Paul Industries is a US process equipment contractor for Ireland, building PED-compliant process skids, purified water and WFI systems, CIP units, vessels and sanitary piping in its US shop for pharmaceutical, biologics, food and medical device plants in Cork, Dublin, Limerick, Sligo and across the Republic. Each system is engineered for the Irish 50 Hz supply, documented in English to EU requirements, proven at a factory acceptance test, and shipped to Dublin Port or the Port of Cork. Paul then installs and commissions it at the plant, start-up included, or supervises its installation, and the validation file, weld records and as-built drawings arrive with the equipment.
Request a quote or call 201-450-8280
What a US process equipment contractor for Ireland delivers
A US process equipment contractor for Ireland delivers a finished system that an Irish plant can put into service under EU law: a design checked against the Pressure Equipment Directive, equipment built and documented to it, a factory test, export packing, and the field work that brings it to a running, qualified state. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, carries that scope under one contract.
The equipment is what Irish pharmaceutical and biologics sites buy most often from American fabricators: pump skids and dosing skids, purified water and WFI systems, CIP and SIP units, clean steam generators and distribution, buffer and media tanks, pressure vessels and orbital-welded sanitary process piping. Larger scopes combine them into a turnkey utility or process train. Paul offers three routes: supply with installation supervision, design-build, and complete installation with commissioning and qualification.
Irish buyers have good reasons to look across the Atlantic. Many of the plants in Cork Harbour and Limerick belong to American parent companies whose engineering standards, preferred instrument brands and validation templates were written in the United States, and an American fabricator that builds to those standards and to the PED at the same time removes a translation step from every project. US pharma companies in Ireland also tend to run global equipment frameworks, so a skid built for a sister plant in North Carolina or Puerto Rico is often the template for the Irish one, adjusted for 50 Hz power and EU documentation.
Why are Ireland’s process plants buying from the United States?
Ireland’s process plants buy from the United States because the country’s pharmaceutical sector is large, export-driven and heavily American-owned, and its expansion projects run on schedules that stretch the capacity of every fabricator in Europe. Medical and pharmaceutical products accounted for 99.9 billion euros of Irish exports in 2024, 45 percent of the total, according to the Central Statistics Office. That figure grew by 29 percent in a single year, which tells a buyer how much new capacity is being built.
A list of pharmaceutical companies in Ireland reads like a list of the world’s largest drug makers, and many of the top pharmaceutical companies in Ireland are American. The American pharmaceutical companies in Ireland include Pfizer, with manufacturing at Ringaskiddy in Cork, Grange Castle in Dublin and Newbridge in Kildare; Eli Lilly, which employs close to 2,700 people at Kinsale and Little Island in County Cork and has committed about 2 billion dollars to a biologics plant at Raheen; Regeneron, whose Industrial Operations and Product Supply campus covers about 20 hectares of the Raheen Business Park in Limerick; and AbbVie, with manufacturing in Sligo and Cork. These are named here as market facts about the Irish industry.
For a plant manager, the practical result is that pharmaceutical engineering, Ireland’s busiest industrial discipline, is short of fabrication slots during peak build years. A US shop with open capacity, ASME BPE experience and a working knowledge of the PED gives the project a second supply line.
| Region | Industry examples (market facts) | Typical process systems | What Paul Industries builds for it |
|---|---|---|---|
| Cork Harbour (Ringaskiddy, Little Island, Kinsale) | Pfizer Ringaskiddy, the former Janssen biologics plant at Ringaskiddy, Lilly Kinsale and Little Island | API synthesis, biologics drug substance, solvent recovery, high-potency containment | Pressure vessels, process skids, WFI and clean steam systems, solvent and utility piping |
| Dublin and Kildare | Pfizer Grange Castle and Newbridge, a dense base of sterile and biologics fill-finish sites | Cell culture, purification, aseptic filling, cleanroom utilities | Buffer and media skids, CIP units, sanitary process piping, cleanroom utility systems |
| Limerick and the Shannon region | Regeneron’s Raheen campus, Lilly’s Raheen biologics plant | Large-scale bulk biologics, buffer preparation, purified water | Purified water and WFI generation and loops, buffer hold vessels, transfer panels |
| Sligo and the north-west | AbbVie manufacturing in Sligo | Oral solid dose and API | Process water skids, dosing systems, utility piping |
| Galway and the west | Medical device manufacturing | Washing and passivation lines, process water, compressed air | DI and purified water skids, process tanks, passivation of stainless parts |
Which rules apply to process equipment in Ireland?
