Paul Industries provides chiller repair in Massachusetts for laboratories, hospitals, university central plants, biomanufacturing plants and data centers, repairing centrifugal, screw, scroll and process chillers from Boston and Cambridge to Worcester, Springfield and the South Coast. Massachusetts adds its own layer to every chiller job: a state certificate of inspection for refrigeration systems of 20 tons or more, technician licensing tied to machine size, and building emissions rules in Boston and Cambridge that turn a repair into an energy decision. Paul Industries diagnoses, repairs, overhauls, retrofits and replaces chillers, and supplies and installs new machines when repair stops paying back.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State inspection Refrigeration and air conditioning systems of 20 tons or more, at least once a year (MGL c.146, s.45A)
Technician license Required for refrigeration work, classed by system size (MGL c.146, ss.84 and 86)
Boston July normals 82 F high, 66 F low (NOAA, 1991-2020)
Industrial power 18.19 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What does chiller repair in Massachusetts involve?

Chiller repair in Massachusetts involves the same mechanical work found anywhere, from compressor and bearing repair to leak location, tube cleaning and controls, plus a set of state and city records that follow the machine: the annual certificate of inspection under Massachusetts General Laws chapter 146, the EPA leak rate records that began in 2026, and, in Boston and Cambridge, the emissions reporting that a chiller’s electricity use feeds into. A repair that ignores those records leaves the owner with a running machine and an open compliance item.

The general picture of faults, symptoms and repair methods sits on the national chiller repair page. This page covers what is particular to the Commonwealth: the inspection and licensing statutes, the emissions ordinances, a heating-dominated climate in which many chillers still run all winter, and some of the highest industrial electricity prices in the continental United States.

Which Massachusetts chillers need a state certificate of inspection?

Massachusetts requires a certificate of inspection for every refrigeration or air conditioning system of 20 tons capacity or more, under section 45A of chapter 146, unless the system falls into one of the listed exemptions such as private residences, apartment houses of fewer than five units, federal property or agricultural use. The certificate comes either from the state, through the Department of Fire Services inspection program, or from a company authorized to insure pressure vessels in the Commonwealth that inspects the system periodically. Systems that hold a state certificate are inspected at least once a year, and the detailed rules are in 522 CMR 9.00.

The statute has teeth. A system that needs a certificate may not be operated without one, and a district engineering inspector who finds a system in dangerous condition or out of line with the rules can order it shut until a new certificate issues. For a repair, that means the shells, relief valves, rupture discs and pressure controls on the machine are part of the scope, not an afterthought, and the work is documented so the next inspection finds a clean history.

How Massachusetts inspection law reaches different chillers
MachineTypical capacitySection 45A statusWhat the repair file should hold
Large centrifugal chiller, central plant300 to 2,000 tons and upCertificate required; annual inspectionRelief device data, leak records, pressure test results after any shell or tube work
Screw chiller, lab or plant100 to 500 tonsCertificate required; annual inspectionOil and refrigerant analysis, relief valve dates, control and safety test results
Air-cooled scroll chiller, rooftop or pad20 to 200 tonsCertificate required at 20 tons and aboveCoil and circuit leak checks, compressor replacement records
Process or laboratory chillerUnder 20 tonsExempt by size from section 45AEPA records where the HFC charge is 15 pounds or more; process temperature logs
Absorption chiller on campus steam200 to 1,500 tonsRefrigeration side under section 45A; steam supply under the boiler rulesSolution analysis, purge and vacuum records, steam valve and trap condition

Can a chiller explode?

A chiller can fail violently if pressure inside a shell rises beyond what its relief devices can discharge, which is the reason Massachusetts treats these machines as inspected pressure systems. The realistic causes are a relief valve that has been painted, capped or left past its replacement date, a fire near the machine, a water box pressurized with its vents closed, or brazing and welding on a charged circuit. Paul Industries checks relief device dates and discharge piping on every repair, recovers refrigerant before any hot work, and pressure tests repaired shells and water boxes before the machine returns to service.

What a Massachusetts refrigeration license covers on a chiller job

A Massachusetts refrigeration license is required of anyone who works as a refrigeration technician in the Commonwealth, under section 84 of chapter 146, and section 86 classes each license by the maximum size of refrigerating system the holder is qualified to install or service, with a separate path to a license covering all sizes. Applications and examinations run through that same Office of Public Safety and Inspections. The practical effect for an owner is that the license class must match the machine: work on a 1,200-ton centrifugal chiller calls for a license that covers systems of that size.

