Paul Industries designs, fabricates, installs and tests process piping in Delaware for refineries, chemical and materials plants, API manufacturers and poultry processors, building each line to ASME B31.3 and to the Delaware permits that sit around it. Delaware packs a refinery, a chemical industry that dates to 1802, pharmaceutical producers and the county that has long led the nation in broiler production into three counties, and a good share of that industry sits inside the Coastal Zone. Paul Industries takes piping work in every one of those settings, from New Castle County to Sussex County.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Coastal Zone Act Heavy industry limited to 14 existing sites; manufacturing needs a DNREC permit
Air permits DNREC approval before building or altering an emitting source (Reg. 1102)
Boiler external piping ASME B31.1, adopted in 7 DE Admin. Code 1353
Delaware City Refinery throughput capacity 180,000 barrels a day (PBF)
Reviewed November 2026

What is process piping work at a Delaware plant?

Process piping work at a Delaware plant means building the lines that carry crude oil and refined products at Delaware City, acids, solvents and monomers at chemical and materials plants along the river, reaction media and solvents at API producers around Newark, and ammonia, hot water and wastewater at poultry plants in Sussex County. Every one of those lines is process piping in the sense of ASME B31.3: piping that moves the chemicals, products, intermediates and utilities a plant uses to make what it sells, inside the plant boundary.

In practice the work covers design and stress review, material selection, spool fabrication, field erection, supports, welding and examination, pressure testing, and the records that prove the line matches its design. The national scope and the code basis are on the process piping page. Product-contact stainless work under ASME BPE has its own Delaware page, sanitary process piping in Delaware. This page covers the rest of the plant: the industrial lines that carry hydrocarbons, corrosives, gases, refrigerants and plant utilities.

Where Delaware’s process plants sit, county by county

Delaware’s process plants sit in three bands: a heavy industrial strip along the Delaware River from Claymont through Wilmington to Delaware City, a research and pharmaceutical cluster around Newark, and a food and poultry economy that runs down the Delmarva peninsula through Kent and Sussex counties. Each band brings its own fluids, codes and outage habits, and the piping work follows them.

Delaware’s process regions, the plants found there and the piping they run
RegionPlants found there (market facts)Typical process linesHow outages are usually taken
Delaware City and the Route 9 corridorPBF’s Delaware City refinery (180,000 barrels a day); Croda’s Atlas Point plant at New CastleHydrocarbon, hydrogen, sour water, steam and ethylene oxide servicePlanned unit turnarounds, with tie-ins staged for the outage
Wilmington, Claymont and EdgemoorChemical company headquarters, specialty producers, port and terminal operationsSolvent, acid, caustic, compressed gas and transfer linesShort weekend outages and hot taps on live headers
Newark and the STAR CampusWilmington PharmaTech’s 54-acre API campus; the Chemours Discovery HubSolvent, nitrogen, vacuum, reactor jacket and laboratory utility linesCampaign changeovers and suite-by-suite shutdowns
Middletown, Smyrna, Dover and Kent CountyFood, packaging and light manufacturing plantsHot water, glycol, compressed air, steam and process waterWeekend and holiday shutdowns
Georgetown, Millsboro, Milford, Seaford and Sussex CountyPerdue in Georgetown and Milford, Mountaire in Millsboro and Selbyville, Allen Harim in Harbeson and MillsboroAmmonia refrigeration, chilled water, hot water, wastewater and rendering linesSanitation shifts and short line stops

Process piping in Wilmington and along the river

Process piping in Wilmington and the river towns runs through some of the oldest industrial ground in the country, and old ground means old drawings. Plants here often carry several generations of piping on the same rack, installed decades apart to different specifications, with alloy or lined pipe added later for newer chemistries. Before any new line is routed, Paul Industries walks the rack, confirms which lines are live, and records what the drawings miss, because a tie-in placed on the right pipe the first time costs the least.

Delaware City, New Castle and the refinery corridor

The Delaware City refinery, which PBF rates at 180,000 barrels a day of throughput, and the chemical sites around New Castle concentrate the state’s high-hazard piping. Hydrogen, hydrocarbon and sour water service bring B31.3 normal or severe cyclic conditions, high examination rates, positive material identification on alloy, and a management of change review for every modification. Croda’s Atlas Point plant began making ethylene oxide from bio-ethanol feedstock in 2017, a reminder that new chemistry still lands on old Delaware sites, and with it new piping.

