Paul Industries is a US process equipment contractor for South Korea that designs and fabricates process skids, pressure vessels, water systems and complete process systems in the United States, tests them before shipment, sends them to Busan or Incheon, and installs, starts up and commissions them at the Korean plant or supervises the installation. Pressure vessels are built and documented for KOSHA safety certification, gas equipment for the High-Pressure Gas Safety Control Act, panels for Korea’s 60 Hz, 220/380 V supply, and GMP systems for the MFDS rules that follow the PIC/S guide. The company’s headquarters are at 256 Shore Drive, Kilmarnock, Virginia.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pressure vessels KOSHA safety certification above 0.2 MPa design pressure
High-pressure gas High-Pressure Gas Safety Control Act (KGS)
Power 60 Hz, 220/380 V
GMP MFDS; PIC/S member since 2014
Trade agreement KORUS FTA, in force since March 15, 2012
Reviewed November 2026

Why Korean plants choose a US process equipment contractor for South Korea

Korean plants choose a US process equipment contractor for South Korea when they want one firm to own a utility system from process design to qualified operation, and when the owner’s corporate engineering standards were written around ASME and US practice. Biologics manufacturers in Songdo, memory and foundry fabs south of Seoul, and chemical plants on the southern coast all run equipment of that lineage. Paul Industries designs the system, fabricates and tests it in the United States, ships it, and then takes it through installation, start-up and qualification at the site, so the plant deals with one contractor across the whole sequence.

Typical scope covers purified water and WFI systems, CIP and SIP systems, bioreactor installation and the utilities around it, ultrapure water systems, process cooling and pressure vessels for chemical service. Korean buyers order in one of three ways: supply with Paul supervising installation, design-build in which Paul also engineers the utility room and interconnections, or complete installation with Paul on site from first lift to signed OQ. The countries on Paul’s list appear on the international overview.

Pharmaceutical industry in South Korea: the Songdo biologics cluster

The pharmaceutical industry in South Korea has concentrated its biologics manufacturing in Songdo, a district of Incheon inside the Incheon Free Economic Zone, where installed drug substance capacity rose from about 50,000 liters in 2010 to 560,000 liters in 2020 and is projected by the zone authority to reach 2.14 million liters by 2030. Samsung Biologics completed Plant 5, a 180,000 liter facility and the first plant on its Bio Campus II, in March 2025, bringing its total to 784,000 liters. Celltrion runs three Songdo plants of 100,000, 90,000 and 60,000 liters and has announced Plants 4 and 5 with 180,000 liters more.

Plants at that scale consume large volumes of WFI, clean steam, CIP solutions and buffer, and every expansion adds utility load before the first bioreactor is filled. The pharmaceutical industry in Korea also includes synthetic drug and vaccine makers across Gyeonggi Province, Osong in North Chungcheong and other regional clusters, which buy reactors, solvent recovery, purified water and cleaning systems. Paul builds those utilities for biotech manufacturing with sanitary design to ASME BPE, drainable slopes, orbital welds logged by weld number, and surface finish records for every product-contact spool.

Semiconductor fabs in South Korea

Semiconductor fabs in South Korea sit mostly in Gyeonggi Province, south of Seoul. Samsung Electronics’ Pyeongtaek campus has its P4 building partly in operation, with the first P5 fab targeted for 2028. SK hynix began construction of the first fab at the Yongin semiconductor cluster in February 2025, aiming for completion in May 2027, on a site planned for four fabs, alongside its existing Icheon operations. Every new fab building draws heavily on ultrapure water, process cooling water, chemical and slurry distribution and scrubbed exhaust. Paul designs and builds those systems for semiconductor plants to the purity targets each fab sets, with SEMI F63 guidance applied to ultrapure water where the fab names it.

Petrochemical complexes in Ulsan, Yeosu and Daesan

Ulsan, Yeosu and Daesan are Korea’s three major petrochemical complexes, and all three are being reshaped: the government approved naphtha cracker restructuring plans for Daesan in February 2026 and for Yeosu in July 2026, and Ulsan’s operators are under pressure to follow. Restructuring shifts investment toward specialty chemicals, which need smaller, more flexible process units: dosing and injection skids, jacketed reactors, heat exchanger packages and process piping, the work described on the chemical manufacturing page.

