Paul Industries installs data center liquid cooling in New Jersey, piping coolant distribution units, direct-to-chip row manifolds, rear door heat exchangers and the facility water that feeds them, for exchange-adjacent colocation in the Meadowlands, converted research buildings in Union County and new high-density campuses in South Jersey. Rack densities in the state now range from single-digit kilowatts in enterprise rooms to rack-scale systems near 120 kilowatts, and each step up changes what the building has to supply. Paul Industries designs, supplies, installs, tests and maintains the liquid side of the hall, and takes this work across New Jersey and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Typical rack today 7.5 kW average; 9% of operators above 50 kW (Uptime, 2025)
Rack-scale GPU systems About 120 kW per rack, liquid cooled (manufacturer data)
Dry cooler hours Nearly 8,000 hours a year below 80 F at Newark (NOAA)
Heat reuse Rewarded in New Jersey's 2026 large data center law
Reviewed November 2026

What does data center liquid cooling in New Jersey cover?

Data center liquid cooling in New Jersey covers every loop that carries server heat in water or coolant instead of air: the technology cooling system between the cold plates and the CDU, the facility water system between the CDU and the plant, the heat rejection or chiller plant at the end, and the controls, leak detection and filtration that protect the servers. On most New Jersey projects the work also includes the conversion of part of an existing air-cooled hall, because few owners start with an empty building.

The technology itself, from cold plate physics to quick disconnects and coolant chemistry, is explained on the national data center liquid cooling page. This page deals with where liquid cooling is landing in New Jersey, what the Newark climate means for warm-water loops, how different New Jersey building types take a retrofit, and what the state’s 2026 large data center law means for heat that liquid cooling captures.

Do data centers use liquid cooling in New Jersey?

Liquid cooling is in use in New Jersey data centers today, but it is concentrated in the high-density halls, while most racks across the state are still cooled by air. Uptime Institute’s 2025 global survey put the average rack at about 7.5 kilowatts, found that more than 80 percent of operators had no rack above 30 kilowatts, and found that 9 percent had racks above 50 kilowatts. That last group is where liquid becomes necessary.

The step change comes from rack-scale GPU systems, which their manufacturer rates at about 120 kilowatts per rack, cooled by direct-to-chip liquid. A data center with liquid cooling at that density carries most of the heat in water, with a smaller share still removed by air from power supplies, memory and network gear. New Jersey owners are meeting that step in two ways: by adding liquid-cooled rows to existing halls, and by building new campuses designed for liquid from the ground up.

Rack density bands and the cooling approach each usually calls for (typical ranges, not limits)
Rack densityUsual cooling approachWhat the building has to supply
Up to about 15 kWRoom air with hot or cold aisle containmentChilled water to CRAH units or fan walls
About 15 to 40 kWRear door heat exchangers or in-row coolersChilled or facility water piped to each row, with leak detection
About 40 to 80 kWDirect-to-chip cold plates with CDUs, plus air for the residualFacility water to CDUs, row manifolds, reduced room airflow
Around 120 kW and aboveDirect-to-chip as the main path; immersion in some hallsLarge facility water flows, CDU redundancy, heavy-duty floors

Dense racks near the exchanges: Secaucus, Carteret and Mahwah

Dense racks near the New Jersey exchanges follow from how electronic trading works: firms place their servers as close as they can to the matching engines at Equinix NY4 in Secaucus, Nasdaq’s primary data center at Equinix NY11 in Carteret and the ICE US Liquidity Center in Mahwah, where colocation is sold by the kilowatt and the cabinet. When space next to the engine is scarce and priced by the cabinet, tenants put more compute in each one.

Liquid cooling in these buildings is usually a tenant project inside a facility the tenant does not own. The building operator controls the chilled water plant, the floor and the ceiling, so the tenant’s options depend on what the operator allows: a rear door on each cabinet fed from a building water tap, a liquid-to-air CDU that rejects heat into the room without touching building water, or a liquid-to-liquid CDU connected to a dedicated branch. Paul Industries prepares the method statements, drawings and pressure test records that colocation operators require before any pipe enters a live floor, and works in the operator’s approved windows.

Converting New Jersey research buildings for dense racks

Converting former New Jersey research buildings into data halls has become a path for high-density compute, because the state’s pharmaceutical history left large lab buildings with heavy floors, tall floor-to-floor heights and substantial electrical service. The clearest example is the data center in Kenilworth NJ, where CoreWeave bought a former Merck research building on the NEST campus in 2025 for conversion, and PSE&G said it would ready the area’s electrical infrastructure for the project.

