Paul Industries is a US process equipment contractor for Germany, engineering and fabricating pressure vessels, process skids, tanks, high-purity water systems and process piping in the United States for chemical parks and pharmaceutical and biotech plants from Ludwigshafen and Leverkusen to Frankfurt, Marburg and Penzberg. Equipment is built to the Pressure Equipment Directive, designed to AD 2000 or EN 13445 where the plant specifies them, delivered with German-language operating instructions, and wired for the 400 V, 50 Hz supply. After a witnessed factory test and shipment through Hamburg or Bremerhaven, Paul sets it in place, connects it and commissions it, or supervises the installation, with the BetrSichV and GMP records in the turnover file.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Druckgeraeteverordnung 14. ProdSV, implementing PED 2014/68/EU
Operator inspections BetrSichV: vessel intervals up to 2, 5 and 10 years
Mains supply 230/400 V three phase, 50 Hz
Instructions Operating instructions in German, 14. ProdSV section 6
Reviewed November 2026

What a US process equipment contractor for Germany builds

A US process equipment contractor for Germany builds equipment that a German operator can accept into its plant register and run under German operating law: CE-marked pressure equipment with a complete conformity file, machinery that meets the EU machinery rules, electrical equipment to VDE practice, and documents in German. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, delivers that equipment and the field work under a single contract.

German plants buy from Paul the equipment that fills a chemical or pharmaceutical process building: pressure vessels and reactors, storage and process tanks, pump, dosing and transfer skids, purified water and WFI systems, and process piping in stainless and alloy grades. Controls come with the equipment, with PLC programming for the plant’s own control platform. Plants pick supply with installation supervision, design-build with process engineering and design, or complete installation through commissioning.

The reason German buyers look to the United States is capacity and fit. During large investment cycles, the shops that serve the chemical parks book out, and a US fabricator that already works to ASME, ASME BPE and FDA documentation norms, and adds the PED, AD 2000 and German documentation on top, offers a second source for vessels and skids without lowering the specification.

Where are the chemical parks in Germany and the pharmaceutical plants?

The chemical parks in Germany cluster along the Rhine and in the Ruhr, with a second concentration in Saxony-Anhalt around Leuna, while pharmaceutical and biotech production sits in Hesse and Bavaria. The sites below are named as market facts about German industry and show where process equipment demand concentrates.

BASF’s Ludwigshafen site covers about 10 square kilometres with roughly 200 plants and 2,850 kilometres of pipelines, and the company describes it as the largest contiguous chemical complex in the world. CHEMPARK Leverkusen, operated by Currenta, covers 480 hectares, with sister parks at Dormagen and Krefeld-Uerdingen. Chemiepark Marl, home to Evonik, holds 18 companies and around 100 production plants, and the Leuna complex run by InfraLeuna spreads across 1,300 hectares. Among pharmaceutical companies in Germany, Sanofi produces insulin at the Industriepark Höchst in Frankfurt, a 460 hectare park with about 90 companies; CSL Behring runs the historic Behringwerke site in Marburg; and Roche operates its biotechnology centre in Penzberg, where it committed a further 600 million euros in 2023.

German chemical parks and pharma sites, and the equipment they run
Site (market fact)RegionProcess profileWhat Paul Industries supplies
BASF LudwigshafenRhineland-PalatinateIntegrated Verbund chemistry, about 200 plantsPressure vessels, reactors, alloy process piping, dosing skids
CHEMPARK Leverkusen, Dormagen, Krefeld-UerdingenNorth Rhine-WestphaliaMulti-tenant chemical and life science parksTanks, transfer skids, utility and solvent piping
Chemiepark MarlRuhr, North Rhine-WestphaliaSpecialty chemicals, 18 companies on siteProcess vessels, heat exchanger skids, piping modules
Leuna chemical complexSaxony-AnhaltRefining, chemicals, biorefinery projects, 1,300 hectaresPressure equipment, process piping, modular skids
Industriepark Höchst, FrankfurtHessePharma and chemicals, including Sanofi insulin productionWFI and clean steam, CIP, buffer and media vessels
Marburg and PenzbergHesse and BavariaPlasma proteins, biologics and therapeutic proteinsPurified water and WFI, sanitary piping, bioprocess skids

Which rules govern pressure equipment in Germany?