Newark API plants and research buildings

Newark is where Delaware’s pharmaceutical chemistry is growing. Wilmington PharmaTech announced in March 2026 a $50 million expansion of its Newark campus, with two 10,000-liter reactor suites for small-molecule APIs and peptides due by the third quarter of 2027. API reactor suites are piped mostly to B31.3, not to sanitary standards: solvent charge lines, nitrogen blanketing, vacuum, jacket heating and cooling, scrubber headers and transfer lines, often in Hastelloy, glass-lined or PTFE-lined pipe where the chemistry demands it.

Sussex County poultry and the Delmarva peninsula

Sussex County’s poultry plants run large anhydrous ammonia refrigeration systems, scalder and chiller water, and wastewater lines that work in wet, washed-down, corrosive rooms. Ammonia piping follows ASME B31.5 and IIAR 2 in addition to the plant’s own rules, carbon steel and stainless only, with no copper or brass anywhere in contact with the ammonia. Plants from Georgetown to Seaford schedule this work between processing shifts, so spools arrive cut, welded and tested, ready to set during the sanitation window. The meat and poultry page covers the wider process.

How does the Coastal Zone Act affect process piping in Delaware?

The Delaware Coastal Zone Act affects process piping in Delaware by deciding whether a project can happen at all along the river and bay, before anyone asks how the pipe is built. The 1971 Act barred heavy industry uses that were not already operating on June 28, 1971 from the coastal zone, and the 2017 Coastal Zone Conversion Permit Act let DNREC permit new heavy industry on 14 existing heavy industry sites, 13 of them in New Castle County and one in Kent County. Manufacturing uses inside the zone need a standard permit from DNREC.

For a piping project, the Act matters in three ways. A project that adds new manufacturing capacity or a new process within the zone can need a Coastal Zone permit decision before construction starts, so the piping schedule waits on it. A project at one of the 14 conversion sites runs through the conversion permit process, with its own public steps and offset requirements. And like-for-like replacement inside an existing permitted unit is usually treated very differently from expansion, which is why the plant’s permit file is the first document Paul Industries asks to see when a riverfront job is scoped.

When does a piping change need a DNREC air permit?

A piping change needs a DNREC air permit when it constructs, installs or alters equipment that emits an air contaminant or controls one, because 7 DE Admin. Code 1102 bars that work until the Department approves the application unless the equipment is exempt. New vents, relief headers, scrubber inlets, thermal oxidizer feeds, flare connections and tank vapor lines are the piping items that most often pull a project into Regulation 1102. A new valve and flange population on a volatile organic stream can also add components to a plant’s leak detection and repair program.

Paul Industries sizes and routes the vent and relief piping, lists the new components for the plant’s air permit application and leak detection records, and holds fabrication of the affected spools until the permit position is settled. Delaware facilities that hold extremely hazardous substances above threshold quantities also run risk management programs under 7 Del. C. Chapter 77 and Regulation 1201, which adopts the federal 40 CFR Part 68 program with state additions. A piping change in a covered process feeds that program: updated piping and instrument diagrams, a hazard review of the change, and a pre-startup safety review before the line goes into service.

Delaware rules that reach a process piping job, and what each asks of the work
RuleAdministered byWhat it asks of a piping job
Coastal Zone Act and 2017 Conversion Permit ActDNRECPermit decision for new manufacturing or heavy industry use in the coastal zone before construction
7 DE Admin. Code 1102DNREC Division of Air QualityApproval before building or altering a source that emits or controls air contaminants; vent and relief piping is part of the application
7 Del. C. Chapter 77 and Regulation 1201DNRECRisk management program records, hazard review and pre-startup review for changes in covered processes
7 DE Admin. Code 1352DNREC Tank Management SectionRules for aboveground storage tanks over 250 gallons, including the piping connected to them
7 DE Admin. Code 1353DNREC Boiler Safety ProgramASME B31.1 for boiler external piping; National Board Inspection Code for repairs and alterations
Delaware State Fire Prevention Regulations, 2026 editionState Fire Marshal and fire companiesNFPA 1 (2024) with Delaware amendments, including hot work permits for field welding
26 Del. C. Chapter 8Approved one-call notification centerLocate request 2 to 10 working days before digging for buried lines
29 Del. C. 6960Delaware Department of LaborPrevailing wage on public works above $500,000 new construction or $45,000 alteration and repair
County and municipal building codesNew Castle, Kent and Sussex counties and municipalitiesPermits for building, structural and plumbing work around the process piping

