Paul Industries is a US process equipment contractor for the Czech Republic, designing and fabricating pressure vessels, process skids, brewing and CIP systems, purified water units and process piping in the United States for pharmaceutical plants around Prague, the chemical sites of north Bohemia and Pardubice, and breweries and food producers from Plzen to Moravia. Each system ships with its PED conformity file, Czech-language instructions and the records its initial revision needs under Government Regulation 192/2022 Sb., wired for 400 V, 50 Hz. After the crossing to Hamburg or Bremerhaven and the rail leg inland, Paul installs and commissions it or supervises the installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Supply into the EU market NV 219/2016 Sb., implementing PED 2014/68/EU
Equipment in operation Act 250/2021 Sb. and NV 192/2022 Sb.
Power 230/400 V, 50 Hz; CSN 33 2000 installations
GMP regulator SUKL, in the PIC Scheme since January 1997
Import VAT 21 percent standard rate
Reviewed November 2026

What a US process equipment contractor for the Czech Republic supplies

A US process equipment contractor for the Czech Republic supplies equipment that a Czech operator can place on the market under the European directives and then run as reserved technical equipment under Czech operating law, which sets its own revisions, inspections and operating rules. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, builds to both from the specification onward.

Czech plants order pressure vessels and receivers, process and storage tanks, pump, dosing and transfer skids, CIP and SIP systems and sanitary process piping from Paul, with controls engineered alongside through PLC programming on the plant’s chosen platform. Plants choose supply with installation supervision, design-build from their user requirements, or complete installation through start-up and qualification.

Two things draw Czech buyers to a US builder. Plants that export medicines, beer or chemicals to the United States want equipment documented to US and European expectations at once, and in busy investment years a US source adds fabrication capacity to the regional market without lowering the specification.

Czech Republic manufacturing and the process industries behind it

Czech Republic manufacturing is built on automotive production, chemicals and refining, pharmaceuticals, brewing and food, and engineering, and the process industries among them run the vessels, utilities and piping that Paul Industries builds. The country’s industrial map follows its regions: the chemical belt of north Bohemia and the Elbe, pharmaceutical production around Prague and in Silesia, brewing in west and south Bohemia, and automotive and engineering clusters across central Bohemia and Moravia.

Skoda Auto, whose headquarters and main plant are in Mladá Boleslav, built about 575,000 vehicles there in 2024, with further plants at Kvasiny and Vrchlabí. Automotive plants of that scale run paint shop pretreatment, process cooling, compressed air and wastewater systems, all of which call for the same pressure equipment and piping discipline as a chemical site. Paul supplies chillers, glycol loops, pump skids and treatment equipment to industrial plants of this kind as well as to the process sectors described below.

Pharmaceutical companies in Czech Republic plants: Prague, Opava and Bohumil

Pharmaceutical companies in the Czech Republic manufacture in and around Prague, in Silesia and in Moravia, with a mix of Czech-rooted producers and plants owned by international groups. The Czech pharmaceutical industry exports much of what it makes, and several plants supply the US market directly.

Among pharmaceutical companies in Prague, Zentiva runs its headquarters on the premises of its original factory in Dolní Měcholupy, where it produces solid dose forms, injectable solutions, sterile ointments, hormones and active ingredients. Teva opened a plant in Opava in 2010 to make tablets and gelatin capsules for the US market, and Novo Nordisk completed its purchase of a recombinant protein plant at Bohumil from Novavax for 200 million US dollars at the end of 2024 to add mammalian production capacity. These plants are named as market facts about where Czech pharmaceutical companies and international groups make medicines.

Plants like these run reactors and solvent systems, granulation and coating suites, sterile filling, and cell culture and purification trains, each supported by purified water, WFI, clean steam and CIP. Paul Industries builds that equipment for pharmaceutical and biotech producers, designed for EU GMP and, for plants that ship to the United States, for FDA expectations at the same time.

A Czech plant that supplies American patients answers to two inspectorates, SUKL at home and the FDA during pre-approval and routine inspections, and both read the same equipment records. Paul therefore keeps one design history for each system: the user requirements, a traceability matrix from requirement to test, material and weld records with heat numbers, surface finish and passivation reports, and the executed qualification protocols. That single file serves a SUKL inspector in Czech and an FDA investigator in English without a second round of documentation.