Process equipment in Ireland is governed by EU product law at the point of supply and by Irish health and safety law once it is installed, with medicines regulation on top for any plant that makes drugs. The supplier’s side is the Pressure Equipment Directive, the Machinery Directive and the EU electrical directives; the plant’s side is the General Application Regulations and the HPRA’s GMP inspections. Paul Industries designs and documents each system to meet both sides, because an Irish plant needs equipment that satisfies both at once.
Pressure vessel regulations: Ireland applies two layers
The first layer is the European Union (Pressure Equipment) Regulations 2017, S.I. No. 233 of 2017, which give the PED force in Irish law and were amended in 2022. Equipment with a maximum allowable pressure above 0.5 bar is classified by fluid group, pressure and volume or nominal size into Categories I to IV, and the conformity assessment module that applies to its category decides what has to happen before the CE mark is affixed. From Category II upward the directive brings a notified body into design review, material and welding approval or final assessment, so the choice of notified body Ireland’s regulations recognise is part of the early project plan. The vessel arrives with its CE marking, the EU declaration of conformity and operating instructions in English.
The second layer is Part 10 of the Safety, Health and Welfare at Work (General Application) Regulations 2007, inserted by S.I. No. 445 of 2012 and in operation since 1 January 2013. Part 10 requires the plant to know the safe operating limits of each pressure system, to have it examined by a competent person before it is put into use, and to repeat the examination at the intervals in Schedule 12: 14 months for steam generating equipment in Category 1 and 26 months for other pressure vessels in Category 2. The plant also keeps a register of its pressure vessels. Paul’s turnover package gives the plant every figure that examination and register draw on: design pressure and temperature, relief valve sizing, material certificates and the hydrostatic test record.
Plants that compare a pressure vessel manufacturer Ireland’s own industry uses with a US builder find that the deciding issue is the conformity route rather than the fabrication. A vessel designed to ASME Section VIII reaches the Irish market through the PED essential safety requirements and the module its category demands, while a design to EN 13445 draws on a harmonised standard. Paul fixes the route during the code review, so material purchase, weld procedures and the test plan all follow it from the start.
Purified water, WFI and clean steam for Irish biologics
Purified water, WFI and clean steam systems are the utilities Irish biologics plants order most, and they carry the heaviest documentation load of any equipment on site. A WFI loop for a plant in Cork or Limerick has to meet the Ph. Eur. monograph, hold its temperature and velocity across every point of use, drain completely, and arrive with a material and weld history that lets the plant’s validation group trace every wetted component. Paul Industries designs the generation unit, storage vessel, distribution loop and points of use as one system, sizes heat exchangers and pumps for the Irish 50 Hz supply, and fabricates the loop from ASME BPE tube and fittings with orbital welds and borescope records. Clean steam generators and their distribution follow the same discipline, with condensate sampling points and steam quality test connections designed in from the first drawing.
Machinery, electrical and GMP rules
A process skid with pumps, agitators or automated valves is also machinery, and today it is placed on the EU market under the Machinery Directive 2006/42/EC. From 20 January 2027 the Machinery Regulation (EU) 2023/1230 replaces the directive, with no transition period for equipment placed on the market after that date, so a project in design today that ships in 2027 is built to the regulation. Control panels follow IEC 60204-1, and the installation they connect to follows I.S. 10101, the National Rules for Electrical Installations published by NSAI in 2020, which replaced ET 101 and now stands at I.S. 10101:2020 with its 2024 amendment.
