Paul Industries installs data center liquid cooling in Pennsylvania, piping coolant distribution units, rack manifolds, rear-door heat exchangers and the facility water loops behind them for dense compute halls from Lancaster to Pittsburgh. Pennsylvania suits warm-water liquid cooling unusually well: summers mild enough that dry coolers can reject rack heat for most of the year, river basin water limits that reward closed loops, and a wave of high-density campuses announced across the state. Paul Industries, headquartered in Kilmarnock, Virginia and formerly based in Pennsylvania, designs, fabricates, installs and starts up these systems statewide.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Dense rack example 120 kW per rack for a liquid-cooled GB200 NVL72 (NVIDIA)
Warm-water classes W32 = 89.6 F, W40 = 104 F, W45 = 113 F facility water (ASHRAE)
July normal highs Philadelphia 88 F, Pittsburgh 83 F, Erie 81 F (NOAA, 1991-2020)
Electricity Pennsylvania 2024 average retail price of 12.51 cents/kWh (EIA)
Reviewed November 2026

Data center liquid cooling in Pennsylvania: where the dense racks are landing

Data center liquid cooling in Pennsylvania is arriving in three kinds of building: new campuses designed around dense compute from the first drawing, university and research computing rooms that have run liquid-cooled systems for years, and existing colocation and enterprise halls adding a few liquid-cooled rows to air-cooled floors. Each starts from a different place, and the piping, controls and testing differ to match.

The market facts are public. In July 2025 CoreWeave announced more than $6 billion for a campus in Lancaster planned to start at 100 megawatts with room to grow to 300, and the company says liquid cooling is essential to the rack densities it deploys. Owners weighing data centers in Lancaster PA are working in the Susquehanna basin, where closed loops help keep water use under the commission’s threshold. In Pittsburgh, the Pittsburgh Supercomputing Center, a joint research center of Carnegie Mellon University and the University of Pittsburgh, runs national research systems such as Bridges-2, part of a research computing community whose rooms have long carried dense, heat-heavy equipment. These are market facts about the state, named only to show where the work is.

The general method, from cold plates to the W classes, is set out on the data center liquid cooling page. This page covers what Pennsylvania changes: the weather behind the dry coolers, the water rules behind the heat rejection choice, the buildings the racks go into, and how Paul Industries delivers the work.

How dense are the racks coming into Pennsylvania halls?

The racks coming into Pennsylvania halls now run well past what air can cool. NVIDIA rates its liquid-cooled GB200 NVL72 rack at 120 kilowatts, and reporting on the generation before it put the practical ceiling for air-cooled racks at roughly 60 kilowatts. Many older enterprise rooms were built for racks well under 15 kilowatts, so a single new row can carry more heat than the rest of an older floor combined.

Rack density bands and the cooling each tends to need in a Pennsylvania hall
Rack densityTypical coolingFacility work it triggersWhere it shows up in Pennsylvania
Under 15 kWRoom air with containmentCRAH or fan wall capacity, airflow managementEnterprise rooms, older colocation suites
15 to 40 kWRear-door heat exchangers or in-row coolersChilled water taps at the row, condensate and leak protectionColocation suites adding dense tenants, university clusters
40 to 80 kWDirect-to-chip cold plates with residual air coolingCDUs, a technology cooling loop, row manifolds, quick disconnectsResearch computing rooms and new dense rows in existing halls
80 to 130 kW and upRack-scale liquid systems with in-rack or row CDUsLarge facility water mains, warm-water heat rejection, power and weight upgradesNew campuses built for dense compute
Immersion tanksSingle-phase or two-phase fluid bathsFloor loading, fluid handling, facility water to tank exchangersSpecialty halls; see data center immersion cooling

The density band decides the data center liquid cooling design more than any other input. Paul Industries starts each job from the rack schedule: kilowatts per rack, supply temperature and flow the rack maker requires, the share of heat that still goes to air, and how many racks arrive in each phase. From that come the CDU count and size, the main and branch pipe sizes, the manifold arrangement and the heat rejection plant.

Which facility water temperature fits Pennsylvania weather?