Korean industrial regions and the process systems Paul supplies
RegionMain industrySystems Paul suppliesArrival port
Songdo, IncheonBiologics drug substance and fill-finishWFI, clean steam, CIP and SIP, media and buffer skidsIncheon
Pyeongtaek, Yongin, IcheonMemory and foundry fabsUltrapure water, process cooling water, chemical distributionPyeongtaek-Dangjin or Busan
Osong and GyeonggiSynthetic drugs and vaccinesReactors, purified water, solvent and cleaning systemsIncheon or Busan
UlsanRefining and petrochemicalsDosing skids, heat exchangers, pressure vesselsUlsan or Busan
Yeosu and DaesanPetrochemicals and specialty chemicalsReactor packages, process piping, gas handling skidsGwangyang or Daesan

What is KOSHA certification for a pressure vessel?

KOSHA certification for a pressure vessel is the mandatory safety certification, carrying the KCs mark, that the Occupational Safety and Health Act requires before a listed hazardous machine is placed in a Korean workplace. KOSHA’s scope for pressure vessels covers a fluid-handling container in a chemical process, or a container in another process that handles air or nitrogen, with a design pressure exceeding 0.2 MPa gauge. That threshold reaches most process vessels, air receivers and nitrogen buffer tanks on a skid. The Korean pressure vessel regulations treat pressure vessels as one of ten hazardous machine types, alongside cranes, presses and lifts.

KOSHA safety certification runs in stages. A document assessment reviews the design drawings, calculations and materials against the safety certification standard; a product assessment examines the finished vessel; and an assessment of technical capability and the production system looks at how the vessel is made. Once certification is in place, a surveillance assessment once a year confirms that production still matches the approved design and process. Fees scale with internal volume. For a US-built vessel that sequence sets the schedule, because design documents go into review before steel is cut, and the product assessment needs access to the vessel during fabrication.

Planning KOSHA certification for a US-built vessel

Planning for KOSHA certification starts at the code review on a Paul Industries project. Paul lists every pressure-retaining item on the skid with its design pressure and contents, identifies the ones above 0.2 MPa that need certification, and prepares the drawings, calculations and material records in the form the document assessment expects. The fabrication plan builds in the product assessment, so the vessel ships with its certification record complete. South Korea pressure vessel certification also reaches the safety devices on the vessel, since KOSHA safety certification covers pressure relief valves and rupture disks as safety devices in their own right, so Paul selects relief devices that carry the KCs mark rather than leaving them to be swapped at site.

Korean regimes that apply to an imported process system
Item on the skidKorean regimeWhat the rule requiresHow Paul prepares it
Process vessels, air and nitrogen receivers above 0.2 MPaKOSHA safety certification (KCs)Document assessment, product assessment, annual surveillanceDrawings, calculations and material records prepared before fabrication
Relief valves and rupture disksKOSHA safety device certificationDevice carrying the KCs mark fitted to the vesselKCs-marked devices specified in the design
High-pressure gas equipmentHigh-Pressure Gas Safety Control Act (KGS)Manufacturer registration and inspection of gas equipmentGas items identified and documented for KGS inspection
Electrical equipment in hazardous areasKOSHA explosion-proof device certificationExplosion-protected equipment carrying the KCs markArea classification and KCs-marked devices in the panel design
Panels and wiringKorea Electro-technical Code (KEC)Installation practice based on IEC 60364IEC-based panel design for 60 Hz, 220/380 V
GMP utilitiesMFDS GMPQualification to the PIC/S-aligned GMP rulesURS, DQ, IQ and OQ protocols and executed records

KGS rules for vessels holding high-pressure gas

Vessels that hold high-pressure gas in Korea follow a separate law and a separate inspection body. The Korea Gas Safety Corporation, a public body set up under Article 28 of the High-Pressure Gas Safety Control Act, inspects gas equipment and registers overseas manufacturers of regulated gas products. Refrigeration packages, CO2 and ammonia systems, nitrogen and specialty gas skids for fabs, and some reactor systems fall under KGS rather than KOSHA. Steam and heat-using equipment such as boilers sits under a third authority, the Korea Energy Agency. The Korean pressure vessel code a plant applies therefore depends on what the vessel holds, and Paul assigns each item to its regime during design so the inspection records match the right authority from the start.

