Paul Industries designs, builds and services ultrapure water systems in Massachusetts for research laboratories, biomanufacturing plants, microelectronics and photonics cleanrooms and power plants, from Cambridge and Boston to Route 128, the I-495 belt and Worcester. The feedwater decides more of a Massachusetts ultrapure plant than any catalog: the MWRA’s soft, high-pH, chloraminated supply behaves very differently from the Cambridge Water Department’s own reservoir water, which carries several times the dissolved solids. Paul Industries sizes pretreatment, reverse osmosis, electrodeionization, polishing and distribution loops to the water that actually reaches the building.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
MWRA water Hardness about 16 mg/L, pH about 9.3, monochloramine averaging 1.99 ppm in 2025
Cambridge water Sodium 93.5 ppm, chloride 167 ppm, TDS 323 ppm in 2025 single samples
Microelectronics Northeast Microelectronics Coalition hub, CHIPS and Science Act, led by MassTech since 2023
Industrial power 18.19 cents/kWh in 2024; US average 8.13 (EIA)
Reviewed November 2026

Who needs ultrapure water systems in Massachusetts?

Ultrapure water systems in Massachusetts serve four groups of users: life science research laboratories in Cambridge, Boston and the Route 128 suburbs; quality control and process development labs at biomanufacturing plants; microelectronics, photonics and materials research cleanrooms; and power and campus plants that need demineralized boiler makeup. The Commonwealth’s lab density is the defining feature, because a single Kendall Square building can house a dozen tenants who each want 18 megohm-centimeter water at the bench.

The national treatment of ultrapure water, from definitions to monitoring, is on the ultrapure water systems page. This page concerns the Massachusetts specifics: two very different municipal source waters, a dense lab building market, a growing microelectronics base, sewer rules for reject water, and electricity priced at more than twice the national industrial average.

Massachusetts ultrapure water users and what they ask of the system
UserWhere they clusterTypical quality targetSystem shape
Life science research labsKendall Square, the Seaport, Longwood, Waltham, LexingtonASTM D1193 Type I reagent water, 18 megohm-cm, low TOC and endotoxin for cell workCentral RO and EDI plant with point-of-use polishers on each floor
Biomanufacturing QC and process developmentDevens, Marlborough, Norwood, Andover, WorcesterType I for analytical work beside compendial Purified Water and WFILab polishing fed from the plant’s pretreatment, separate from the GMP loop
Microelectronics and photonics cleanroomsLexington, Wilmington, Lowell, university cleanroomsASTM D5127 electronics grades; SEMI F63 as a guide for fabsMake-up, primary and polishing loops with continuous resistivity, TOC and particle monitoring
Power and campus plantsUniversity central plants, cogeneration, hospital boilersDemineralized makeup for high-pressure boilersRO with EDI or mixed bed, sized to steam load

Semiconductor companies in Massachusetts and their water

Semiconductor companies in Massachusetts and the research fabs beside them make up a smaller but demanding group of ultrapure water users, centered on analog, RF, photonics and defense microelectronics rather than high-volume advanced-node logic. Analog Devices is based in Wilmington. MIT Lincoln Laboratory’s Microelectronics Laboratory in Lexington runs a 200 millimeter wafer line with a 90 nanometer CMOS toolset. In September 2023, the federal Microelectronics Commons program under the CHIPS and Science Act selected the Northeast Microelectronics Coalition, led by MassTech, as one of eight hubs, with an initial award of $19.7 million and later awards that bring the total to about $37 million.

Fabs and cleanrooms on that scale use ultrapure water for wafer rinses, wet benches, chemical mechanical planarization and tool cooling, and they watch particles, dissolved oxygen, silica, metals and TOC as closely as resistivity. SEMI F63 is the industry guide for ultrapure water in semiconductor processing, and ASTM D5127 sets grades for electronics and semiconductor water; a research or specialty fab picks the grade its processes need rather than copying a high-volume logic plant. Paul Industries builds the make-up, primary and polishing loops, the monitoring and the distribution to those targets, with cleanroom work covered on cleanrooms in Massachusetts and the wider sector on the semiconductor page.

How does Massachusetts feedwater change an ultrapure water treatment train?

