Paul Industries is a US process equipment contractor for Australia that designs skids, pressure vessels, purified water systems and complete process systems, fabricates and tests them in the United States, ships them to Melbourne, Sydney, Brisbane or Fremantle, and installs, starts up and commissions them at the Australian plant or supervises the installation. Vessels arrive with the design documentation that state design registration calls for, panels are built for 50 Hz, 230/400 V supply and AS/NZS 3000 installation, and GMP equipment is qualified to the PIC/S guide the Therapeutic Goods Administration applies. Every Australian order is managed from the company headquarters at 256 Shore Drive in Kilmarnock, Virginia.
Request a quote or call 201-450-8280
When an Australian plant uses a US process equipment contractor for Australia
An Australian plant uses a US process equipment contractor for Australia when it wants one firm responsible for a process system from design to qualified operation, and when the owner’s standards, the product’s regulators or the existing plant are built around American codes and equipment. Biologics and vaccine plants in Melbourne, LNG trains in Queensland and Western Australia, and dairy and food plants across Victoria and New South Wales each fit that description. Paul Industries designs the system, builds and tests it in the United States, crates and ships it, and completes installation, start-up and qualification at the Australian site.
The equipment list runs from purified water and WFI and clean steam to pressure vessels, heat exchanger packages, pump and chemical injection skids, CIP systems and process tanks. Australian buyers choose between supply with installation supervision, design-build that adds layout and interconnecting piping, and complete installation with Paul on site through commissioning. Every country Paul works in is listed on the international page.
Pharmaceutical manufacturing in Australia and the plants around Melbourne
Pharmaceutical manufacturing in Australia is heavily concentrated in Victoria, where two recent plants show the scale of investment. CSL opened its A$900 million plasma fractionation facility at Broadmeadows, in Melbourne’s north, on 7 December 2022, lifting the site’s capacity to more than nine million plasma equivalent litres a year. Moderna opened its mRNA vaccine plant on Monash University’s Clayton campus in December 2024, built to produce up to 100 million doses a year and described by the Victorian Government as the Southern Hemisphere’s first commercial-scale, end-to-end mRNA facility.
Fractionation, vaccine and biologic plants of that kind consume WFI, clean steam and CIP solutions in volume, run cold rooms and process chillers continuously, and qualify every utility that touches product. Paul builds those systems for biotech and pharmaceutical plants with sanitary design to ASME BPE, slopes that drain, and weld and surface finish records for every product-contact spool, and the same approach serves contract manufacturers and complementary medicine makers in Sydney and Melbourne.
LNG, mining and minerals processing
Australia’s resource plants buy process equipment of a heavier kind. Three LNG plants stand on Curtis Island near Gladstone in Queensland, among them Queensland Curtis LNG with 8.5 million tonnes a year of capacity, while Western Australia hosts the North West Shelf, operating since 1989 at 16.9 million tonnes a year and approved to run until 2070, and Chevron’s 15.6 million tonne Gorgon plant on Barrow Island. Lithium hydroxide refineries at Kwinana and Kemerton show how fast minerals processing moves: Kwinana’s second phase was halted in January 2025 and Kemerton placed in care and maintenance in February 2026. Operators of that kind buy chemical injection and dosing skids, pressure vessels, heat exchangers, water treatment and produced water systems, the scope on the oil and gas page.
Dairy and food processing
Dairy processors in Victoria’s Gippsland and western districts, and food plants around Sydney, Brisbane and Adelaide, buy CIP systems, hot water and steam utilities, glycol and chilled water packages and hygienic process piping. Paul designs those systems to the hygiene and cleanability standards the plant’s export markets demand, described on the dairy processing page.
