Paul Industries provides chiller repair in Georgia for hospitals, universities, manufacturing plants, data centers and commercial buildings, diagnosing and repairing centrifugal, screw and scroll machines from metro Atlanta to Savannah, Augusta, Macon and Columbus. Georgia chillers carry warm nights as well as hot afternoons, many sit on cooling towers that now run under drought rules, and Georgia’s pressure vessel law reaches some chiller shells and not others. Paul Industries repairs, overhauls, retrofits, maintains and replaces chillers, and supplies and installs new machines when repair stops paying.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Atlanta summer July normals 90 F high, 72 F low (NOAA, 1991-2020)
Savannah summer July normals 92 F high, 74 F low (NOAA, 1991-2020)
Pressure vessel law O.C.G.A. 25-15, triennial vessel inspections
Industrial power 7.21 cents/kWh against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What chiller repair in Georgia covers on a typical job

Chiller repair in Georgia covers fault finding, refrigerant leak location and repair, compressor, bearing and motor work, starter and control repair, tube cleaning and eddy current testing, tower and pump faults that show up at the chiller, and the leak and inspection records that federal and state rules ask owners to keep. The fault list looks much like it does anywhere; what Georgia changes is how many hours the machine has run, how warm the condenser water arrives, and which state permits and inspections a repair touches.

The national guide to symptoms, repair methods and replacement scope sits on the chiller repair page. This page stays with what is particular to Georgia: the climate in the Piedmont and on the coast, the campus and hospital plants that dominate Atlanta’s cooling load, the pressure vessel and conditioned air laws, water limits on cooling towers, and the decisions Georgia owners face as refrigerant rules tighten.

How Georgia’s heat and humidity wear on a chiller

Georgia’s heat and humidity wear on a chiller by keeping it loaded late into the night: Atlanta’s July normals are a 90 degree Fahrenheit high and a 72 degree low, and Savannah’s are 92 and 74 (NOAA, 1991 to 2020). A 72 degree night in saturated air leaves the plant removing moisture from ventilation air long after sunset, so run hours climb faster than the daytime highs alone suggest.

The coastal plain adds a second load. Savannah, Brunswick and the Golden Isles sit in humid, salt-laden air that attacks air-cooled condenser coils, fin edges, brazed joints and electrical enclosures, and corroded joints are a frequent source of slow refrigerant leaks. North Georgia’s mountains around Dalton, Rome and Gainesville see shorter seasons but colder winter nights, which brings freeze risk to idle evaporators and outdoor piping. Middle and South Georgia, around Macon, Columbus, Albany and Valdosta, combine long seasons with heavy process loads at food, paper and manufacturing plants.

Georgia regions and the chiller faults each one tends to produce
RegionOperating conditionTypical faultWhere repair effort goes
Metro Atlanta and GwinnettHot, humid summers; campus, hospital and office loads around the clockHigh condensing pressure, tube fouling, worn bearings from long run hoursTube cleaning, oil and vibration trending, staged overhauls in winter
Savannah, Brunswick and the coastHottest nights in the state, salt air, port and logistics loadsCoil and fin corrosion, leaks at corroded joints, enclosure faultsCoil repair or coating, leak checks at brazed joints, enclosure sealing
Augusta and the Savannah River corridorLong season; medical center, plant and process loadsProcess cooling faults during production runsRepairs timed to shutdowns, glycol and process loop checks
Macon, Columbus and Middle GeorgiaHot summers, manufacturing and hospital plantsOverloaded towers raising lift, control driftTower and condenser water work, controls tuning
Dalton, Rome and North GeorgiaShorter season, cold winter nightsFreeze damage in idle evaporators and outdoor linesWinter layup or glycol protection, spring startup inspection

Do Georgia’s pressure vessel rules reach a chiller?

Georgia’s Boiler and Pressure Vessel Safety Act reaches a chiller’s shells unless one of the Act’s exemptions applies, and which exemption applies depends on the shell’s size, working pressure and use. The Act was moved in 2012 from Title 34 of the Georgia Code to Title 25, Chapter 15, Article 2, and it is administered by the Safety Engineering Section of the Safety Fire Division in the Office of Insurance and Safety Fire Commissioner. Its exemption list, now O.C.G.A. 25-15-16, covers vessels of no more than five cubic feet at 250 psig, vessels working at 15 psig or less of any size, components that ASME Section VIII does not cover, and manufacturing process vessels that carry insurance or equivalent self-coverage and are inspected by a commissioned inspector.

