into chemicals, fuels and gases inside the state.
| Industry | Where in Wyoming | Key process equipment | What Paul Industries supplies and installs |
|---|---|---|---|
| Soda ash and trona | Green River Basin, west of Green River in Sweetwater County | Calciners, dissolvers, clarifiers, evaporators, crystallizers, dryers, solution mining wells | Slurry and liquor piping, evaporator and exchanger work, tanks, caustic-service repairs |
| Petroleum refining and renewable diesel | Sinclair, Casper, Newcastle and Cheyenne | Crude and vacuum units, hydrotreaters, heaters, exchangers, tank farms | ASME B31.3 piping, vessels, exchanger bundles, turnaround piping scope |
| Gas processing, helium and CO2 | LaBarge, the Green River and Wind River basins, Powder River gas fields | Acid gas removal, dehydration, cryogenic separation, compression | Process and utility piping, pressure vessels, heat exchangers, heat tracing |
| Coal and uranium | Powder River Basin around Gillette; in-situ uranium sites in central and northeastern Wyoming | Coal preparation, dust control, ion exchange and elution circuits, water treatment | Pump skids, tanks, water treatment, dust collection, piping |
| Data centers | Cheyenne and Laramie County | Chilled water, liquid cooling, heat rejection, water treatment | Cooling plant piping, closed loops, commissioning support records |
Wyoming trona mines and the Green River soda ash plants
Wyoming trona mines sit on the world’s largest known trona deposit in the Green River Basin, and the U.S. Geological Survey counts four companies operating five soda ash plants there, with national output of about 12 million tons in 2024. The Bureau of Land Management credits the region with about 90 percent of the nation’s soda ash, and USGS reports that more than half of U.S. soda ash was exported in 2025. Wyoming soda ash goes into glass, chemicals, detergents and water treatment, and several of the plants also make caustic soda, sodium bicarbonate and sodium sulfite.
Wyoming trona is mined underground or dissolved in place by solution mining, then calcined, dissolved, clarified, filtered, evaporated, crystallized and dried. That chain is hard on equipment: hot sodium carbonate liquors scale evaporators and exchangers, caustic service at temperature cracks carbon steel welds that were not stress relieved, and slurries erode pumps, elbows and reducers. Paul Industries has dedicated pages for the work: evaporation, crystallization and process water, process and slurry piping, caustic cracking and passivation, and descaling and turnaround cleaning. Products bound for food and pharmaceutical use add a separate set of rules, covered under food and pharmaceutical grade segregation.
Wyoming refinery capacity at Sinclair, Casper and Newcastle
Wyoming refinery capacity stood at about 127,000 barrels per calendar day of crude distillation on January 1, 2025, according to the U.S. Energy Information Administration, spread across three crude plants. The Sinclair, Wyoming refinery carries most of that capacity and shares its site with a renewable diesel unit; the Casper, Wyoming refinery runs mostly Rocky Mountain crude; and the Newcastle, Wyoming refinery serves the northeastern corner of the state. The Cheyenne, Wyoming refinery stopped processing crude oil in 2020 and moved to renewable fuels, which changed its equipment from crude units to feedstock pretreatment and hydroprocessing.
Every Wyoming refinery inspects its piping and vessels to API 570 and API 510 and renews them during planned turnarounds. Paul Industries fabricates replacement spools and vessels ahead of the outage, repairs and replaces heat exchanger bundles, and plans the piping scope of shutdowns and turnarounds so the hot work fits the window.
Wyoming natural gas processing, helium and carbon dioxide
Wyoming natural gas processing includes one of the most unusual gas plants in the country. ExxonMobil’s Shute Creek plant, fed from the LaBarge field, treats a raw gas that is roughly 65 percent carbon dioxide, 21 percent methane, 7 percent nitrogen, 5 percent hydrogen sulfide and 0.6 percent helium, and separates it into pipeline gas, carbon dioxide sold for enhanced oil recovery, and helium the company puts at about a fifth of world supply. Across the state’s other gas fields, conventional processing plants remove water, carbon dioxide and hydrogen sulfide and recover natural gas liquids before the gas enters interstate pipelines.