| State and region | Industry | Systems Paul supplies | Usual arrival port |
|---|---|---|---|
| Victoria (Melbourne north and southeast) | Plasma fractionation, vaccines, biologics | WFI, clean steam, CIP, process cooling, buffer skids | Melbourne |
| New South Wales (Sydney) | Pharmaceuticals, complementary medicines, food | Purified water, CIP, process tanks, pump skids | Port Botany |
| Queensland (Gladstone, Brisbane) | LNG, chemicals, food processing | Chemical injection skids, vessels, heat exchangers | Brisbane or Gladstone |
| Western Australia (Pilbara, Kwinana) | LNG, minerals and battery materials | Pressure vessels, water treatment, dosing skids | Fremantle |
| Victoria and South Australia (regional) | Dairy and food | CIP, glycol and chilled water, hygienic piping | Melbourne or Adelaide |
How does pressure vessel design registration work in Australia?
Under the rules for pressure vessel design registration, Australia’s states and territories each run the process within the Australian pressure equipment regulations: before certain pressure equipment is used at a workplace, its design is registered with the work health and safety regulator, and some items are then registered individually as well. In the states that adopted the model Work Health and Safety Regulations, including New South Wales, Queensland and Western Australia, Schedule 5 lists the plant affected. Western Australia’s regulator applies design registration to pressure equipment, other than pressure piping, in hazard levels A to D, and item registration to boilers and pressure vessels in hazard levels A, B or C. Victoria runs its own Occupational Health and Safety Regulations 2017, whose Schedule 2 also lists pressure equipment for design registration with WorkSafe Victoria.
The design registration application has to demonstrate that the design complies with published technical standards or engineering principles, and it includes representational drawings of the plant. Regulators accept recognised international standards such as ASME, AS and EN, on condition that the chosen standard is applied in full rather than mixed clause by clause. Australia pressure vessel registration therefore rests on a clean design basis: one named code, calculations to it, drawings that show the design, and fabrication and test records that prove the vessel matches. Air receivers on compressor packages are the items most often overlooked, and Western Australia’s regulator notes that they typically need registration.
What sets a pressure vessel hazard level?
A pressure vessel hazard level comes from Section 2.1 of AS 4343, which grades pressure equipment from A, for the greatest hazard, down to E, for the least, using pressure, volume, the fluid contained and the type of equipment. The level decides which registrations apply: hazard levels A to D need design registration, and A to C also need item registration for boilers and vessels. Paul Industries calculates the hazard level of every vessel, receiver and heat exchanger on a skid during the code review and lists it beside the item on the bill of materials, so the Australian plant sees at once which items need design registration, which need item registration as well, and which need neither.
AS1210 vs ASME: choosing the design code
AS1210 vs ASME is a decision the plant and Paul settle before design starts. AS 1210 is the Australian pressure vessel standard and the natural basis for a vessel registered in Australia, while ASME Section VIII is a recognised international standard that regulators accept when it is applied in full, and it suits owners whose corporate standards and spare parts are built around ASME. Either way, the vessel’s documentation names a single code. Paul designs to the code the owner chooses, prepares calculations and drawings in the form a design registration application needs, and keeps fabrication, weld and pressure test records that tie the finished vessel to the registered design. The table below summarizes the registration picture for a typical process skid.
| Item | Hazard levels in scope | Registration required | What Paul delivers |
|---|---|---|---|
| Process pressure vessel | A to C | Design registration and item registration | Design basis, calculations, drawings, fabrication and test records |
| Pressure vessel at hazard level D | D | Design registration | Calculation package and representational drawings |
| Air receiver on a compressor package | Set by its pressure and volume under AS 4343 | Design registration; item registration at C | Hazard level calculation and registration documents |
| Steam boiler or clean steam generator | Set by AS 4343 | Design and item registration where in scope | Code basis, test records, nameplate data |
| Pressure piping | Outside design registration | None for design registration | Piping design to the named code with test records |
| Equipment at hazard level E | E | None | Design and test records for the plant’s files |
Electrical supply and importing electrical equipment into Australia
Electrical supply in Australia is 50 Hz, at 230 V single phase and 400 V three phase, with 415 V still common in practice, and installations are built to AS/NZS 3000, the Wiring Rules, which state electrical safety laws incorporate. Importing electrical equipment into Australia for a process skid therefore means designing the panel and field wiring so connection and inspection against AS/NZS 3000 go ahead without rework. Paul builds control panels to IEC 60204-1 with IEC wiring colours and metric conductors, selects motors and drives for 50 Hz duty, sizes pumps on 50 Hz curves so flow and head hold at the design point, and rates enclosures for the site, from humid tropical Queensland to the dust and heat of the Pilbara.
