Paul Industries is a New England process equipment contractor that designs, fabricates, installs, tests, starts up and services process systems, process piping and plant utilities for manufacturers in Maine, New Hampshire, Vermont, Massachusetts, Rhode Island and Connecticut. The company is an East Coast contractor headquartered at 256 Shore Drive in Kilmarnock, Virginia, formerly based in northern New Jersey, then Pennsylvania, and it carries New England work under the same single contract it uses in every state. Call 201-450-8280 or request a quote.
Request a quote or call 201-450-8280
What does a New England process equipment contractor do?
A New England process equipment contractor turns a plant’s process requirement into installed, tested and documented equipment, then keeps that equipment running for the life of the plant. In this region the work spans a biologics suite in Cambridge, a jet engine test cell utility in East Hartford, a boiler house at a Maine paper mill and a glycol loop in a Vermont creamery. Paul Industries carries each of those from first sketch through turnover records, and it remains on the job afterward for service, repair and upgrades.
What is an industrial contractor, compared with a commercial builder? A commercial builder finishes offices, stores and schools; an industrial contractor builds the equipment trains and piping that produce goods, working to ASME B31.3 for chemical and general process lines, ASME BPE for sanitary tubing and ASME B31.1 for power piping. Paul Industries works as a New England industrial contractor in exactly that sense, and its proposals name the code for every line before a price is given.
Plants usually buy in one of three ways. Supply-only orders cover fabricated skids, pipe spools, tanks and code vessels, tested and documented before they ship. Design-build orders begin with a process requirement and end with a working system. Complete installation orders add demolition, tie-ins, pressure tests and commissioning in a running plant, timed to the owner’s shutdown calendar.
The process industries of New England, state by state
The industries of New England that depend on process equipment differ sharply from one state to the next, even though the six states share a grid operator, a climate and a good part of their supply chain. Each row below gives a state, the plants that generate most of its process projects, its average 2024 industrial power price as reported by EIA, and a link to the matching Paul Industries state page.
| State | Industries that buy process systems | Cents/kWh, 2024 | State page |
|---|---|---|---|
| Maine | Pulp and paper at Skowhegan, Rumford, Baileyville and Madawaska; Navy shipbuilding at Bath; seafood, potato and blueberry processing; diagnostics | 12.46 | Maine paper, shipyard and food plants |
| New Hampshire | Biologics at the Pease Tradeport in Portsmouth, medical devices, precision machining, beverage plants | 16.21 | New Hampshire biologics and device work |
| Vermont | Chip fabrication at Essex Junction, dairy and cheese, maple syrup, breweries and cideries | 11.58 | Vermont fab and dairy systems |
| Massachusetts | Biotech and pharmaceutical research and manufacturing in Cambridge, along Route 128 and I-495, at Devens and in Worcester; medical devices | 18.19 | Massachusetts biomanufacturing projects |
| Rhode Island | Submarine module construction at Quonset Point, biologics in West Greenwich, metal finishing and jewelry, food | 19.70 | Rhode Island defense and biologics plants |
| Connecticut | Jet engines and helicopters, submarine final assembly in Groton, pharmaceutical research, medical and diagnostic devices | 17.12 | Connecticut aerospace and pharma systems |
All six states pay well above the 2024 national industrial average of 8.13 cents per kilowatt-hour. That single fact shapes engineering choices across the region, from drive selection and heat recovery to insulation thickness, more than it does anywhere else on the Atlantic coast.
Where New England manufacturing companies concentrate
New England manufacturing companies that rely on process systems cluster in four places: the biotech corridor around Boston, the aerospace and submarine belt of Connecticut and Rhode Island, the paper and food towns of Maine, and the chip, dairy and maple economy of Vermont. The companies and sites below are named as public market facts, to show where demand sits.
Biotech in New England, from Kendall Square to Portsmouth
Biotech in New England grows outward from Cambridge in rings. Research and pilot suites crowd Kendall Square, commercial manufacturing spreads along Route 128 and I-495, and larger plants stand at Devens and in Worcester, where floor plates and loading docks allow full stainless trains. Pharmaceutical companies in Devens, MA run large-molecule production on a campus northwest of Boston, and pharmaceutical manufacturing companies in Massachusetts lean on the same short list of systems: purified water and WFI, clean steam, CIP and SIP, sanitary tubing and graded cleanrooms.