Gas plants combine sour service, cryogenic temperatures and high pressure, which puts strict demands on materials, welding procedures and testing. Paul Industries builds process piping and pressure vessels for that duty, with hardness control and material traceability for sour gas, impact-tested materials where temperatures run low, and documented pressure tests for every system before it is energized.
Coal, uranium and the Powder River Basin
Wyoming has been the top coal-producing state since 1988 and mined almost two-fifths of all U.S. coal in 2024, according to the Energy Information Administration, most of it from the Powder River Basin around Gillette. Coal handling and preparation plants need dust collection, conveyor and transfer point enclosures, water treatment and pump systems. Wyoming also produces most of the country’s in-situ recovery uranium: the Energy Information Administration lists five operating in-situ facilities in the state, where wellfield solutions are pumped through ion exchange columns and processing plants. Paul Industries builds the tanks, pump skids, piping and water treatment those plants rely on, and dust collection systems for coal and mineral handling.
In-situ uranium plants are process plants in every sense. Injection and production wells are tied to header houses, solution flows through ion exchange columns where uranium loads onto resin, the resin is stripped in an elution circuit, and the product is precipitated, filtered and dried. The barren solution is refortified and sent back to the wellfield, and a portion is bled off to deep disposal wells or evaporation ponds. Header piping, column internals, chemical feed, tanks and filtration all wear or corrode, and expansions add new wellfields that tie into existing trunk lines. Paul Industries builds those circuits with materials suited to the chemistry, documents every pressure test, and plans tie-ins around the plant’s production schedule.
Cheyenne data centers
Cheyenne has hosted Microsoft data centers since 2012 and Meta has built an $800 million data center there, and in 2025 Tallgrass and Crusoe announced a campus south of the city that would start at 1.8 gigawatts, powered by natural gas with carbon capture, with room to grow toward 10 gigawatts. Data centers at that scale run large chilled water plants, liquid cooling loops and heat rejection, and the high, dry Cheyenne climate favors economizers and dry coolers for much of the year. Paul Industries builds data center cooling systems and the water treatment that protects them.
Campuses, hospitals and public plants
Campuses, hospitals and public utilities round out the Wyoming market. The University of Wyoming in Laramie, community colleges, hospitals in Cheyenne, Casper, Gillette and Sheridan, and municipal water and wastewater plants all run central steam or hot water plants, chilled water, domestic and process water treatment and pumping stations. Those systems age on a long cycle and are usually replaced while the building stays open, which calls for temporary boilers or chillers, staged cutovers and careful isolation. Paul Industries plans that sequence so heating, cooling and water service continue while the new equipment goes in.
How a process equipment contractor in Wyoming delivers the work
A process equipment contractor in Wyoming delivers the work by carrying engineering, fabrication, installation, testing and startup together, so the plant has one firm accountable for the result. Wyoming manufacturing companies and mine operators buy that work from Paul Industries in three ways: supply-only skids, spools, vessels and tanks; a design-build package; or a full build-out of drawings the owner’s engineers already completed.
| System | Wyoming plants that use it | Paul Industries scope |
|---|---|---|
| Process and slurry piping | Soda ash, refining, gas processing, uranium | Process piping in carbon steel, stainless, alloy and lined pipe, prefabricated and tested |
| Pressure vessels | Gas plants, refineries, soda ash | Separators, receivers and process vessels through pressure vessel fabrication, Section VIII documented |
| Heat exchangers and evaporators | Soda ash, refineries, gas plants | Heat exchanger repair, retubing, replacement bundles and evaporator work |
| Boilers and steam | Soda ash, refineries, hospitals, campuses | Boiler repair, steam and condensate piping, feedwater and deaeration |
| Tanks | Liquor storage, crude and product, process water | Tank fabrication, nozzles, linings and repairs |
| Freeze protection | Outdoor racks, tank farms, wellfield headers | Heat tracing and insulation sized for wind and altitude |
A shutdown at a Wyoming soda ash plant, refinery or gas plant is expensive, so prefabrication pays off quickly. Paul Industries builds spools, skids and modules complete with supports, instruments and insulation where practical, pressure tests them before shipment, and plans the installation so field work is limited to setting, bolting and a small number of closure welds.