Australian plants work in metric units, kilopascals and DN sizes, and English documents need no translation, though Australian spelling and terms appear in operating procedures. Paul issues drawings in metric units, tags every item to the owner’s numbering, and selects instruments and valves the plant’s maintenance team already stocks.
Heat, cyclones and remote sites
Australian site conditions range further than most destinations Paul ships to. Northern Queensland and the Pilbara bring cyclone seasons, high ambient temperatures and salt-laden coastal air; inland mine and processing sites bring dust and long distances from spares; and southern dairy and pharmaceutical plants see hot, dry summer peaks that set the duty of every cooling tower and chiller. Paul designs skid frames, enclosures and supports for the wind loads and ambient temperatures in the plant’s design basis, specifies coatings and stainless grades for coastal exposure, fits panels with cooling or ventilation sized for summer peaks, and sizes heat rejection on the site’s summer design conditions. For remote sites, modules are planned around road access and crane availability at the destination, and spare parts packages are written so the plant holds the wear items that would otherwise stop a utility for weeks.
Service after handover in Australia
Service for an Australian plant draws on the records built during the project. Paul Industries keeps the calculations, registration documents, control program, FAT data and as-built drawings for each system on file, so an alarm, a drifting instrument or a pump running off its curve is diagnosed against the original design while the plant’s engineers share live data. Planned maintenance, recalibration and requalification visits are set to the plant’s shutdown calendar, and design changes are recorded so the registered design and the plant’s GMP file stay current.
TGA GMP requirements for pharmaceutical equipment
TGA GMP requirements for medicine manufacturers are set by the Therapeutic Goods (Manufacturing Principles) Determination, which since 1 September 2025 adopts the PIC/S Guide to GMP of 25 August 2023, PE009-17, except Annexes 4, 5 and 14. The guide has legal force through section 36 of the Therapeutic Goods Act 1989, and the change from the previous version concerns the revised Annex 1 for sterile manufacture, which the TGA is assessing in phases at inspection. For equipment, that means contamination control strategy, closed processing, water and steam quality, and qualification records that trace every requirement to a test.
Paul Industries writes the user requirement specification, design qualification and the installation and operational qualification protocols against PE009-17 and its Annex 1, executes them on site through validation and commissioning, and hands the executed protocols to the plant’s quality unit in its own document format. Water systems are designed to the pharmacopoeia the products are registered against, commonly the European and British monographs alongside the United States monograph for exporters.
Sea shipping from USA to Australia and clearing customs
Sea shipping from USA to Australia runs through the Panama Canal for East Coast cargo, and forwarder data puts New York to Sydney at about 36 days, with East Coast to Australian ports generally in a 35 to 42 day range depending on the service and its calls. Melbourne is Australia’s largest container port and the arrival point for Victorian pharmaceutical and dairy plants; Port Botany serves Sydney, Brisbane serves Queensland, and Fremantle serves Perth, Kwinana and the gateway to the Pilbara. Paul selects the port by the inland route to the plant, then fixes the factory acceptance test date backward from the chosen sailing.
Importing machinery into Australia from the United States is simplified by the Australia-United States Free Trade Agreement, in force since 1 January 2005, under which 99 percent of US-origin goods enter duty free with the right origin documentation. Goods and services tax of 10 percent applies to the value of the taxable importation, which adds customs value, any duty, and international transport and insurance, and registered businesses generally claim it back. Australian biosecurity rules apply to timber packaging, so every crate uses ISPM 15 heat-treated and marked wood. Under Incoterms 2020, plants with an established forwarder take FCA at a US port, DAP suits plants that want Paul to carry transit risk to the gate, and DDP puts the GST and clearance in Paul’s price. All quotes are in US dollars.