On the GMP side, the Health Products Regulatory Authority, HPRA, Ireland’s medicines regulator, grants manufacturing authorisations, inspects plants against EU GMP and posts the resulting GMP certificates on the EU’s EudraGMDP database. The HPRA completed 83 GMP inspections of human medicine and active substance sites in 2024. For sterile manufacturing, the 2022 revision of EU GMP Annex 1 sets the contamination control strategy that equipment design has to fit, and water for injections follows the Ph. Eur. monograph, which accepts membrane-based production equivalent to distillation.
| Area | Irish or EU requirement | What it requires of the equipment | What Paul delivers |
|---|---|---|---|
| Pressure equipment | PED 2014/68/EU via S.I. No. 233/2017 | Category assessment, conformity module, CE marking, declaration of conformity, English instructions | Category analysis per vessel and line, design file, material traceability, PED documentation set |
| In-service safety | General Application Regulations 2007, Part 10 | Safe operating limits, examination before first use, Schedule 12 intervals, register of vessels | Safe operating limits table, relief sizing, test records and data sheets for the register |
| Machinery | Directive 2006/42/EC, then Regulation (EU) 2023/1230 from 20 January 2027 | Risk assessment, essential health and safety requirements, CE marking of the assembly | Risk assessment, guarding and interlock design, technical file |
| Electrical | IEC 60204-1 for the machine; I.S. 10101 for the installation | 230/400 V, 50 Hz design, IEC wiring colours, earthing and protective devices | Panels designed and tested for Irish supply, metric cable sizing, I/O lists |
| GMP and water | HPRA inspection against EU GMP, Annex 1 (2022), Ph. Eur. 0169 | Cleanable, drainable, documented equipment within the plant’s contamination control strategy | URS-driven design, ASME BPE fabrication, surface finish records, IQ and OQ protocols |
Power, units and documents for Irish plants
Irish plants run on a 50 Hz supply at 230 volts single phase and 400 volts three phase, the standard voltages ESB Networks publishes for the country. Paul Industries selects motors, variable frequency drives and transformers for that supply from the first data sheet, so pump curves, agitator speeds and heater ratings in the design match what the equipment does once energised in Ireland.
Drawings are issued in metric units with DN pipe sizes and pressures in bar, while hygienic tubing follows the series the plant already stocks, often ASME BPE sizes at American-owned sites. Every document is in English, which suits both the PED requirement for instructions in the language of the member state and the HPRA’s inspection practice. Commercial terms are written in US dollars under the Incoterm agreed for the order, so the buyer’s finance team converts on its own terms.
Shipping to Ireland from the US East Coast
Shipping a process skid to Ireland starts at an East Coast container port such as New York and New Jersey, Philadelphia, Baltimore or Norfolk, and ends at Dublin Port or the Port of Cork. Direct North Atlantic sailings reach Dublin in about 12 to 16 days port to port, other services take about 20 days, and routings that transship in Rotterdam, Antwerp or a British port take longer, according to published carrier and forwarder schedules. Paul builds the export plan around the sailing that suits the equipment and the site date, with the price weighed against the transit.
For Cork Harbour plants, the Port of Cork’s container terminal at Ringaskiddy, an investment of about 86 million euros that became operational in 2022, puts the quay a short haul from several of the country’s largest pharmaceutical sites. Dublin Port serves the plants around the capital, Kildare and the midlands. Out-of-gauge loads on flat racks need a carrier that calls the chosen Irish port with suitable equipment, which is why skid width and height are fixed during design.
Customs, VAT and Incoterms for an Irish order
Ireland is inside the EU customs union, so US-built equipment is cleared once on entry and then moves freely within the EU. The importer needs an EORI number from the Revenue Commissioners, which is valid across the EU, and the declaration is lodged in Revenue’s Automated Import System. Duty is set by the Common Customs Tariff according to the equipment’s Combined Nomenclature code, and import VAT is charged at the Irish domestic rate, 23 percent at the standard rate, with postponed accounting available to VAT-registered businesses.
Under Incoterms 2020, an Irish buyer usually chooses FCA at the US port when its own forwarder handles freight, DAP to the plant gate in Cork, Limerick or Dublin when it wants Paul to carry the transport risk, or DDP when it wants a single landed price with duty and clearance included. The term decides who books the vessel, who insures the crossing and who pays duty and VAT at entry.
How does a project for an Irish plant run with Paul Industries?