Lab buildings bring useful bones and difficult systems. Their air handling was designed for once-through exhaust and their piping for lab services, so a conversion usually strips the old systems back to the structure, brings in a new facility water plant sized for the IT load, and runs new mains to each hall. Paul Industries plans the routes for large facility water mains through existing shafts and corridors, fabricates spool pieces and row manifolds off site to cut the time spent welding in the building, and sets isolation valves so halls can be filled and tested one at a time as they are finished.

Power is often the reason a research campus is chosen, and the cooling design has to respect what the existing electrical service can carry. Every kilowatt spent on pumps, fans and trim chillers is a kilowatt unavailable for servers, so conversions favor warm-water loops that run most of the year on dry coolers and small pumps. Paul Industries reviews the substation and switchgear capacity the owner has allocated to mechanical load, then sizes CDUs, facility water pumps and heat rejection to fit inside that allocation at the summer design condition, with a margin for the hottest Newark afternoons.

Hyperscale data centers in New Jersey designed for liquid

Hyperscale data centers in New Jersey designed for liquid from the start are a newer pattern, led by the Vineland data center that DataOne is developing for Nebius at a planned 300 megawatts. Greenfield sites like it can lay out halls, CDU galleries and heat rejection yards around warm-water loops instead of retrofitting liquid into rooms built for air.

The large data centers in NJ being built for dense compute share some design choices. Facility water mains are sized for full buildout and installed with valved branches for future halls. CDUs sit in galleries outside the white space so that maintenance never opens a server room. Heat rejection relies on dry coolers wherever the supply temperature allows, with trim cooling for the summer hours. Paul Industries builds the mains, branches, CDU connections and heat rejection piping in phases, so each block of halls is flushed, tested and turned over while construction continues around it.

Water planning matters on greenfield sites as well. A campus at hundreds of megawatts that relied on evaporative towers would draw large volumes of makeup water, while closed dry cooler loops hold their charge and lose very little. South Jersey sites with room for large coil yards can lean toward closed loops and keep evaporative assist for the summer peak, which Paul Industries sizes from the Newark and regional weather record during design.

Warm-water liquid cooling and the Newark weather record

Warm-water liquid cooling suits New Jersey’s climate for most of the year, because the NOAA record for Newark shows only about 860 hours a year at or above 80 degrees Fahrenheit. Direct-to-chip systems in ASHRAE’s W32 class accept facility water up to 32 degrees Celsius, about 90 degrees Fahrenheit, and W40 systems up to 104 degrees, temperatures a dry cooler can reach without compressors for the great majority of hours.

Newark dry-bulb hours (NOAA, 1973 to 1995) and what a dry cooler can deliver to a liquid cooling loop
Outdoor dry bulbHours per yearDry cooler leaving water, assuming a 10 F approachEffect on a W32 loop (90 F supply limit)
49 F and belowAbout 3,50059 F or coolerFull load on dry coolers; mixing valves hold supply above dew point
50 to 64 FAbout 2,14060 to 74 FFull load on dry coolers
65 to 79 FAbout 2,30075 to 89 FFull load on dry coolers, close to the limit at the top of the band
80 F and aboveAbout 86090 F and higherTrim chiller, adiabatic assist or chilled water blending needed

The approach temperature in the table is an assumption for illustration; the actual figure depends on the coil size the owner pays for. A W40 loop extends compressor-free operation through nearly every hour, while a loop held at 75 degrees for older cold plates needs trim cooling from late spring to early autumn. Paul Industries sets the design supply temperature with the IT equipment specification in hand, then sizes dry coolers, trim chillers and the controls that move between them.

Cold weather brings the opposite problem. Newark’s 99.6 percent heating design temperature is 10 degrees, so outdoor dry cooler loops run on glycol or sit behind a heat exchanger, and the facility water must never fall below the room dew point when it reaches a cold plate. Mixing valves and supply temperature limits on the CDUs keep the technology loop above the dew point all winter.

CDU placement and redundancy in New Jersey halls

CDU placement in a New Jersey hall is set by the building first and the rack layout second, because converted buildings, leased cages and new campuses offer very different places to put a pump skid that weighs several tons when full. The choice is between in-row CDUs that sit in the rack line, floor-standing units at the end of a row, and gallery CDUs in a separate room that feed several rows through larger mains.

In-row units suit colocation cages and small deployments, since they need no new rooms and keep the technology loop short. Gallery CDUs suit campus halls and converted research buildings, where a corridor or former lab can become a CDU room and maintenance stays outside the white space. Redundancy follows the same thinking as any critical pump system: N+1 CDUs on a common header, or paired CDUs on each row, with valves arranged so one unit can be removed while the other carries the load. Paul Industries lays out the headers, check valves and isolation valves to match the chosen scheme, sizes the mains for the flow at full buildout and sets the controls so a failed pump or a blocked filter swaps duty without a temperature excursion at the cold plates.

