Paul Industries is a US process equipment contractor for Switzerland that engineers Swiss process systems, builds their skids, vessels, tanks and spools in a US shop, proves them in a factory acceptance test, and ships them up the Rhine to install, start up and commission at the plant or to supervise the plant’s installers. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries builds each Swiss system to the Pressure Equipment Ordinance, Swiss machinery and electrical rules and Swissmedic GMP expectations, with documentation in the language the site works in. Pharmaceutical, biotech and chemical plants in Basel, the Valais, Zurich and the Lake Geneva region receive one contract that runs from code review to service.
Request a quote or call 201-450-8280
What does a US process equipment contractor for Switzerland deliver?
A US process equipment contractor for Switzerland delivers engineered, fabricated and tested process systems to Swiss plants, together with the Swiss conformity file, the installation and the commissioning record that let the plant put the equipment into service. For Paul Industries that means process design, shop fabrication of the hardware, a factory acceptance test, export crating, freight through a North Sea port and up the Rhine, and then the field work at the plant.
The equipment range matches what Swiss life sciences and chemical sites buy most often: pump skids for transfer, dosing and filtration, high-purity water systems producing purified water and water for injections, clean steam generators, CIP and SIP systems, pressure vessels and process tanks, and turnkey process systems that combine all of them on one control platform.
Swiss buyers choose one of three routes. The supply route covers design, fabrication, FAT, shipping and supervision of the plant’s own installation team. Design-build adds the process engineering, room layout and utility tie-in design for the room or building that houses the equipment. Under complete installation, Paul Industries sets the equipment, connects piping and wiring, starts it up and qualifies it, handing the Swiss plant a system that already runs and already has its records.
Which pharmaceutical companies in Switzerland run the plants that buy process systems?
The pharmaceutical companies in Switzerland that anchor the market are Roche and Novartis, both headquartered in Basel, along with Lonza in Basel and Visp and a long list of Swiss and foreign producers on the Lake Geneva shore, around Zurich and in Ticino. Their production sites, contract manufacturers and suppliers form the customer base for skids, water systems and clean utilities. Paul Industries names these plants here as market facts that describe where Swiss process demand sits.
Pharmaceutical products made up 41.3 percent of Swiss exports excluding gold in 2025, worth CHF 118.4 billion, according to the industry association scienceindustries, and the wider chemical and pharmaceutical sector exported CHF 152.1 billion. That concentration explains why so much Swiss process equipment demand sits in drug substance, drug product and the clean utilities behind them.
Biotech companies in Switzerland and the Valais biologics cluster
Biotech companies in Switzerland cluster in three areas: the Basel region, the Lake Geneva arc from Geneva to Lausanne, and the Zurich area, with large-scale biologics manufacturing in the Valais. Lonza describes Visp as its largest and oldest site, and its Ibex biomanufacturing campus there, five buildings completed in 2020 with bioconjugation suites added since, shows the scale of single-use and stainless biologics capacity being built in the Rhone valley. Pharma and biotech companies in Switzerland share the same buying pattern: buffer and media preparation skids, WFI loops, clean steam, CIP and temperature-controlled process tanks.
Why are so many pharmaceutical companies in Switzerland?
Swiss pharmaceutical strength traces to Basel’s chemistry base, the research universities and hospitals around it, and a century of reinvestment by companies that started as dye makers and became drug makers. The supplier base followed: equipment builders, contract manufacturers, testing laboratories and engineering firms grew up around the large producers, and biologics capacity in the Valais and on Lake Geneva added a second wave. For a plant buying a process system, that history means demanding specifications, experienced validation teams and close attention to documentation.