Czech process clusters and the systems Paul Industries supplies
ClusterRegionProcess profile (market facts)What Paul Industries supplies
Prague and central BohemiaPrague, Central Bohemian RegionGenerics, sterile forms, APIs, biologics at BohumilWFI, clean steam, bioprocess skids, sanitary piping
Opava and SilesiaMoravian-Silesian RegionTablets and capsules, including for the US marketPurified water, process tanks, CIP, solvent piping
Litvinov and KralupyUsti and Central Bohemian RegionsRefining, olefins, polyethylenePressure vessels, alloy piping, heat exchanger skids
Neratovice and PardubiceCentral Bohemia, Pardubice RegionPVC, caprolactam, lubricants and specialty chemicalsDosing and transfer skids, storage tanks, process piping
Plzen and south BohemiaPlzen and South Bohemian RegionsBrewing and maltingBrewhouse vessels, fermenters, CIP, glycol cooling
Mlada Boleslav and KvasinyCentral Bohemia, Hradec Kralove RegionAutomotive assembly and component plantsProcess cooling, compressed air, pretreatment and wastewater

Czech chemical companies: Litvinov, Kralupy, Neratovice and Pardubice

Czech chemical companies cluster on the north Bohemian lignite and refining belt and along the Elbe, and the chemical industry in Czech Republic terms is dominated by one integrated group. ORLEN Unipetrol, owned by Poland’s ORLEN, is the country’s largest refining and petrochemical company and its only crude oil processor, with refineries at Litvínov and Kralupy nad Vltavou; its Chempark Záluží complex at Litvínov hosts the new polyethylene unit described as the largest investment in the history of the Czech chemical industry.

Spolana at Neratovice, on the Elbe north of Prague, is the only Czech producer of PVC and caprolactam, and Pardubice adds lubricant production and specialty chemistry. These sites run hydrocarbon and chlorine chemistry under strict process safety rules, so the vessels, heat exchangers and piping that serve them carry full PED categorisation, EN 13480 or ASME B31.3 piping documentation and ATEX-rated instruments where the zoning calls for them. Paul Industries supplies that equipment for chemical manufacturing plants and documents each line for the plant’s inspection regime.

Czech brewing equipment and brewery systems from a US builder

Czech brewing equipment carries a reputation the rest of the world copies, and a Czech brewery system is still designed around decoction mashing, cold lagering and long maturation in large cylindro-conical or horizontal tanks. Plzeňský Prazdroj, brewer of Pilsner Urquell in Plzeň since 1842, is the country’s largest beer producer and exporter, and recorded total production of 11.5 million hectolitres in 2018; regional and craft breweries across Bohemia and Moravia run the same processes at smaller scale.

Paul Industries builds stainless brewhouse vessels, fermentation and lagering tanks, bright beer tanks, yeast propagation skids, CIP stations and glycol cooling for brewing and distilling producers. Tanks that hold CO2 or operate under pressure fall under the PED and, once installed, under the Czech pressure equipment regime, so Paul delivers them with the category schedule, Czech instructions and test records the initial revision checks.

Which rules govern pressure equipment in the Czech Republic?

Pressure equipment in the Czech Republic is governed at two stages: Government Regulation 219/2016 Sb. implements the Pressure Equipment Directive for placing equipment on the market, and Act 250/2021 Sb. with Government Regulation 192/2022 Sb. governs its operation as reserved technical equipment once it is installed. Paul Industries builds the documentation for both stages into every Czech order.

NV 219/2016 Sb.: CE marking and Czech-language instructions

Government Regulation 219/2016 Sb., issued under Act 90/2016 Sb. on conformity assessment and effective from 19 July 2016, brings Directive 2014/68/EU into Czech law. Every vessel, line and accessory above the directive’s thresholds receives a hazard category from I to IV, worked out from its fluid group and its pressure combined with volume or pipe size, and that category selects the assessment module, which brings in a notified body from Category II upward. The regulation also states that the instructions and safety information of the directive’s Annex I points 3.3 and 3.4 must be provided in Czech, and importers and distributors check that before the equipment is supplied. Paul Industries delivers the Czech instructions and safety information with the CE marking documents and an English set for the engineering team.