Massachusetts feedwater changes an ultrapure water treatment train mainly through which utility serves the building. Most of Greater Boston and many surrounding communities receive MWRA water from the Quabbin and Wachusett reservoirs, treated at the John J. Carroll Water Treatment Plant in Marlborough with ozone and ultraviolet light, adjusted for pH and alkalinity with sodium carbonate and carbon dioxide, and carried through the mains with monochloramine. Cambridge runs its own system, drawing from the Hobbs Brook and Stony Brook reservoirs into Fresh Pond, and many other towns use their own surface or groundwater.

MWRA and Cambridge feedwater compared for an ultrapure water plant
ParameterMWRA supplyCambridge Water Department supplyWhat it means for the plant
HardnessAbout 16 mg/L, softAbout 50 to 70 mg/L, slightly hardSoftening or antiscalant matters more on Cambridge water
SodiumHighest monthly result 35.6 mg/L in 202593.5 ppm in a 2025 sample, attributed to road saltHigher RO permeate conductivity and more load on EDI with Cambridge water
Chloride and dissolved solidsLow-mineral reservoir waterChloride 167 ppm and total dissolved solids 323 ppm in 2025 samplesSecond-pass RO is often justified for Cambridge feed
pHAbout 9.3 after corrosion control treatmentAdjusted for corrosion control at the Sullivan plantCarbon dioxide and ammonia behavior across RO and EDI
DisinfectantMonochloramine, 1.99 ppm average in 2025MonochloramineCatalytic carbon or bisulfite ahead of the membranes; ammonia passes RO

Reading the MWRA water quality report for an ultrapure plant

The MWRA water quality report gives an ultrapure water designer the numbers that set pretreatment: the monochloramine residual, which averaged 1.99 parts per million in 2025 with results as high as 3.7, the sodium level, and the treatment steps at the Carroll plant. MWRA’s water is soft, about 16 milligrams per liter of hardness, and treated to a pH of about 9.3. Soft, high-pH water is gentle on RO membranes from a scaling point of view, but the chloramine has to be removed completely before the membranes, and the ammonia it leaves behind passes through RO and shows up as conductivity downstream.

Cambridge and Kendall Square: a heavier feed

Cambridge labs draw water with a very different profile, because the Cambridge Water Department’s reservoirs sit in a developed watershed crossed by major roads. The department’s 2025 report lists a single-sample sodium result of 93.5 parts per million attributed to road salt, chloride at 167, total dissolved solids at 323 and hardness in the slightly hard range. The Walter J. Sullivan Water Purification Facility at Fresh Pond treats that water with ozone, dissolved air flotation, granular activated carbon and monochloramine, so organics are well controlled, but the dissolved salts reach the lab building. An RO system sized on MWRA numbers will underperform on Cambridge water, and conductivity trends should be watched through the winter road-salting season.

Designing the treatment train for Massachusetts water

Designing ultrapure water treatment for a Massachusetts site starts with a full feedwater analysis at the building, taken in more than one season, and then builds the train stage by stage around it. The usual sequence is multimedia or cartridge filtration, chloramine removal with catalytic activated carbon or sodium bisulfite, softening or antiscalant dosing where hardness calls for it, one or two passes of reverse osmosis, electrodeionization, and a polishing loop with 185 nanometer ultraviolet light for TOC reduction, mixed-bed or polishing ion exchange, and final filtration or ultrafiltration.

Treatment train choices on MWRA and Cambridge feedwater
StageTypical choice on MWRA waterTypical choice on Cambridge water
Chloramine removalCatalytic carbon or bisulfite, sized for residuals up to about 3.7 ppmCatalytic carbon or bisulfite, with ORP monitoring ahead of the membranes
Hardness controlAntiscalant often enough on soft waterSoftener or antiscalant sized for 50 to 70 mg/L hardness
Reverse osmosisSingle pass often meets EDI feed limitsDouble pass commonly chosen for the higher sodium and chloride
Carbon dioxide and ammoniapH adjustment or membrane degassing to protect EDI performanceSame, with closer conductivity trending
EDI and polishingEDI to polishing mixed bed, 185 nm UV, final filtersSame train with more frequent polishing resin exchange
DistributionPVDF or polypropylene recirculating loop, continuous resistivity and TOCSame, with tenant branches valved for future fit-outs

Water purification systems in Massachusetts also contend with cold winter feedwater from reservoir supplies, which lowers membrane output unless the feed is tempered, and with the cost of power for pumps, UV and any heat used for sanitization. Paul Industries sizes the RO for the coldest expected feed temperature or adds a heat exchanger that recovers building waste heat, and chooses ozone, hot water or chemical sanitization according to loop material and use.