The facility water temperature that fits Pennsylvania weather is usually warmer than a traditional chilled water plant supplies, because warm water lets outdoor dry coolers reject rack heat without running compressors. ASHRAE names its liquid cooling classes for the upper limit of facility water supply: W17 at 62.6 degrees Fahrenheit, W27 at 80.6, W32 at 89.6, W40 at 104 and W45 at 113, with W+ above that. A dry cooler can deliver water only some degrees warmer than the outdoor air, so the class sets how many hours of the year the compressors can stay off.

ASHRAE facility water classes set against Pennsylvania’s July normal highs (NOAA, 1991 to 2020)
ClassUpper supply limitPhiladelphia (88 F July normal high)Pittsburgh (83 F) and Erie (81 F)Heat rejection that usually fits
W1762.6 FChillers through the whole summerChillers through summer; long economizer season in winterChiller plant with water-side economizer
W2780.6 FChillers on most summer afternoonsDry coolers through spring and autumn, chillers on summer peaksChillers with dry cooler or tower economizer
W3289.6 FDry coolers most of the year, adiabatic assist or trim chillers on hot afternoonsDry coolers nearly year round, small trim capacityDry or adiabatic coolers with trim chillers
W40104 FDry coolers through normal summer afternoonsDry coolers year roundDry coolers; trim only for rare extremes
W45 and W+113 F and aboveDry coolers year round, with heat reuse possibleDry coolers year round, with heat reuse possibleDry coolers; heat recovery to buildings or processes

Normal highs are averages, and the plant is sized on design extremes above them, so the table shows the direction rather than the selection. The pattern holds, though: the cooler the region and the warmer the class, the fewer compressor hours a Pennsylvania site buys. Philadelphia’s warm, humid July nights, with a normal low of 70 degrees, keep a W27 plant on chillers around the clock in high summer, while a W32 or W40 plant in Scranton, State College, Pittsburgh or Erie runs on dry coolers nearly all year. Paul Industries checks the rack maker’s actual supply limit, which may sit below the class ceiling, before setting the plant’s design temperature.

Liquid cooling and Pennsylvania’s water rules

Pennsylvania’s water rules favor liquid cooling because warm-water loops can reject their heat through closed dry coolers that evaporate nothing in normal operation. The Susquehanna River Basin Commission reviews consumptive use at 20,000 gallons a day across the center of the state, and a hall cooled through evaporative towers can pass that figure early. A dry cooler plant on a W32 or warmer loop keeps data center liquid cooling water consumption to the small amounts needed for filling and topping up the loops.

For owners who ask about data center cooling without water, warm-water liquid cooling in a Pennsylvania climate is the most practical route, with adiabatic assist kept for the hottest afternoons if the site’s water approvals allow it. The water thresholds for each basin, and how they decide between towers and dry coolers, are laid out on the data center cooling in Pennsylvania page.

Fill water and coolant for a Pennsylvania loop

Fill water for a Pennsylvania technology cooling loop should never come straight from the tap, because municipal supplies across the state differ in hardness, chlorides and dissolved solids, and cold plate channels are narrow enough for scale or corrosion products to matter. The loop is filled with the coolant the cold plate maker approves, typically a propylene glycol blend or inhibited water made from deionized or reverse osmosis water, and the chemistry is checked before and after the first heat load. Paul Industries supplies treated fill water on site with portable equipment or a permanent make-up system, and the high-purity water systems in Pennsylvania page covers the permanent treatment option for large campuses that top up many loops.

Bringing liquid cooling into existing Pennsylvania buildings

Existing Pennsylvania buildings take liquid cooling well when their structure, ceiling height and plant capacity are checked first. Reused industrial buildings, such as the former printing plants proposed for Lancaster halls, usually carry heavy floors and generous clear heights that suit overhead pipe racks and heavy liquid-cooled racks. Older office and research buildings in Philadelphia and Pittsburgh are tighter: lower ceilings, raised floors rated for lighter equipment, and chilled water plants sized for air.

Paul Industries surveys before it designs. The survey records floor ratings against loaded rack weights, overhead clearances for mains and manifolds, the spare capacity and supply temperature of any existing chilled water plant, electrical capacity for CDU pumps, and the routes by which new piping can reach the hall without crossing live electrical gear. Where an existing chilled water plant supplies the new loop, a heat exchanger or CDU separates the clean technology cooling loop from the older water, and filtration protects the cold plates from scale and debris the old mains carry.