Chemical companies in Switzerland and the Basel heritage
Chemical companies in Switzerland grew out of Basel’s nineteenth-century dye industry, when Geigy, Ciba and Sandoz supplied colors to the region’s silk ribbon makers; Roche, founded in Basel in 1896, was the first firm there to focus on medicines alone, and Ciba-Geigy and Sandoz merged into Novartis in 1996. The Swiss chemical industry today spans specialty chemicals, agrochemicals, flavors and fragrances and active pharmaceutical ingredients, with plants along the Rhine at Basel and in the Valais. Those sites buy reactors and receivers, solvent recovery, scrubbers, process piping and chemical process systems designed for corrosive and flammable service.
| Region | What the plants make | Process systems in demand |
|---|---|---|
| Basel and the Rhine (Basel-Stadt, Basel-Landschaft, Aargau) | Drug substance, drug product, specialty and agrochemicals | WFI and purified water, CIP skids, reactor modules, solvent and utility piping |
| Valais (Visp, Monthey) | Biologics, bioconjugates, chemical intermediates | Media and buffer skids, clean steam, process tanks, containment piping |
| Lake Geneva (Geneva, Vaud) | Biologics, injectables, life science research | Sterile utilities, cleanroom systems, pilot-scale skids |
| Zurich and Zug | Biotech, medical devices, food and flavors | Water treatment, pilot and clinical-scale skids, sanitary piping |
| Ticino | Generic and contract pharmaceutical manufacture | Purified water, compounding vessels, CIP systems |
Which Swiss rules apply to pressure equipment, machinery, electrical work and GMP?
Swiss rules for process equipment come from four federal ordinances and one regulator: the Pressure Equipment Ordinance for design and conformity, the Pressure Equipment Use Ordinance for operation, the Machinery Ordinance for assembled machines and skids, the Low-Voltage Installation Ordinance for fixed wiring, and Swissmedic for GMP. Switzerland sits outside the European Union, yet its product rules track EU law closely, so equipment built to the PED and the Machinery Directive starts from familiar ground.
| Rule | What it governs | What the equipment and its file need |
|---|---|---|
| Pressure Equipment Ordinance (DGV, SR 930.114) | Placing pressure equipment and assemblies above 0.5 bar on the Swiss market | PED Annex I essential safety requirements, category, conformity assessment module under PED Annexes III and IV, declaration of conformity |
| Pressure Equipment Use Ordinance (DGVV, SR 832.312.12) | Installation, operation and maintenance at the workplace | Data for notification of reportable equipment and for periodic inspection, operating instructions |
| Machinery Ordinance (MaschV, SR 819.14) | Skids and assemblies with moving parts | Risk assessment, technical file and declaration to the Machinery Directive 2006/42/EC requirements |
| Product Safety Ordinance (SR 930.111) | Instructions and warnings | Text warnings and precautions in all Swiss official languages |
| NIV (SR 734.27) and NIN SN 411000:2025 | Fixed low-voltage installations at the site | Panels and field wiring that tie into a NIN installation and its safety certificate at handover |
| Medicinal Products Licensing Ordinance, Annex 1 | GMP for drug manufacture | Design and records that support EU GMP and PIC/S GMP inspection by Swissmedic |
Pressure equipment: PED rules without the CE obligation
The Swiss Pressure Equipment Ordinance applies the PED’s essential safety requirements, categories and conformity assessment procedures through a direct reference to Directive 2014/68/EU, so a vessel or skid is categorized and assessed exactly as it would be for an EU plant. The difference is the mark: the ordinance removes the duty to affix CE marking in Switzerland, while allowing CE marking already affixed under EU rules to stay on the nameplate. A pressure vessel designed to ASME Section VIII therefore reaches a Swiss site through the PED route, covering materials, welding procedures, welder qualifications, non-destructive testing and the final pressure test, and Paul Industries builds that file from the design stage onward.
Once the equipment is running, the Pressure Equipment Use Ordinance takes over: reportable vessels are notified before operation and inspected at intervals, and the EKAS guideline on pressure equipment fills in the detail. Paul Industries hands over the design data, test certificates and operating instructions those steps draw on.
Machinery: the 2027 switch to the EU Machinery Regulation
The Swiss Machinery Ordinance implements the EU Machinery Directive 2006/42/EC in equivalent form, and the Federal Council opened a consultation on its total revision in September 2025 as the EU moves to Machinery Regulation 2023/1230, which applies from January 20, 2027. A skid delivered in 2027 or later is documented against the rule in force on its delivery date, and Paul Industries confirms that basis during the code review so the risk assessment and declaration match.