The cluster runs past the Massachusetts line. Lonza makes monoclonal antibodies and recombinant proteins at the Pease Tradeport in Portsmouth, New Hampshire. Amgen’s West Greenwich campus in Rhode Island, which received FDA licensure in 2005, added a $200 million, 120,000 square foot next-generation plant after a 2018 groundbreaking. Biotechnology companies in New England share one engineering trait: they change products and scales often, so their utilities have to be expandable without a full requalification.
Connecticut aerospace companies and the submarine yards
Connecticut aerospace companies include Pratt & Whitney, headquartered in East Hartford, and Sikorsky, headquartered in Stratford and owned by Lockheed Martin since 2015. The Connecticut aerospace industry runs heat treating, plating and surface finishing lines, engine test cells, parts washers, compressed air plants and large cooling water systems, all of which sit inside the scope of a process contractor.
Submarine work ties Connecticut to Rhode Island. Electric Boat fabricates and outfits submarine hull modules at Quonset Point in North Kingstown, then sends them by barge to Groton for final assembly, and the Connecticut Office of Military Affairs counted about 25,000 employees across its two states in 2026. Shipyard growth pulls a supplier base of machine shops, coaters and fabricators that need compressed air, welding gas distribution, steam and cooling water. Maine adds Bath Iron Works on the Kennebec, which builds Navy surface combatants, and Portsmouth Naval Shipyard in Kittery, which overhauls submarines.
Paper, food and maple in northern New England
Maine’s pulp and paper mills at Skowhegan, Rumford, Baileyville and Madawaska run large boilers, steam and condensate networks, process water treatment and chemical recovery. The market is volatile: Woodland Pulp paused its Baileyville mill late in 2025 before reopening, which is why mill owners favor repairs and upgrades that pay back inside a short horizon.
Food manufacturing in New England leans on seafood, potatoes and wild blueberries in Maine, cheese and fluid milk in Vermont, and specialty foods and beverages throughout the region. Vermont produced 3.091 million gallons of maple syrup in 2026, nearly 53 percent of the US crop, and its evaporator houses and bottling lines need sanitary piping, heat recovery and CIP like any dairy. GlobalFoundries employs about 1,800 people at its Essex Junction fab, whose ultrapure water and process cooling needs set the pace for suppliers across northern Vermont.
| Cluster | Where | Systems most often in scope |
|---|---|---|
| Biologics and pharma | Cambridge, Route 128, Devens, Worcester; Portsmouth, NH; West Greenwich, RI; New Haven and Groton, CT | Purified water and WFI, clean steam, CIP and SIP, ASME BPE tubing, cleanrooms, bioreactor and skid tie-ins |
| Aerospace and defense | East Hartford, Stratford, Groton, Quonset Point, Bath, Kittery | Compressed air, process cooling water, plating and finishing rinse systems, wastewater pretreatment, steam |
| Pulp and paper | Skowhegan, Rumford, Baileyville, Madawaska | Boilers, steam and condensate, process water, pumps and valves, tank and vessel repair, shutdown work |
| Dairy, maple and food | Vermont, Maine, western Massachusetts | Sanitary piping, glycol and ammonia refrigeration, pasteurizer utilities, CIP, heat recovery |
| Semiconductor | Essex Junction, Vermont and its suppliers | Ultrapure water, process cooling, chemical distribution, exhaust and abatement piping |
| Medical devices | Greater Boston, southern New Hampshire, central Connecticut | Cleanrooms, purified water, compressed air and gases, parts cleaning and passivation |
Medical device companies in New England sit between these clusters, often in the same suburban parks as biotech tenants, and they buy cleanroom, water and compressed air work on shorter schedules than a drug plant.
How do boiler, building and tank rules differ across New England?