Steam is the second licensing thread on many Massachusetts campuses. Section 46 of the same chapter requires an engineer or fireman holding the proper license to be in charge of steam boilers and engines of nine horsepower or more, with periodic, noncontinuous or continuous attendance depending on aggregate horsepower. Plants whose boilers feed absorption chillers, or whose steam turbines drive centrifugal compressors, carry that obligation on the steam side, and a chiller repair that touches steam valves, traps or the turbine is planned with the plant’s steam engineer on duty. Heating plants on the same campus are covered on boiler repair in Massachusetts.

How BERDO 2.0 and BEUDO change a Boston or Cambridge chiller decision

Boston’s Building Emissions Reduction and Disclosure Ordinance, known as BERDO 2.0, and Cambridge’s Building Energy Use Disclosure Ordinance, BEUDO, both count the electricity a chiller plant uses toward a building’s reported emissions, so a chiller repair in either city is also an emissions decision. BERDO covers non-residential buildings of 20,000 square feet or more and residential buildings with 15 or more units, requires annual energy and water reporting, and sets emissions limits per square foot by building use that step down every five years to net zero in 2050, starting with buildings over 35,000 square feet. Cambridge amended BEUDO in 2023 so that non-residential buildings of 100,000 square feet or more must reach net zero emissions by 2035, and those from 25,000 to 100,000 square feet by 2050.

Under both ordinances, chiller efficiency and heat recovery matter more than they did when a repair was judged on mechanical condition alone. A worn compressor that adds a tenth of a kilowatt per ton across a lab building’s long run hours shows up in the annual report. A heat recovery chiller that captures heat from the chilled water loop and uses it to warm reheat coils can displace gas-fired heating, which is often the larger emissions line in a laboratory. Boston allows compliance through direct reductions, renewable energy purchases or alternative compliance payments, and Cambridge’s amendment set a charge of $234 per metric ton for emissions above the limit.

BERDO and BEUDO from the chiller plant’s point of view
QuestionBoston BERDO 2.0Cambridge BEUDO
Which buildings reportNon-residential 20,000 sq ft and up; residential with 15 or more unitsNon-residential 25,000 sq ft and up, with the strictest target at 100,000 sq ft
End pointNet zero by 2050, limits tightening every five yearsNet zero by 2035 for the largest non-residential buildings; 2050 for the rest
What a chiller repair changesElectricity per ton of cooling, refrigerant leak losses, run hours on the worst machineSame, plus heavy pressure to recover heat in lab buildings
Options when a target is missedDirect reductions, renewable purchases, alternative compliance paymentsReductions, verified carbon credits for large buildings, $234 per metric ton of excess
Records the owner gains from the repairBefore and after kilowatts per ton, leak rate, run timeSame, plus heat recovered where a heat recovery chiller is added

How New England weather works a Massachusetts chiller

New England weather works a Massachusetts chiller in two seasons rather than one: a humid summer peak, with Boston’s July normals at 82 degrees Fahrenheit by day and 66 at night (NOAA, 1991 to 2020), and a long heating season in which labs, hospitals and data centers still need cooling while the outdoor air sits below freezing. January in Boston averages a 37 degree high and a 23 degree low. A chiller that runs through that kind of winter faces problems that a Virginia or Carolina machine rarely sees.

Low condenser water temperature is the first of them. Cooling towers in January can return water far colder than a chiller’s design minimum, and without tower bypass, fan staging or head pressure control the machine short cycles, loses oil return or trips on low refrigerant pressure. Freeze risk is the second: evaporators in plants that idle one machine, outdoor air-cooled units, and tower basins and makeup lines all need protection. Coastal machines at the Seaport, on the North and South Shores, and in Fall River and New Bedford add salt air to the list, which attacks air-cooled condenser coils and electrical enclosures. Inland, Worcester and the Pioneer Valley run cooler summers and colder winters than Boston, which shortens the cooling peak and lengthens the freeze season.

Why is my chiller tripping in a Massachusetts winter?