Voltage in Switzerland and the electrical design of a skid
Voltage in Switzerland is 400 V between phases and 230 V from phase to neutral, at 50 Hz, the same supply as the neighboring EU countries, and a skid built for a 60 Hz, 480 V American plant needs different motors, drives and transformers before it runs there. The 3 phase voltage in Switzerland, 400 V between lines, feeds most process motors directly, while larger sites take medium voltage and transform it on site.
Voltage and frequency in Switzerland shape three parts of a design. Pump and fan motors turn about one sixth slower at 50 Hz than at 60 Hz, so pump curves, impeller trims and variable frequency drive settings are selected for 50 Hz from the start. Control panels are built to EN 60204-1, using IEC-rated components and metric conductor cross-sections. Field wiring at the site joins an installation governed by the Low-Voltage Installation Ordinance and the NIN 2025 standard, so terminations, protective earthing and cable types are specified to meet the requirements the site’s safety certificate checks.
Swissmedic GMP and the documents a Swiss pharmaceutical system ships with
Swissmedic GMP rests on Annex 1 of the Medicinal Products Licensing Ordinance, which makes both the EU GMP Guide and the PIC/S GMP Guide valid in Switzerland, and Swissmedic has been part of PIC since May 1971 and of the PIC Scheme since February 1996. For a process system this means the same expectations a German or Irish inspector applies: a contamination control strategy for sterile products, qualified utilities, data integrity in control systems and traceable materials.
The Swissmedic interpretation of GMP Annex 1, published as a technical interpretation of the 2022 revision, gives plants a Swiss view of points such as closed systems, sterilization of product-contact parts and utility monitoring. Paul Industries writes the user requirement specification, design qualification and test protocols so that a Swissmedic GMP inspection finds the reasoning already in the file. Water systems are designed to the European Pharmacopoeia monographs for purified water and water for injections, and stainless product-contact parts follow ASME BPE surface finish and weld standards with full weld maps and borescope records.
Documents arrive in the language the site runs on: German in Basel and Zurich, French in Geneva, Vaud and much of the Valais, Italian in Ticino, with Swiss official-language rules applied to warnings and precautions in the operating instructions. Drawings are metric, pipe sizes are DN, pressures are in bar, and English engineering documents are supplied alongside where the plant’s validation team works in English.
Shipping to Switzerland from USA East Coast ports: ocean, Rhine and road
Process equipment bound for a Swiss plant runs by ocean from a US East Coast port to Rotterdam or Antwerp, then up the Rhine by barge to the Swiss Rhine ports at Basel, or onward by rail or truck, because Switzerland is landlocked and has no seaport of its own. Each leg has its own timing and size limits, and Paul Industries fixes the route when the crated dimensions are known.
| Leg | Route | Typical time | What limits it |
|---|---|---|---|
| Ocean | New York, Baltimore or Norfolk to Rotterdam or Antwerp | About 10 to 14 days port to port on direct services | Container door openings, flat-rack out-of-gauge rules, sailing frequency |
| Rhine barge | Rotterdam or Antwerp to Basel-Kleinhueningen, Birsfelden or Muttenz | About 5 days upstream on published averages, about 3.5 days downstream | River water level, lock and bridge clearance, crane capacity at the quay |
| Rail alternative | North Sea port to Basel or inland Swiss terminals | Set by the operator’s timetable | Loading gauge for tall or wide crates |
| Road to site | Basel port or border crossing to the plant | Hours within the Basel region, longer to the Valais or Ticino | Swiss weight limits, special transport permits for oversize loads, Alpine routes |
The Rhine handles heavy items well: the Birsfelden port section has shipped a 236 tonne compressor downstream by barge to Antwerp, and the Auhafen at Muttenz handles heavy cargo. Low water in late summer is the main schedule risk, since barges then sail part-loaded and rail shuttles take some of the volume. Paul Industries books the ocean leg and the river or rail leg together so the equipment leaves on a sailing that fits the site date.
Import duty, VAT and Incoterms for a Swiss delivery
The import duty Switzerland once charged on industrial goods ended on January 1, 2024, when the country abolished tariffs on industrial products of any origin in customs tariff chapters 25 to 97. An import declaration is still filed, and import VAT is due at the standard rate of 8.1 percent. Under DAP, Paul Industries carries freight and transit risk to the named Swiss site and the plant clears the goods and pays VAT; under DDP, Paul includes clearance and import VAT in a landed price. FCA suits plants that already book their own freight from US ports, and CIP to the Swiss site covers freight and insurance for multimodal moves. Every quote states the Incoterms 2020 rule it is based on.