Electrical supply, units and documentation in Korea

Electrical supply in South Korea is 60 Hz at 220 V single phase and 380 V three phase, the same frequency as the United States, and installations follow the Korea Electro-technical Code, which Korea built on the IEC 60364 framework. The shared frequency simplifies one thing: a pump curve selected for 60 Hz holds its duty point. The voltage changes everything else. A US motor wound for 460 V runs poorly on 380 V, so Paul selects motors, drives, transformers and heaters for 380 V from the start and builds panels to IEC 60204-1 with IEC wiring practice, metric conductors and the PLC platform the plant standardizes on. Hazardous-area equipment for solvent rooms and fab chemical areas carries the KCs mark that KOSHA explosion-proof certification grants.

Korean plants work in metric units, megapascals and DN sizes, and operating staff work in Korean. Manuals, labels, standard operating procedures and qualification protocols are issued in the language plan the plant sets, typically Korean with English alongside for a global owner, and tag numbers follow the owner’s engineering standard. Paul agrees that language plan at kickoff so drawings, nameplates and protocols share one terminology.

Cold winters, humid summers and multi-level utility floors

Korean sites swing between cold continental winters and hot, humid summers with a monsoon season, and equipment design has to cover both ends. Outdoor cooling towers, chilled water lines and instrument tubing need freeze protection and drain points for winter, while summer wet-bulb temperatures set the heat rejection capacity of process cooling and the condensation load on cold surfaces. Paul sizes cooling equipment for the summer design condition, adds heat tracing and insulation where lines run outdoors, and specifies vapor barriers on chilled piping so insulation stays dry through the rainy season. Fab and biologics buildings in Korea also stack utilities on several levels to save land, so skids are designed around the lift openings, freight elevators and floor loading of the receiving building. Paul splits larger systems at flanged breaks into modules that fit those openings, then tests the modules joined together at FAT so the work in Korea reduces to setting, bolting up and connecting utilities.

Service after turnover

Service for a Korean plant continues on the records built during the project. Paul Industries keeps the design files, the control program, the FAT data and the as-built drawings for each system, so a question about an alarm, a drifting conductivity reading or a pump that falls off its curve is worked through against the original design. Spare parts lists are written with Pacific shipping times in view, so the plant holds the seals, gaskets, sensors and membranes that would otherwise halt a utility. Planned visits for preventive maintenance, recalibration and requalification are scheduled with the plant’s shutdown calendar.

MFDS GMP and Korea pharmaceutical regulations

MFDS GMP is the manufacturing standard the Ministry of Food and Drug Safety applies to Korean drug plants, and Korea pharmaceutical regulations have tracked the PIC/S guide since the ministry, then the Korea Food and Drug Administration, joined PIC/S in 2014 after applying in 2012. Membership depends on keeping the rules current, so MFDS revises its GMP requirements ahead of PIC/S reassessments. For plant equipment the practical result is a qualification structure that matches EU and PIC/S expectations: user requirements, design qualification, installation and operational qualification, and change control that traces every modification.

Songdo plants supplying the United States and Europe also meet FDA and EU inspections, so their water systems are designed to the United States, European and Korean pharmacopoeia monographs at once. Paul Industries takes the tightest conductivity, TOC and microbial limit among those monographs as the design basis, programs alarm thresholds below it, and runs the installation and operational qualification as part of its validation and commissioning scope, writing the protocols in the Songdo quality unit’s own template so they file directly into its GMP records.

Shipping a skid from the US East Coast to Busan or Incheon

Shipping a skid from the US East Coast to Busan takes about 24 to 35 days on most forwarder data for a full container via the Panama Canal, and some listings show 43 to 56 days where cargo transships. Busan is Korea’s main container gateway and the arrival port for most heavy equipment; Incheon is closer to Songdo, and Pyeongtaek-Dangjin serves the fab belt south of Seoul. Paul chooses the port by the trucking route to the site as much as by the sailing, since a short road leg from Incheon to Songdo or from Pyeongtaek to the fabs reduces handling of a finished module.