Filters deserve a place in the plan. Cold plates have fine internal channels, so the technology loop carries fine strainers or filters at each CDU, with differential pressure alarms and isolation for cleaning. Paul Industries specifies the filter rating to the cold plate manufacturer’s requirement and places the housings where they can be serviced without lifting floor tiles in the hall.

Keeping liquid-cooled racks running through New Jersey grid events

Liquid-cooled racks in New Jersey need their coolant pumps to keep running through any utility interruption, because a cold plate holds very little thermal mass and a processor at full power heats up within seconds once flow stops. That makes the CDU pumps, the leak detection and the CDU controls part of the critical load, not part of the general mechanical load.

The state’s 2026 large data center law raises the stakes. Large data center customers commit to demand flexibility and face curtailment ahead of residential customers in a system emergency, so their sites will spend more hours on generators or reduced utility supply than in the past. Paul Industries designs the liquid cooling system so that CDU pumps and controls sit on uninterruptible power, facility water pumps and dry cooler fans ride on the generators, and a chilled water or warm water buffer tank carries the loop through the seconds between utility loss and generator pickup. The sequence is tested during integrated systems testing, with the hall under load, before the owner accepts the system.

Liquid cooling for New Jersey building types

Liquid cooling for New Jersey building types varies more by who controls the building than by rack density, because a tenant in a leased cage, an enterprise owner of a converted building and a developer of a greenfield campus can each change very different parts of the plant. The table sets out the usual route for each.

Typical liquid cooling routes for New Jersey building types
Building typeExample areasUsual routeMain constraint
Leased colocation cageSecaucus, Carteret, Mahwah, WeehawkenLiquid-to-air CDUs or rear doors on a building water tapOperator approval, work windows, no changes to the base plant
Converted urban buildingNewark, Jersey CityLiquid-to-liquid CDUs on new risers from a rooftop or basement plantShaft space, roof structure, shared condenser water
Converted research buildingKenilworth and other former research campusesNew facility water plant and mains, CDU rooms beside each hallRemoving lab systems while keeping usable structure and power
Enterprise campus hallPiscataway, Edison, Parsippany, PrincetonLiquid-cooled rows added beside air-cooled rows, fed from the chilled water plant through a heat exchangerPlant temperature set for air, not for warm water
Greenfield high-density campusVineland and other South Jersey sitesWarm-water loops on dry coolers, CDU galleries, phased mainsSpeed of phased construction and testing

Immersion tanks are a further option in halls with strong floors and room to service them, described on data center immersion cooling. Paul Industries supplies data center liquid cooling equipment for each route, including CDUs, rear doors, manifolds, valves and filters, and installs it with the piping, controls and testing that make it work.

Is liquid cooling dangerous for servers in a New Jersey hall?

Liquid cooling is safe for servers when the loops are built, tested and monitored correctly, and the risk is managed by the same methods that protect any water system in a critical space: tested joints, leak detection, isolation valves and controlled coolant chemistry. Most leaks on new systems appear at connections made in the field, so the quality of the installation decides the risk more than the technology does.

Paul Industries limits field joints by prefabricating manifolds and spool pieces, tests every section to the pressure the design and the mechanical subcode require before coolant is introduced, and installs rope or spot leak sensors under manifolds, CDUs and rear door connections, wired to the building management system. Each row gets isolation valves so a single branch can be shut without draining the hall. Coolant is filtered and its chemistry logged from the first fill, because corrosion and particles cause the slow leaks and blocked cold plates that show up a year after startup. Testing and flushing methods for these loops are covered on hydrostatic testing and the closed loop design behind them on closed loop cooling systems.

Heat reuse under New Jersey’s 2026 large data center law

Heat reuse gained a policy reason in New Jersey when P.L.2026, c.32, signed on July 7, 2026, directed the Board of Public Utilities to set standards that encourage large data center customers to improve efficiency, including through technologies that capture and use the heat their servers produce. Liquid cooling is the practical way to capture that heat, because warm-water loops return water hot enough to be useful.

A direct-to-chip system running W32 or W40 facility water can return water well above 100 degrees Fahrenheit, warm enough to feed a heat exchanger serving office heating, domestic hot water preheat, a neighboring building or a district loop. Paul Industries designs the facility water system with a valved heat recovery connection and space for the exchanger, so an owner can add reuse when a heat customer is ready without shutting the loop. The broader tariff terms and their effect on cooling plants are covered on data center cooling in New Jersey.