A project for an Irish plant runs through the same disciplined sequence as any Paul Industries export job, with Irish and EU requirements written into each stage instead of added at the end. The table shows the stages, what is particular to Ireland in each, and the documents the plant receives.
| Stage | Ireland-specific content | Records handed to the plant |
|---|---|---|
| 1. Requirements and code basis | URS review against EU GMP and the site’s own standards; PED category of every pressure part; machinery and electrical basis | Code basis memo, category list, conformity route per item |
| 2. Engineering | Metric drawings, 50 Hz motor and drive selection, IEC panel design, shipping envelope for the Dublin or Cork route | P&IDs, general arrangements, calculations, electrical schematics |
| 3. Fabrication in the US shop | Weld procedures and welder qualifications matched to the PED route; EN or ASME materials with full traceability | Weld logs and maps, mill certificates, Ra readings and passivation reports |
| 4. Factory acceptance test | Test run at 50 Hz where the supply allows; buyer and quality team present or on video | Executed FAT protocol, punch list close-out |
| 5. Export packing and freight | ISPM 15 crates, preservation for the crossing, booking to Dublin Port or Ringaskiddy under the agreed Incoterm | Commercial invoice, packing list, bill of lading, certificate of origin |
| 6. Site installation | Setting, tie-ins and wiring inside the plant’s permit-to-work system, by Paul or under Paul’s supervision | Installation records, tie-in weld records, redlines |
| 7. Start-up and SAT | Flushing, passivation where specified, instrument checks, site acceptance test on Irish utilities | Start-up report, executed SAT |
| 8. Qualification and handover | IQ and OQ executed to the site’s validation procedures, data for PQ, turnover for HPRA-facing files | Executed IQ and OQ, as-built drawings, manuals, spare parts list |
Stage 1 carries the most weight on an Irish job. Once the conformity route for each pressure part is fixed, every later stage follows from it, and the documentation set an Irish quality unit expects at handover is planned from the first week rather than assembled after the equipment ships. The validation and commissioning protocols are drafted alongside the FAT protocol so the site work repeats only what the crossing and installation could change.
Who builds process systems for plants in Ireland?
Paul Industries builds process systems for plants in Ireland, designing and fabricating them in its US shop, testing them at FAT, shipping them to Dublin or Cork, and installing, starting up and commissioning them on site or supervising their installation. Buyers at American-owned sites value a builder that speaks both the ASME and PED languages; buyers at European-owned sites value the documentation discipline that comes from years of FDA-facing work in the United States.
The systems most often requested are purified water and WFI trains, CIP and SIP, clean steam, buffer and media preparation skids, and the vessels and piping that join them. For cleanroom installation, Ireland’s new fill-finish and cell therapy buildings draw on the same team, with cleanroom construction and HVAC-linked utilities planned with the process equipment. Plants in pharmaceutical manufacturing and biotech account for most Irish enquiries, alongside dairy and food plants and medical device sites. Whole utility buildings are delivered as turnkey process systems.
What drives the cost of a process equipment project in Ireland?
The cost of a process equipment project in Ireland is driven by the equipment itself and by five delivery factors that a US-only project never carries: the PED conformity work, freight and port choice, export crating, duty and VAT under the chosen Incoterm, and the installation route. Paul Industries lists each one separately in the quote so the plant’s finance team can compare it with a European tender line by line.
- PED conformity. Category III and IV vessels need notified body involvement at the design and final assessment stages, and material choices made for the PED route affect both price and lead time.
- Freight and port. A skid that fits a high cube container ships for a fraction of a flat rack load, and a direct sailing to Dublin or Cork costs differently from a transshipment routing.
- Crating and preservation. Heat-treated crates, desiccant, nitrogen blanketing of sanitary lines and polished-surface protection scale with the size and sensitivity of the equipment.
- Duty and VAT. Under FCA or DAP the Irish importer pays duty and import VAT; under DDP they sit in Paul’s price. Postponed VAT accounting changes the plant’s cash flow while the total stays the same.
- Installation route. Supervision of the plant’s installation uses fewer Paul field hours; complete installation keeps start-up risk with the company that built and tested the system.
Paul gives a budget range from a scope description and a firm price once drawings, the Irish destination and the Incoterm are fixed.