NV 192/2022 Sb.: classes, initial revision and inspection intervals

Government Regulation 192/2022 Sb., in force since 1 July 2022 under Act 250/2021 Sb., treats boilers and pressure vessels above its thresholds as reserved technical equipment. Vessels above 100 bar with a volume over 1,000 litres are class I; other vessels above 0.5 bar with a volume over 10 litres or a pressure-volume product over 100 are class II. Before a new vessel is commissioned it needs an initial revision (výchozí revize), documented by a qualified revision technician, and the regulation assigns that revision to the supplier unless the contract provides otherwise. Paul Industries plans for that duty in its Czech contracts and supplies the design data, material certificates, weld and NDT records, pressure test certificate and safety valve data the revision draws on.

Once running, a stationary class I or class II vessel receives an operating revision every year, an internal revision every five years and a pressure test every ten years, with the pressure test cycle counted from the year of manufacture. The operator also issues site operating rules within one or two months of start-up. Technická inspekce České republiky acts as the organisation designated under the Act. Paul designs manways, nozzles and drains so internal revisions proceed without cutting the vessel.

Czech requirements for US-built process equipment
Stage of the equipment’s lifeGoverning Czech or EU textObligation on equipment and papersPaul Industries’ answer
Supply into the EU marketNV 219/2016 Sb. (PED 2014/68/EU)Category, conformity module, CE mark, declaration, instructions in CzechCategory schedule, technical file, Czech instructions
Before commissioningNV 192/2022 Sb., section 12Initial revision of new equipment by a revision technicianRevision documents, test certificates, safety valve data
In operationNV 192/2022 Sb., Annex 4Vessels: operating revision yearly, internal revision every 5 years, pressure test every 10Inspection-ready design and a complete vessel file
MachineryDirective 2006/42/EC until 20 January 2027, then Regulation (EU) 2023/1230Machine risk assessment, essential requirements met, machinery CE markingSafeguarding design and a complete machinery dossier
ElectricalCSN 33 2000 series; EN 60204-1Low-voltage installation and machine electrical safetyControl panels proven on a 400 V, 50 Hz test supply
GMPSUKL inspection against EU GMP and Annex 1Systems that fit the plant’s contamination control strategyDesign traced to the URS, BPE welds, IQ and OQ protocols

Design codes Czech plants specify

Czech plants usually specify EN 13445 for unfired vessels and EN 13480 for metallic industrial piping, the harmonised standards that give a presumption of conformity with the PED, while US-owned sites and exporters often keep ASME Section VIII and ASME B31.3 with a PED conformity route. Paul Industries designs to either set, buys material with EN 10204 3.1 certificates and lists European and ASTM grades side by side where a plant wants one spool to satisfy both systems.

Flange and fitting standards follow the same choice. Czech plants built to European practice use EN 1092-1 flanges and DN sizes, while lines tied into an American-designed unit keep ASME B16.5 flanges and NPS sizes, and a transition spool joins the two. Paul marks every connection on the P&ID with its standard and rating, so the plant’s maintenance stores hold the right gaskets and bolts from the first shutdown onward.

Voltage in Czech Republic plants and the CSN 33 2000 rules

Voltage in the Czech Republic matches the rest of the EU: a 50 Hz grid delivering 400 V between phases and 230 V from phase to neutral. For anyone asking what voltage is used in Czech Republic industry, Czech Republic 3 phase voltage of 400 V feeds motors, heaters and process panels, 230 V serves controls and instruments, and large sites take a medium-voltage supply and transform it on site. Voltage in Prague is identical to voltage in Brno, Plzeň or Ostrava.

Low-voltage installations follow the ČSN 33 2000 series, the Czech adoption of the HD 60364 rules, while machine wiring on a skid is governed by EN 60204-1. Paul Industries builds skid panels with IEC components, metric conductors and European colour codes, and selects pumps, fans and compressors on their 50 Hz curves, since a motor runs about one sixth slower than on the 60 Hz US supply. Every panel is tested at the factory on 400 V, 50 Hz before it ships.

SUKL GMP inspection and documents for Czech pharmaceutical plants

SUKL GMP inspection is the gate every Czech pharmaceutical plant passes: the State Institute for Drug Control (SÚKL) licenses and inspects manufacturers against the EU GMP Guide and has been a member of the Pharmaceutical Inspection Co-operation Scheme since January 1997. Czech sterile and biologic lines are inspected against the contamination control expectations of Annex 1 as revised in 2022, and their purified water and WFI are tested against Ph. Eur. limits.

