Paul Industries is a US process equipment contractor for Malaysia that designs, fabricates and commissions pressure vessels, ultrapure and purified water systems, process cooling and chilled water plants, chemical dosing and CIP skids, and process piping for semiconductor plants in Penang and Kedah, glove, palm oil and food plants, pharmaceutical manufacturers, refineries and Johor data centres, built to DOSH design verification rules and the 400/230 V, 50 Hz supply. Paul runs factory acceptance tests in the United States, ships through Port Klang, the Port of Tanjung Pelepas or Penang, and then installs and commissions the equipment or directs its installation at the plant. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia; the company was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Vessel approval DOSH design verification before import
Supply 400/230 V, 50 Hz
GMP regulator NPRA, PIC/S member since 2002
Main ports Port Klang, Tanjung Pelepas, Penang
Sales tax 0, 5 or 10 percent by item
Reviewed November 2026

Systems a US process equipment contractor for Malaysia designs, builds and commissions

A US process equipment contractor for Malaysia is accountable for the whole path of a system: the process design, mechanical and electrical engineering to Malaysian rules, design verification documents for any pressure vessel, fabrication and testing in the United States, the export voyage, and installation through start-up. Paul Industries supplies pressure vessels and receivers, ultrapure water trains, purified water and WFI systems, data centre cooling plants, chemical dosing and CIP skids, heat exchanger packages and the stainless, alloy and PVDF piping that connects them.

Three contract routes cover most Malaysian projects. Equipment supply with Paul supervising installation suits an owner already running a large building contract. Design-build widens Paul’s scope to the plant room, utilities and controls. Turnkey delivery brings everything from the requirement specification to commissioning records into a single Paul contract. Malaysia is one of the Asia Pacific markets named on Paul’s international projects page.

Semiconductor companies in Malaysia: Penang, Kulim and beyond

Semiconductor companies in Malaysia concentrate their assembly, test and advanced packaging in Penang, where about 60 integrated device makers and related firms operate, much of it in the Bayan Lepas Free Industrial Zone, and their wafer fabrication across the state line in the Kulim Hi-Tech Park in Kedah. Intel’s advanced packaging project in Bayan Lepas is a US$7 billion plant with a clean room of about 710,000 square feet, ASE opened its fifth Penang plant in 2025, and Infineon’s Kulim plant is set to become a 200-millimeter silicon carbide fab at full operation in 2027. These names are market facts describing what Malaysian plants build; they describe no Paul project.

Packaging and test plants run on deionized and ultrapure water for wafer saw, plating and cleaning steps, process cooling water for test handlers and burn-in, chilled water for cleanroom air, and wastewater treatment for copper, nickel and acid rinses, while a wafer fab adds full ultrapure water trains, specialty chemical distribution and fluoride treatment. Paul builds reverse osmosis, electrodeionization and polishing skids, closed loop cooling packages and wastewater modules for those plants, wired for 400 V at 50 Hz and documented for the plant’s maintenance system. The semiconductor industry page covers how those utilities serve the tools.

Glove manufacturers in Malaysia, palm oil refiners and food plants

Glove manufacturers in Malaysia supply about 45 percent of global rubber glove demand, according to the industry association MARGMA, and earned about RM14 billion in exports in 2025. Nitrile glove manufacturers in Malaysia and latex glove manufacturers in Malaysia run long dipping lines that need compounding and latex storage tanks, coagulant and leaching tanks with temperature control, hot water and thermal oil systems for curing ovens, chlorination and neutralization systems, and wastewater treatment for the rinse streams. Paul designs and builds stainless and lined tanks, dosing skids, heat exchanger packages and effluent treatment modules for those lines, as described on the process wastewater page.

Palm oil refinery equipment

A palm oil refinery degums, bleaches and deodorizes crude palm oil and fractionates it into olein and stearin. For a palm oil refinery, Malaysia’s refining clusters set the shipping route: plants operate around Port Klang and Pulau Indah in Selangor, Pasir Gudang in Johor, and Sandakan and Lahad Datu in Sabah. Refining plants buy pressure vessels for bleaching and deodorizing, heat exchanger trains, vacuum system condensers, steam and thermal oil systems, fractionation crystallizer cooling and tank farm piping. Paul builds that equipment in stainless and carbon steel to ASME Section VIII and ASME B31.3, and the food and beverage page explains how hygienic design carries over to edible oil plants.