Boiler, building and storage tank rules in New England are written separately by each of the six states, so a design approved in Massachusetts can need a different permit, inspector or operator arrangement once it crosses into New Hampshire or Rhode Island. Paul Industries builds those differences into the drawings and the schedule at the start of a project.
| State | Boiler and pressure vessel rule | Building code in force | Storage tank program |
|---|---|---|---|
| Maine | 32 MRSA Chapter 131 under the Office of Professional and Occupational Regulation; boiler operators hold a state license; power boilers inspected each year, pressure vessels every three years | MUBEC, built on the 2021 model codes; enforcement became mandatory for towns above 4,000 residents, with the amended adoption in effect since April 7, 2025 | 06-096 CMR 691 requires registration of underground petroleum tanks |
| New Hampshire | RSA 157-A with the Lab 1200 rules, administered by the Department of Labor | State Building Code moving to the 2024 IBC on July 1, 2026 | Env-Or 300 for aboveground facilities with a single tank system over 660 gallons; Env-Or 400 for underground tanks |
| Vermont | 20 V.S.A. Chapter 173, Division of Fire Safety; operating certificates, with inspection by an insurer’s inspector or one the Commissioner authorizes | 2025 Vermont Fire and Building Safety Code, referencing the 2021 IBC, for commercial buildings | Underground tanks under 10 V.S.A. Chapter 59, Agency of Natural Resources |
| Massachusetts | 522 CMR; a steam plant’s engineer in charge holds a Massachusetts engineer or fireman license, and plant records are kept seven years | Tenth edition of 780 CMR, based on the 2021 International Codes; the ninth edition stopped applying after June 30, 2025 | 310 CMR 80.00 for underground systems, with most inspected every three years |
| Rhode Island | R.I. Gen. Laws Chapter 28-25; a permit to install from the Division of Occupational Safety boiler unit, and an NBIC form filed after welded repairs | Rhode Island State Building Code on the 2021 IBC | 250-RICR-140-25-1 for underground storage of regulated substances and hazardous materials |
| Connecticut | Chapter 540 of the General Statutes; DAS issues each operating certificate, and a low-pressure heating boiler’s certificate runs 24 months | 2022 Connecticut State Building Code on the 2021 IBC, in force since October 1, 2022 | RCSA 22a-449(d)-101 to 113, revised effective December 1, 2021 |
Two differences cause most surprises. Massachusetts ties steam plant operation to a named, license-holding engineer in charge, so any boiler or steam project there includes that arrangement in its startup plan. Rhode Island requires a permit before a new or second-hand boiler goes in, so procurement and permit applications run in parallel. Paul Industries writes both into its schedule rather than discovering them at the inspection.
How much does process equipment cost to run in New England?
Process equipment in New England costs far more to run than the same equipment in most other states, because industrial electricity in all six states priced between 1.42 and 2.42 times the national average in 2024. A 500 kW load running all year uses 4,380,000 kWh, and the table shows its annual bill at each state’s 2024 average industrial price.
| State | Cents/kWh | Annual cost, 4,380,000 kWh | Multiple of US average |
|---|---|---|---|
| Rhode Island | 19.70 | $862,860 | 2.42 |
| Massachusetts | 18.19 | $796,722 | 2.24 |
| Connecticut | 17.12 | $749,856 | 2.11 |
| New Hampshire | 16.21 | $709,998 | 1.99 |
| Maine | 12.46 | $545,748 | 1.53 |
| Vermont | 11.58 | $507,204 | 1.42 |
| US average | 8.13 | $356,094 | 1.00 |
A plant in Providence pays roughly $500,000 a year more than the national average to run that load. Manufacturing companies in New England therefore get a fast return from variable-speed drives on pumps, fans and compressors, from heat recovery on air compressors and refrigeration, from economizer cooling in winter and from properly insulated steam and hot water lines. Paul Industries calculates those paybacks against the tariff the plant actually pays and builds the winners into the base design.
Construction cost follows scope, materials, the share of fabrication completed off site, outage length, the documentation the plant’s quality group needs and each state’s permit path. Paul Industries first quotes a budget band drawn from similar past scopes, and converts it to a fixed figure when the drawings are complete, the site has been walked and the shutdown calendar is settled.
Who installs and maintains process equipment across New England?
Paul Industries installs and maintains process equipment across New England for biotech, pharmaceutical, aerospace, defense supply, paper, food, dairy and semiconductor plants, as an East Coast contractor headquartered in Kilmarnock, Virginia. Engineering, fabrication, equipment supply, field installation, testing, commissioning, service and repair sit in a single agreement that applies in all six states.
Owners who run more than one New England site gain the most from that arrangement. The weld procedures, inspection records and turnover format stay the same at a Portsmouth biologics plant, a Groton supplier and a Skowhegan mill, so a corporate engineering group reads one standard. The state differences in the code table above become line items in each project rather than findings at inspection.