The United States-Korea Free Trade Agreement entered into force on March 15, 2012, removing duties on nearly 80 percent of industrial goods trade at once and phasing out most remaining lines since, so US-origin process equipment generally qualifies for duty-free entry with origin documentation. Value-added tax of 10 percent is charged on the customs value plus any duty, and the importer files the declaration through UNI-PASS, the electronic clearance system of the Korea Customs Service. Under Incoterms 2020, Korean buyers often take FCA at a US port with their own forwarder, choose DAP when they want Paul to carry transit risk to the plant, or choose DDP to fold clearance and VAT into Paul’s price. Paul quotes in US dollars and names the Incoterm on every quote.

Export controls and preservation for the Pacific route

US export controls apply to fab and chemical equipment bound for Korea. Wetted parts made from high-nickel alloys, tantalum, titanium or fluoropolymer linings are checked against export classification 2B350, and Electronic Export Information is filed where required. Paul settles classifications when materials are bought. For the voyage, every line is dried after hydrostatic testing, polished surfaces are capped and wrapped, crates carry desiccant, humidity cards and shock indicators, and a photographic packing record goes to the plant before sailing so the Korean receiving team checks the arrival against it.

How a Korean project with Paul Industries runs

A Korean project with Paul Industries moves through nine stages, beginning with a review that sorts every item into its regulator: KOSHA, KGS or the energy agency. Each row shows the stage and what the Korean plant keeps from it.

Stages of a process system project for a Korean plant
StageActivityRecord for the Korean plant
1. Regulator reviewEach pressure item assigned to KOSHA, KGS or the energy agency; voltage confirmed at 380 VCertification list and electrical basis
2. DesignP&IDs, general arrangement, calculations, IEC panel designDocument package for the KOSHA document assessment
3. US fabricationWelding, assembly and wiring with traceable materialsProduct assessment access, weld logs, material records
4. FATPressure, function and interlock testing on 60 Hz powerSigned FAT report, video or in-person witness
5. Export and freightClassification, crating, booking to Busan, Incheon or PyeongtaekInvoice, packing list and origin papers for UNI-PASS
6. Setting and tie-inInstallation by Paul, or supervision of the installationInstallation checklist, marked-up drawings
7. Start-upLine flushing, chemical passivation if the specification calls for it, initial operationCommissioning log and final setpoints
8. QualificationSAT, IQ and OQ to the MFDS GMP rulesExecuted protocols for the quality team
9. TurnoverTraining in the plant’s language, spares, service planAs-builts, KCs records, manuals

Korea is 13 or 14 hours ahead of US Eastern time, depending on US daylight saving, so a factory acceptance test streamed to Korean engineers runs in the US evening, which is the Korean morning. After turnover, Paul keeps the drawings, program and test data on file and works service questions through with the plant on a shared screen before any part ships across the Pacific.

Who builds process systems for plants in South Korea?

Paul Industries builds process systems for plants in South Korea, carrying WFI loops, CIP and SIP skids, ultrapure water trains, process cooling and chemical process packages from US fabrication to qualified operation at Korean sites. Paul engineers the systems, fabricates them in the United States, prepares each pressure vessel’s record for KOSHA safety certification and each gas item for KGS, builds panels for 380 V and 60 Hz, and qualifies GMP equipment to MFDS rules. The company was formerly based in northern New Jersey and then Pennsylvania, now has its headquarters in Kilmarnock, Virginia, and takes work in every US state and abroad, including plants in Japan on both of that country’s grids.

What adds to the cost of a process system delivered to South Korea?

The cost of a process system delivered to South Korea is shaped by five items besides the equipment, and Paul Industries shows each on its own line in the quote.