Pressure equipment in Germany is governed by two separate sets of rules: the Pressure Equipment Directive, which controls how equipment is designed, assessed and marked before it is placed on the market, and the Betriebssicherheitsverordnung, which controls how the operator inspects and runs it afterwards. Pressure vessel regulations Europe-wide follow the same directive, but Germany adds its own operating regime, its language rule and a long tradition of the AD 2000 code. Paul Industries plans for all of it from the first design review.

The Pressure Equipment Directive in German law: the 14. ProdSV

Germany implements the Pressure Equipment Directive 2014/68/EU through the Druckgeräteverordnung, the 14th ordinance under the Product Safety Act (14. ProdSV). It carries the directive’s requirements into German law and adds one obligation every exporter has to plan for: section 6 requires pressure equipment and assemblies to come with operating instructions and safety information in German. Paul Industries prepares the instructions in German as part of the delivery, alongside English versions for the project team.

The directive’s pressure equipment categories run from I to IV, set by the fluid group, the maximum allowable pressure and the volume or nominal size. Category I allows internal production control by the manufacturer; Categories II to IV bring a notified body into the module the category calls for, covering design examination, material and welding approval, production quality or final assessment. Below Category I, equipment is built to sound engineering practice without the CE mark. Paul produces a category schedule for every vessel, line and safety accessory on a skid, which tells the German buyer exactly which modules apply.

AD 2000 vs ASME: which design code a German plant expects

The AD 2000 pressure vessel code is the German rule set that many operators still specify for vessels, even though the PED itself names no single code. Its publisher states that AD 2000 sets out the directive’s essential safety requirements in detail and fulfils its conformity requirements, and German inspectors and operators know it well. EN 13445 is the harmonised European standard for unfired pressure vessels, and applying it gives a presumption of conformity with the directive. ASME Section VIII is accepted as a design basis when the conformity route shows the essential safety requirements are met.

The AD 2000 vs ASME choice shows up in materials, allowable stresses, weld factors and test pressures, so the same vessel designed to each code differs in wall thickness and documentation. The AD2000 vs EN 13445 choice is narrower, since both are European, but EN 13445 carries the harmonised presumption. Paul Industries designs to the code in the plant’s specification, AD 2000, EN 13445 or ASME with PED conformity, and buys plate, pipe and forgings with the certificates that code requires, typically EN 10204 3.1 inspection certificates with material numbers such as 1.4404 alongside their ASME equivalents.

What is BetrSichV, and what does it mean for new equipment?

BetrSichV, the Betriebssicherheitsverordnung or Industrial Safety Regulation, is the German ordinance that governs the safe use of work equipment and installations requiring monitoring, including pressure installations. Annex 2, Section 4 sets inspections before commissioning and periodic inspections, and assigns them to an approved inspection body (zugelassene Überwachungsstelle, ZÜS) or a qualified person depending on fluid, pressure and volume. For pressure vessels inspected by a ZÜS, the maximum intervals are two years for the external inspection, five years for the internal inspection and ten years for the strength test, with the operator setting the actual dates within those limits.

For a German plant receiving new equipment, BetrSichV means the vessel’s documentation has to support the inspection before commissioning and every inspection after it. Paul Industries supplies the design calculations, material certificates, weld and NDT records, pressure test certificate, safety valve data and German instructions that the inspection draws on, and designs inspection openings and nozzles so the internal inspection proceeds without cutting into the vessel.

German requirements for US-built process equipment
TopicGerman or EU ruleRequirement on equipment and documentsPaul Industries’ response
Placing on the marketPED 2014/68/EU, 14. ProdSVCategory, conformity module, CE marking, EU declaration of conformity, German instructionsCategory schedule, conformity file, German and English instructions
Design codeAD 2000, EN 13445 or ASME VIII with PED routeCalculations, materials and tests to the specified codeDesign to the plant’s code, EN 10204 3.1 material certificates
OperationBetrSichV, Annex 2 Section 4; TRBS 1201 Part 2Inspection before commissioning, periodic inspections, records the operator keepsInspection-ready design, test certificates and safety valve data
MachineryDirective 2006/42/EC; Regulation (EU) 2023/1230 from 20 January 2027Risk assessment, essential requirements, technical file, CE markingRisk assessment, safeguarding, machinery technical file
ElectricalDIN EN 60204-1 (VDE 0113-1); DIN VDE 0100400 V, 50 Hz design, protective measures, documentation to VDE practicePanels designed and tested for German supply, metric conductors
GMPAMG, AMWHV, EU GMP with Annex 1 (2022)Equipment that fits the plant’s qualification and contamination controlURS-based design, ASME BPE fabrication, IQ and OQ protocols