A Massachusetts chiller that trips in winter is usually reacting to conditions outside its design envelope rather than to a failed component: condenser water that is too cold, a load too small for the smallest stable stage, or freeze protection acting on a cold evaporator. The question “why is my chiller tripping” has different answers in January and July, so the trip log and the season are the first things Paul Industries reads.

Low refrigerant pressure trips in winter often trace to cold condenser water pulling head pressure down until the expansion device cannot feed the evaporator. Repeated low-load cycling on centrifugal machines points to minimum load settings, hot gas bypass condition or a plant sequence that keeps too many machines online. Low evaporator leaving temperature trips can come from a flow switch, a sticking valve or a sensor that has drifted. Paul Industries confirms the fault from trend data, adjusts tower and head pressure control where the cause is upstream, and opens the machine only when the evidence points inside it.

Which Massachusetts buildings lean hardest on their chillers?

Laboratory buildings in Cambridge, the Seaport and along Route 128 lean hardest on their chillers in Massachusetts, because they run on large volumes of outdoor air for fume hoods and animal rooms, and their process loads continue all year. Hospitals in Boston’s Longwood Medical Area and across the state, university central plants, biomanufacturing plants on the I-495 belt and data centers follow close behind. Each type limits when a machine can be taken out of service.

Massachusetts building types and how chiller repairs are scheduled in each
Building typeWhere it clustersCooling profileHow the repair is scheduled
Research laboratoriesKendall Square, the Seaport, Waltham, Lexington, BurlingtonHigh outdoor air, year-round process and equipment loadsWinter and shoulder months; heat recovery machines planned around heating demand
HospitalsLongwood, downtown Boston, Worcester, SpringfieldAround the clock, with tight limits in surgical and pharmacy areasRedundancy confirmed first; temporary cooling where margin is thin
University central plantsCambridge, Boston, Amherst, WorcesterCampus loops with research buildings on them all yearOverhauls between semesters, staged so the loop keeps its minimum capacity
Biomanufacturing plantsDevens, Marlborough, Andover, NorwoodProcess cooling plus classified area conditioningPlanned shutdowns, with change records for validated systems
Data centersBoston, Lowell, Holyoke, suburban office parksYear-round load with redundant machinesOne machine at a time under a written method of procedure

HVAC chiller repair at labs and hospitals

HVAC chiller repair at a Massachusetts lab or hospital begins with a capacity check rather than a wrench, because the chilled water serves areas where temperature and humidity are part of research integrity or infection control. Paul Industries confirms what the remaining machines can carry at the expected load during the outage, checks that air handlers serving critical rooms can hold setpoint, and connects temporary cooling where the margin is thin. Classified spaces downstream are covered on cleanrooms in Massachusetts.

Industrial chiller repair in Massachusetts plants

Industrial chiller repair in Massachusetts plants follows the production calendar, because a process chiller fault at a biologics, medical device or food plant can stop product, not just comfort. Paul Industries plans the work into scheduled shutdowns wherever possible, brings likely parts for the window, and provides the change and test records a validated system needs to close the work. Glycol and process water piping around the machine is handled under process piping in Massachusetts, so a leak at a flange or a failed valve is fixed in the same outage.

Refrigerant rules a Massachusetts chiller owner faces from 2026

Massachusetts chiller owners answer to two sets of refrigerant rules: the federal AIM Act programs run by the EPA, and MassDEP’s own hydrofluorocarbon regulation, 310 CMR 7.76, issued in December 2020. The state rule prohibits certain HFCs in new refrigeration equipment and new comfort-cooling chillers after the dates in its Table 1, covering centrifugal and positive displacement machines; existing equipment that already uses a listed refrigerant may keep operating and be serviced.

On the federal side, the leak repair provisions of the Emissions Reduction and Reclamation rule have applied since the start of 2026 to any appliance with an HFC charge of 15 pounds or more. Every top-up triggers a leak rate calculation; the annual limits are 10 percent for comfort cooling, 20 percent for commercial refrigeration and 30 percent for industrial process refrigeration, and a machine that exceeds its limit gets 30 days for the fix, stretched to 120 when the plant has to shut a process down, followed by an initial and a follow-up verification test. New comfort-cooling chillers have been limited to refrigerants with a global warming potential below 700 since January 1, 2025, and virgin R-123 import allowances end in 2030, after which low-pressure centrifugal machines run on reclaimed supply.