Water treatment ties many of these systems together. Soda ash plants recycle process water and run large cooling circuits, refineries and gas plants treat boiler feed and cooling tower make-up, and data centers need treated water for towers and closed loops. Paul Industries designs softening, reverse osmosis, filtration and chemical feed for each duty, sizes it for the plant’s water source and chemistry, and delivers it as tested skids with the operating targets written down, so operators can see when scaling or corrosion potential begins to rise.
Wyoming boiler law and code requirements
Wyoming boiler law is unusual: according to the National Board of Boiler and Pressure Vessel Inspectors, Wyoming state government employs no boiler or pressure vessel inspectors and has no general boiler or pressure vessel rules. At most Wyoming plants, the owner, the insurer and the codes written into contracts carry the weight of boiler safety in place of a state chief inspector. Plants that mine underground are the main exception: Wyoming’s mine rules for underground metal and nonmetal mines, and the matching federal MSHA standard at 30 CFR 57.13001, require boilers and pressure vessels to be built, installed and maintained to the ASME Boiler and Pressure Vessel Code.
| Equipment or activity | Rule that applies | What the plant should have on file |
|---|---|---|
| Boilers and pressure vessels at underground mines | 30 CFR 57.13001 and 053-3 Wyo. Code R. 57.13001: ASME code construction, installation and maintenance | ASME data reports, nameplates, relief valve records, inspection history |
| Boilers and vessels elsewhere in industry | No general state rules; insurer requirements and the ASME code in the purchase specification | National Board registration, insurer inspection reports, repair records |
| Repairs and alterations | National Board Inspection Code, typically required by insurers and owners | Repair forms, weld procedures, test records |
| Refinery and gas plant piping and vessels | API 570 and API 510 inspection programs; ASME B31.3 for new piping | Inspection plans, thickness data, design records |
| Buildings and mechanical systems | City and county codes; State Fire Marshal adoption of the IBC, IFC, IMC, IFGC and IEBC | Permits, approved drawings, inspection sign-offs |
Paul Industries applies the full code standard in Wyoming all the same. New boilers and vessels are specified to the ASME code with National Board registration, repairs follow the National Board Inspection Code, relief valves are set and documented to the nameplate, and every job closes with a record the plant’s insurer will accept. Plants that look for boiler companies in Wyoming usually need exactly that combination: repair and replacement work plus paperwork that stands up to an insurance inspection, which is how Paul Industries delivers a Wyoming boiler job. Wyoming boiler inspection, in practice, is the insurer’s inspection, and Paul Industries prepares equipment and records for it.
Wyoming has no single statewide building code. Cities and counties adopt and enforce their own, and the State Fire Marshal adopts the International Building, Fire, Mechanical, Fuel Gas and Existing Building Codes for the buildings under its authority. Process piping follows ASME B31.3, steam piping ASME B31.1.
Materials for caustic, scale, slurry and sour service in Wyoming
Materials for Wyoming process service are chosen for four recurring threats: caustic cracking in hot alkaline liquors, scaling in evaporators and exchangers, erosion in slurry lines, and sulfide stress cracking in sour gas. Each one has an established engineering answer, and the answer has to be written into the specification before fabrication starts.
Caustic service is the first concern at soda ash plants. Carbon steel exposed to hot caustic or concentrated carbonate solutions can crack at welds and cold-worked areas, and NACE SP0403 guides when post-weld heat treatment is required based on caustic concentration and metal temperature. Paul Industries specifies stress relief, weld procedures and, where temperatures run high, alloy upgrades, then records the heat treatment charts with the weld map so the plant knows which welds were relieved.