Machinery, electrical and GMP requirements

A German process skid is machinery as well as pressure equipment, so it needs a risk assessment and technical file under the Machinery Directive today and under the Machinery Regulation (EU) 2023/1230 for anything placed on the market from 20 January 2027, when the directive is repealed without a transition period. Electrical equipment follows DIN EN 60204-1, published in Germany as VDE 0113-1, and connects to installations built to the DIN VDE 0100 series on the German 230/400 V, 50 Hz supply.

Pharmaceutical plants in Germany hold manufacturing licences under section 13 of the Arzneimittelgesetz and are inspected by the competent authorities of the federal states, coordinated by the ZLG, against the AMWHV and EU GMP. Equipment for sterile production has to fit the contamination control strategy of the 2022 Annex 1, and Paul designs drainable, cleanable and documented systems for that environment, with commissioning and qualification executed on site.

For German biologics and plasma plants, the clean utilities carry most of the GMP weight. A WFI system for a site in Hesse or Bavaria is designed against the European Pharmacopoeia monograph, sized for the plant’s peak draw, held hot or cold according to its sanitisation concept, and built with sample points, drain points and instrument connections that the plant’s quality unit has approved on the P&IDs before fabrication starts. Clean steam generators, CIP stations and buffer preparation skids follow the same discipline, so every utility arrives with one consistent qualification file.

Process piping and modules for German chemical parks

Process piping for German chemical parks has to satisfy the same directive as the vessels it connects, because piping above the PED thresholds is categorised by fluid group, pressure and nominal size just as a vessel is by volume. A transfer line for a flammable solvent in DN 50 sits in a different category from a cooling water header in DN 200, and the category decides the welding, NDT and assessment steps. Paul Industries prepares a line list with the category of every run, so the plant knows which lines carry the CE mark and which are built to sound engineering practice.

Multi-tenant parks such as CHEMPARK and Industriepark Höchst add their own site standards on top: pipe rack layouts, colour coding, flange standards and preferred valve makes. German plants usually specify EN 1092-1 flanges and DIN or EN material grades, while American-owned tenants often keep ASME B16.5 flanges and ASTM materials. Paul fabricates in either system and supplies dual-grade material where the plant wants one spool to satisfy both. Larger scopes are built as skid-mounted modules with their own section of pipe rack, wiring and instruments, tested together in the US shop and split at flanged joints for the crossing, which shortens the work inside the park’s fence.

The documentation package a German operator expects

The documentation package a German operator expects is complete, indexed and bilingual where it matters. It contains the EU declaration of conformity, the German operating instructions and safety information, the strength calculations to the specified code, EN 10204 3.1 material certificates traced to each part, welding procedure and welder qualification records, NDT reports, the pressure test certificate, safety valve data sheets, the machinery risk assessment and the electrical circuit documentation. For GMP plants it also includes surface finish records, passivation reports and executed IQ and OQ protocols. Paul Industries assembles the package from one master equipment list, so tag numbers, design data and materials read identically across every document an inspector or auditor opens.

Shipping to Germany from the USA

For process equipment, shipping to Germany from USA ports runs from an East Coast port to Hamburg or Bremerhaven, the two main German container gateways on the North Sea. Published carrier data put New York to Bremerhaven or Hamburg at about 9 to 13 days port to port on direct weekly services, with the quickest listed sailing at about 11 days. Inland legs by truck, rail or barge, plus customs clearance, come on top.