What each refrigerant rule asks of a Massachusetts chiller repair
RuleWhat it reachesWhat happens at the repair
EPA leak repair, 40 CFR 84.106HFC appliances with 15 pounds or more of chargeLeak rate calculated at each addition; repair and verification tests inside the deadline
EPA Technology TransitionsNew chillers manufactured, imported or installedA replacement comfort chiller uses a refrigerant under GWP 700
MassDEP 310 CMR 7.76New comfort-cooling chillers and refrigeration equipment in MassachusettsReplacement refrigerant checked against the state table as well as the federal one
HCFC phaseoutR-22 and R-123 machinesTightness and purge performance protect a shrinking reclaimed supply
MGL c.146 s.45ASystems of 20 tons or moreRelief devices, pressure tests and repair records ready for the annual inspection

Repair, retrofit or replace at Massachusetts power prices

Massachusetts power prices tilt many chiller decisions toward efficiency, because the state’s 2024 average industrial electricity price was 18.19 cents per kilowatt-hour against a US average of 8.13 (EIA), more than double. A kilowatt per ton saved is worth over twice as much in Worcester or Waltham as it is in a typical state, and BERDO and BEUDO add an emissions value on top in Boston and Cambridge.

As an illustration with stated assumptions, a 400-ton chiller plant that runs the equivalent of 2,000 full-load hours a year and improves by 0.20 kilowatts per ton after an overhaul, a variable speed drive or a replacement saves 160,000 kilowatt-hours a year, about $29,100 at 18.19 cents. The same arithmetic run on the owner’s own trend data, tariff and run hours decides between three paths: repair the fault and keep the machine, retrofit it with a drive, new controls or a lower-GWP refrigerant where the manufacturer supports one, or replace it, possibly with a heat recovery chiller that also cuts heating fuel. Paul Industries prices the repair and the alternative side by side so the owner can see both numbers before work starts.

Who repairs chillers in Massachusetts?

Paul Industries repairs chillers in Massachusetts as an East Coast mechanical contractor headquartered at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania. It takes chiller repair, overhaul, retrofit and replacement work across the Commonwealth, from Boston, Cambridge and the Seaport to Route 128, the I-495 belt, Worcester, Lowell and Lawrence, Springfield and the Pioneer Valley, the North and South Shores and the South Coast, as well as in all 50 states and at plants outside the United States through international projects.

Brand-specific pages cover Trane chiller repair, York chiller repair and Carrier chiller repair; Paul Industries works on those machines and the towers, pumps, piping and controls around them under one contract. When a diagnosis shows replacement is the better path, the same team answers the question of who installs chillers: Paul Industries furnishes a new machine or sets one the owner has bought, then takes care of refrigerant recovery from the old unit, rigging, piping, electrical connections, startup and the records for the new refrigerant. Data center plants follow the redundancy practice set out on data center mechanical contractor in Massachusetts and data center cooling systems in Massachusetts. For comparison with the headquarters state, see chiller repair in Virginia, and for the city with its own permit layer, chiller repair in New York.

What does chiller repair cost in Massachusetts?

Chiller repair cost in Massachusetts depends on the fault and its parts, the size and type of machine, refrigerant recovery and recharge, rigging and access in dense Boston and Cambridge buildings, temporary cooling, and whether the work must fall in a narrow winter or shoulder-season window. A sensor or control fault is a small job; a compressor rebuild is a large one; a replacement adds rigging, electrical and piping work and, in Boston, often a crane permit and street occupancy.

Chiller maintenance cost follows the same logic on a smaller scale: the number and size of machines, how many annual inspections and tube cleanings the plant needs, and how much winter operation adds to tower and freeze protection work. Refrigerant has become a cost line of its own as reclaimed HCFC supply shrinks and HFC caps tighten. Paul Industries prices repairs after diagnosis, with parts, refrigerant and labor shown separately, and gives a budget range from comparable scope for a major repair or replacement before a firm price.