Paul Industries designs to that standard: drainable sanitary piping with orbital welds, borescope and surface finish records, WFI loops held at the temperature the sanitisation concept sets, and CIP systems with documented coverage. Qualification documents, including design qualification files and IQ and OQ protocols, are written for the plant’s quality unit and executed with it on site.

Shipping to Czech Republic from USA through Hamburg and Bremerhaven

Shipping to Czech Republic from USA East Coast ports always combines a sea leg with an inland leg, because the country is landlocked: equipment sails to Hamburg or Bremerhaven, usually in about 9 to 13 days from New York on direct services, and continues by rail or road. Hamburg is the established gateway for Czech container trade, and the Metrans rail network that began with two trains a week between Prague and Hamburg now runs about 650 connections a week across its terminals.

Container-sized skids and crated spools ride the rail shuttles to inland terminals and finish by truck. Out-of-gauge vessels and modules move by road on permitted heavy transport, so their dimensions are fixed during design with the route in mind, including bridge clearances and the receiving plant’s access. Paul Industries sets the shipping envelope, split points and lifting points before fabrication starts, so a module built in the United States fits the route to Litvínov, Bohumil or Plzeň without rework.

Customs, duty and VAT for Czech importers

The Czech Republic belongs to the EU customs union, so equipment is cleared on entry, at the German port or inland under transit, and then moves freely. While Regulation (EU) 2026/1455 applies, from July 1, 2026 through 2029, industrial goods of US origin carry no EU customs duty. Import VAT is the main border charge: the standard Czech rate is 21 percent, and a VAT-registered Czech importer deducts it on its return. The country uses the Czech koruna, and Paul Industries quotes in US dollars so the buyer converts on its own terms.

How does a Czech project run with Paul Industries?

A Czech project with Paul Industries runs in nine stages, with the code basis, the initial revision duty, the language set and the rail or road route agreed in the first stage. The table shows what is particular to a Czech plant.

A Czech project with Paul Industries, stage by stage
StageCzech-specific workOutput for the plant
1. Specification reviewPED categories, design code, NV 192/2022 class, who arranges the initial revision, GMP needsConformity basis and class list
2. EngineeringMetric design, EN 13445 and EN 13480 or ASME, 400 V, 50 Hz, CSN 33 2000 interfaceP&IDs, calculations, layouts, circuit diagrams
3. FabricationEN 10204 3.1 material, qualified welding, orbital welds on sanitary linesMaterial and weld dossiers, NDT reports
4. Factory acceptance testPressure and function tests, witnessed in person or by videoSigned FAT report, pressure test certificate
5. ShippingISPM 15 crates, sailing to Hamburg or Bremerhaven, rail or heavy road legBill of lading, transit documents, packing list
6. InstallationSetting, piping and wiring under the plant’s permits, by Paul or under Paul’s supervisionInstallation records, marked-up drawings
7. Initial revisionRevision documents for the technician, draft site operating rulesRevision file in Czech
8. CommissioningFirst run on product or water, SAT, qualification for GMP linesSigned SAT, qualification records
9. HandoverOperator training in the plant, Czech manuals, recommended sparesFinal drawings and the full equipment dossier

Who builds process systems for plants in the Czech Republic?

Paul Industries builds process systems for plants in the Czech Republic, from a single brewery tank or receiver to complete WFI systems, chemical dosing units and process modules, and keeps responsibility for it from the first P&ID, through fabrication and testing in America and the journey to Bohemia or Moravia, to the day it runs at the Czech plant. Paul was formerly based in northern New Jersey, then Pennsylvania, and runs its work abroad from Kilmarnock, Virginia.

Czech enquiries come from pharmaceutical producers in Prague and Silesia, from the refining and chemical sites of north Bohemia and the Elbe, from breweries in Plzeň and south Bohemia, and from automotive and engineering plants that need process cooling and utilities. Groups with plants across the border compare the Germany and Poland pages, since one equipment standard often serves sites in all three countries.

What drives the cost of process equipment delivered to the Czech Republic?

The cost of process equipment delivered to the Czech Republic depends on the equipment and on five delivery items: the PED conformity route, the Czech documentation and initial revision file, the sea and inland freight, import VAT under the chosen Incoterm, and the installation route. A buyer weighing shipping from USA to Czech Republic cost finds that the inland leg often matters as much as the crossing, and Paul Industries prices each item on its own line.