Paul Industries for Irish process plants
From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries carries out process equipment projects across Ireland as part of its work in countries outside the United States. For each Irish plant, Paul engineers the system, builds the skids, pipe spools, tanks, vessels and complete process trains in its US shop, proves them at the factory acceptance test and ships them to Dublin Port or the Port of Cork. On site, Paul installs and commissions the equipment, start-up included, or supervises its installation, and every item arrives built and documented to the PED and the plant’s GMP requirements. Plants with sister sites across the Irish Sea will find the post-Brexit rules on the United Kingdom page, and EU projects in the chemical heartland on the Germany page. Send the URS, P&IDs or a scope note with the site location and preferred Incoterm to request a quote.
Standards referenced: Pressure Equipment Directive 2014/68/EU · European Union (Pressure Equipment) Regulations 2017 (S.I. No. 233/2017) · Safety, Health and Welfare at Work (General Application) Regulations 2007, Part 10 and Schedule 12 · EN 13445 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Machinery Directive 2006/42/EC · Machinery Regulation (EU) 2023/1230 · I.S. 10101 National Rules for Electrical Installations · IEC 60204-1 · EU GMP Annex 1 · Ph. Eur. 0169 Water for Injections · ISO 14644-1 · Incoterms 2020 · ISPM 15
Frequently asked questions
Can a US contractor build process equipment that meets Irish and EU law?
Paul Industries builds process equipment for Irish plants to the Pressure Equipment Directive as transposed by S.I. No. 233 of 2017, to the EU machinery and electrical rules, and to the plant’s GMP requirements. Each pressure part is categorised, the matching conformity module is followed, and the equipment ships with its CE marking, declaration of conformity, English instructions and the data the plant needs for its Part 10 examination and register.
Why are so many pharmaceutical companies in Ireland, and what does that mean for equipment buyers?
Pharmaceutical companies have built in Ireland for decades because of its EU market access, an English-speaking workforce trained in pharmaceutical science and engineering, a long record of FDA and HPRA approved plants, and clusters of suppliers and skilled staff that each new plant strengthens. The result is a sector worth 99.9 billion euros of exports in 2024. For equipment buyers, it also means constant expansion projects, which is why Paul Industries builds skids and water systems for Irish sites in its US shop.
What pharmaceutical companies are in Cork, and what do their plants need?
Cork Harbour holds one of Europe’s densest clusters of drug manufacturing, with Pfizer at Ringaskiddy, Lilly at Kinsale and Little Island, AbbVie, and the former Janssen biologics plant at Ringaskiddy among the sites named in industry listings. Their plants run API synthesis, biologics and high-potency processes that need pressure vessels, WFI and clean steam, solvent handling and containment-ready skids. Paul Industries builds that equipment to the PED and ships it through the Ringaskiddy container terminal.
What does shipping to Ireland from US ports involve for a process skid?
A skid leaves an East Coast port such as New York and New Jersey or Baltimore in a container or on a flat rack, crosses to Dublin Port or the Port of Cork in roughly 12 to 20 days on direct services, and clears EU customs on arrival. Paul Industries handles the ISPM 15 crating, preservation, export filing and booking, and quotes freight under the Incoterm the plant chooses, from FCA at the US port to DDP at the plant gate.
Which pharmaceutical companies in Limerick, Ireland, are expanding?
Limerick’s Raheen area hosts two major biologics investments: Regeneron’s Industrial Operations and Product Supply campus of about 20 hectares, and Lilly’s biologics plant, with total committed investment of about 2 billion dollars. Bulk biologics at that scale need buffer and media preparation, purified water and WFI loops, CIP and large hold vessels, all equipment Paul Industries designs, fabricates and commissions for Irish plants.
Does Paul Industries install equipment at plants in Dublin and Kildare?
Paul Industries installs, starts up and commissions equipment at plants in Dublin, Kildare and across Ireland, or supervises the installation when the plant prefers that route. The field work runs inside the site’s permit-to-work system and safety rules, with method statements sent ahead for approval, and ends with the site acceptance test, IQ and OQ and a full turnover package for the plant’s quality unit.
How does the HPRA affect equipment bought from the United States?
The HPRA inspects the plant that uses the equipment against EU GMP rather than approving each item, so every skid, vessel and water system has to fit the site’s qualification and contamination control strategy. Paul Industries designs to the plant’s URS, fabricates to ASME BPE hygienic practice, and delivers IQ and OQ protocols, surface finish records and weld documentation in the form an HPRA inspector expects to see in the plant’s files.