Chiller service and repair from Paul Industries across Massachusetts

Paul Industries delivers chiller service and repair across Massachusetts: diagnostics, leak location and repair, compressor and drive work, tube cleaning and eddy current testing, controls and winter operation fixes, overhauls, retrofits and complete replacements, with records ready for the section 45A inspection and the EPA leak rules. Among chiller repair companies, the deciding factors for a Massachusetts owner are licensing that matches the machine, records that satisfy the state and the city, and one accountable contractor for the machine and everything around it, which is how Paul Industries works. Send the nameplate details, refrigerant type, trip records and a few weeks of trend data, then call 201-450-8280 or request a quote. The Massachusetts page lists the process, water and piping work Paul Industries delivers in the Commonwealth, and the Northeast page covers the wider region.

Standards referenced: MGL c.146 s.45A (refrigeration and air conditioning system inspection) · 522 CMR 9.00 · MGL c.146 ss.84-86 (refrigeration technician licensing) · MGL c.146 s.46 (steam engineer and fireman licensing) · 780 CMR (Massachusetts State Building Code, 10th edition) · Boston BERDO 2.0 · Cambridge BEUDO · MassDEP 310 CMR 7.76 · EPA Emissions Reduction and Reclamation rule, 40 CFR 84.106 · EPA Technology Transitions rule · MGL c.149 ss.26-27 (prevailing wage) · ASHRAE 15

Frequently asked questions

Who handles chiller repair in Boston, from the Longwood Medical Area to the Seaport?

Paul Industries handles chiller repair in Boston for hospitals in the Longwood Medical Area, office and lab towers downtown and in the Seaport, and university plants across the city. Boston machines often sit in cellars or on high roofs, so rigging and access are planned with the repair, and buildings covered by BERDO 2.0 receive before and after efficiency readings they can use in their annual report. Call 201-450-8280 with the machine details.

Does Paul Industries repair chillers in Cambridge and Kendall Square lab buildings?

Yes. Paul Industries repairs centrifugal, screw and heat recovery chillers in Cambridge lab buildings, including those around Kendall Square, where high outdoor air volumes keep machines running through the winter. Large non-residential buildings there face the BEUDO net zero target in 2035, so each repair is planned with efficiency and heat recovery in view as well as the immediate fault.

Who provides chiller repair in Worcester and Central Massachusetts?

Paul Industries provides chiller repair in Worcester and across Central Massachusetts, including hospitals, colleges, biomanufacturing plants and distribution buildings. Inland sites run cooler summers and colder winters than Boston, so freeze protection, tower bypass and low-ambient controls get as much attention as the summer peak. Send the make, model, refrigerant and alarm history to start the diagnosis.

Does Paul Industries service chillers along Route 128 and the I-495 belt?

Yes. Paul Industries services chillers at labs, offices and plants in Lexington, Waltham and Burlington on Route 128, and in Marlborough, Andover, Devens and other I-495 communities. Many of these buildings hold research or manufacturing loads that never shut off, so repairs are staged one machine at a time with redundancy confirmed before isolation.

Who repairs chillers in Springfield, Holyoke and the Pioneer Valley?

Paul Industries repairs chillers in Springfield, Holyoke, Chicopee and across the Pioneer Valley, at hospitals, colleges, food and beverage plants and manufacturers. The valley’s cold winters make freeze protection of idle evaporators, towers and outdoor piping a regular part of the work, and spring startups include refrigerant charge, safety and relief device checks before the first warm spell.

Can a Massachusetts chiller keep running while its state inspection certificate is out of date?

Section 45A of chapter 146 says a refrigeration or air conditioning system that needs a certificate may not be operated without a current one, and an inspector may order a system shut until a certificate issues. The statute also sets fines for violations. Owners keep the certificate current through the annual state inspection or the periodic inspection of a company authorized to insure pressure vessels, and Paul Industries keeps the repair records those inspections review.

Does a chiller under 20 tons need a Massachusetts inspection certificate?

Systems of less than 20 tons capacity are exempt from the section 45A certificate requirement, which covers many small process and laboratory chillers. The EPA leak rules still apply to any HFC appliance holding 15 pounds or more of refrigerant, and technician licensing applies to the work regardless of machine size, so small machines still need proper records when they are repaired.

Which refrigeration license class applies to a large centrifugal chiller in Massachusetts?

Section 86 of chapter 146 classes refrigeration technician and contractor licenses by the maximum size of refrigerating system the holder is qualified to install or service, and also allows a license for all sizes. Work on a large centrifugal chiller therefore calls for a license class that covers machines of that capacity. Applications and examinations are handled by the Office of Public Safety and Inspections.