Scale and erosion come next. Carbonate and bicarbonate liquors deposit scale wherever velocity drops or temperature rises, so evaporator and exchanger layouts keep velocities up, avoid low points and give cleaning access. Slurry lines get long-radius bends, heavier wall at known wear points, and lined or hardfaced spools where abrasion is severe, with flanged sections that can be rotated or replaced during a short stop.
Sour gas service at gas processing plants follows NACE MR0175/ISO 15156, which limits carbon steel hardness to 22 HRC to resist sulfide stress cracking. Paul Industries qualifies welding procedures with hardness testing, controls heat input, and keeps material traceability from mill certificate to installed spool.
Designing for altitude, wind and cold in Wyoming
Designing for altitude, wind and cold in Wyoming starts with physics that sea-level designs overlook. Cheyenne sits at about 6,062 feet, and at 6,000 feet the atmosphere averages about 11.8 psia instead of 14.7, air is about 84 percent as dense as at sea level, and water boils near 201 degrees Fahrenheit. Those numbers change equipment sizing in ways that matter.
- Pumps. Lower atmospheric pressure cuts the net positive suction head available to pumps drawing from open tanks by roughly seven feet of water, so a pump that runs cleanly at sea level can cavitate in Green River or Cheyenne unless the suction is designed for it.
- Fans, burners and air-cooled equipment. Thinner air moves less mass per cubic foot, so burners, combustion air fans, air-cooled exchangers and dry coolers are derated and selected for the site elevation.
- Vents, flash and boiling. Hot liquors and condensate flash at lower temperatures, which affects flash tank sizing, vent design and how hot an open tank can run before it boils.
- Wind and cold. Strong prevailing winds and long cold spells drive heat loss from outdoor piping and tanks, so heat tracing, insulation thickness and weather enclosures are sized for wind, and outdoor equipment is supported for wind load and drifting snow.
Paul Industries checks each of those effects during engineering and documents the site conditions on the design basis, so equipment arrives sized for Wyoming instead of being adjusted after startup.
How a Wyoming project moves from scope to startup
A Wyoming project with Paul Industries moves through five steps, and the plant keeps one point of contact from the first scope review to the final record.
- Scope review. The plant shares drawings, process data, photos, the site elevation and the outage window; Paul Industries confirms tie-ins, materials and the inspection requirements the insurer or mine rules impose.
- Engineering. Piping is routed and stress checked, vessels and exchangers are specified, pumps and burners are corrected for altitude, and freeze protection is sized for wind.
- Fabrication and testing. Spools, skids, vessels and supports are built, heat treated where required, examined and pressure tested before shipment.
- Installation. Equipment is set and connected in the planned window under the plant’s permits for hot work, isolation, confined space and, at gas plants, hydrogen sulfide.
- Startup and records. Systems are flushed, tested and commissioned, and the plant receives as-built drawings, data reports, weld and heat treatment records and a winterization checklist.
What does process work in Wyoming cost?
Process work in Wyoming costs what the scope, material, code class and outage window require, plus allowances for the conditions that are specific to the state: caustic and slurry service that calls for heavier wall, alloy or lined pipe; sour gas service with its hardness and testing requirements; altitude corrections on pumps, fans and burners; and wind and cold protection on outdoor work. Prefabrication usually lowers total cost by shortening the time spent inside the plant. Industrial electricity averaged 7.96 cents per kilowatt-hour in Wyoming in 2024 against 8.13 nationally, which shapes the payback on evaporator heat recovery, variable-speed drives and condensate return. Paul Industries prices Wyoming work in two steps: a budget figure drawn from comparable jobs while the design is young, then a fixed quotation when every line and tie-in is settled.
Who builds process systems in Wyoming?