Overhead or under the floor in a Pennsylvania retrofit

Overhead piping keeps leaks above the rack rather than beneath it, frees the raised floor for air, and gives clear access for valves and sensors; under-floor piping uses space that already exists and avoids lighting and cable tray conflicts. In converted industrial buildings across Pennsylvania the height usually favors overhead routes, while older raised-floor halls in office buildings often keep piping below with drip trays and leak cable. Paul Industries draws both options against the room before the owner chooses.

CDUs, manifolds and the piping a Pennsylvania installation needs

A Pennsylvania liquid cooling installation needs the same core equipment as any other: coolant distribution units that separate facility water from the technology cooling loop, supply and return mains, row headers, rack manifolds with quick disconnects, isolation and balancing valves, air vents, filters, expansion tanks and sensors. Data center liquid cooling equipment is often selected by the IT side, and Paul Industries matches the facility piping to those selections.

Material choice follows the coolant and the cold plate maker’s wetted-material list. Stainless steel mains welded with orbital equipment give smooth, clean bores for the technology loop; copper and approved polymer hoses serve the final connections at the rack. Paul Industries fabricates headers and manifold assemblies off site where that shortens the work in a live hall, and the industrial welding services in Pennsylvania page covers the welding behind them. Each data center liquid cooling pump in a CDU is sized with its redundancy, so a single pump failure leaves the row at full flow.

Data center liquid cooling manifolds at the rack need room to connect and disconnect servers without disturbing neighbors, labeled valves for each branch, and capped future branches that are flushed and tested with the rest so they hold no stagnant water. Data center liquid cooling leak detection runs along mains, under manifolds and inside CDUs, wired to the building management system with alarms that name the location.

Phasing liquid cooling as a Pennsylvania campus grows

Phasing decides much of the piping design on a Pennsylvania campus, because large sites announce their full capacity years before the last hall fills. A campus planned to start at 100 megawatts and grow to 300, as the Lancaster announcement describes, will add CDUs, rows and dry coolers many times while earlier halls run at full load. Every addition has to connect without draining or disturbing the loops already serving live racks.

Paul Industries builds for that from the first phase. Mains are sized for the final load, or arranged as parallel loops that can be added side by side. Isolation valves sit at every planned branch point, and future branches are capped close to the main so no long dead legs hold stagnant coolant. Dry cooler yards get headers with valved connections for the next block of coolers, and the controls are set up to accept more CDUs without rewriting the sequence. Prefabricated manifold and header assemblies, built and pressure tested off site, shorten the time any live area is open for new work.

Each phase ends with its own flushing, testing and coolant verification before it joins the running system, so a new hall never sends construction debris into racks already in service.

Rear-door heat exchangers in Pennsylvania colocation halls

Rear-door heat exchangers suit Pennsylvania colocation halls where a tenant needs 15 to 40 kilowatts per rack in a room built for air. The door replaces the rack’s back panel with a water coil, so hot exhaust air is cooled before it reaches the room, and the hall’s air system carries on as before. Passive doors rely on the servers’ own fans; active doors add fans for higher loads.

A rear door needs chilled water close to the row, usually from a CDU or a dedicated branch, at a temperature high enough that the coil stays above the room’s dew point and never sweats. In humid Philadelphia summers that dew point check matters more than in Erie. Paul Industries pipes the branches, sets the supply temperature controls, installs leak detection under the connections and tests each door with the rest of the loop before the tenant moves in.

Power and controls behind the CDUs

Power and controls behind the CDUs keep coolant moving through a utility outage, which matters more for liquid-cooled racks than for air because cold plates hold very little thermal mass. CDU pumps and controls are usually fed from uninterruptible power so flow continues while generators start, and the facility water pumps behind them are set to restart in a defined order. Paul Industries works through the electrical one-line with the owner’s engineer so every pump in the chain has the backed-up power the racks require, then proves the transfer during testing.