Does an efficient replacement chiller lower a Boston building's BERDO emissions?

It usually does, because BERDO counts the electricity the chiller plant uses, and a machine that needs fewer kilowatts per ton reports less. The size of the reduction depends on run hours and on how much of the building’s total is cooling. Where the building also burns gas for reheat, a heat recovery chiller can cut the heating line as well, which often matters more in lab buildings.

How does Cambridge BEUDO treat a lab building's chiller plant?

BEUDO counts the energy the plant uses toward the building’s emissions, and the 2023 amendment requires non-residential buildings of 100,000 square feet or more to reach net zero by 2035. For a lab building, that puts weight on chiller efficiency, refrigerant leak tightness and, above all, heat recovery, since labs reheat large volumes of outdoor air. Paul Industries prices repairs alongside heat recovery options so owners see both.

Can a heat recovery chiller replace gas heating in a Massachusetts lab?

A heat recovery chiller can carry a large share of a lab’s reheat load, because the heat it removes from the chilled water loop is delivered to a hot water loop at temperatures suited to reheat coils. Whether it replaces gas fully depends on the heating water temperature the building needs and on winter cooling load. Paul Industries sizes the machine from trend data on both loops.

Does 310 CMR 7.76 force an existing R-134a chiller out of service in Massachusetts?

MassDEP’s regulation applies its HFC prohibitions to new equipment after the dates in its Table 1, and existing equipment already using a listed refrigerant may continue in use and be serviced. An existing R-134a chiller can therefore keep running and be repaired. A replacement machine has to meet both the state table and EPA’s Technology Transitions limits.

What freeze protection does a Massachusetts chiller plant need between November and April?

Idle evaporators and condensers should be drained or kept above freezing, outdoor air-cooled chillers need glycol or a drain-down plan, and cooling tower basins, makeup lines and bypass piping need heat or drainage. Flow switches and low-temperature safeties should be tested before the first hard freeze. Paul Industries sets up winter layup or winter operation for each machine and returns it to service in spring.

How do Massachusetts labs and data centers run chillers through the winter?

Many use waterside economizers, which let cold tower water cool the chilled water loop through a plate heat exchanger while the chillers idle or run at low load. Machines that stay online need tower bypass, fan control and head pressure control to keep condenser water above the manufacturer’s minimum. Paul Industries checks those controls when winter trips start, since the cause often sits outside the chiller.

Which tasks go into a Paul Industries chiller service program for a Massachusetts campus?

A typical program covers spring startup and winter operation checks, monthly reviews of the plant’s logs, the EPA leak rate calculations, oil sampling, refrigerant purity checks, vibration trending, condenser tube brushing, eddy current testing at set intervals and relief device tracking for the section 45A inspection. Contracts can include the towers, pumps and water treatment that serve the chillers, so chiller service in Massachusetts covers the whole plant under one agreement.

Is a chiller repair at a Massachusetts public building covered by prevailing wage?

Massachusetts prevailing wage law, chapter 149 sections 26 and 27, reaches public works carried out by public entities, which includes many state university, municipal and public hospital projects. Privately owned buildings without public funds generally fall outside it. The awarding authority sets the requirement in the bid documents, and Paul Industries prices the work to the wage schedule the project specifies.

Who installs chillers at Massachusetts sites when repair is no longer worthwhile?

Paul Industries installs replacement chillers in Massachusetts, supplying the machine or setting an owner-furnished one, recovering refrigerant from the old unit, rigging, piping, wiring and starting the new one. In Boston and Cambridge the plan often includes crane permits and street occupancy. Keeping the diagnosis and the replacement with one contractor means the findings that justified replacement shape the new installation.

What should the first call about a failed Massachusetts chiller include?

Give the make, model and serial number, the refrigerant and charge, the alarm or trip history, what the machine serves and whether redundant capacity is online. Recent operating logs, the last service report, the current certificate of inspection and any refrigerant addition records help the diagnosis. Paul Industries uses that information to plan the first visit and to price the repair with parts, refrigerant and labor shown separately.

Have a chiller to repair somewhere in Massachusetts?

Send the chiller make, model and serial number, the refrigerant, the trip history and recent operating logs. Call 201-450-8280 or request a quote.