Process systems Paul Industries builds for New England plants
Process systems Paul Industries builds for New England plants run from clean utilities for drug makers to boilers for mills and refrigeration for food producers. The most frequent scopes in the region, and the pages that describe them in depth, are:
- High-purity water systems: purified water and WFI generation, storage and loops for Massachusetts, New Hampshire and Rhode Island biologics plants.
- Sanitary process piping: orbital-welded ASME BPE tubing with borescope and passivation records.
- Cleanrooms: graded suites for fill-finish, cell therapy and device assembly.
- Ultrapure water systems: polishing loops for the Vermont fab and its suppliers.
- Boiler repair: tube work, burner and control upgrades and code repairs for mills and campus plants.
- Steam piping: headers, condensate return and trap stations sized for winter heating plus process load.
- Compressed air piping: aluminum and stainless distribution for aerospace and shipyard suppliers.
- Glycol cooling systems: freeze-protected chilling for dairies, breweries and maple producers.
- Industrial water treatment: softening, RO and boiler feed treatment for mills and food plants.
Each scope can be bought alone or folded into a turnkey project, and Paul Industries services and repairs what it installs as well as existing systems of any origin.
How New England industrial contractors are compared
New England industrial contractors are compared on how much of the job they carry: engineering, fabrication, field work, testing and documentation, and the years of service after the system starts. Paul Industries carries every one of those stages under one name, which gives the owner one point of accountability for schedule, quality and records.
Plants that are sorting mechanical contractors in New England for a process job should also look at how a proposal treats the state rules. A strong Massachusetts proposal names the engineer in charge for any steam work; a Rhode Island proposal includes the boiler unit’s permit to install; a New Hampshire tank project states whether Env-Or 300 or Env-Or 400 applies. Paul Industries puts those items in the scope so they are priced from day one.
The last test is the turnover package. Industrial companies in Massachusetts and Connecticut with FDA-regulated product expect as-built isometrics, weld logs keyed to a weld map, mill certificates for every heat of pipe, hydrostatic and pneumatic test reports, passivation results, commissioning sheets and executed IQ and OQ protocols. Paul Industries supplies a sample package with its proposal so the format is agreed before work begins.
How a New England project runs from walkdown to turnover
A New England project with Paul Industries runs in six stages, and the plant sees a defined deliverable at the end of each one. Process industry in New England works around fixed outage windows, quality reviews and state permits, so the stages are arranged to keep the shutdown itself as short as possible.
- Walkdown and data gathering. Engineers trace the existing lines, record pipe specifications, photograph tie-in points and confirm floor ratings, clearances and rigging routes.
- Process design. P&IDs, equipment sizing, line lists and a code list for each service, with the state permit items named for that site.
- Off-site fabrication. Skids, spools, tanks and vessels are built and pressure tested before shipment, which moves most welding hours out of the plant.
- Pre-outage work. Supports, sleeves, electrical pathways and new equipment are set while the plant is still running.
- Outage tie-ins and testing. Isolation, cut-ins, final welds, hydrostatic or pneumatic tests, flushing and passivation where the service calls for it.
- Startup and turnover. Commissioning, operator walkthroughs, qualification protocols for regulated plants and the indexed record package.
The plan changes with the industry. A Maine mill usually offers one or two long annual outages, a biologics plant in Massachusetts plans changeovers around campaigns, and a Vermont dairy prefers short weekend windows outside the spring flush. Paul Industries builds each schedule around the plant’s own calendar rather than a template.
Building in older New England plants and through the winter
Older New England plants often occupy brick mill buildings, wartime factory halls or research buildings converted several times, and each conversion leaves undocumented piping, mixed materials and floors rated for loads far below a modern skid. Paul Industries walks every route before pricing, confirms structural capacity for new equipment and plans rigging paths through doors, stairwells and roofs that were never designed for it.
Winter work needs its own plan. Exterior tie-ins are scheduled for shoulder seasons where possible, temporary heat protects hydrostatic tests and fresh insulation, and cooling towers and outdoor lines receive freeze protection before commissioning. Snow and ice loads under the state building code govern rooftop supports, and outage windows at mills and campus plants usually fall outside the coldest weeks because the boilers carry building heat.