  • KOSHA and KGS documentation. Each vessel above 0.2 MPa and each regulated gas item adds document preparation and assessment time, so the count of pressure items drives this line.
  • Voltage conversion at the design stage. Motors, drives and heaters bought for 380 V cost differently from standard US 460 V items, and IEC panels follow their own component list.
  • Freight and port choice. Container versus flat rack, transshipment, and the arrival port set the ocean and road costs.
  • VAT and clearance under the Incoterm. FCA and DAP leave the 10 percent VAT with the importer; DDP places it in Paul’s price.
  • Installation route. Supervision uses a smaller Paul team in Korea; complete installation keeps start-up and qualification with the builder.

A budget estimate comes from comparable scope early on, and the fixed price follows once the drawings, the certification list and the Incoterm are agreed.

Paul Industries for South Korean plants

Paul Industries designs, builds, tests, ships and commissions process equipment for biologics plants in Songdo, fabs in Pyeongtaek, Yongin and Icheon, and chemical plants in Ulsan, Yeosu and Daesan. Each system leaves the United States wired for 380 V and 60 Hz, with its pressure vessels documented for KOSHA, its gas items for KGS and its GMP records ready for the plant’s quality team. Korean plants share the process duty, the site and their delivery terms when they request a quote.

Standards referenced: Occupational Safety and Health Act (KOSHA safety certification, KCs mark) · High-Pressure Gas Safety Control Act · Korea Electro-technical Code (KEC) · IEC 60364 · IEC 60204-1 · MFDS GMP (KGMP) · PIC/S GMP Guide · Korean Pharmacopoeia · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · SEMI F63 · Incoterms 2020 · ISPM 15

Frequently asked questions

Which US-built vessels need KOSHA safety certification before use in Korea?

A vessel used in a Korean chemical process, or one holding air or nitrogen, with a design pressure above 0.2 MPa gauge needs KOSHA safety certification under the Occupational Safety and Health Act. That means a document assessment of its drawings and calculations, a product assessment of the finished vessel and annual surveillance. Paul Industries prepares the design documents before fabrication and builds the assessment into the fabrication plan.

What is KGS certification, and which equipment needs it?

KGS is the Korea Gas Safety Corporation, a public body under the High-Pressure Gas Safety Control Act that inspects gas equipment and registers overseas manufacturers of regulated gas products. Refrigeration packages, CO2 and ammonia systems, and nitrogen and specialty gas skids typically fall under it. Paul Industries identifies those items at the code review and documents them for the KGS inspection.

Do relief valves on a skid need their own certification in Korea?

KOSHA lists pressure relief valves and rupture disks among the safety devices that need safety certification, separate from the vessel they protect. A US-built skid fitted with uncertified relief devices faces replacement at site. Paul Industries specifies relief valves and rupture disks that carry the KCs mark during design, so the protected vessel and its devices arrive with matching records.

Does a 60 Hz US pump work on Korean power?

Korea’s 60 Hz supply matches the United States, so a pump curve keeps its duty point, but the 380 V three phase voltage differs from US 460 V. A motor wound for 460 V runs undervoltage on 380 V, losing torque and running hot. Paul Industries buys motors, drives, heaters and transformers for 380 V from the start, so every rotating machine runs at its rating.

What transit time should a Korean plant plan for between the US East Coast and Busan?

Most forwarder data puts a full container from the US East Coast to Busan at about 24 to 35 days via the Panama Canal, with some listings showing 43 to 56 days where cargo transships. Canal conditions and port congestion move those figures. Paul Industries reserves space with the carrier once crate sizes are fixed, and the schedule shows ocean transit as a separate activity after FAT.

Should equipment for a Songdo biologics plant land at Incheon or Busan?

Incheon sits next to Songdo and gives the shortest road move for finished modules, while Busan offers the widest choice of sailings from the US East Coast. The decision rests on sailing availability, crate dimensions and the road route into the plant. Paul Industries compares both for each shipment and books the one that delivers the module with the least handling.

What does KORUS change for a Korean importer of a US-built skid?

The United States-Korea Free Trade Agreement, in force since March 15, 2012, eliminated duties on nearly 80 percent of industrial goods trade immediately and has phased out most other lines since, so US-origin process equipment generally enters duty free with origin documentation. Value-added tax of 10 percent still applies at import. Paul Industries supplies the origin papers with each shipment.