Preservation for a long southern voyage
A voyage to Australia crosses the tropics before arriving in a different season from the one it left, so Paul prepares crates for heat and humidity over five or six weeks. Every line is drained and dried after the hydrostatic test, polished surfaces are capped and wrapped, crates are lined with vapor barrier and filled with desiccant for the full transit, and humidity cards and shock indicators go inside each crate. Vessels are nitrogen blanketed where the specification asks for it, and a photo record of every crate’s contents reaches the plant before the ship docks.
How an Australian project with Paul Industries runs
An Australian project with Paul Industries follows nine steps, starting with the hazard level and registration review that decides how each vessel is documented. The table shows each step and the record it leaves with the Australian plant.
| Step | What Paul does | Record for the Australian plant |
|---|---|---|
| 1. Registration review | Hazard level of every pressure item, design code chosen, state regulator identified | Registration list per item |
| 2. Engineering | P&IDs, layout, calculations, 50 Hz panel design to IEC 60204-1 | Calculations and representational drawings for design registration |
| 3. Fabrication | Welding, assembly and wiring in the United States with material traceability | Weld, material and pressure test records tied to each design |
| 4. Acceptance testing | Hydrostatic, functional and interlock testing on 50 Hz power | Signed FAT record from an in-person or video witness |
| 5. Export | ISPM 15 crating, preservation, booking to the nearest Australian port | Invoice, packing list and AUSFTA origin documents |
| 6. Site installation | Installation by Paul, or supervision of the installation | Installation records for AS/NZS 3000 inspection |
| 7. Commissioning | Flushing, passivation as specified, first production runs | Commissioning report and setpoint list |
| 8. Qualification | SAT, IQ and OQ against PE009-17 | Executed protocols for the TGA file |
| 9. Handover | Training, spares, service plan | As-builts, registration documents, manuals |
Sydney and Melbourne run 14 to 16 hours ahead of US Eastern time across the year as both countries change their clocks in opposite seasons, and Perth runs 12 or 13 hours ahead. Witnessed tests that Australian engineers follow by video therefore start in the US late afternoon or evening, which is the next morning in Australia, and service calls after handover follow the same pattern.
Who builds process systems for plants in Australia?
Paul Industries builds process systems for plants in Australia, delivering anything from a single chemical injection skid to complete WFI, clean steam, CIP, process cooling and water treatment systems, qualified and running at the Australian site. Paul engineers each system, fabricates and tests it in the United States, prepares the design documentation for state design registration, builds panels for 50 Hz supply and AS/NZS 3000 installation, and qualifies GMP equipment to PE009-17. Formerly based in northern New Jersey and then Pennsylvania, Paul now operates from its Kilmarnock, Virginia headquarters and takes work across the United States and abroad, including Singapore plants on the same 50 Hz frequency and Japanese plants on two grids.
What does a process system for an Australian plant cost beyond the equipment?
A process system for an Australian plant carries five cost lines beyond the equipment, and Paul Industries itemizes each in the quote.
- Registration documentation. Calculation packages and drawings for design registration grow with the number of vessels in hazard levels A to D.
- 50 Hz and AS/NZS 3000 design. Motors, drives and panels for 230/400 V supply follow a different component list from a US 60 Hz build.
- Freight to the southern hemisphere. The long voyage, container or flat rack choice and the inland leg to sites like Gladstone or the Pilbara set the freight line.
- GST and clearance by Incoterm. On FCA or DAP terms the importer pays the 10 percent GST at the border, while a DDP quote carries it inside the delivered price.
- Installation route. Supervision keeps the Paul team in Australia small; complete installation keeps commissioning and qualification with the builder.