Multi-tenant lab buildings: one plant, many tenants

Multi-tenant lab buildings in Cambridge, the Seaport, Watertown and the Route 128 suburbs shape ultrapure water design more than any other Massachusetts building type, because the landlord’s base building plant has to serve tenants who arrive, expand and leave on their own schedules. The common pattern is a central pretreatment, RO and EDI plant installed by the building, a recirculating loop with valved stubs on each floor, and tenant-owned point-of-use polishers that bring water to Type I quality at the bench.

That arrangement works when the central loop is sized for the building’s full future draw, monitored continuously so a tenant complaint can be traced to the plant or to the bench, and built with capped branches so a new tenant connects without draining the loop. Paul Industries designs the central plant and loop, installs tenant branches during fit-out, and sanitizes and qualifies each new section before it joins the running system. Piping practice for those loops follows process piping in Massachusetts, and stainless sections where they appear follow sanitary process piping in Massachusetts.

Ultrapure water beside compendial water at Massachusetts biomanufacturing plants

Ultrapure water at a Massachusetts biomanufacturing plant usually sits beside, not inside, the compendial water system. Purified Water and Water for Injection for GMP production follow USP monographs and the plant’s validation program, while QC and process development labs need Type I water for analytical instruments, buffers and cell culture media development. Plants in Devens, Marlborough, Norwood, Andover and Worcester often feed both from one pretreatment and RO train, then split into a validated compendial loop and a lab polishing loop.

Moderna’s clinical mRNA plant in Norwood, which opened in 2018, is one of many Massachusetts sites where lab-grade and production-grade water coexist. Keeping the two systems distinct in design, monitoring and change control keeps the lab loop flexible and the GMP loop validated. The compendial side is covered on high-purity water systems in Massachusetts, and the qualification work on validation and commissioning in Massachusetts.

Discharging RO reject and regenerant water under MWRA rules

RO reject, softener brine and other wastewater from an ultrapure water plant in an MWRA sewer community fall under the authority’s sewer use regulations, 360 CMR 10.000, administered by its Toxic Reduction and Control department. A facility generally needs a Sewer Use Discharge Permit or other written authorization before discharging, and a permit may limit the rate, timing and characteristics of the discharge. Communities outside the MWRA sewer system apply their own sewer use rules.

Reject water from Massachusetts plants is mostly concentrated municipal water, so it is often suitable for reuse as cooling tower makeup, which reduces both sewer volume and potable demand. Paul Industries designs RO recovery, reject reuse and neutralization so the discharge stays within the permit, and documents flows and chemistry for the authority’s paperwork. Lower reject volume also helps lab owners in Boston and Cambridge who report water use under the cities’ building performance ordinances.

Keeping a Massachusetts lab loop clean: ozone, hot water or chemical sanitization

Keeping an ultrapure lab loop clean in Massachusetts comes down to three choices of sanitization, each tied to loop material, building type and energy price: dissolved ozone with UV destruction before the outlets, periodic hot water, or periodic chemical sanitization. Bacteria and the endotoxin they shed matter to cell culture and molecular biology labs as much as resistivity, and a loop that stands still over a long weekend or a tenant changeover is where problems begin.

Continuous recirculation at a velocity that discourages biofilm, short dead legs at every branch, sloped and drainable runs, and UV at the return all reduce how often the loop needs a full sanitization. Paul Industries designs the loop around the sanitization method the owner can run with the least disruption to tenants, and writes the procedure, frequency and acceptance tests into the turnover package.

Sanitization methods for Massachusetts ultrapure loops
MethodSuits these loop materialsTradeoffs in a Massachusetts building
Continuous dissolved ozone with UV destructionPVDF, stainless steelConstant microbial control; ozone must be destroyed before outlets; low energy use
Periodic hot waterPVDF, stainless steelWell understood; heat energy priced at Massachusetts rates; loop out of service while hot
Periodic chemical sanitizationPolypropylene, PVDF, stainless steelLower equipment cost; tenants lose water during the cycle and rinse-down
UV at the return plus scheduled flushingAny compatible plasticSimple for small labs; relies on recirculation discipline

Monitoring and records Massachusetts quality teams expect

Monitoring on a Massachusetts ultrapure system gives the owner continuous evidence that water at the outlet meets the specification, and it tells a quality team or a lab manager where to look when a result drifts. A typical package measures resistivity after RO, after EDI and at the loop return; TOC at the loop; flow and pressure at the supply and return; and, for fabs, particles, dissolved oxygen and silica. Periodic samples cover bacteria, endotoxin and metals where the users need them.