The refrigerant decides a great deal. A low-pressure R-123 centrifugal runs its condenser at only a few psig on a summer day, while an R-134a condenser at 100 degrees Fahrenheit sits near 124 psig, so two chillers of the same tonnage can land on opposite sides of the 15 psig line. Where a chiller’s shells are within the Act, Rule 120-3-26 sets a triennial inspection for pressure vessels, requires an installation permit before a new or secondhand vessel is installed, and requires welded repairs to follow the National Board Inspection Code with the inspector’s permission, with an R-1 report filed with the Chief Inspector within 30 days. Paul Industries checks each shell’s nameplate, design pressure and volume during the survey, so the repair plan already shows which inspections and reports the job carries.

Georgia conditioned air license rules and the mechanical code

The Georgia conditioned air license law separates conditioned air work into two classes under Chapter 14 of Title 43 of the state code: a Class I license is restricted to systems of no more than 175,000 BTU per hour of net heating and five tons of cooling, while Class II is unrestricted. A commercial or industrial chiller is far beyond five tons, so the comfort-cooling work around it falls in the scope the statute assigns to Class II. The rule describes what the work requires, and buyers comparing repair proposals should read it that way.

Replacement work also meets the building code. Since January 1, 2026, the Georgia State Minimum Standard Mechanical Code has been the 2024 International Mechanical Code with Georgia amendments, enforced by county and city building departments, and its refrigeration chapter draws on ASHRAE 15 for machinery rooms, refrigerant detection, ventilation and relief piping. A like-for-like repair rarely triggers a permit; a chiller replacement or a refrigerant change usually does, and the machinery room has to meet the current code for the refrigerant going in. Paul Industries prepares the drawings and equipment data the permit needs and books the inspections into the outage plan.

Refrigerant rules a Georgia chiller owner now works under

The refrigerant rules a Georgia chiller owner now works under come from the EPA’s AIM Act programs: the HFC phasedown, the Technology Transitions limits on refrigerants in new equipment, and the leak repair requirements of the Emissions Reduction and Reclamation rule, in force since January 1, 2026. HCFC machines answer to an older phaseout instead, and for R-123 the last imports arrive in 2030.

The leak repair rule is the one that changes a service visit. For appliances holding 15 pounds or more of an HFC, a leak rate is calculated every time refrigerant is added; comfort cooling is held to 10 percent a year, commercial refrigeration to 20 percent and industrial process refrigeration to 30 percent. Once a machine crosses its threshold, the owner has 30 days to fix the leak, stretched to 120 days where fixing it means shutting down an industrial process, and two verification tests, one at the repair and one afterward, confirm the fix held. Paul Industries records the calculation, the repair and both tests on the same service report, so the owner’s file answers an auditor’s questions in one place.

What a repair visit records for a Georgia chiller, by rule
RuleWhen it appliesWhat the visit records
EPA leak repair, 40 CFR 84.106HFC charge of 15 pounds or morePounds added, calculated leak rate, repair, initial and follow-up verification
EPA Technology TransitionsNew or replacement comfort chillers from January 1, 2025; process chillers from January 1, 2026Refrigerant of the replacement machine and its GWP class
Georgia Act, O.C.G.A. 25-15Shells within the Act and outside the exemptionsNameplate data, inspection date, R-1 or R-2 report for welded repairs or alterations
Georgia mechanical codeReplacement, relocation or refrigerant changePermit, machinery room ventilation and detection, relief piping
Clean Air Act Section 608Any refrigerant recoveryRecovered pounds and the disposition of recovered refrigerant

Atlanta campus and hospital chiller plants

Atlanta campus and hospital chiller plants are large, interconnected and seldom idle, which is why chiller service in Atlanta, like chiller service in Georgia generally, is mostly planned rather than reactive. Georgia Tech runs two primary chiller plants, the 10th Street and Holland plants, that together serve more than seven million square feet of buildings, and Emory University runs three central chilled water plants on underground distribution. Plants of that kind keep standby capacity, but taking one machine out still reduces margin on every hot afternoon.