A budget estimate draws on similar past scope, and the fixed price follows once the hazard level list, the drawings and the Incoterm are agreed. Because every Paul quote is fixed in US dollars, the Australian dollar equivalent moves with the exchange rate until payment, so each quote states the Incoterm and the scope behind every price line, letting the plant compare delivery options on the same basis. Plants comparing a supervised installation with a complete installation see the difference as separate site labor and commissioning lines, with the equipment price unchanged between the two.
Paul Industries for Australian plants
Paul Industries designs, fabricates, tests, ships and commissions process equipment for pharmaceutical plants in Melbourne and Sydney, LNG and minerals plants in Queensland and Western Australia, and dairy and food plants across the south east. Each system leaves the United States wired for 50 Hz, with its vessels documented for design registration and its GMP records ready for the TGA file. Australian plants share the duty, the site and the delivery term when they request a quote.
Standards referenced: Model Work Health and Safety Regulations (Schedule 5) · Occupational Health and Safety Regulations 2017 (Victoria) · AS 1210 Pressure vessels · AS 4343 Pressure equipment: hazard levels · AS/NZS 1200 Pressure equipment · ASME Boiler and Pressure Vessel Code Section VIII · AS/NZS 3000 Wiring Rules · IEC 60204-1 · PIC/S Guide to GMP PE009-17 (TGA Manufacturing Principles) · ISO 14644-1 · Incoterms 2020 · ISPM 15
Frequently asked questions
Does a US-built pressure vessel need design registration before use in Australia?
Pressure equipment in hazard levels A to D under AS 4343, other than pressure piping, needs its design registered with the state or territory regulator before use, and boilers and vessels at levels A to C need item registration too. The application shows the design meets a published standard such as AS 1210 or ASME Section VIII applied in full. Paul Industries prepares the calculations, drawings and records the application needs.
What does pressure vessel design registration in Australia require in the application?
The application demonstrates that the design complies with published technical standards or engineering principles and includes representational drawings of the plant. A recognised international standard is acceptable when applied in full. Paul Industries supplies a design basis naming one code, calculations to that code, the drawings and the fabrication and test records that tie the built vessel to the registered design.
How is a pressure vessel hazard level worked out under AS 4343?
AS 4343 grades pressure equipment from A, for the greatest hazard, down to E, for the least, based on its pressure, volume, the fluid contained and the equipment type. The grade decides the registrations: A to D need design registration and A to C also need item registration for vessels and boilers. Paul Industries calculates the level for every pressure item during the code review and lists it on the bill of materials.
Which is better for an Australian plant, AS 1210 or ASME Section VIII?
Both are accepted when applied in full. AS 1210 is the Australian vessel standard and fits plants that standardize on Australian codes, while ASME Section VIII suits owners whose corporate engineering standards and spares are built around ASME. The deciding factors are the owner’s standards and the plant’s inspection program. Paul Industries designs to the chosen code and documents the vessel for design registration.
Do air receivers on compressor packages need registration in Australia?
Air receivers on compressor packages usually fall within design registration, and Western Australia’s regulator notes that they typically need registration. Depending on their hazard level under AS 4343, item registration applies as well. Paul Industries calculates the receiver’s hazard level, lists it as a registrable item in the code review and supplies the documents the registration needs.
What voyage length should a Melbourne or Sydney plant schedule for a skid from New York?
Forwarder data puts New York to Sydney at about 36 days, and US East Coast to Australian ports generally at 35 to 42 days via the Panama Canal, depending on the service and its port calls. Paul Industries books space once crate sizes are fixed and shows the ocean voyage as its own activity in the schedule between factory testing and site arrival.
Which port should equipment for a Gladstone or Pilbara project use?
Queensland projects around Gladstone usually receive equipment through Brisbane or directly through Gladstone, while Pilbara and Kwinana projects use Fremantle as the container gateway, with long road legs north. The inland route often decides module size more than the ship does. Paul Industries plans modules around road limits and site access as well as the ocean container or flat rack.