How does a Swiss project with Paul Industries run?
A Swiss project with Paul Industries runs in nine steps from code review to service, and the first two steps carry the Swiss-specific decisions on pressure category, machinery basis, language and voltage. The table lists each step and what the Swiss plant receives from it.
| Step | Swiss focus | What the plant receives |
|---|---|---|
| 1. Code and site review | DGV category and module, MaschV or Machinery Regulation basis, NIN interface, Swissmedic GMP basis, document language | Code basis, list of reportable equipment, language plan |
| 2. Design | Metric drawings, DN piping, 230/400 V 50 Hz electrical design, Ph. Eur. water specification | P&IDs, general arrangements sized for barge and container, calculations |
| 3. US shop fabrication | Material traceability to EN or ASME specifications accepted under the PED route | Weld maps, weld logs, material certificates, surface finish records |
| 4. Factory acceptance test | Function tests at 50 Hz where a supply or converter is available, Swiss team on site or by video | Signed FAT protocol, closed punch list |
| 5. Crating and freight | ISPM 15 crates, preservation for the river leg, route via Rotterdam or Antwerp and the Rhine | Packing list, invoice, bill of lading, Swiss import data |
| 6. Installation or supervision | Work inside the plant’s permit system, method statements in the site language | Installation records, tie-in weld records |
| 7. Start-up | Flushing, loop checks, first runs on site utilities | Start-up report, setpoint list |
| 8. Commissioning and qualification | SAT, IQ and OQ to EU GMP and PIC/S expectations, data for PQ | Executed protocols, deviation reports |
| 9. Handover and service | Operator training, spares sized for the transatlantic lead time | As-builts, manuals, service schedule |
Swiss teams witness the factory acceptance test either in the US shop or by live video. Switzerland runs six hours ahead of the US East Coast for most of the year, so remote test sessions are scheduled in the Swiss afternoon and the US morning, with data and photographs posted to a shared folder as each step closes.
Qualification follows the plant’s own validation master plan, and Paul Industries’ validation and commissioning team writes the protocols during design so that the site test repeats only what freight and installation affect.
Who builds process systems for plants in Switzerland?
Paul Industries builds process systems for plants in Switzerland, from single skids to complete water, CIP, vessel and piping packages for pharmaceutical, biotech and chemical producers, and carries each one from design through Rhine freight to start-up and qualification at the Swiss site. The plant deals with one firm that engineered the system, built it, tested it and commissions it, so questions about a weld, a setpoint or a deviation go to the people who hold the records. Projects across the rest of Europe follow the same model, described on the Germany and Netherlands pages and on the international projects page.
What drives the cost of delivering process equipment to Switzerland?
The delivered cost of process equipment for a Swiss plant is driven by six items beyond the equipment itself: freight across three legs, crating and preservation, Swiss code and documentation work, import VAT under the chosen Incoterm, translation of instructions, and the installation route. Paul Industries prices each as its own line.
Freight. Ocean freight, the Rhine or rail leg and the final truck move are booked together; flat racks and out-of-gauge cargo cost more than containers, and low-water surcharges apply on the river in dry seasons. Crating and preservation. Export crates, vapor barrier, desiccant and nitrogen blankets protect polished internals for a crossing plus several days on the river. Code work. The PED-route conformity assessment, machinery file and pressure equipment use data add engineering hours. Taxes. Industrial goods carry no Swiss import duty, so the tax line is import VAT at 8.1 percent, paid by the plant under DAP or included by Paul under DDP. Language. Instructions and warnings are prepared in German, French or Italian for the site. Installation route. Supervision of the plant’s installation team costs fewer field hours than complete installation by Paul Industries, which keeps start-up responsibility with the firm that built the system. Quotes are in US dollars, with a budget range first and a firm price once scope, site and delivery terms are fixed.