Repairs on a hospital chiller plant

A hospital chiller plant serves operating rooms, sterile processing, pharmacies and isolation rooms where temperature and humidity are part of infection control, so a repair starts with a capacity check rather than a wrench. Paul Industries compares the remaining machines against the expected peak for the outage window, confirms the air handlers on critical areas can hold setpoint on the reduced plant, and sets up temporary cooling on the critical loop when that margin is thin. The repaired machine runs under load, with safeties tested, before it rejoins the plant.

Commercial chiller repair in Atlanta offices and towers

Commercial chiller repair in Atlanta office towers, hotels and mixed-use buildings follows weekends and the cooler months, when the building can ride on reduced capacity. Larger work such as compressor rebuilds, retubing and refrigerant conversions is planned for November through March, and temporary chillers come in only for repairs that would outlast the cool weather.

Industrial chiller repair in Georgia plants

Industrial chiller repair in Georgia plants follows the production calendar of poultry and food processors, carpet and textile mills around Dalton, pulp and paper mills, battery and automotive suppliers and biomanufacturers, where a chiller fault can stop product rather than comfort. Paul Industries plans repairs into scheduled shutdowns, stocks the likely parts for the window, and supplies the change and test records a validated or audited plant needs. Single-line process machines are covered on the process chillers page, and the piping around a plant’s chillers on process piping in Georgia.

Cooling towers, drought rules and reclaimed water

Cooling towers in Georgia now run with drought in the background: the Georgia Environmental Protection Division declared a statewide Drought Response Level 1 on April 27, 2026, and metro Atlanta draws most of its water from the Chattahoochee basin. Every gallon a tower evaporates is drawn from that supply, so water use and chiller performance are now discussed together.

Running a tower at higher cycles of concentration saves makeup water but raises scaling potential, and scale in the condenser tubes is the fault a chiller feels first: condensing pressure rises, capacity falls, and centrifugal machines edge toward unstable operation. Emory shows where some plants are heading. Its WaterHub, opened in 2015, recycles up to 400,000 gallons a day, and reclaimed water serves as process make-up at the three central chiller plants and the steam plant; in 2020 three quarters of the campus’s cooling tower make-up was reclaimed water. Reclaimed and higher-cycle water both demand tighter treatment and more frequent tube inspection. Paul Industries ties chiller repair to the tower side through cooling tower water treatment and tower repair, so a fouling problem is fixed at its source rather than only in the tubes.

Tube condition, eddy current testing and retubing

Tube condition decides more Georgia repair-or-replace calls than any other single finding, because condenser tubes on open tower systems collect scale, silt and biological growth through a long, warm season. Cleaning restores heat transfer; eddy current testing then measures wall loss, pitting and cracking from inside each tube and tells the owner how much life the bundle has left.

Paul Industries brushes condenser and evaporator tubes mechanically, switches to a chemical clean when the scale resists the brush, and tests a sample or every tube depending on age and history. Results decide whether a few tubes are plugged, the bundle is retubed, or the chiller goes on the replacement list. Where a shell is within the Georgia Act, a retube or a welded repair to the shell is handled under the National Board Inspection Code with the inspector consulted before the work begins. When a shell, head or water box is beyond repair, new construction is handled through pressure vessel fabrication in Georgia.

Repair or replace a Georgia chiller?

Repairing or replacing a Georgia chiller comes down to six findings: the refrigerant it holds, compressor condition, tube condition, the leak history under the 2026 EPA rule, the efficiency gap at Georgia power prices, and how well the machine’s capacity still matches the load. A sound machine on R-134a with a contained fault usually earns its repair; an R-22 or R-123 machine with thinning tubes and rising leak rates usually does not.

Repair or replace signals for a chiller in Georgia service
FindingPoints toward repairPoints toward replacement
Refrigerant chargeR-134a, R-513A or another refrigerant still in productionR-22 from reclaimed stock, or R-123 without a plan for the years after 2030
CompressorFault confined to a bearing, seal, guide vane actuator or sensorRepeat failures, impeller or rotor damage, a motor already rewound
TubesEddy current shows modest wall loss; few tubes pluggedWidespread pitting, plugging near the allowance, retube cost close to a new machine
Leak historyOne leak, found, repaired and verifiedRepeated exceedances of the 10 percent comfort cooling threshold
EfficiencyMeasured kW per ton near the original ratingWide gap to a new machine over Georgia’s long run hours
CapacityLoad unchanged since installationCampus or plant growth has left the machine undersized, or load has fallen away