Storage tank connections under Delaware’s tank rules

Storage tank connections fall under Delaware’s aboveground storage tank regulation, 7 DE Admin. Code 1352, whenever the tank holds a regulated substance and exceeds 250 gallons. DNREC’s Tank Management Section administers it under the Jeffrey Davis Aboveground Storage Tank Act, and the rule was last amended effective January 11, 2024. For piping, the practical effect is that the transfer line from a regulated tank to the process is treated as part of the tank system: its material, corrosion protection, leak prevention and testing are documented with the tank, not left on a separate drawing.

Paul Industries designs and builds the tank nozzle connections, transfer piping, overfill and vent lines together, so the tank file and the piping file agree. New tanks and tank replacements are covered on the tank fabrication in Delaware page.

Boiler external piping and steam lines under Delaware’s boiler rules

Boiler external piping in Delaware is built to ASME B31.1, because the state’s boiler regulation, 7 DE Admin. Code 1353, adopts B31.1 for it alongside the ASME boiler construction codes. Beyond the boiler external piping boundary, a plant’s steam and condensate headers are usually designed to B31.3 or B31.1 by owner choice, and the choice is written into the piping specification so welding, examination and testing follow one code throughout.

Repairs and alterations to boilers and pressure vessels follow the National Board Inspection Code under the same rule. A welded repair is approved by an inspector commissioned in Delaware, made under a National Board repair certificate of authorization, and reported on an R-1 form filed with the DNREC Boiler Safety Program; an alteration is reported on an R-2 with the original data report. Where a piping job touches a boiler or vessel nozzle, Paul Industries plans the work and the paperwork together. Boiler work itself is covered on boiler repair in Delaware, and new vessels on pressure vessel fabrication in Delaware.

Industrial piping in Delaware: materials for refinery, chemical and food service

Industrial piping materials at Delaware plants follow the fluid first and the climate second: carbon steel for hydrocarbons, steam and ammonia, austenitic stainless for most solvents and food service, nickel alloys or lined pipe for hot acids and chlorides, and plastics for water and wastewater. The table sets out how those choices usually fall on Delaware jobs, and what each service means for examination and testing.

Fluid service, material and testing on common Delaware process lines
ServiceUsual materialsWhere it shows up in DelawareExamination and test notes
Crude, products and hydrogenCarbon steel, chrome-moly for hot hydrogenDelaware City refineryHigher examination rates, hardness checks, positive material identification
Acids, chlorides and solvents316L, alloy 20, Hastelloy, PTFE-lined or glass-lined steelRiver chemical plants, Newark API suitesLined pipe is assembled from flanged spools; owner decides on Category M
Ethylene oxide and reactive monomersStainless steel, with strict cleanlinessNew Castle chemical plantsCleanliness verification, leak testing, process safety review of every change
Anhydrous ammoniaCarbon steel and stainless; no copper alloysSussex and Kent County poultry and cold storageASME B31.5 and IIAR 2 requirements; pressure test before charging
Steam and condensateCarbon steel; stainless for some condensateRefinery, chemical and food plants statewideB31.1 inside the boiler external piping boundary; hydrotest
Nitrogen, compressed air and vacuumStainless, carbon steel or copper by serviceAPI plants, laboratories, packaging linesPneumatic or hydro test by specification; dryness and cleanliness checks
Process water and wastewaterHDPE, PVC, FRP, ductile iron or stainlessPoultry plants, chemical effluent systemsJoint method and test pressure set by the material standard

Delaware’s coastal air adds a second layer. Outdoor racks within reach of salt air along the river and bay need coatings and insulation jacketing chosen for that exposure, and stainless lines under insulation need attention to chloride stress cracking. Freeze protection is the third layer: with a statewide January mean near 35 degrees Fahrenheit (1991 to 2020 normal), dead legs, instrument lines and outdoor water service need heat tracing or drainage, which heat tracing work provides.