What does AUSFTA mean for the landed cost of a US-built skid?
Under the Australia-United States Free Trade Agreement, in force since 1 January 2005, 99 percent of US-origin goods enter duty free when the importer holds the right origin documentation. GST of 10 percent still applies to the value of the taxable importation and registered businesses generally claim it back. Paul Industries supplies the origin documents with each shipment.
How is GST calculated on a skid imported into Australia?
GST on imports is 10 percent of the value of the taxable importation, which adds the customs value, any customs duty and the cost of international transport and insurance. For duty-free AUSFTA goods, that is essentially the landed value. The importer pays it at clearance unless the order is DDP, in which case Paul Industries pays it and includes it in the price.
Does Paul Industries build WFI and clean steam systems for biologics plants in Melbourne?
Paul Industries designs, fabricates and installs WFI generation and distribution, clean steam generators and CIP systems for biologics, plasma and vaccine plants in Melbourne and across Victoria, and qualifies them to the PIC/S guide the TGA adopts. Sanitary design follows ASME BPE, product-contact welds are logged, and any registrable vessel ships with its design registration documents.
What are the TGA GMP requirements for water and steam systems?
The TGA requires medicine manufacturers to meet the PIC/S Guide to GMP PE009-17, adopted from 1 September 2025 with its revised Annex 1 for sterile manufacture. For water and steam that means systems designed for the registered pharmacopoeia, a contamination control strategy, monitoring and qualification records. Paul Industries designs and qualifies water and steam systems against those requirements with the plant’s quality unit.
How does Australia's 50 Hz supply affect a US-designed pump skid?
A pump selected on a 60 Hz curve runs about one sixth slower on Australia’s 50 Hz supply, losing flow and head, and a motor wound for US voltage runs at the wrong rating on 400 V. Paul Industries selects pumps on 50 Hz curves and motors for 230/400 V from the start, so the skid meets its duty point on arrival.
What electrical standard does a control panel shipped to Australia follow?
Electrical installations in Australia are built to AS/NZS 3000, the Wiring Rules, which state laws incorporate, and machine control panels follow IEC 60204-1 practice. Paul Industries builds panels with IEC wiring colours, metric conductors and 50 Hz components, and documents them so the plant’s electrical inspection against AS/NZS 3000 proceeds without rework.
Does Paul Industries supply chemical injection skids for LNG plants in Queensland and Western Australia?
Paul Industries designs and builds chemical injection and dosing skids, pressure vessels and heat exchanger packages for LNG and gas processing plants in Queensland and Western Australia, wired for 50 Hz and documented for design registration where the items fall in hazard levels A to D. Enclosures and coatings are selected for coastal and tropical sites.
Why do crates for Australia need ISPM 15 wood?
Australia enforces strict biosecurity rules on timber packaging, and wood packaging must be heat treated and marked to ISPM 15 to clear without fumigation or rejection. Paul Industries builds every export crate from ISPM 15 treated and marked timber, records the marks on the packing list, and photographs each crate so Australian biosecurity inspection proceeds smoothly at the port.
What does Paul Industries hand over at the end of an Australian project?
The handover includes as-built drawings, design calculations, design and item registration documents for each registrable vessel, weld and material records, FAT and SAT reports, executed IQ and OQ protocols for GMP systems, operating manuals, the control program and a spares list sized for the ocean lead time to Australia, delivered in the plant’s own document format.
What should an Australian plant send to get a quote in US dollars?
A complete enquiry lists the process duty or P&IDs, the plant’s state and address, its utilities, the owner’s engineering standards and preferred vessel code, whether the system is GMP, the delivery term, and the installation route. Paul Industries responds with a hazard level and registration list, a port and sailing plan and an estimate in US dollars.
Planning a process system for an Australian plant?
Describe the duty and the Australian site, name the state, and Paul Industries will set out the registration list, the sailing schedule and an early estimate in US dollars. Call 201-450-8280 or request a quote.