Who provides liquid cooling for data centers in New Jersey?

Paul Industries provides liquid cooling for data centers in New Jersey, designing, supplying and installing CDUs, technology cooling system piping, facility water mains, rear door heat exchangers, dry coolers and trim chillers in Secaucus, Newark, Jersey City, Carteret, Edison, Piscataway, Kenilworth, Princeton, Trenton, Camden and Vineland, and across every other part of the state. Paul Industries, once based in northern New Jersey and headquartered today in Kilmarnock, Virginia, delivers the same work in all 50 states and at sites outside the United States.

The welding, fabrication and test work behind the piping is described on industrial welding services in New Jersey and process piping in New Jersey. Startup, flushing and integrated testing are covered on data center commissioning in New Jersey, and whole-building mechanical packages on data center mechanical contractors in New Jersey. For owners with halls in more than one state, the retrofit approach Paul Industries uses in its headquarters state is set out on data center liquid cooling in Virginia.

Pricing a New Jersey liquid cooling installation

Pricing a New Jersey liquid cooling installation starts with the number and density of liquid-cooled racks, the CDU type and redundancy, the facility water supply temperature, the distance from the plant to the hall, the building’s access and work-window rules, and whether new heat rejection is needed. A rear door retrofit for a few colocation cabinets and a direct-to-chip buildout for a new hall differ by orders of magnitude, so each is priced from its own scope.

Operating savings are part of the comparison. Removing heat in water lets the room run with less fan power; as an illustration, cutting 20 kilowatts of continuous fan draw saves about 175,000 kilowatt-hours a year, roughly $29,000 at New Jersey’s 2025 average commercial price of 16.53 cents per kilowatt-hour (EIA). Paul Industries gives a budget range from comparable scope once the rack plan is known, and a firm price after a survey of the plant, routes and connection points.

Liquid cooling installations by Paul Industries across New Jersey

Paul Industries designs, supplies, installs, flushes, tests and maintains liquid cooling systems for New Jersey data centers, from a few rear doors in a leased cage to warm-water loops across a new campus. For a proposal, send the rack count and densities, the IT equipment’s coolant and temperature requirements, the CDU preference if any, building drawings and the existing plant data. Call 201-450-8280 or request a quote. Other services for New Jersey plants, campuses and buildings appear on the New Jersey page.

Standards referenced: ASHRAE TC 9.9 Liquid Cooling Guidelines (W classes) · International Mechanical Code 2024 (New Jersey mechanical subcode) · N.J.A.C. 5:23 (New Jersey Uniform Construction Code) · ASME B31.9 · P.L.2026, c.32 (large data center electricity standards)

Frequently asked questions

Who installs liquid cooling for colocation tenants in Secaucus, Carteret or Mahwah?

Paul Industries installs rear doors, liquid-to-air CDUs and liquid-to-liquid CDU connections for colocation tenants in Secaucus, Carteret, Mahwah and Weehawken. The work follows the building operator’s rules: approved method statements, set work windows, pressure test records before any connection to building water, and leak detection tied into the operator’s monitoring. Send the cage layout, rack plan and the operator’s requirements to start the scope.

Can Paul Industries add liquid cooling to a converted building in Newark or Jersey City?

Yes. Paul Industries surveys the shafts, roof structure and existing plant in converted urban buildings in Newark and Jersey City, then routes new risers to liquid-to-liquid CDUs on the data floors. Where the building’s condenser water is shared, a heat exchanger separates the tenant loop from the base building. Work is sequenced so neighboring tenants keep their cooling throughout.

Does Paul Industries pipe liquid-cooled halls in Kenilworth, Piscataway or Princeton?

Yes. Paul Industries installs facility water mains, CDU connections and row manifolds in converted research buildings and campus halls in Kenilworth, Piscataway, Princeton, Edison and the rest of Central Jersey. In lab conversions, Paul Industries removes or isolates the old systems, prefabricates spool pieces off site and tests each hall’s piping separately so halls can be turned over as they are finished.

How are data centers liquid cooled when the building has no chilled water to spare?

A liquid-to-air CDU solves it. The CDU circulates coolant to the cold plates or rear doors and rejects the heat through its own coil into the room, where the existing air cooling removes it. The approach suits moderate densities in colocation cages and older rooms. Above that, the building needs new facility water, which Paul Industries provides from a dedicated dry cooler or chiller and new piping.

Are data centers water cooled in New Jersey?