The CDU controls report supply temperature, flow, pressure and alarms to the building management system, and the sequence decides what each unit does on a pump failure, a high-temperature alarm or a leak signal.

Winter, glycol and freeze protection for Pennsylvania loops

Winter protection for Pennsylvania liquid cooling loops centers on the outdoor dry coolers and the piping that reaches them. January normal lows of 20 to 26 degrees Fahrenheit across the state’s main cities, and much colder design lows, mean outdoor coils must run glycol or drain safely. Paul Industries usually keeps glycol in the outdoor loop only, with a plate heat exchanger separating it from the facility water that serves the CDUs, so the technology loop carries the coolant the cold plate maker specifies.

Glycol strength is set to the site’s design low, with Erie, Scranton and the northern tier needing more protection than Philadelphia. Exposed piping gets heat tracing and insulation, and the controls keep fans and pumps running at low speed in cold weather rather than letting water sit still in an outdoor coil. A warm-water loop helps in winter, too: the return water leaving the hall is warm enough to keep outdoor coils well above freezing while the load is running.

Testing and turnover before the first rack connects

Testing before the first rack connects protects cold plates that cost far more than the piping feeding them. Paul Industries pressure tests every section, flushes the loops at velocity through temporary strainers with the CDUs and racks bypassed, fills with the specified coolant, vents air at every high point, and verifies coolant chemistry and particle counts before the IT team connects a single server. The full inspection and testing sequence on a Pennsylvania permit sits on the data center commissioning in Pennsylvania page.

Data center liquid cooling maintenance starts at turnover: coolant sampling on a schedule, filter changes when differential pressure rises, CDU pump and valve checks, leak sensor tests and trending of supply temperatures and flows. Paul Industries offers maintenance contracts that carry the system forward under the same records it was built with.

What does data center liquid cooling cost in Pennsylvania?

Data center liquid cooling cost in Pennsylvania depends on rack count and density, the cooling class, whether the building is new or existing, the CDU arrangement, piping material, heat rejection and the phasing of the IT arrivals. A per-rack figure without those inputs misleads, so Paul Industries gives a budget range from comparable scope once the rack schedule is known, then a firm price when drawings and site conditions are defined.

Energy savings belong in the same calculation. As a stated example, a chiller plant running at 0.6 kilowatts per ton to remove one megawatt of heat draws about 171 kilowatts; at 12.51 cents a kilowatt-hour, the state’s 2024 average retail price according to the EIA, that is about $21 an hour, or about $187,000 a year if the compressors never stopped. Every hour a warm-water loop runs on dry coolers instead saves most of that, less the cooler fan power.

What drives the price of a liquid cooling installation in Pennsylvania
Cost driverLower-cost caseHigher-cost case
BuildingNew hall with overhead space planned for mainsOccupied older hall with low ceilings and live equipment
Cooling classW32 or warmer on dry coolersW17 or W27 needing chiller capacity
CDU arrangementRow CDUs serving many racksIn-rack CDUs and many small branches
Piping materialApproved copper or polymer where the coolant allowsOrbital-welded stainless mains with documented weld records
PhasingFull build in one sequenceMany small phases tied into a live loop
Winter workIndoor work in a heated shellOutdoor dry cooler yards built in January

Paul Industries offers three routes: supply-only CDUs, manifolds and prefabricated piping assemblies; design-build of the whole liquid cooling system; or complete installation to an owner’s engineered design.

Who installs data center liquid cooling in Pennsylvania?

Paul Industries installs data center liquid cooling in Pennsylvania, from CDUs and rack manifolds to the facility water mains and dry cooler plants behind them, for colocation operators, enterprises, universities and developers of new campuses. Paul Industries, an East Coast contractor with its headquarters in Kilmarnock, Virginia, installs liquid cooling in every state and abroad through its international program.

The same work runs as data center liquid cooling in Virginia, the headquarters state, and data center liquid cooling in New Jersey. In Pennsylvania it connects with the mechanical package on the data center mechanical contractors in Pennsylvania page and with research building work under research labs and universities. The full list of services in the state is on the Pennsylvania page.