How is import VAT calculated on a skid entering Korea?

Korea charges value-added tax of 10 percent on the customs value of the goods, usually the CIF value, plus any customs duty. With duty-free KORUS entry, a skid with a customs value of 1 billion won carries 100 million won of VAT. The importer pays it through the UNI-PASS declaration unless the order is DDP, in which case Paul Industries includes it in the price.

Which ultrapure water work does Paul Industries take on at Pyeongtaek and Yongin fabs?

For Korean fabs in the Pyeongtaek and Yongin regions, Paul Industries engineers and builds ultrapure water trains, from pretreatment and reverse osmosis through polishing loops and distribution to the tools, and installs them on site. Systems are built from high-purity polymers and electropolished stainless steel to the resistivity, TOC and particle limits the fab sets, wired for 380 V and 60 Hz, and commissioned with the fab’s facilities team.

Does Paul Industries supply WFI and CIP systems to biologics plants in Songdo?

Paul Industries builds WFI generation and distribution, clean steam, and CIP and SIP systems for biologics plants in Songdo, Incheon, and qualifies them on site to MFDS GMP rules. Sanitary design follows ASME BPE, every product-contact weld is logged, and vessels above 0.2 MPa ship with their KOSHA certification records. Paul also builds the media and buffer preparation skids around them.

What is MFDS GMP, and how does it affect plant equipment?

MFDS GMP is the drug manufacturing standard of Korea’s Ministry of Food and Drug Safety, aligned with the PIC/S guide since Korea joined PIC/S in 2014. For equipment it means documented user requirements, design qualification, installation and operational qualification, and controlled changes. Paul Industries writes and executes those protocols with the plant’s quality team so the records match MFDS expectations.

Which equipment for a Yeosu or Ulsan chemical plant needs explosion-proof certification?

Electrical equipment installed in hazardous areas, where flammable solvents or gases are present, needs KOSHA explosion-proof device certification in Korea. On a chemical skid that covers motors, instruments, junction boxes and lighting inside the classified zone. Paul Industries classifies the areas during design and specifies explosion-protected devices carrying the KCs mark for every item inside them.

What language are manuals and protocols in for a Korean plant?

Operators and maintenance staff at Korean plants work in Korean, so manuals, operating procedures, labels and qualification protocols follow the language plan the plant sets, often Korean with English alongside for a global owner. Paul Industries agrees that plan at kickoff, and drawings, nameplates and protocols then share one terminology from the first draft to turnover.

Which Incoterm suits a first US equipment order for a Korean plant?

Plants with a group forwarder usually take FCA at a US port. A plant placing its first order often prefers DAP to the site, with Paul Industries carrying freight and transit risk to the gate while the importer handles UNI-PASS clearance and VAT. DDP adds both to Paul’s scope. Paul prices the options side by side on request.

How does a factory acceptance test work for engineers in Korea?

Korean engineers either attend the test in person or follow it by live video, with the sequence scheduled for the US evening, which is the Korean morning. The test covers pressure holds, instrument loops, interlocks and automatic sequences on 60 Hz power, and the plant signs the record before the crates close. Paul Industries sends the protocol ahead so the plant’s engineers comment before the test date.

What does Paul Industries deliver at turnover for a Korean project?

Turnover includes as-built drawings, design calculations, KOSHA and KGS records for the pressure and gas items, weld logs and material certificates, factory and site test reports, signed IQ and OQ packages, Korean and English manuals as agreed, PLC and HMI program backups, and recommended spares chosen with the ocean lead time to Busan in mind. Records come in the plant’s document format.

Which information lets Paul Industries price a Korean project?

A useful enquiry from Korea includes P&IDs or a process description, the plant address and available utilities, corporate engineering standards, whether the system is GMP, the documentation language, the delivery term and the installation route the plant prefers. From that, Paul Industries prepares a list of KOSHA and KGS items, a port and sailing proposal, and a budget figure in US dollars.

Planning a process system for a plant in South Korea?

Share the duty, the Korean plant location and the vessels on the skid; Paul Industries answers with the KOSHA and KGS item list, a port plan and a budget figure. Call 201-450-8280 or request a quote.