Paul Industries for Swiss pharmaceutical, biotech and chemical plants
From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries takes Swiss process projects from the first code review to service: engineering the system, building the skids, vessels, tanks and spools in its US shop, proving them in a witnessed factory acceptance test, crating them for the ocean crossing and the Rhine, and then setting, starting up and qualifying them at the Swiss plant or directing the plant’s own installers through those steps. Each system is built and documented to the Pressure Equipment Ordinance, Swiss machinery and electrical rules and Swissmedic GMP expectations, with weld records, as-builts and validation documents delivered with it. Send your scope, site location and preferred Incoterm to request a quote.
Standards referenced: Swiss Pressure Equipment Ordinance (DGV, SR 930.114) · EU Pressure Equipment Directive 2014/68/EU · Pressure Equipment Use Ordinance (DGVV, SR 832.312.12) · Swiss Machinery Ordinance (MaschV, SR 819.14) · EU Machinery Directive 2006/42/EC · EU Machinery Regulation 2023/1230 · Swiss Product Safety Ordinance (SR 930.111) · Low-Voltage Installation Ordinance (NIV, SR 734.27) · NIN SN 411000:2025 · EN 60204-1 · Medicinal Products Licensing Ordinance (MPLO) · EU GMP Guide (EudraLex Volume 4) and Annex 1 · PIC/S GMP Guide · European Pharmacopoeia · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Incoterms 2020 · ISPM 15
Frequently asked questions
Which pharmaceutical companies in Basel, Switzerland buy process equipment?
Basel is home to Roche and Novartis, and Lonza is headquartered there too, with production, development and supplier sites spread across Basel-Stadt, Basel-Landschaft and the Fricktal in Aargau. Those plants and their contract manufacturers buy WFI and purified water systems, CIP skids, process vessels and clean utility piping. Paul Industries supplies these systems to Basel-area plants, built to the Swiss Pressure Equipment Ordinance and documented for Swissmedic GMP inspection.
What happens to a Basel delivery if the Rhine is too low for loaded barges?
Low Rhine water, most often in late summer and autumn, forces barges to sail part-loaded, adds surcharges and stretches schedules. Paul Industries plans for it by building float into the freight window, keeping a rail option to Basel open for crates within the loading gauge, and reserving barge or road capacity for oversize items early. The site date in the project schedule allows for the river season the shipment falls in.
What is the voltage in Switzerland for industrial equipment?
Swiss plants draw 50 Hz power at 400 V between phases and 230 V phase to neutral, and larger sites take medium voltage. Motors, drives and transformers on a skid are selected for that supply, because a 60 Hz American motor turns about one sixth slower at 50 Hz and its pump curve shifts. Paul Industries designs the electrical system for 400 V, 50 Hz from the first drawing and builds panels to EN 60204-1.
How much is import duty in Switzerland on process equipment from the USA?
Switzerland abolished import duty on industrial goods on January 1, 2024, so skids, vessels, pumps and piping from the United States enter without customs duty. An import declaration is still required and import VAT is charged at the standard rate of 8.1 percent on the value of the goods. Paul Industries states in every quote whether VAT is the plant’s cost under DAP or included in a DDP price.
How long does shipping from USA to Switzerland take for a crated skid?
A crated skid crosses from a US East Coast port to Rotterdam or Antwerp in about 10 to 14 days on a direct service, then moves up the Rhine to Basel in about five days on published barge averages, before the road leg to the plant. Customs, port dwell and low water on the Rhine add time. Paul Industries books the legs together and sets the FAT date to meet a planned sailing.
Does equipment for Switzerland need CE marking?
The Swiss Pressure Equipment Ordinance applies the PED’s safety requirements and conformity assessment procedures but removes the obligation to affix CE marking in Switzerland. Equipment that already carries CE marking under EU rules may keep it. What a Swiss plant needs is equipment that meets the PED essential safety requirements for its category, with the conformity assessment completed and the declaration and technical file in hand, which Paul Industries delivers with the equipment.
Can an ASME vessel be installed at a plant in Switzerland?
An ASME Section VIII vessel is installed in Switzerland once it meets the Pressure Equipment Ordinance, which follows the PED. Design to ASME stays valid as the calculation basis, while materials, welding procedure and welder qualifications, non-destructive testing and the final test are documented against PED Annex I. Paul Industries plans that route at the start, so the vessel ships with its Swiss conformity file complete.