The turnover file holds the design basis, the feedwater analyses used, pressure test and sanitization records for each loop section, instrument calibrations, and baseline data from the first weeks of operation. Paul Industries hands that file over at startup and keeps it current under a service agreement, so a new tenant, an auditor or an investigator has one place to look.

Demineralized water for Massachusetts power and campus plants

Demineralized water for Massachusetts power, cogeneration and campus steam plants uses the same core train of carbon, RO and EDI or mixed-bed polishing, built for steady production rather than many outlets. University central plants, hospital steam plants and industrial cogeneration units feed boilers whose pressure sets the purity they need, and an RO and EDI train replaces the chemical regeneration that older ion exchange plants relied on. Feed sizing follows steam load and blowdown, and the system ties into the plant’s water treatment program and condensate return. Heating plants on those campuses are covered on boiler repair in Massachusetts.

Storms, outages and restarting a Massachusetts ultrapure plant

Storms and utility outages test an ultrapure plant in Massachusetts most often in winter, when nor’easters bring down lines and buildings run on standby power. A loop that stops circulating loses quality quickly, so the recirculation pump, UV and monitoring are worth placing on standby power even where the RO and EDI are not. After a long stop, the restart plan flushes the loop to drain, checks resistivity and TOC against baseline, and sanitizes before tenants draw water again. Boil-water advisories or main breaks upstream call for extra feed checks at the carbon and RO stages. Paul Industries writes the restart sequence into the operating procedures at handover.

Who installs ultrapure water systems in Massachusetts?

Paul Industries installs ultrapure water systems in Massachusetts. It is an East Coast process contractor whose headquarters stand at 256 Shore Drive, Kilmarnock, Virginia, after it was based in northern New Jersey and then in Pennsylvania. Massachusetts projects run from Cambridge, Boston and the Seaport out through the Route 128 and I-495 suburbs to Worcester, Lowell, Springfield and the Pioneer Valley, and the company builds the same systems in every state of the country and at facilities abroad, listed on the international page.

Owners choose the delivery route: supply-only skids for pretreatment, RO, EDI and polishing; design-build of the plant and loop; or complete installation through startup, qualification and service. Paul Industries designs, fabricates, supplies, installs, tests, sanitizes and maintains the system, so the feedwater analysis, the design, the installed loop and the monitoring records come from one source. For an ultrapure water system in Boston or any other Massachusetts city, the work is organized around the building’s real feed and its tenants’ real draw. Comparable work in the headquarters state is described on ultrapure water systems in Virginia, and for fab-scale water on ultrapure water systems in New York.

Installing ultrapure plants in crowded Massachusetts lab buildings

Installing an ultrapure plant in a Massachusetts lab building usually means working in a penthouse, a basement mechanical room or a shared floor, with access through loading docks and freight elevators that also serve tenants. Paul Industries builds pretreatment, RO, EDI and polishing equipment as skids sized for those routes, tests them before delivery, and sets them in a short window so the building’s other trades and tenants keep moving. Loop piping is prefabricated in spool lengths that fit the risers and ceilings, then joined and tested floor by floor. Where a plant replaces an older one, the new skids are set and run beside the old equipment, and the loop is switched over only after the new water meets the outlet specification.

What does an ultrapure water system cost in Massachusetts?

An ultrapure water system in Massachusetts is priced from its flow and quality target, the feedwater it must treat, the number of passes and polishing stages, the length and material of the distribution loop, the monitoring package, and the installation conditions in the building. A central plant for a multi-tenant lab building, a QC lab polishing loop at a biologics plant and a make-up and polishing system for a research fab are very different projects.