Pipe fabrication and tie-ins at operating Delaware plants

Pipe fabrication for Delaware plants is done off site wherever the line allows, because a spool welded, examined and tested under cover takes far less outage time to set than a line built joint by joint in the unit. Paul Industries prefabricates spools from isometrics, numbers them to the drawings, hydrotests them where the specification permits, and delivers them in installation sequence. Field welds are kept to the closure joints and tie-ins.

Tie-ins at operating Delaware plants are planned around the plant’s own windows: refinery turnarounds, chemical campaign changeovers, API suite shutdowns and poultry sanitation shifts. Each tie-in gets a package with the isolation points, the line clearing method, the weld procedure, the examination required and the test or alternative leak test that closes it. Where a header cannot be taken out of service, a hot tap is planned with a wall thickness survey and the plant’s hot work permit under the Delaware State Fire Prevention Regulations. The welding behind this work, including procedure and welder qualification records, is described on industrial welding services in Delaware; process piping and welding are handled under one Paul Industries contract.

Inspection, testing and turnover: how often should pipes be inspected?

How often should pipes be inspected depends on whether the question is about new construction or about piping in service. New B31.3 piping is examined during construction at the rate its fluid service requires, then leak tested, usually by hydrostatic test at not less than 1.5 times design pressure corrected for temperature, or by pneumatic test at 1.1 times where water cannot be used. Piping in service at refineries and chemical plants is commonly inspected under API 570, whose maximum intervals for thickness measurements are five years for Class 1 piping and ten years for Classes 2 and 3, capped at half the remaining life, with external visual inspection every five years for Classes 1 and 2.

A Delaware winter changes the test plan more than the code does. Water left in a low point overnight in January can split a fitting, so outdoor hydrotests are scheduled for milder days, use heated water or freeze-protected test media where the specification allows, and are drained and blown dry the same shift. Stainless lines are tested with low-chloride water and dried promptly.

Turnover closes the job. Paul Industries hands over marked-up isometrics, weld maps tying every weld to a welder and a procedure, examination reports, material test reports and identification records, pressure test records signed by the plant’s witness, and, for covered processes, the documents the plant’s risk management program needs for its pre-startup review.

What does process piping in Delaware cost?

The cost of process piping in Delaware is set by the fluid service and the plant, not by the state: the same line costs very differently in a riverfront refinery unit and in a Kent County packaging plant. A buyer asking how much does piping cost will get a firm figure once the line list, material, fluid service category and outage plan are known; before that, a budget range from comparable scope is possible. The main drivers are:

  • Material and joining method: carbon steel, stainless, nickel alloys and lined pipe differ several times over in material and labor.
  • Examination rate: normal fluid service, Category M and severe cyclic conditions require very different amounts of radiography or ultrasonic testing.
  • Outage access: work packed into a turnaround or sanitation window needs more prefabrication, more shifts and more planning hours.
  • Permits: a Coastal Zone or Regulation 1102 permit adds lead time, and lead time adds cost if the outage date is fixed.
  • Public funding: Delaware’s prevailing wage law applies to public works above $500,000 of new construction or $45,000 of alteration and repair.
  • Access and height: rack work, confined spaces and work over live equipment add rigging, scaffolding and safety time.

Paul Industries prices supply-only spools, design-build packages and complete installation as separate routes, so a plant can compare them on one scope.

Who installs process piping in Delaware?

Paul Industries installs process piping in Delaware, from refinery and chemical units on the river to API suites in Newark and ammonia systems in Sussex County poultry plants. Paul Industries carries a line from design through fabrication, installation, examination, testing and turnover under one contract, with one schedule and one set of records. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey and later Pennsylvania, Paul Industries takes work across Delaware, the Mid-Atlantic, all 50 states and at plants outside the United States through its international work.

Delaware plants often share owners and specifications with sites across the state line. Paul Industries builds process piping in Maryland and process piping in Pennsylvania to the same records standard, and its headquarters state page, process piping in Virginia, covers the Hopewell and Hampton Roads plants. Every Delaware service Paul Industries offers is listed on the Delaware page.