Georgia’s industrial electricity averaged 7.21 cents per kilowatt-hour in 2024 against a US average of 8.13 (EIA), which stretches the payback on efficiency alone. As an example with stated assumptions, a 400-ton chiller running the equivalent of 3,200 full-load hours a year that improves from 0.70 to 0.52 kilowatts per ton saves about 230,000 kilowatt-hours, or roughly $16,600 a year at that average price. Paul Industries runs the same arithmetic on the owner’s own trend logs, tonnage and tariff, then weighs it against refrigerant risk and repair cost before recommending chiller replacement in Georgia or another round of repair.

Low-pressure machines, purge units and Georgia humidity

Low-pressure centrifugal chillers on R-123 run their evaporators below atmospheric pressure, so any small leak draws humid air into the machine instead of pushing refrigerant out, and Georgia’s damp summers make that air wetter than in most of the country. Moisture and air in the circuit raise condensing pressure, form acids with the refrigerant and oil, and corrode tubes and motor windings from the inside.

The purge unit is the machine’s defense. A purge that runs often, or for longer each week, is reporting a leak, and a purge that has stopped running altogether may be hiding one. Paul Industries reads purge run time and pump-out counts as leak indicators, tests the purge’s own operation, checks the refrigerant for moisture and acid, and finds the leak path, which on older machines is often a gasket, a sight glass, a tube roll or a relief device. Each repair is recorded with the purge readings before and after, so the owner can see the leak has stopped rather than assume it.

Keeping cooling on while a Georgia chiller is out

Keeping cooling on while a Georgia chiller is out relies on three tools: carrying the load on the remaining machines, shedding noncritical load, or connecting a temporary chiller. The test is the hottest hour of the planned window, not the average day, so the plan begins with a load estimate for a July afternoon in Atlanta or a July night on the coast.

Temporary cooling is quicker where the plant already has valved, capped connections on the chilled water headers. Where a Georgia plant has no such connections, Paul Industries adds permanent tie-in points while the chiller is already down for repair, and every later outage benefits. The rental machine needs a power source sized for its starting current, a level pad within hose reach and, for water-cooled units, a condenser water arrangement, all planned before the original chiller is opened. The temporary unit leaves only after the repaired chiller has carried a full afternoon peak.

Who performs chiller repair in Georgia?

Paul Industries performs chiller repair in Georgia, taking diagnosis, repair, overhaul, retrofit and replacement work across the state: metro Atlanta and Gwinnett, Athens, Augusta, Macon, Columbus, Savannah and the coast, Albany, Valdosta, Dalton, Rome and Gainesville. The company’s headquarters is at 256 Shore Drive, Kilmarnock, Virginia, and its chiller work reaches all 50 states and plants outside the United States.

One contract can cover the machine, its tower, pumps, piping and controls, so the diagnosis follows the fault wherever it sits. Heating plants on the same campuses are covered by boiler repair in Georgia, and data hall plants are planned under the redundancy rules described for a data center mechanical contractor in Georgia, with air and water distribution on data center cooling systems in Georgia. Owners comparing chiller contractors in Atlanta or elsewhere in Georgia can see the same Paul Industries approach on chiller repair in Virginia, its headquarters state, and on chiller repair in North Carolina.

What does chiller repair in Georgia cost?

The cost of chiller repair in Georgia depends on the fault and its parts, the size and type of machine, refrigerant recovery and recharge, rigging and access, temporary cooling, and whether state inspections or permits apply. A control or sensor repair is a small fraction of a compressor rebuild, and a rebuild is a fraction of a replacement, which adds rigging, electrical work, piping and a permit.

Refrigerant is often the swing item. R-22 now comes only from reclaimed stock, R-123 imports end in 2030, and HFC prices rise with every phasedown step, which is why the refrigerant line on an old, leaking machine can exceed the labor line. Paul Industries prices a repair after diagnosis, with refrigerant, parts and labor shown separately, and gives a budget figure for replacement alongside any major repair so the two can be compared on the same page.