What is the conformity route for an ASME-designed vessel going to Ireland?
An ASME Section VIII design reaches Ireland by meeting the PED essential safety requirements through the conformity module set by its category. For Categories II to IV that means notified body involvement covering design, materials, welding and final assessment, with European material requirements addressed through harmonised standards, a European material approval or a particular material appraisal. Paul Industries decides the route at the code review, before any plate or pipe is bought.
Can the factory acceptance test be witnessed from Ireland?
Plant engineers and quality staff from Ireland attend the factory acceptance test in person or witness it remotely by live video, with the protocol, punch list and test data shared in real time. The FAT covers pressure testing, wiring checks at the destination voltage and frequency where the supply allows, control sequences, alarms and surface checks on sanitary lines, so the site test in Ireland repeats only what shipping and installation could affect.
Which electrical standards do Irish plants apply to skid control panels?
Irish plants apply IEC 60204-1 to the electrical equipment of machines and I.S. 10101, the National Rules for Electrical Installations, to the installation the skid connects to. That means 230/400 V, 50 Hz design, IEC conductor colours and sizes in square millimetres, and protective devices rated to European practice. Paul Industries builds panels to that basis and tests them before shipment.
How are duty and VAT handled on equipment imported into Ireland?
Equipment entering Ireland from the United States pays duty at the rate the Common Customs Tariff sets for its Combined Nomenclature code, and import VAT at the Irish domestic rate, 23 percent standard. A VAT-registered importer with an EORI number uses postponed accounting to declare import VAT on its VAT return rather than at the border. Under a DDP order, Paul Industries carries clearance and duty in its price.
Can an Irish biologics plant source its WFI generation and loop from Paul Industries?
Paul Industries builds WFI generation, storage and distribution systems for biologics plants in Ireland, by distillation or by the membrane route that the Ph. Eur. monograph has accepted since 2017. The loop, storage vessel, heat exchangers and points of use are fabricated from ASME BPE components, documented to the PED where pressure rules apply, and qualified on site with the plant’s validation team.
What does a medical device plant in Galway buy from a US process contractor?
Medical device plants in Galway and the west of Ireland buy purified and DI water skids, parts washing and passivation equipment, process tanks and compressed air and utility piping. Paul Industries builds those systems for 50 Hz supply and EU machinery rules, ships them through Dublin or Cork, and installs and commissions them on site or supervises the work, with documentation that suits the plant’s quality system.
How long does a typical Irish skid project take from order to start-up?
The length of an Irish skid project depends on design approval, the PED category and notified body steps, long-lead components such as pumps and instruments, fabrication, the FAT, a crossing of roughly two to three weeks plus customs, and site installation. Paul Industries builds a schedule from those blocks at the quotation stage and holds weekly progress reviews with the plant so the start-up date stays visible throughout.
Can equipment for an Irish plant be built to the parent company's US standards?
Paul Industries builds equipment for Irish plants to the parent company’s engineering standards and to EU law together. Many American-owned sites in Ireland specify US instrument brands, ASME BPE tubing and corporate validation templates, and Paul follows those while meeting the PED, the machinery rules and the Irish 50 Hz supply. The plant receives one documentation set that satisfies both its corporate engineering group and Irish inspectors.
Does Paul Industries supply dairy and food plants in Ireland?
Paul Industries supplies Irish dairy and food plants with CIP systems, sanitary process piping, process tanks, pump skids and glycol and chilled water systems, built to hygienic design practice and EU machinery rules. Dairy processors in Munster and the midlands run long seasonal peaks, so Paul plans installation and start-up around the plant’s milk intake calendar and its shutdown windows.
What should an Irish plant send to get a quote from Paul Industries?
An Irish plant gets a complete, comparable quote by sending the URS or a scope description, P&IDs if they exist, the site location in Ireland, utility data such as steam pressure and supply voltage, the preferred Incoterm and the intended installation route. Paul Industries replies with a budget range first, then a firm price with freight, crating, PED work and installation shown as separate lines.
Planning new process equipment for a plant in Ireland?
Send the URS or scope, the site location in Ireland and your preferred Incoterm, and Paul Industries will set out the PED route, freight and installation plan with the price. Call 201-450-8280 or request a quote.