Liquid cooling from Paul Industries for Pennsylvania halls

Paul Industries designs, fabricates, supplies, installs, tests and maintains liquid cooling systems for Pennsylvania data centers: coolant distribution units, technology cooling loops, rack manifolds and quick disconnects, rear-door heat exchangers, facility water mains, dry cooler and trim chiller plants, glycol separation, leak detection and controls. Each system is flushed, tested and documented before servers connect, and maintained afterward on the same records. Send the rack schedule and building drawings and request a quote.

Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments (liquid cooling classes W17 to W+) · ASHRAE TC 9.9 liquid cooling guidance · ASME B31.9 Building Services Piping · ASME B31.3 Process Piping (where specified for stainless TCS piping) · Pennsylvania Uniform Construction Code (34 Pa. Code Chapters 401-405) · Open Compute Project rack and liquid cooling specifications

Frequently asked questions

Who pipes liquid cooling for data centers in Lancaster PA and South Central Pennsylvania?

Paul Industries pipes and installs liquid cooling for halls in Lancaster, York, Harrisburg and the rest of South Central Pennsylvania, including reused industrial buildings converted for dense compute. The region sits in the Susquehanna basin, where closed warm-water loops on dry coolers help a site stay under the commission’s 20,000 gallon a day consumptive use threshold. Paul Industries designs the loop temperature and heat rejection together.

Does Paul Industries install liquid cooling for research computing in Pittsburgh?

Yes. Paul Industries installs CDUs, manifolds, facility water piping and dry cooler plants for university and research computing rooms in Pittsburgh and across Southwest Pennsylvania. Pittsburgh’s July normal high of 83 degrees Fahrenheit gives warm-water loops a long season on dry coolers. Work in occupied research buildings is phased around the users’ schedules, with tie-ins planned during agreed outages.

Can Paul Industries add liquid cooling to a hall in Philadelphia or King of Prussia?

Paul Industries adds liquid cooling to existing halls in Philadelphia, King of Prussia and the suburban counties, surveying floor ratings, ceiling heights, chilled water capacity and electrical capacity first. Philadelphia’s warm summer nights, with a July normal low of 70 degrees, mean warm-water classes such as W32 or W40 save the most compressor hours there. New piping is routed and tied in while the rest of the hall stays live.

Which data center liquid cooling system suits a Pennsylvania hall with 120 kilowatt racks?

Racks at 120 kilowatts, the density NVIDIA states for its liquid-cooled GB200 NVL72, need direct-to-chip cold plates fed by in-rack or row CDUs, with a small share of heat still removed by air. Behind the CDUs, a warm facility water loop on dry coolers suits most Pennsylvania sites. Paul Industries sizes the CDUs, mains and heat rejection from the rack maker’s flow and temperature requirements.

What should Pennsylvania buyers check when comparing data center liquid cooling companies?

Check how each of the data center liquid cooling companies on the list handles the facility side: loop design matched to the rack maker’s limits, welded and documented piping, flushing and coolant verification before any server connects, leak detection, and maintenance after turnover. Paul Industries designs, fabricates, installs, tests and maintains the whole system under one contract with one set of records.

Can dry coolers carry a liquid-cooled hall through a Philadelphia summer?

Dry coolers can carry a W40 or warmer loop through Philadelphia’s normal summer afternoons, since the water may run well above the 88 degree July normal high. A W32 loop needs adiabatic assist or trim chillers on the hottest afternoons, and a W27 loop needs chillers through much of summer. Paul Industries selects coolers on the site’s design extremes and adds trim capacity only where the class requires it.

What data center liquid cooling temperature should a new Pittsburgh hall use?

The data center liquid cooling temperature for a new Pittsburgh hall should be the warmest the chosen racks accept, often 89.6 degrees Fahrenheit (W32) or higher, because Pittsburgh’s cooler summers then let dry coolers carry the load nearly all year. Paul Industries confirms the rack maker’s actual supply limit and the share of heat left to air before setting the design temperature.

Are data centers liquid cooled in Pennsylvania today?

Many are, at least in part. Research computing rooms have used liquid cooling for dense systems for years, colocation halls are adding liquid-cooled rows for tenants who need them, and new campuses announced for high-density compute, such as the planned Lancaster site, are designed around it. Most halls run a mix: liquid for the densest racks and air for the rest. Paul Industries builds both sides of that mix.