For plants on the Rhine, such as Ludwigshafen or the CHEMPARK sites, the route through Rotterdam or Antwerp with onward barge or rail is a common alternative to a German North Sea port, and the right choice depends on skid dimensions and the receiving quay. Out-of-gauge loads move on flat racks and need heavy-haul permits on German roads, so Paul fixes the shipping envelope during design and agrees split points with the plant.

Customs, import VAT and Incoterms for a German order

Germany is part of the EU customs union, so equipment is cleared once on entry, through the German customs system ATLAS, and then moves freely in the EU. The importer needs an EORI number, which is valid across the EU. Duty follows the equipment’s tariff classification, and import VAT, the Einfuhrumsatzsteuer, is charged at 19 percent on the customs value plus duty; a VAT-registered German importer recovers it as input tax.

Incoterms 2020 decide where Paul’s delivery ends. German buyers often order FCA at the US port through a contracted forwarder, DAP to the chemical park gate with Paul carrying the freight risk, or DDP when they want customs entry and import charges inside the price.

How does a German project run with Paul Industries?

A German project with Paul Industries runs in eight stages, and the code, language and inspection decisions are fixed in the first stage so that fabrication and documentation follow them. The table shows what is particular to a German plant at each stage.

A German project with Paul Industries
StageGerman-specific workOutput for the plant
1. Specification reviewPlant standards, design code (AD 2000, EN 13445 or ASME with PED), category schedule, BetrSichV inspection needsCode and conformity basis, category list
2. EngineeringMetric design, DIN and EN material grades, 400 V, 50 Hz electrics, VDE drawing practiceP&IDs, layouts, strength calculations, circuit diagrams
3. Material purchase and fabricationEN 10204 3.1 certificates, weld procedures and welders qualified for the PED routeMaterial dossier, weld and NDT documentation
4. Factory acceptance testPressure test, function test, documentation check, attended by the plant or followed by videoSigned FAT report, open points list closed
5. Packing and shipmentISPM 15 crating, preservation, sailing to Hamburg, Bremerhaven or a Rhine routingCommercial invoice, packing list, bill of lading
6. InstallationWork under the plant’s permit and safety rules, by Paul or under Paul’s supervisionInstallation records and as-installed markups
7. CommissioningStart-up, site acceptance test, data for the inspection before commissioningSAT report, safety valve and test certificates
8. Qualification and handoverIQ and OQ for GMP plants, German operating instructions, trainingExecuted protocols, as-built drawings, documentation in German

Who builds process systems for plants in Germany?

Paul Industries builds process systems for plants in Germany, from single pressure vessels to complete skid-mounted process units and water systems, and carries them through design, fabrication in its US shop, factory testing, shipment, installation and commissioning in Germany. For buyers comparing a pressure vessel manufacturer Germany’s own industry relies on with a US source, Paul brings ASME and PED experience together and delivers the German documentation set the operator needs.

German enquiries come mainly from chemical manufacturing plants in the parks along the Rhine and the Ruhr, and from pharmaceutical and biotech sites in Hesse and Bavaria. Each order is quoted in US dollars, with the Incoterm stated so the buyer’s purchasing team converts on its own terms.

German plants also value predictability in the field. Paul’s site teams work to the plant’s permit-to-work system, its explosion protection zoning in chemical areas and its cleanroom gowning rules in pharmaceutical buildings, with method statements and lifting plans submitted for approval before arrival. Because the same engineers who ran the factory acceptance test lead the start-up, faults are traced quickly to their cause, and the inspection before commissioning under BetrSichV proceeds on documents the inspector has already seen in draft. The result for the operator is a shorter path from the arrival of the crates to a running, inspected and, where GMP applies, qualified installation.

What drives the cost of a process equipment project in Germany?

The cost of a process equipment project in Germany depends on the equipment and on the delivery work around it: the design code and PED conformity steps, German documentation, freight and inland routing, duty and import VAT under the agreed Incoterm, and the installation route. Paul Industries shows each item as its own line in the quote.