Paul Industries builds process systems in Wyoming: process and slurry piping, pressure vessels, tanks, heat exchangers and evaporators, boilers and steam systems, heat tracing, dust collection and water treatment for soda ash plants, refineries, gas processing plants, coal and uranium operations and data centers. Plants comparing mechanical contractors in Wyoming for process work get engineering, fabrication, installation, testing, startup and records from Paul Industries on one contract.
An East Coast company with projects in every state
Paul Industries is an East Coast contractor with its headquarters at 256 Shore Drive, Kilmarnock, Virginia. It accepts work throughout Wyoming and all 50 states, along with projects at plants in other countries, and brings the same fabrication and documentation standard to a Green River evaporator that it brings to an East Coast pharmaceutical or data center project. The Colorado and Montana pages cover neighboring states.
Send your Wyoming project to Paul Industries
Paul Industries engineers, fabricates, installs, tests and maintains process equipment for Wyoming plants, from a single exchanger bundle or boiler repair to a complete process system. Send drawings, equipment data, site elevation, photos and the outage dates, call 201-450-8280, or request a quote to start the Wyoming project.
Standards referenced: ASME Boiler and Pressure Vessel Code · National Board Inspection Code · 30 CFR 57.13001 (MSHA boilers and pressure vessels) · 053-3 Wyo. Code R. 57.13001 · International Building Code · International Mechanical Code · ASME B31.1 · ASME B31.3 · API 510 · API 570 · NACE SP0403 · NACE MR0175/ISO 15156
Frequently asked questions
What industry is Wyoming known for?
Wyoming is known for mining and energy: coal from the Powder River Basin, soda ash from Green River trona, oil and natural gas, helium and carbon dioxide from LaBarge, and uranium from in-situ recovery operations. Those industries run evaporators, gas plants, refineries and water treatment systems. Paul Industries designs, fabricates and installs that process equipment for Wyoming plants and maintains it in service.
How many trona mines and soda ash plants are in Wyoming?
The U.S. Geological Survey counts four companies operating five soda ash plants in Wyoming, all drawing on the trona deposit of the Green River Basin, either by underground mining or solution mining. Together with one California producer they made about 12 million tons of soda ash in 2024. Paul Industries supplies and installs piping, evaporator, exchanger and tank work for soda ash plants.
How many refineries does Wyoming have?
Wyoming has three crude oil refineries, at Sinclair, Casper and Newcastle, with about 127,000 barrels per calendar day of crude distillation capacity on January 1, 2025, by the Energy Information Administration count. The former Cheyenne crude refinery now produces renewable fuels. Paul Industries takes piping, vessel, exchanger and turnaround work at Wyoming refining plants.
Does Wyoming require boiler inspections?
Wyoming has no general state boiler or pressure vessel inspection program, according to the National Board, so inspections are usually set by the plant’s insurer and its own procedures. Underground mines are different: state mine rules and the federal MSHA standard require ASME code construction and maintenance for boilers and pressure vessels. Paul Industries builds and repairs Wyoming boilers to the ASME code with records an insurer will accept.
What code should a new boiler or pressure vessel in Wyoming meet?
A new boiler or pressure vessel in Wyoming should be built to the ASME Boiler and Pressure Vessel Code, Section I or IV for boilers and Section VIII for vessels, and registered with the National Board, because insurers, mine rules and most purchase specifications expect it. Repairs follow the National Board Inspection Code. Paul Industries specifies, fabricates and installs equipment on that basis.
Who repairs evaporators and heat exchangers at Green River soda ash plants?
Paul Industries repairs evaporators and heat exchangers at soda ash plants around Green River: retubing, bundle replacement, nozzle and shell repairs, descaling and the liquor piping that connects them. Work in hot carbonate and caustic service is planned with stress relief and material choices that resist caustic cracking. Replacement parts are fabricated before the outage so the plant is down for the shortest time.
Does Paul Industries take refinery turnaround work in Sinclair and Casper?
Paul Industries takes refinery turnaround work in Sinclair and Casper: replacement process piping, heat exchanger bundles and repairs, pressure vessels, tank piping and relief system work. Spools and vessels are fabricated ahead of the outage and documented for the refinery’s API 570 and API 510 programs. Call 201-450-8280 to discuss a turnaround scope.