Do Pennsylvania liquid cooling loops need glycol?

The outdoor dry cooler loop needs glycol, or a safe drain-down arrangement, because Pennsylvania January lows run from 20 to 26 degrees Fahrenheit on average and much lower at design conditions. Paul Industries usually keeps glycol outdoors only and separates it from the indoor facility water with a plate heat exchanger, so the technology loop carries the coolant the cold plate maker specifies.

Data center liquid cooling vs air cooling: which fits an existing Pennsylvania hall?

The choice between data center liquid cooling vs air cooling in an existing Pennsylvania hall follows rack density. Below about 15 kilowatts per rack, air with containment remains practical; from about 15 to 40 kilowatts, rear doors or in-row coolers bridge the gap; above that, direct-to-chip liquid cooling is the workable route. Paul Industries surveys the room and the plant, then lays out where each method fits.

How is a data center liquid cooling cost estimate built for a Pennsylvania project?

Paul Industries builds the estimate from the rack schedule, the cooling class, the building survey, the CDU and piping arrangement, the heat rejection plant and the phasing. A budget range from comparable scope comes first, then a firm price once drawings are complete. Energy savings at the owner’s actual electricity rate are set against the installed cost so the owner sees the full picture.

Which data center liquid cooling solutions work in a leased Pennsylvania colocation suite?

In a leased colocation suite, the practical data center liquid cooling solutions are rear-door heat exchangers on the building’s chilled water, row CDUs fed from a landlord tap, or liquid-to-air CDUs that reject heat into the room where no water is available. Paul Industries agrees the tap, metering and leak protection with the landlord before installing the tenant’s equipment.

How many CDUs does a Pennsylvania liquid-cooled row need?

The CDU count follows the row’s heat load, the flow the racks need and the redundancy target. A row designed for N+1 carries one more CDU than the load needs, so any single unit can be serviced at full load. Each data center liquid cooling pump inside a CDU also has a duty and standby arrangement. Paul Industries sizes CDUs and their power feeds together.

Where should leak sensors go in a Pennsylvania liquid-cooled hall?

Data center liquid cooling leak detection belongs under every manifold and CDU, along mains wherever they cross above electrical equipment, in drip trays under valves, and at low points of any under-floor route. Rope or cable sensors cover long runs and spot sensors cover equipment. Paul Industries wires them to the building management system with alarms that name the exact location.

Who does liquid cooling for data centers on a supply-only basis?

Paul Industries supplies CDUs, manifolds, valves and prefabricated piping assemblies on a supply-only basis for an owner’s installer, and also offers design-build and complete installation. Data center liquid cooling providers that offer all three routes let the owner keep the procurement method it prefers. Paul Industries prices each route clearly, with equipment and labor shown separately.

What does data center liquid cooling maintenance include after turnover?

Maintenance covers coolant sampling for chemistry and particles, filter changes on rising differential pressure, CDU pump and valve inspection, leak sensor testing, glycol strength checks on the outdoor loop before winter, and trending of supply temperatures and flows. Paul Industries offers data center liquid cooling services under contract, using the records from installation as the baseline.

Can a university server room in State College or Philadelphia move to direct-to-chip cooling?

University rooms can move to direct-to-chip cooling one row at a time. Paul Industries checks the building’s chilled water capacity and temperature, adds a CDU to separate a clean technology loop, routes mains and manifolds through the room, and phases tie-ins around the academic calendar. State College’s cooler summers and Philadelphia’s warmer ones change how much dry cooler capacity a dedicated plant needs.

What drawings and data start a Pennsylvania liquid cooling quote?

Send the rack schedule with kilowatts, flow and supply temperature limits, the number of racks in each phase, building drawings with ceiling heights and floor ratings, details of any existing chilled water plant, and the site address. Paul Industries uses that to propose a loop arrangement, a heat rejection plant, a budget range and a schedule, then a firm price.

Bringing liquid-cooled racks into a Pennsylvania hall?

Send the rack schedule, supply temperature limits and building drawings. Call 201-450-8280 or request a quote.