  • Code and conformity. AD 2000 or EN 13445 design, and notified body steps for Categories II to IV, add engineering hours and fees that grow with the category.
  • German documentation. Translated operating instructions, safety information and labelling are part of the scope from the start.
  • Freight and inland routing. A container-sized skid through Hamburg costs less than a flat rack load needing heavy-haul permits, and a Rhine barge routing changes both cost and timing.
  • Duty and import VAT. Under FCA or DAP the importer pays duty and 19 percent Einfuhrumsatzsteuer, which it recovers if VAT-registered; under DDP Paul includes them.
  • Installation route. Supervision of the plant’s installation needs fewer Paul field days; complete installation keeps start-up with the builder.

Two German factors also shape the estimate: the access rules and shutdown windows inside a chemical park, which set when tie-ins happen, and whether the equipment is built as finished modules that minimise work on site. A budget figure follows a short scope note, and a binding price follows once the specification, plant location and Incoterm are settled.

Paul Industries for German process plants

From its headquarters at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries takes process equipment projects across Germany as part of its work for plants outside the United States. For a German plant Paul engineers the system, fabricates the vessels, skids, tanks and piping in its US shop, proves them at the factory acceptance test, ships them through Hamburg, Bremerhaven or a Rhine routing, and installs and commissions them, start-up included, or supervises their installation, built and documented to the PED, the plant’s design code and German operating law. Neighbouring markets are covered on the Switzerland and Netherlands pages, and EU pharmaceutical projects on the Ireland page. Send your specification, plant location and preferred Incoterm to request a quote.

Standards referenced: Pressure Equipment Directive 2014/68/EU · Druckgeraeteverordnung (14. ProdSV) · Betriebssicherheitsverordnung (BetrSichV) · TRBS 1201 Part 2 · AD 2000 Code · EN 13445 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Machinery Directive 2006/42/EC · Machinery Regulation (EU) 2023/1230 · DIN EN 60204-1 (VDE 0113-1) · DIN VDE 0100 · Arzneimittelgesetz (AMG) and AMWHV · EU GMP Annex 1 · Incoterms 2020 · ISPM 15

Frequently asked questions

Does a US-built pressure vessel need the CE mark to be used in Germany?

A pressure vessel above the sound engineering practice threshold needs the CE mark, an EU declaration of conformity and German operating instructions before it is placed on the German market, wherever it was built. Paul Industries categorises each vessel, follows the conformity module its category requires, and delivers the marking documents and German instructions with the equipment.

What pharmaceutical companies are in Germany, and where do they make medicines?

Germany’s pharmaceutical production includes Sanofi’s insulin manufacturing at the Industriepark Höchst in Frankfurt, CSL Behring at the Behringwerke site in Marburg and Roche’s biotechnology centre in Penzberg, Bavaria, alongside German-headquartered groups. Their plants run WFI, clean steam, CIP and bioprocess systems, and Paul Industries builds that equipment in the United States to the PED and EU GMP and commissions it on site.

Can Paul Industries design a vessel to the AD 2000 code?

Paul Industries designs vessels to the AD 2000 code when a German plant specifies it, as well as to EN 13445 or to ASME Section VIII with a PED conformity route. Materials are bought with the certificates the code requires, weld procedures are qualified for it, and the strength calculations, test pressure and documentation follow its rules, so the vessel fits the operator’s existing standards.

Which inspections does BetrSichV require after a new skid is installed?

BetrSichV requires an inspection of a pressure installation before commissioning and periodic inspections afterwards, assigned to an approved inspection body or a qualified person according to the equipment’s fluid, pressure and volume. For vessels inspected by an approved body, the maximum intervals are two, five and ten years for external, internal and strength inspections. Paul Industries supplies the records and inspection access those steps rely on.

How does equipment reach the chemical parks in Ludwigshafen and Leverkusen?

Equipment for Ludwigshafen, Leverkusen and the other Rhine-side parks arrives either through Hamburg or Bremerhaven with onward rail or road transport, or through Rotterdam or Antwerp with a Rhine barge or rail leg. Paul Industries chooses the routing with the plant’s logistics team, based on skid dimensions, the receiving quay and the delivery date, and books it under the agreed Incoterm.

Are operating instructions in German compulsory for pressure equipment?

Operating instructions and safety information in German are compulsory for pressure equipment placed on the German market under section 6 of the Druckgeräteverordnung, the 14. ProdSV. Paul Industries delivers the German instructions with the equipment, keeps an English set for the engineering team, and labels nameplates, valves and warning signs to match.