Malaysian industrial regions, their plants and the systems Paul Industries ships to them
RegionPlants (market facts)Entry portSystems Paul Industries supplies
Penang and Kedah (Bayan Lepas, Kulim)Chip assembly, test and advanced packaging; silicon carbide wafer fabPenangUltrapure and DI water, process cooling, wastewater skids
Selangor and the Klang ValleyGlove plants, palm oil refineries, pharmaceutical and food plantsPort KlangTanks, dosing skids, purified water, pressure vessels
Johor (Kulai, Sedenak, Pengerang, Pasir Gudang)Data centres, refinery and petrochemical complex, palm oil refiningPort of Tanjung Pelepas or Johor PortChilled water and cooling plants, vessels, exchangers, alloy piping
Sabah and SarawakPalm oil refining, oil and gas processingSandakan or Lahad DatuRefining vessels, heat exchangers, pump skids

Refineries, petrochemicals and Johor data centres

Refinery and petrochemical projects in Malaysia centre on the Pengerang Integrated Complex in southeast Johor, a US$27 billion development with a refinery rated at 300,000 barrels a day, along with oil and gas processing in Terengganu, Sabah and Sarawak. Those plants buy pressure vessels, heat exchanger bundles, pump skids, chemical injection packages and alloy piping spools for turnarounds and expansions, built by Paul to ASME Section VIII vessel rules and ASME B31.3 piping rules with the design verification package Malaysian rules require, as covered on its oil and gas page.

Johor has become one of Asia Pacific’s busiest data centre markets: a mid-2026 market report counted about 1,110 megawatts of operational IT capacity in the state, 602 megawatts under construction and 2,486 megawatts in planning, with most operational capacity in the Sedenak and Kulai area. Data centre operators there buy chiller plants, cooling towers, coolant distribution units for liquid-cooled racks, and water treatment, and Paul supplies cooling plant modules, pump skids and prefabricated chilled water piping for those halls, described on the data centers page.

What does DOSH require of a pressure vessel imported into Malaysia?

DOSH, the Department of Occupational Safety and Health, requires every pressure vessel to obtain design verification before it enters Malaysia, under the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, which came into operation on 1 June 2024 when the amended Occupational Safety and Health Act 1994 took over from the repealed Factories and Machinery Act 1967. Those regulations name steam boilers, pressure vessels and lifting machinery as plant that needs a certificate of fitness to operate.

The DOSH application guide for imported vessels sets the route: the application is lodged online in the MySKUD system with the technical documents listed in the Fifth Schedule of the regulations, the design must follow a recognized code listed in the Fourth Schedule, and every document must be in Malay or English. Design verification for an imported vessel covers new, unused vessels. Vessels designed to ASME Section VIII Division 2 or Division 3 have their design verified by an authorized inspecting body, and a vessel whose inside diameter in inches multiplied by its design pressure in psig reaches 3,000 or more needs a declaration from an authorized inspecting body with the application. Vessels listed in the Second Schedule fall outside the application.

DOSH approval for pressure vessel packages: what Paul Industries prepares

DOSH approval for pressure vessel projects depends on a complete design file, and Paul Industries prepares it before fabrication starts: general arrangement and detail drawings, design calculations to the code named, material specifications, the welding procedure and qualification records, the nondestructive examination plan, and the hydrostatic test procedure, all in English. A DOSH pressure vessel file also needs the vessel’s fluid, volume, design pressure and temperature stated consistently across drawings and calculations, and Paul cross-checks those values before the application goes in. Each DOSH unfired pressure vessel or fired vessel ships with its manufacturer’s data report, material certificates and test records for the certificate of fitness inspection after installation.

DOSH pressure vessel exemption and the Second Schedule

A DOSH pressure vessel exemption applies to the classes of vessel the Second Schedule of the 2024 regulations lists, and DOSH published further guidance in 2026 on the qualifying conditions for pressure vessels. Paul checks each vessel on a skid against the schedule during design, records whether it falls inside or outside the certificate of fitness regime, and gives the plant a register of every pressure-retaining item with its design data, so the owner’s safety and health officer knows which items need verification and inspection.