  • Conformity route. Notified body involvement for Categories II to IV, and the choice of EN or ASME design, set the engineering and assessment hours.
  • Czech documentation. Translated instructions, safety texts, nameplates and the initial revision file are scoped from the first estimate.
  • Freight and inland leg. A container-sized skid on a Hamburg rail shuttle costs a fraction of an out-of-gauge vessel moved by permitted road transport.
  • VAT. Under FCA or DAP the importer pays 21 percent import VAT and deducts it; under DDP Paul includes clearance and VAT in the price.
  • Installation route. Supervision shortens Paul’s time on site; complete installation, start-up and qualification by Paul puts the whole job under one contract.

A budget figure follows a short description of the process, capacity and plant location, and a firm price follows once the specification and Incoterm are fixed.

Paul Industries for Czech pharmaceutical, chemical and brewing plants

Paul Industries, at 256 Shore Drive in Kilmarnock, Virginia, delivers Czech projects as part of its projects outside the United States. Czech plants receive engineered systems whose vessels, skids, tanks and spools are fabricated in America, accepted at a witnessed factory test, routed through Hamburg or Bremerhaven and then by rail or road, and set to work by Paul or under Paul’s supervision, with the paperwork the PED, NV 192/2022 Sb. and Czech language rules call for. Tell Paul about the process and the plant to request a quote.

Standards referenced: Pressure Equipment Directive 2014/68/EU · Narizeni vlady 219/2016 Sb. · Act 250/2021 Sb. on reserved technical equipment · Narizeni vlady 192/2022 Sb. · Machinery Directive 2006/42/EC · Machinery Regulation (EU) 2023/1230 · CSN 33 2000 series (HD 60364) · EN 60204-1 · EN 13445 · EN 13480 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · EU GMP Guide and Annex 1 · European Pharmacopoeia · Regulation (EU) 2026/1455 · Incoterms 2020 · ISPM 15

Frequently asked questions

What voltage is used in Czech Republic factories for process skids?

Czech factories supply process skids at 400 V three phase, 50 Hz, with 230 V phase to neutral for controls and instruments. Paul Industries designs motors, drives and panels for that supply, builds panels to EN 60204-1 for connection to installations under the CSN 33 2000 series, and tests every panel on 400 V, 50 Hz at the factory acceptance test.

Who supplies WFI and clean steam to pharmaceutical companies in Prague?

Paul Industries supplies WFI generation and distribution, clean steam generators and CIP systems to pharmaceutical companies in Prague and central Bohemia. Each system meets Ph. Eur. water quality and the Annex 1 expectations, is welded from BPE-grade tube and fittings in America, carries Czech and English documents, and installed and qualified by Paul or under Paul’s supervision.

How is the pharmaceutical industry in Czech Republic supervised for GMP?

The State Institute for Drug Control, SUKL, authorises Czech manufacturing sites, inspects them to EU GMP and joined the PIC Scheme in January 1997. Sterile and biologic plants also follow the 2022 Annex 1. Paul Industries designs process and utility equipment to fit that inspection regime and delivers IQ and OQ protocols written for the plant’s quality unit.

Who carries out the initial revision of a new pressure vessel in the Czech Republic?

Under section 12 of Government Regulation 192/2022 Sb., a new vessel needs an initial revision before commissioning, documented by a qualified revision technician, and the supplier arranges it unless the contract says otherwise. Paul Industries agrees that duty in the contract and supplies the design data, material and weld records, pressure test certificate and safety valve data the revision requires.

How often are pressure vessels inspected in the Czech Republic after start-up?

Stationary class I and class II vessels under Government Regulation 192/2022 Sb. receive an operating revision every year, an internal revision every five years and a pressure test every ten years, with the test cycle counted from the year of manufacture. Paul Industries designs manways, nozzles and drains for those internal revisions and supplies a complete vessel file.

Must instructions for pressure equipment be in Czech?

Government Regulation 219/2016 Sb., which implements the Pressure Equipment Directive, requires the instructions and safety information of Annex I points 3.3 and 3.4 to be provided in Czech, and importers and distributors check this before supply. Paul Industries delivers Czech instructions, safety texts and nameplates with every system, together with an English set for engineers.

Can Paul Industries build a Czech brewery system for a plant in Plzen?