Chiller work from Paul Industries in Georgia

Paul Industries repairs, overhauls, retrofits, maintains, supplies and installs chillers for Georgia hospitals, universities, plants, data centers and commercial buildings, with supply-only equipment, design-build replacement and complete installation all offered. For a repair, send the nameplate details, the refrigerant type and charge, recent alarms and a few weeks of logs; for a replacement study, add the load profile and electric tariff. Call 201-450-8280 or request a quote. The Georgia page lists the process, water and piping work Paul Industries takes across the state.

Standards referenced: Georgia Boiler and Pressure Vessel Safety Act, O.C.G.A. 25-15-10 et seq. · Georgia Rules for Boilers and Pressure Vessels, Chapter 120-3-26 · National Board Inspection Code (NBIC) · ASME Boiler and Pressure Vessel Code, Section VIII · Georgia State Minimum Standard Mechanical Code (2024 IMC with Georgia amendments) · O.C.G.A. 43-14 (conditioned air contractors) · ASHRAE 15 · EPA Emissions Reduction and Reclamation rule, 40 CFR 84.106 · EPA Technology Transitions rule · Clean Air Act Section 608

Frequently asked questions

Who handles chiller repair in Atlanta for hospitals, campuses and office towers?

Paul Industries handles chiller repair in Atlanta and across Fulton, DeKalb, Cobb and Gwinnett counties for hospitals, university plants, office towers and data centers. Most Atlanta plants run machines around the clock in summer, so repairs are staged one chiller at a time with the remaining capacity checked against the afternoon peak. Send the make, model, refrigerant and alarm history to start the diagnosis.

Does Paul Industries provide chiller repair in Savannah and along the Georgia coast?

Yes. Paul Industries provides chiller repair in Savannah, Pooler, Brunswick and the Golden Isles, where the warmest nights in the state and salt air combine. Coastal machines see coil and fin corrosion, enclosure damage and leaks at corroded brazed joints, so a coastal repair visit includes a leak search at those joints and a coil condition check alongside the fault that prompted the call.

Who provides chiller repair in Augusta and the Savannah River corridor?

Paul Industries provides chiller repair in Augusta, Evans, Martinez and along the Savannah River corridor for medical centers, plants and process loads. Process chillers there are often tied to production schedules, so repairs are timed to planned shutdowns, with glycol strength and process loop condition checked during the same visit to prevent a second outage later in the season.

Does Paul Industries take chiller repair in Macon, Columbus and Middle Georgia?

Paul Industries takes chiller repair in Macon, Warner Robins, Columbus and the rest of Middle Georgia, from hospital central plants to manufacturing process cooling. Long summers there load cooling towers heavily, and an undersized or fouled tower raises the lift a chiller works against, so the tower and condenser water side are checked whenever a chiller trips on high pressure.

Does a Georgia chiller need a state pressure vessel inspection?

A Georgia chiller needs state inspection when its shells fall within the Boiler and Pressure Vessel Safety Act and outside the exemptions in O.C.G.A. 25-15-16. Vessels working at 15 psig or less, very small vessels, and certain manufacturing process vessels with insurance coverage and commissioned inspections are exempt; medium-pressure shells on R-134a machines often are not. Covered pressure vessels are inspected every three years under Rule 120-3-26. Paul Industries reads each nameplate during the survey.

What does a welded repair to a chiller shell require in Georgia?

A welded repair to a chiller shell that is within the Georgia Act follows the National Board Inspection Code, with the inspector’s permission obtained before the work, and an R-1 report filed with the Chief Inspector within 30 days; an alteration uses an R-2 report. Paul Industries plans these steps into the repair schedule, so the inspection and paperwork do not hold the machine out of service longer than the repair itself.

Which Georgia conditioned air license class covers chiller work?

Georgia’s conditioned air law gives Class I a scope of no more than 175,000 BTU per hour of net heating and five tons of cooling, and leaves Class II unrestricted. Commercial and industrial chillers run from tens to thousands of tons, so the comfort-cooling work around them sits in the unrestricted class under O.C.G.A. 43-14. Plumbing and electrical work on the same job follows the state’s separate rules for those trades.

Does replacing a chiller in Georgia need a building permit?

Replacing a chiller in Georgia normally needs a mechanical permit from the county or city building department, which enforces the Georgia State Minimum Standard Mechanical Code, now the 2024 International Mechanical Code with Georgia amendments. The machinery room is checked for refrigerant detection, ventilation and relief piping suited to the new refrigerant. Paul Industries prepares the permit drawings and equipment data and schedules the inspections inside the outage.