Operating cost deserves the same attention as capital. Ultrapure water cost per gallon in Massachusetts reflects 18.19 cents per kilowatt-hour industrial electricity in 2024 (EIA), consumables such as polishing resin, carbon and filters, sewer charges for reject water, and labor for monitoring and sanitization. Cambridge feedwater adds resin and membrane load that MWRA water does not. Paul Industries prepares a budget range from comparable scope once the flow, quality target and feed analysis are known, and a firm price from a design and equipment list. Ultrapure water standards such as ASTM D1193 and D5127 go into the specification so every bid and test is measured against the same targets.

Ultrapure water treatment from Paul Industries across Massachusetts

Paul Industries delivers ultrapure water treatment for Massachusetts laboratories, biomanufacturing plants, microelectronics cleanrooms and power plants: feedwater analysis, design, prefabricated skids, distribution loops, startup, sanitization, qualification and ongoing service. Send the flow and quality target, the points of use, the water utility and any feed analysis, and the building drawings. Call 201-450-8280 or request a quote; the full range of Paul Industries work in the Commonwealth is on the Massachusetts page, with neighboring states on the Northeast page.

Standards referenced: ASTM D1193 (reagent water) · ASTM D5127 (electronics and semiconductor water) · SEMI F63 · USP <1231> and USP <645> · MWRA 360 CMR 10.000 (sewer use) · 780 CMR (Massachusetts State Building Code, 10th edition) · ASME BPE

Frequently asked questions

Which contractor builds ultrapure water systems for labs in Cambridge and Kendall Square?

Paul Industries builds central ultrapure water plants, building loops and tenant branches for lab buildings in Cambridge and around Kendall Square. Cambridge buildings draw from the Cambridge Water Department rather than the MWRA, and that water carries far more sodium, chloride and dissolved solids, so the RO and EDI stages are sized for it from the start rather than adapted after a tenant complains.

Does Paul Industries install an ultrapure water system in Boston, the Seaport or the Longwood area?

Yes. Paul Industries installs ultrapure water systems in Boston lab buildings in the Seaport, the Longwood Medical Area and across the city, most of them on MWRA water. Pretreatment centers on removing monochloramine and managing the ammonia and carbon dioxide that follow, and loops are built with valved stubs so new tenants can connect during fit-out without a building shutdown.

Who builds ultrapure water systems along Route 128 and the I-495 belt, from Lexington to Devens?

Paul Industries builds ultrapure water systems for labs, biomanufacturing plants and research cleanrooms in Lexington, Waltham, Burlington, Bedford, Marlborough, Andover and Devens. Those sites are on MWRA or town water with different chemistry, so each design starts with a feed analysis taken at the building in more than one season.

Does Paul Industries take ultrapure water work in Worcester, Springfield and Western Massachusetts?

Yes. Paul Industries takes ultrapure water projects in Worcester, Springfield, Holyoke, Amherst and across Central and Western Massachusetts, for university research labs, hospital labs, manufacturers and campus power plants. Feedwater in those cities comes from different reservoirs and treatment plants than Boston’s, so the pretreatment is designed from the site’s own analysis.

Why is Cambridge tap water harder on an RO system than MWRA water?

The Cambridge Water Department’s 2025 report lists single-sample results of 93.5 parts per million sodium, 167 chloride and 323 total dissolved solids, with sodium attributed to road salt, while MWRA water is soft and low in minerals. More dissolved salt means higher RO permeate conductivity, more load on EDI and polishing resin, and often a second RO pass for the same final quality.

How does MWRA's monochloramine affect an ultrapure water system?

Monochloramine damages polyamide RO membranes, so it must be removed completely, usually with catalytic activated carbon or sodium bisulfite, before the feed reaches them. MWRA’s residual averaged 1.99 parts per million in 2025 and reached 3.7, so the removal stage is sized for the high end. The ammonia released passes RO and has to be handled downstream to protect EDI performance.

What should an ultrapure water designer take from the MWRA's annual test results?

The useful numbers are the chloramine residual and its range, sodium, turbidity and the treatment description, which shows ozone and UV at the Carroll plant and pH and alkalinity adjustment with sodium carbonate and carbon dioxide. Those values set carbon or bisulfite sizing, RO design and degassing needs. A sample taken at the building tap remains the basis for the final design.

Does MWRA water need softening before reverse osmosis?

Often it does not, because MWRA water is soft at about 16 milligrams per liter of hardness, and antiscalant dosing is usually enough to protect the membranes at normal recovery. Sites pushing for very high RO recovery, or sites in towns that blend groundwater, may still need softening. Paul Industries decides from a scaling projection on the building’s own feed analysis.