Most New Jersey data centers already use water somewhere in their cooling: chilled water serves the CRAH units or fan walls in many larger halls, and condenser water runs to cooling towers. What is new is water reaching the rack itself, through rear doors and cold plates. Paul Industries installs both the plant side and the rack side of those systems.

How many data centers use liquid cooling?

Industry surveys suggest it is still a minority of sites. Uptime Institute’s 2025 survey found that more than 80 percent of operators had no rack above 30 kilowatts and 9 percent had racks above 50 kilowatts, the range where liquid becomes necessary. Rack-scale GPU systems near 120 kilowatts are liquid cooled by design, so the share grows with every high-density hall built.

How often does liquid cooling need maintenance?

Routine checks are monthly to quarterly: coolant level, pressure and temperature trends, filter differential pressure, leak sensor tests and pump condition. Coolant samples are typically tested on a schedule set by the coolant and CDU manufacturers, often quarterly in the first year. Paul Industries offers a maintenance program for CDUs, filters, valves and facility water piping, with coolant analysis logged for warranty records.

Which data center liquid cooling options suit a leased colocation cage?

Rear door heat exchangers and liquid-to-air CDUs suit leased cages best, because neither needs changes to the base building plant. Rear doors take a building water tap where the operator allows one; liquid-to-air CDUs need only power and floor space. For higher densities, a liquid-to-liquid CDU on a dedicated branch is the next step, subject to the operator’s approval.

What facility water temperature should a new New Jersey liquid-cooled hall use?

The answer comes from the IT equipment specification. Many current cold plate systems accept W32 water, up to about 90 degrees Fahrenheit, which New Jersey dry coolers can deliver without compressors in all but roughly 860 hours a year at Newark. Higher W40 limits extend that further. Paul Industries confirms the server supplier’s limits before setting the design temperature.

What happens when liquid-cooled racks draw from a New Jersey plant set up for 45 degree water?

Often, yes, through a heat exchanger or a CDU that blends plant water up to the temperature the cold plates need. A plant running 45 degree water can serve the liquid loop, though it gives up the efficiency of warm-water operation. Paul Industries checks spare plant capacity, pump head and the dew point margin before connecting, and plans a dedicated warm-water loop where the rack count justifies it.

Will an older New Jersey floor carry rack-scale liquid-cooled systems?

Rack-scale GPU systems with their coolant, manifolds and power shelves weigh far more than a typical air-cooled rack, and older raised floors and converted buildings were seldom rated for them. A structural review comes before layout. Paul Industries works from the structural engineer’s floor ratings when it places CDUs, manifolds and pipe supports, and spreads loads with dedicated stands where needed.

Does New Jersey's 2026 data center law affect liquid cooling projects?

Indirectly. P.L.2026, c.32 directs the Board of Public Utilities to reward large data center customers for efficiency, including technologies that capture and use server heat. Warm-water liquid cooling returns water hot enough for building heating or a district loop, so new halls can be designed with a heat recovery connection. Paul Industries builds that connection into the facility water piping.

What testing does a New Jersey liquid cooling loop pass before the first server connects?

Each section is tested hydrostatically to the pressure set by the design and the New Jersey mechanical subcode, held for the required time and documented before insulation or connection to IT equipment. The loop is then flushed until filter checks run clean and filled with the specified coolant. Paul Industries records every test and flush for the owner’s turnover file and the colocation operator.

What leak detection does a New Jersey liquid-cooled hall need?

Rope or spot sensors under every manifold, CDU and rear door connection, with alarms wired to the building management system and, where the design calls for it, automatic isolation valves on each row. Drip trays under overhead manifolds add a second layer. Paul Industries installs and tests each sensor zone and records its location so operators know exactly where an alarm originates.

Can liquid cooling piping be installed in a New Jersey hall while servers are running?

Yes, with planning. Paul Industries prefabricates manifolds and spool pieces off site, makes connections to live mains with valved tees or hot taps, controls dust and hot work under the facility’s permit procedures and works in the windows the operator sets. Each new branch is isolated and tested before it is opened to the running system.

What should a New Jersey owner send to price a liquid cooling project?

Send the number of liquid-cooled racks and their density, the server supplier’s coolant and temperature specification, any preferred CDU or rear door model, building drawings with structural ratings, the existing chilled water plant data and the operator’s rules for a colocation site. Paul Industries prices the job first as a budget range drawn from similar installations and then as a firm figure once the site survey is done.

Bringing liquid cooling into a New Jersey data hall?

Send the rack plan and densities, the server coolant and temperature specification, building drawings and existing plant data. Call 201-450-8280 or request a quote.