Process piping from Paul Industries across Delaware

At Delaware refineries, chemical and materials plants, API and pharmaceutical producers, food plants and poultry processors, Paul Industries designs, builds, supplies, tests, starts up, repairs and maintains the process piping. That covers B31.3 process lines, B31.1 steam, ammonia refrigeration piping, tank connections, vent and relief headers, and the supports, insulation and heat tracing around them. Send the line list or P&IDs, the piping specification, the fluid service and design conditions, the plant’s outage windows and any permit status, and Paul Industries will scope and price the work. Call 201-450-8280 or request a quote.

Standards referenced: ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME Boiler and Pressure Vessel Code Section IX · National Board Inspection Code · API 570 · OSHA 29 CFR 1910.119 Process Safety Management · EPA 40 CFR Part 68 · Delaware Coastal Zone Act · 7 DE Admin. Code 1102 (air permits) · 7 DE Admin. Code 1201 (accidental release prevention) · 7 DE Admin. Code 1352 (aboveground storage tanks) · 7 DE Admin. Code 1353 (boilers and pressure vessels) · Delaware State Fire Prevention Regulations · IIAR 2

Frequently asked questions

Who installs process piping at refineries and chemical plants around Delaware City and New Castle?

Paul Industries installs process piping at refinery and chemical sites around Delaware City, New Castle and the Route 9 corridor, including hydrocarbon, hydrogen, sour water, steam and chemical lines built to ASME B31.3. Work inside operating units is staged for turnarounds, with spools prefabricated and tested beforehand, and every change is documented for the plant’s management of change and pre-startup review.

Does Paul Industries take process piping work in Wilmington, Claymont and Edgemoor?

Paul Industries takes process piping work in Wilmington, Claymont, Edgemoor and the rest of northern New Castle County, from solvent and acid lines at specialty chemical plants to transfer piping at river terminals. On older sites the work starts with a rack survey that confirms which lines are live before any new routing is fixed, because drawings on these sites often lag the pipe.

Who builds piping for API reactor suites in Newark, Delaware?

Paul Industries builds the B31.3 piping around API reactor suites in Newark: solvent charge and transfer lines, nitrogen blanketing, vacuum, jacket heating and cooling loops and scrubber headers. Materials range from 316L to Hastelloy and PTFE-lined or glass-lined steel, chosen against the chemistry, and each line is cleaned, tested and documented for the site’s quality records before the reactor is charged.

Can Paul Industries pipe ammonia refrigeration systems at Sussex County poultry plants?

Paul Industries pipes anhydrous ammonia refrigeration systems at poultry and cold storage plants in Georgetown, Millsboro, Milford, Seaford and across Sussex County. The work follows ASME B31.5 and IIAR 2, uses carbon steel and stainless, and is staged around sanitation shifts. Lines are pressure tested and documented before charging, and the records go into the plant’s process safety file.

Does a piping project inside the Delaware coastal zone need a Coastal Zone Act permit?

A piping project inside the Delaware coastal zone needs a Coastal Zone Act decision from DNREC when it adds a new manufacturing use, expands one, or brings new heavy industry to one of the 14 conversion sites. Like-for-like replacement within an existing permitted operation is generally assessed differently. Paul Industries reviews the plant’s existing approvals at scoping so the piping schedule reflects any permit step.

Which DNREC air permit covers new vent and relief piping?

New vent, relief, scrubber and flare piping is covered by DNREC’s Regulation 1102 construction permit process when it serves equipment that emits or controls an air contaminant. The application describes the equipment and its emissions, and the piping route to the control device is part of that description. Operating permit terms then follow under Regulation 1130 for sources that need them.

What does Delaware's accidental release prevention rule mean for a piping change?

Delaware’s accidental release prevention rule, Regulation 1201 under 7 Del. C. Chapter 77, adopts the federal 40 CFR Part 68 risk management program with state additions. When a facility holds an extremely hazardous substance above its threshold, a piping change in that process needs updated drawings, a hazard review and a pre-startup safety review. Paul Industries supplies the piping records each of those steps uses.

Who enforces process safety management at Delaware plants?