How often should chiller tubes be cleaned in a Georgia plant?

How often chiller tubes should be cleaned depends on water quality and run hours, but most Georgia condensers on open towers are cleaned at least once a year, before the cooling season, and more often where towers run at high cycles or on reclaimed water. A rising condenser approach temperature on hot days is the sign that cleaning is due before the scheduled date. Evaporator tubes on closed loops usually need far less attention.

Can chillers provide heating as well as cooling on a Georgia campus?

Chillers can provide heating when they are heat recovery or heat pump machines that deliver condenser heat to a hot water loop instead of rejecting it all to a tower. Georgia campuses and hospitals with year-round cooling and winter reheat loads are good candidates, because the same machine cools data rooms or labs while warming the building. Paul Industries evaluates the load profile and loop temperatures before proposing a heat recovery retrofit.

What does industrial chiller maintenance include at a Georgia plant?

Industrial chiller maintenance at a Georgia plant includes daily or monitored readings of pressures, temperatures and approaches, leak rate calculations whenever refrigerant is added, annual oil analysis, vibration readings and starter checks, tube cleaning before summer, eddy current testing every few years, and winter protection for idle machines in North Georgia. Paul Industries delivers the program under service contracts sized to the plant.

How do drought restrictions affect a Georgia chiller plant?

Drought restrictions affect a Georgia chiller plant through its cooling towers, which evaporate makeup water every hour they run. Under the 2026 drought response, plants have looked at higher cycles of concentration and reclaimed water to cut potable use, and both raise scaling and fouling risk inside condenser tubes. Tighter water treatment and more frequent tube inspection keep the water savings from turning into lost chiller capacity.

Is an R-123 chiller in Georgia still worth repairing?

An R-123 chiller in Georgia is often worth repairing for a planned period, because reclaimed and stockpiled R-123 can still service existing machines after imports end in 2030. Leak tightness and a working purge protect a shrinking supply. The right answer depends on tube condition, compressor history and how long the machine must run; Paul Industries sets out repair, conversion and replacement costs side by side for the owner.

What does the 2026 EPA leak repair rule mean for a Georgia hospital chiller plant?

For a Georgia hospital chiller plant, the 2026 EPA leak repair rule means that any machine holding 15 pounds or more of an HFC needs a leak rate calculation every time refrigerant is added, and a comfort-cooling machine above 10 percent a year must be repaired within 30 days and verified. Hospital plants run hard, so leak records belong in the same file as the repair reports Paul Industries provides.

When should chiller replacement in Georgia be scheduled?

Chiller replacement in Georgia is best scheduled between November and March, when cooling loads are lowest and temporary chillers are easiest to source and connect. Equipment lead times and permit review push the decision back to the previous summer, so owners usually commit by early autumn. Data centers and hospitals with year-round load replace one machine at a time under a written procedure whatever the season.

How do Georgia power prices change a chiller repair decision?

Georgia’s industrial electricity averaged 7.21 cents per kilowatt-hour in 2024, below the US average of 8.13 (EIA), so efficiency savings alone pay back more slowly than in higher-priced states. That puts more weight on refrigerant risk, tube life and reliability when deciding between repair and replacement. Paul Industries uses the owner’s actual tariff and run hours rather than an average when comparing the options.

What should a Georgia facility send to get a chiller repair priced?

A Georgia facility should send the chiller make, model and serial number, the refrigerant and charge, recent alarm codes, operating logs or trend data, the most recent tube test or service report, and photos of the nameplates and starter. For a plant with several machines, add the plant layout and redundancy arrangement. Paul Industries uses that package to scope the diagnosis, parts and any inspections before arriving on site.

Who services chillers at Georgia data centers that cannot drop cooling?

Paul Industries services chillers at Georgia data centers in Douglas, Fulton, Newton and other counties under a written method of procedure for each repair. Redundancy is confirmed before any machine is isolated, the remaining units are watched through the work, and the repaired chiller is load tested before the procedure closes, so the data hall keeps its design capacity from start to finish.

Have a chiller to repair or replace in Georgia?

Tell us the make, model, refrigerant and charge, what the alarms say and how the plant has been running. Call 201-450-8280 or request a quote.