What is the difference between AD 2000 and EN 13445 for a buyer?

EN 13445 is the harmonised European standard for unfired pressure vessels, so applying it gives a presumption of conformity with the PED, while AD 2000 is the German code that its publisher states meets the directive’s essential safety requirements and that many German operators know from decades of use. The choice affects calculations, materials and documentation. Paul Industries designs to whichever the plant’s specification names.

Who supplies WFI loops to biotech sites in Bavaria?

Paul Industries supplies WFI generation, storage and distribution loops to biotech sites in Bavaria and across Germany, by distillation or by membrane processes that the European Pharmacopoeia accepts. Loops and vessels are fabricated from ASME BPE components, designed for the German 400 V, 50 Hz supply, documented to the PED and EU GMP, and qualified with the plant’s validation team.

Which electrical standards apply to a skid panel shipped to Germany?

A skid panel shipped to Germany follows DIN EN 60204-1, published as VDE 0113-1, for the electrical equipment of machines, and connects to an installation built to the DIN VDE 0100 series. That means design for 230/400 V, 50 Hz, European protective measures, IEC conductor colours and metric cross-sections. Paul Industries builds and tests the panel on that basis and delivers circuit documentation the plant’s electricians use.

How long is the crossing from New York to Hamburg or Bremerhaven?

The crossing from New York to Hamburg or Bremerhaven takes roughly 9 to 13 days port to port on direct weekly services, according to published carrier data, with inland transport and customs clearance added at the German end. Paul Industries fixes the factory test date, crating and booking together so the equipment reaches the plant in time for the installation window.

How is Einfuhrumsatzsteuer handled when equipment arrives from America?

A German importer pays Einfuhrumsatzsteuer, the import VAT, at 19 percent on the customs value plus duty when equipment from the United States is cleared, and a VAT-registered business recovers it as input tax. Duty depends on the tariff classification. Under a DDP order Paul Industries carries clearance and import charges in its price.

What does a plant in the Leuna chemical complex need from a vessel supplier?

A plant in the Leuna chemical complex in Saxony-Anhalt needs pressure equipment with a complete PED conformity file, design calculations to the specified code, material certificates, German instructions and the records the BetrSichV inspection before commissioning draws on. Paul Industries fabricates vessels, process piping and skids to that standard and installs and commissions them or supervises the installation.

Can German engineers witness the factory acceptance test?

Engineers from German plants attend the factory acceptance test in person or follow it by live video, working from a protocol agreed during design. The test covers pressure testing, functional and control sequences, wiring checks and a review of the documentation set, and every open point is recorded and closed before the equipment is crated for shipment to Germany.

Which pressure equipment rules apply to a skid for a plant in Frankfurt?

A skid for a plant in Frankfurt falls under the Pressure Equipment Directive for each pressure part and for the assembly where required, under the machinery rules because it has pumps and automated valves, and under BetrSichV once it is in service. Pharmaceutical skids at the Industriepark Höchst also have to fit EU GMP. Paul Industries documents all four in one turnover package.

How does the Machinery Regulation change projects shipping in 2027?

The Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive on 20 January 2027 with no transition period, so a skid placed on the German market from that date has to meet the regulation’s requirements and carry its documentation. Paul Industries checks the planned shipping date during the specification review and designs projects that straddle the change to the regulation from the start.

What currency does Paul Industries quote German projects in?

Paul Industries quotes German projects in US dollars under the Incoterm the plant chooses. The quote shows the equipment, design code and conformity work, German documentation, freight, crating, import charges where included and the installation route as separate lines, so it can be compared directly with a domestic offer.

What should a German plant send to receive an offer?

A German plant receives a precise offer by sending its specification or Lastenheft, P&IDs where they exist, the design code it requires, the plant location, utility data such as supply voltage and steam pressure, the preferred Incoterm and the installation route. Paul Industries replies with a budget range first and a firm price once the scope is settled.

Planning process equipment for a plant in Germany?

Send your specification, the design code you require, the plant location and your preferred Incoterm, and Paul Industries will return the conformity route, documentation plan and a firm offer. Call 201-450-8280 or request a quote.