Who builds WFI systems for biologics plants in the Valais?
WFI systems for Valais biologics plants, including sites around Visp and Monthey, come from Paul Industries as complete packages of generation, storage and loop distribution, meeting the Ph. Eur. requirements for water for injections and the sterile manufacturing expectations of Annex 1. The system is fabricated and tested in the United States, shipped via the Rhine and road, and installed, started up and qualified at the site with documentation in French or German.
What does Swissmedic expect from a process system during a GMP inspection?
Swissmedic inspects against the EU GMP Guide and the PIC/S GMP Guide, so inspectors look for a design rationale tied to product risk, qualified equipment, traceable materials, validated cleaning and sterilization, and control systems with data integrity. For sterile products the contamination control strategy reaches into equipment design. Paul Industries supplies the specifications, test records and protocols that let the plant show that reasoning on demand.
In which language are manuals supplied for a plant in Geneva or Lausanne?
Manuals for a plant in Geneva or Lausanne are supplied in French, the working language of both cities, and Swiss rules require text warnings and precautions in the instructions to appear in all official languages. Paul Industries prepares operating and maintenance manuals, labels and warning text in French, with English engineering documents alongside when the plant’s engineering or validation team works in English.
Is the Rhine route suitable for oversize skids bound for Basel?
The Rhine route suits large and heavy items, and the Basel ports have handled single loads above 200 tonnes. Barge loading depends on river level, so late summer low water reduces payloads and schedule certainty, while very tall loads are checked against bridge clearances. Paul Industries checks crate dimensions against barge, quay crane and road limits during design so the skid splits where the route requires.
Which Incoterm works best for a first Swiss order?
DAP to the Swiss site is the usual first choice, because Paul Industries carries freight and transit risk to the plant while the plant clears import and pays VAT through its own Swiss VAT account. DDP suits buyers who want one landed price. FCA suits plants with an established forwarder. Paul quotes the preferred Incoterms 2020 rule and shows how the price changes under the others.
Can a skid for a Zurich biotech plant be tested at 50 Hz before it ships?
A skid for a Zurich biotech plant is function tested in the US shop with motors and drives run at 50 Hz through a frequency converter or test supply sized for the load, so pump curves and drive settings are proven before shipment. Where a full-load converter is impractical, drives are proven at 50 Hz output and the remaining checks move to the site acceptance test. Paul Industries sets this in the FAT protocol.
What records come with a pressure vessel for a Swiss chemical plant?
A pressure vessel for a Swiss chemical plant ships with its design calculations, drawings, material certificates, welding procedure and welder qualification records, non-destructive testing reports, pressure test certificate, declaration of conformity and operating instructions. Those records support the notification and periodic inspection the Pressure Equipment Use Ordinance requires during operation. Paul Industries compiles them into one indexed turnover file.
Does Paul Industries supervise installation by a Swiss site team?
Paul Industries supervises installation by a Swiss site team when the plant prefers its own installers, directing setting, leveling, tie-ins and electrical connection against the drawings, then directing start-up, the site acceptance test and qualification. The plant gets the same commissioning and documentation as under complete installation, while its team carries out the physical work under Paul’s direction.
How do Swiss plants in Ticino receive equipment from the United States?
Plants in Ticino receive equipment by sea to a North Sea port and onward by Rhine and road through the Alpine corridor, or by sea to an Italian port and north by road, depending on dimensions and timing. Documents and manuals are prepared in Italian. Paul Industries compares both routes once crate sizes are fixed and books the one that meets the site date.
What does service look like after a system starts up in Switzerland?
Service after start-up in Switzerland combines scheduled visits, remote troubleshooting from the drawings, programs and test records Paul Industries already holds, and spare parts shipped from the United States. The spare parts list at handover is sized for the transatlantic and Rhine lead time, so parts most likely to be needed between visits sit in the plant’s own store.
Planning a process system for a Swiss plant?
Tell Paul Industries what the Swiss system has to do, where the plant sits, which language its documents use and which Incoterm suits your finance team; the reply sets out the Swiss code basis, the Rhine freight plan and a first budget. Call 201-450-8280 or request a quote.