New England work within an all-50-state contract
New England work sits inside a contract that reaches every state and plants overseas, so an owner with sites in Massachusetts, Ohio and Texas keeps one contractor and one documentation standard. The service area page covers the rest of the country, the East Coast page covers the full Atlantic seaboard, and the international projects page explains how skids and vessels designed and fabricated in the United States are shipped, installed and commissioned abroad.
Start a New England project with Paul Industries
Paul Industries is the New England process equipment contractor for owners who want design, fabrication, installation, testing and service of process systems under one accountable contract, from Madawaska to Greenwich. Tell us where the plant is, what the system has to do and when the plant can stop, attach any drawings or photographs, then call 201-450-8280 or request a quote for a scope and a budget range.
Standards referenced: ASME Boiler and Pressure Vessel Code · National Board Inspection Code · ASME B31.1 · ASME B31.3 · ASME BPE · 32 MRSA Chapter 131 · RSA 157-A · 20 V.S.A. Chapter 173 · 522 CMR · R.I. Gen. Laws Chapter 28-25 · Conn. Gen. Stat. Chapter 540 · Maine Uniform Building and Energy Code · 780 CMR (Massachusetts State Building Code, tenth edition) · 2022 Connecticut State Building Code · Vermont Fire and Building Safety Code · 310 CMR 80.00 · RCSA 22a-449(d)-101 to 113 · 06-096 CMR 691 · Env-Or 300 and Env-Or 400 · 250-RICR-140-25-1
Frequently asked questions
What industry is New England known for today?
New England is known today for biotech and pharmaceutical manufacturing around Boston, aerospace and submarine building in Connecticut and Rhode Island, paper and food processing in Maine, and dairy, maple and a semiconductor fab in Vermont. Each of those industries runs on process systems: clean utilities, steam, compressed air, cooling water and sanitary piping. Paul Industries designs, builds and services those systems in all six states.
What is an industrial contractor, and how does one differ from a mechanical contractor?
An industrial contractor builds and maintains the systems that make product inside a plant, to process codes such as ASME B31.3 and ASME BPE. A mechanical contractor usually focuses on heating, cooling and plumbing for the building. Paul Industries covers both sides in New England plants, from a WFI loop or a plating rinse system to the boiler and chilled water plant that serve the building, under one contract and one set of records.
Does Paul Industries work for aerospace companies in Connecticut?
Paul Industries works for aerospace companies in Connecticut and their suppliers on compressed air plants and distribution, process cooling water, heat treating and finishing line utilities, rinse water and wastewater pretreatment, and steam. Work is designed to the 2022 Connecticut State Building Code, and boilers follow Chapter 540 with operating certificates from the Department of Administrative Services. Call 201-450-8280 with your scope.
Does Paul Industries build for biotech companies in New Hampshire?
Paul Industries builds for biotech companies in New Hampshire, including biologics manufacturers at the Pease Tradeport in Portsmouth and device and life science plants in the southern part of the state. Typical scopes are purified water and WFI, clean steam, CIP and SIP, ASME BPE tubing and cleanrooms. Boiler work follows RSA 157-A, and new buildings follow the State Building Code as it moves to the 2024 IBC.
Why do factories in New England pay more for electricity than plants elsewhere?
Factories in New England paid between 11.58 cents per kWh in Vermont and 19.70 in Rhode Island in 2024, against a US industrial average of 8.13, according to EIA. Paul Industries responds in design, with variable-speed drives, heat recovery, economizer cooling and better insulation, sized against each plant’s actual tariff.
Which process systems do biologics plants at Devens and in Worcester buy most?
Biologics plants at Devens and in Worcester buy purified water and WFI systems, clean steam generators and distribution, CIP and SIP skids, ASME BPE process tubing, media and buffer prep tanks and graded cleanroom suites. Their larger floor plates and truck docks suit full stainless trains. Paul Industries designs, fabricates, installs and qualifies those systems and services them after startup.
Who repairs boilers at Maine paper mills?
Paul Industries repairs boilers at Maine paper mills, along with the steam and condensate networks, feedwater treatment, deaerators and pumps around them. Maine regulates boilers under 32 MRSA Chapter 131, with power boilers inspected every year and operators holding a state license. Repairs are planned around mill outages and documented under the National Board Inspection Code so the inspector has a complete file.
What does Rhode Island require before a boiler is installed?