Federal OSHA enforces process safety management, 29 CFR 1910.119, at Delaware private-sector plants, because Delaware has no state OSHA plan and the Wilmington Area Office covers all three counties. For piping, PSM means mechanical integrity records, management of change and pre-startup safety reviews. DNREC separately reviews risk management programs under Regulation 1201.

Is the piping from a storage tank to the process covered by Delaware's tank regulation?

The piping connected to a regulated aboveground storage tank of more than 250 gallons is treated as part of the tank system under 7 DE Admin. Code 1352, so its materials, corrosion protection and testing are documented with the tank. Paul Industries builds the tank connections and transfer piping to match that file, which keeps a DNREC tank inspection and the plant’s piping records consistent.

Which code applies to steam piping at a Delaware boiler house?

Steam piping within the boiler external piping boundary at a Delaware boiler house is built to ASME B31.1, which the state boiler regulation adopts. Steam and condensate headers beyond that boundary follow B31.1 or B31.3 according to the plant’s piping specification. Welding, examination and hydrotesting then follow the code the specification names, so the records read consistently.

How are buried process lines located before digging at a Delaware plant?

Before digging for buried process lines at a Delaware plant, a locate request goes to the state’s approved one-call notification center not less than 2 and not more than 10 working days ahead, under 26 Del. C. Chapter 8. Plant-owned lines are rarely marked by utilities, so Paul Industries also uses the plant’s drawings, test pits and pipe locating equipment before excavation.

Do Delaware public projects with process piping pay prevailing wage?

Delaware public projects pay prevailing wage under 29 Del. C. 6960 when they are funded in whole or part by the state or a political subdivision and exceed $500,000 for new construction or $45,000 for alteration, repair or renovation. Wastewater plants, school central plants and state facility upgrades with process piping often fall within it, and Paul Industries prices those jobs on that basis.

How is a hot tap planned on a live header at a Delaware chemical plant?

A hot tap on a live header at a Delaware chemical plant is planned with an ultrasonic wall thickness survey at the branch location, a check of the fluid, pressure and flow against hot tapping limits, a qualified in-service welding procedure, and a hot work permit under the plant’s procedures and the Delaware State Fire Prevention Regulations. The fitting is welded, pressure tested and then tapped through a valve.

Which materials hold up in hot acid and chloride service at Delaware chemical plants?

Hot acid and chloride service at Delaware chemical plants usually calls for nickel alloys such as alloy 20 or Hastelloy, or for PTFE-lined or glass-lined carbon steel spools. The right choice depends on the acid, its concentration, temperature and any oxidizing contaminants. Paul Industries works from the plant’s corrosion data and material selection diagrams, and confirms alloy identity with positive material identification at receipt.

Can outdoor process piping be hydrotested in a Delaware winter?

Outdoor process piping can be hydrotested in a Delaware winter when the test is planned for it: tests are set on milder days, water is heated or freeze protected where the specification allows, and every low point is drained and blown dry the same shift. Where water would cause damage, a pneumatic test at 1.1 times design pressure may be used under B31.3 with added safety controls.

What should a plant receive from piping contractors in Delaware when a job is finished?

At the end of a Delaware process piping job, the plant receives as-built isometrics, weld maps linking each weld to its welder and procedure, procedure and welder qualification records, examination and test reports, material test reports and identification records, and signed pressure test records. Covered processes also get the drawings and checklists their risk management and PSM programs need before startup.

Does Paul Industries supply fabricated spools to Delaware plants without installing them?

Paul Industries supplies fabricated spools to Delaware plants as a supply-only order, built from the plant’s isometrics, examined and tested to the specification, tagged to the drawings and shipped in installation sequence with their records. The same spools can be installed by Paul Industries under a complete installation contract, or delivered as part of a design-build package.

What should a Delaware plant send to get process piping priced?

Send the line list or P&IDs, the piping specification, fluid service and design conditions, isometrics or a site walk request, the outage windows, any permit status and whether the work is publicly funded. With that, Paul Industries prepares a budget range from comparable scope, then a firm price once the design is fixed. Call 201-450-8280 or request a quote.

Planning new process lines at a Delaware plant?

Send the line list or P&IDs, the piping specification, the fluid service and your outage windows. Call 201-450-8280 or request a quote.