Who builds process piping for gas plants near LaBarge and in the Powder River Basin?
Paul Industries builds process piping for gas processing, compression and treating plants near LaBarge and in the Powder River and Green River basins. Piping for sour gas is built with hardness control and full material traceability, low-temperature systems use impact-tested materials, and every system is pressure tested and documented before it is put into service.
What process systems do Cheyenne data centers need?
Cheyenne data centers need chilled water plants, liquid cooling distribution to the racks, cooling towers or dry coolers, closed loops and water treatment, all sized for the site elevation. The high, dry climate gives long hours of economizer cooling. Paul Industries builds data center cooling systems from the central plant to the rack loop, and documents them for commissioning.
How does altitude affect pumps and boilers in Wyoming?
At Wyoming elevations around 6,000 feet, atmospheric pressure is about 11.8 psia, which lowers the suction head available to pumps on open tanks and makes cavitation more likely. Thinner air reduces the mass flow through burners and fans, so combustion equipment is derated, and water boils near 201 degrees Fahrenheit. Paul Industries sizes pumps, burners and vents for the actual site elevation.
Does Paul Industries work at uranium and coal sites in northeastern Wyoming around Gillette?
Paul Industries works at coal and mineral sites in northeastern Wyoming around Gillette and at in-situ uranium facilities in central and northeastern Wyoming: pump skids, process tanks, ion exchange and water treatment piping, dust collection and heat tracing. Skids are built and tested before delivery so field work at wellfield and mine sites is limited to setting and connecting.
How does Paul Industries keep outdoor lines from freezing in Wyoming wind?
Paul Industries keeps outdoor lines from freezing in Wyoming by sizing heat tracing and insulation for wind as well as temperature, sloping lines to drains, eliminating dead legs, enclosing valve stations and instruments, and supporting outdoor equipment for wind load and drifting snow. Each turnover package includes drain points and a winterization checklist.
Which Wyoming manufacturing companies use process equipment?
Wyoming manufacturing companies that use process equipment include soda ash and chemical producers, refiners and renewable fuel makers, gas processors, fertilizer and helium producers, food and beverage makers, and data center operators. Each needs piping, vessels, heat transfer and water treatment. Paul Industries designs, fabricates and installs that equipment as supply-only, design-build or complete installation.
Which codes govern building permits for Wyoming plant projects?
Building permits for process work in Wyoming come from the city or county where the plant sits, since Wyoming has no single statewide building code, and the State Fire Marshal’s adopted codes apply to the buildings under its authority. Paul Industries prepares drawings and calculations for the permit and coordinates the inspections with the plant.
What should a Wyoming plant send for a quote?
A Wyoming plant should send drawings or P&IDs, equipment data, photos, the site elevation, the process fluids and their temperatures and pressures, the materials and code required, and the outage dates. Paul Industries replies first with a budget figure drawn from similar jobs and follows with a fixed quotation when the design is complete. Call 201-450-8280 or request a quote.
Can Paul Industries deliver complete process skids to Wyoming sites?
Paul Industries delivers complete process skids to Wyoming sites: pump skids, chemical feed packages, filtration and water treatment trains, heat exchanger modules and metering skids, assembled, wired, hydrotested and function checked before shipment. Skids arrive with drawings, data reports and test records, ready to set and connect.
How do energy costs in Wyoming affect equipment choices?
Industrial electricity in Wyoming averaged 7.96 cents per kilowatt-hour in 2024, a little under the 8.13 national figure. Evaporators, compressors and large pumps run around the clock, so heat recovery, variable-speed drives and condensate return often pay back. Paul Industries calculates the payback with the plant’s own load data before recommending an upgrade.
Planning process or plant utility work in Wyoming?
Send drawings, equipment data, the site elevation and your outage dates for the Wyoming facility. Call 201-450-8280 or request a quote.