Paul Industries builds Czech brewery system equipment for breweries in Plzen and across Bohemia and Moravia: brewhouse vessels for decoction mashing, fermentation and lagering tanks, bright beer tanks, yeast propagation, CIP and glycol cooling. Pressure-rated tanks carry PED documentation and the records for the Czech initial revision, and Paul installs and commissions them or supervises the installation.

Which Czech chemical companies run refining and polymer plants?

ORLEN Unipetrol is the Czech Republic’s largest refining and petrochemical company and its only crude oil processor, with refineries at Litvinov and Kralupy nad Vltavou and a new polyethylene unit at Chempark Zaluzi, while Spolana at Neratovice is the only Czech producer of PVC and caprolactam. Paul Industries supplies vessels, alloy piping and process skids for plants of this kind.

How does a skid from the United States reach a plant in Moravia?

A skid for a plant in Moravia, around Brno, Olomouc or Ostrava, sails from the US East Coast to Hamburg or Bremerhaven and continues by rail shuttle to an inland terminal, then by truck to the site. Out-of-gauge modules make the whole inland leg by permitted road transport. Paul Industries plans the route, split points and lifting during design.

What is VAT in Czech Republic imports of process equipment?

The standard VAT rate in the Czech Republic is 21 percent, charged on imported process equipment at clearance and deducted by a VAT-registered importer on its return. Customs duty on US-origin industrial goods is zero while Regulation (EU) 2026/1455 applies, through 2029. Under a DDP order Paul Industries carries clearance and import VAT in its price.

Does Paul Industries supply equipment to biologics plants such as Bohumil?

Paul Industries supplies cell culture and purification skids, media and buffer preparation, WFI, clean steam and sanitary piping to biologics plants in the Czech Republic, including sites in central Bohemia such as the Bohumil area east of Prague. Equipment is built in the United States to EU GMP and ASME BPE and qualified on site with the plant’s validation team.

Which design codes do Czech plants accept for vessels and piping?

Czech plants commonly specify EN 13445 for unfired vessels and EN 13480 for industrial piping, the harmonised standards under the PED, and many accept ASME Section VIII and ASME B31.3 with a PED conformity route, especially at US-owned sites. Paul Industries designs to the code in the plant’s specification and supplies EN 10204 3.1 material certificates.

What equipment does Paul Industries supply to automotive plants in Mlada Boleslav?

Automotive plants in Mlada Boleslav, Kvasiny and the wider region run paint shop pretreatment, process cooling, compressed air and wastewater systems. Paul Industries supplies chillers and glycol loops, pump and dosing skids, receivers and treatment equipment for these utilities, documented to the PED and Czech operating rules, and installs and commissions them or supervises the work.

Can Czech engineers attend the factory acceptance test in the United States?

Czech engineers are welcome at the factory acceptance test, on the shop floor or over a live camera link, and the test follows a written protocol both sides sign off during design. Hydrostatic proof, valve and pump sequencing, loop checks and a document audit make up the test, and Paul Industries closes every open point before the equipment is crated for Hamburg or Bremerhaven.

Which route brings a skid from New York to a plant in Prague?

The usual route is a direct sailing from New York to Hamburg or Bremerhaven, about 9 to 13 days port to port, then a rail shuttle to a Prague container terminal and a short truck run to the plant, with customs and handling time added. Paul Industries books the sailing and inland leg together with the factory acceptance test date so equipment reaches the plant for its installation window.

Are Czech offers from Paul Industries priced in koruna or dollars?

Paul Industries quotes Czech projects in US dollars with the Incoterm stated. The equipment, PED conformity work, Czech documentation, crating, sea freight, the inland leg and, under DDP, clearance and VAT appear as separate lines, so a Czech purchasing team converts to koruna or euro and compares the offer directly.

What should a Czech plant send to receive a price?

A Czech plant receives a price by sending its specification or user requirements, any P&IDs, the vessel and piping codes it requires, the plant address, utility data such as steam pressure and cooling water temperature, the preferred Incoterm and whether Paul installs or supervises. Paul Industries replies with a budget range and then a firm price once the scope is agreed.

Planning process equipment for a Czech plant?

Describe the process, the codes your plant names, its location and the delivery term you want, and Paul returns the conformity and revision plan, the Czech documentation list and an offer priced in US dollars. Call 201-450-8280 or request a quote.