Why does the high pH of MWRA water matter for EDI and polishing?

MWRA treats its water to a pH of about 9.3 for corrosion control, which changes the balance of carbon dioxide and bicarbonate entering the treatment train and carries ammonia from the chloramine. Carbon dioxide and ammonia both reach EDI and polishing resin as ionic load. pH adjustment, membrane degassing and correct EDI sizing keep final resistivity stable without exhausting polishing beds early.

Which Massachusetts microelectronics sites drive demand for ultrapure water?

Demand comes from analog, RF and photonics manufacturers such as Analog Devices in Wilmington, research fabs such as MIT Lincoln Laboratory’s 200 millimeter Microelectronics Laboratory in Lexington, university cleanrooms, and members of the Northeast Microelectronics Coalition hub funded under the CHIPS and Science Act. These sites use ultrapure water for rinses, wet benches and tool cooling, with targets chosen per process.

What resistivity and TOC should a Massachusetts research lab specify?

Most life science labs specify ASTM D1193 Type I water at 18 megohm-centimeter resistivity at the outlet, close to the theoretical 18.2, with low TOC and, for cell culture, low endotoxin and bacteria. Analytical labs running trace metals or LC-MS may add tighter TOC and metals limits. Paul Industries writes the outlet specification with the lab before sizing the central plant and polishers.

Can a multi-tenant lab building in Cambridge share one ultrapure water plant?

Yes. A shared central plant with pretreatment, RO, EDI and a monitored recirculating loop, plus tenant polishers at the bench, is a common arrangement. It works when the plant is sized for the building’s full future draw, each floor has valved branches for new tenants, and continuous monitoring shows whether a quality issue starts at the plant or at a tenant’s equipment.

Does RO reject from a Massachusetts ultrapure plant need an MWRA sewer permit?

In MWRA sewer communities, discharges must comply with 360 CMR 10.000, and a Sewer Use Discharge Permit or other written authorization is generally required before discharging unless the regulation exempts the discharge. Permits can limit rate, timing and characteristics. Paul Industries provides the flow and chemistry data for the application and designs the plant to stay within it.

Can RO reject be reused as cooling tower makeup at a Massachusetts site?

Often it can, because reject from municipal feed is concentrated tap water rather than process waste. Reuse depends on the reject’s dissolved solids and silica, the tower’s cycles of concentration and its treatment program. Diverting reject to a tower cuts sewer charges and potable demand, which matters to lab owners reporting water use under the Boston and Cambridge building ordinances.

How do Massachusetts electricity prices change an ultrapure plant's design?

Massachusetts industrial electricity averaged 18.19 cents per kilowatt-hour in 2024, more than twice the US average, so pump energy, UV lamps and heat for sanitization are larger cost lines than in most states. Variable speed loop pumps, energy recovery on large RO trains, ozone instead of hot water sanitization where materials allow, and correctly sized loops pay back faster in Massachusetts.

How does a lab tenant fit-out add ultrapure outlets without shutting down the building loop?

The new branch is built from a valved stub left on the loop, pressure tested and sanitized while isolated, then flushed until resistivity and TOC match the main loop before the valve is opened to tenants. Where no stub exists, a short planned outage or a hot tap on compatible materials is scheduled. Paul Industries plans each connection with the landlord and existing tenants.

What does ongoing service on a Massachusetts ultrapure plant cover?

Service covers trend review of resistivity, TOC and flow, carbon and filter changes, RO cleaning and membrane replacement, EDI checks, polishing resin exchange, UV lamp replacement, loop sanitization and instrument calibration. Plants on Cambridge water typically see more frequent resin and membrane work than MWRA sites. Paul Industries offers that work under scheduled service agreements.

What should a Massachusetts lab or plant send to price an ultrapure water system?

Send the required flow and peak draw, the quality target at each outlet, the number and location of points of use, the water utility and any recent feed analysis, building drawings showing plant space and loop routes, and any existing equipment. Paul Industries answers with a budget range based on comparable systems and follows with a firm price once a design and equipment list are set.

Planning ultrapure water for a Massachusetts lab, plant or cleanroom?

Send the flow, the quality target at each outlet, the water utility and any feed analysis, and the building drawings. Call 201-450-8280 or request a quote.