Rhode Island requires a permit to install from the Division of Occupational Safety boiler unit for any new or second-hand boiler or pressure vessel, under R.I. Gen. Laws Chapter 28-25. Welded repairs and alterations need notice to the boiler unit or an authorized inspector beforehand and an NBIC form afterward. Paul Industries files the permit request alongside procurement so the equipment and the paperwork arrive together.
How are boilers inspected at a Vermont creamery or maple plant?
Vermont regulates boilers under 20 V.S.A. Chapter 173 through the Division of Fire Safety, which issues operating certificates. Equipment carried by an insurance policy is inspected by the insurer’s inspector; other equipment by an inspector the Commissioner authorizes. Paul Industries builds and repairs boilers, steam lines and heat recovery for Vermont creameries, cheese plants and sugarhouses to that rule, and schedules work around milk and sap seasons.
Who must run a steam plant in Massachusetts?
Massachusetts requires a steam plant covered by 522 CMR to have an engineer in charge who holds a Massachusetts engineer or fireman license, and the plant keeps its operating records for seven years. Any Paul Industries boiler or steam project in Massachusetts includes that arrangement in the startup and turnover plan, so the system can run legally the day it is commissioned.
How are storage tanks regulated in the New England states?
Each New England state runs its own tank program. Massachusetts uses 310 CMR 80.00 for underground systems, Connecticut RCSA 22a-449(d)-101 to 113, Maine 06-096 CMR 691, New Hampshire Env-Or 400 for underground and Env-Or 300 for aboveground facilities over 660 gallons, Rhode Island 250-RICR-140-25-1, and Vermont 10 V.S.A. Chapter 59. Paul Industries designs tanks, containment and piping to the program of the state where the tank stands.
Can one contractor serve a plant group with sites in several New England states?
Paul Industries serves owners with plants in several New England states under one contract, one weld procedure set and one turnover format. State differences, such as the Massachusetts engineer in charge, the Rhode Island permit to install or the Maine operator license, are written into each project. Corporate engineering reviews a consistent package from Bangor to Bridgeport.
How does Paul Industries work in an old New England mill building?
Paul Industries starts with a walkdown of existing piping, floors and access routes, because converted mill buildings often hide undocumented branches and floors rated below modern equipment loads. Structural capacity is confirmed before skids are placed, rigging paths are planned in detail, and as much work as possible is fabricated off site so tie-ins fit inside a short outage.
What does a New England process project cost to build?
A New England process project costs what its scope, materials, outage length, documentation and permits require, and those vary widely between a single skid tie-in and a new biologics suite. Paul Industries prices a budget band from similar scopes, then a fixed figure after the drawings, site walkdown and shutdown dates are settled. Send P&IDs, equipment lists and photos to start.
Can Paul Industries supply skids and vessels to a New England plant without installing them?
Paul Industries supplies fabricated skids, pipe spools, tanks and code pressure vessels on a supply-only basis to plants anywhere in New England, tested and documented before shipment. The nameplate, data reports and National Board registration the code requires ship with the equipment. Owners can add installation, startup and service under the same contract at any point.
Is Paul Industries a New England company?
Paul Industries is an East Coast contractor headquartered at 256 Shore Drive, Kilmarnock, Virginia, and it takes work in every New England state, from Aroostook County in Maine to Fairfield County in Connecticut. It also works in the other 44 states and at plants abroad. New England projects run on the same contract, documents and service terms as the rest of its work.
What records does a Connecticut pharmaceutical plant receive at turnover?
A Connecticut pharmaceutical plant receives as-built isometrics, a weld map with its matching log, mill certificates, hydrostatic and pneumatic test reports, passivation and borescope records for stainless lines, vendor manuals, commissioning sheets and executed IQ and OQ protocols. Boiler and pressure vessel work adds the code documents Chapter 540 requires. Paul Industries organizes all of it into one indexed turnover package.
Does Paul Industries work at semiconductor plants in Vermont?
Paul Industries designs and installs ultrapure water polishing, process cooling water, chemical distribution and exhaust piping for semiconductor plants in Vermont, including suppliers around the Essex Junction fab. Work follows the 2025 Vermont Fire and Building Safety Code, and boilers follow 20 V.S.A. Chapter 173. Call 201-450-8280 to discuss a fab or supplier project.
Planning process work at a New England plant?
Tell us the site, the system to be built, repaired or upgraded, and the shutdown dates available, with drawings or photographs if you have them. Call 201-450-8280 or request a quote.