Malaysian rules a US-built system meets, and the records Paul Industries supplies
RequirementRuleRecords from Paul Industries
Imported pressure vessel design verificationOSH (Plant Requiring Certificate of Fitness) Regulations 2024, Fifth Schedule documentsDrawings, calculations, material specifications, welding and test procedures in English
Large or Division 2 and 3 vesselsAuthorized inspecting body verification or declarationCode calculation package organized for that review
Certificate of fitnessInspection of steam boilers and pressure vessels before and during operationData report, nameplate details, relief valve data, inspection access
Electrical installationElectricity Supply Act 1990, Electricity Regulations 1994, MS IEC 60038 voltagesPanel drawings, single-line diagrams, test records
GMP equipmentPIC/S GMP Guide adopted by NPRADesign, installation and operational qualification protocols

Pharmaceutical companies in Malaysia and NPRA GMP guidelines

Pharmaceutical companies in Malaysia manufacture under NPRA GMP guidelines that adopt the PIC/S Guide to Good Manufacturing Practice and its annexes, and Malaysia’s National Pharmaceutical Regulatory Agency has been a PIC/S participating authority since 1 January 2002, the scheme’s 26th member. An NPRA GMP inspection of a plant looks at water, steam and process equipment through the same annexes on sterile manufacture and on qualification and validation used by every PIC/S authority.

Plants making generics, injectables, halal products and nutraceuticals in the Klang Valley and other states need purified water and WFI, clean steam, formulation vessels, CIP and SIP and sanitary piping. Paul Industries builds them to ASME BPE with orbital weld logs, borescope records and passivation records, prepares IQ and OQ protocols on the plant’s templates and runs them through Paul’s validation and commissioning work. Clean utilities for sterile and oral dosage plants are listed on the pharmaceutical industry page.

Malaysia voltage and frequency for process skids

Malaysia voltage and frequency for process skids follow the 400/230 V system designated under MS IEC 60038, at 50 Hz with a permitted frequency variation of plus or minus 1 percent, and TNB, the utility for Peninsular Malaysia, works under the Electricity Supply Act 1990 and the Electricity Regulations 1994 overseen by the Energy Commission, Suruhanjaya Tenaga. Malaysia voltage tolerance at 400 V and 230 V under normal conditions runs from minus 6 to plus 10 percent of nominal. For anyone asking whether Malaysia voltage 230 or 240 applies, the nominal single-phase value is 230 V, and Malaysia voltage 3 phase supply is 400 V between phases.

Malaysia industrial voltage at a large site is taken at medium or high voltage from TNB and transformed down on site, so panels must be rated for the fault level of the plant bus. Malaysia voltage vs US practice changes both voltage and speed: 400 V, 50 Hz instead of 480 V, 60 Hz, so a centrifugal pump designed for 60 Hz loses about one sixth of its speed and close to a third of its head. Paul selects impellers, motors and fan drives for the 50 Hz duty point, uses IEC motors and drives rated for the Malaysian tolerance band, and builds control circuits at 230 V.

Ride-through, humidity and panel design in a tropical plant

Panels in Malaysian plants work in heat and high humidity year round, so Paul specifies enclosures with anti-condensation heaters and filtered ventilation or air conditioning, corrosion-resistant fittings in chemical areas, and conformal coating on drive electronics where the plant asks for it. Critical utilities such as ultrapure water, data centre cooling and process cooling get ride-through for voltage dips through drive settings, UPS-backed controls and automatic restart sequences, so the utility plant rides through a short disturbance on the TNB network and keeps running.

Shipping to Port Klang, the Port of Tanjung Pelepas and Penang

Port Klang in Selangor is the main sea entry for equipment bound for the Klang Valley, with transit from Savannah of about 29 to 38 days and from New York of about 35 to 50 days, depending on carrier and routing, based on forwarder transit data. For buyers asking where is Port Klang located, it sits on the Strait of Malacca west of Kuala Lumpur, and the road leg from Port Klang to Kuala Lumpur and Shah Alam industrial areas runs on the expressway network. Port Klang has two container operators: Westports on Pulau Indah and Northport, Port Klang’s northern terminal.

The port of Tanjung Pelepas in southwest Johor serves the Sedenak, Kulai and Pasir Gudang plants, and between Tanjung Pelepas and Port Klang, Paul books the port with the shorter, clearer road route to the site. Penang Port serves Bayan Lepas and Kulim. Paul plans for Port Klang congestion and transshipment time in the schedule, keeps skid envelopes within a 40-foot high cube container whenever the process layout permits, sends tall tanks and frames on flat racks, and supplies rigging drawings so the crane plan at the Port Klang container terminal and at the plant is agreed in advance. Crates use ISPM 15 heat-treated timber, and contracts are written under Incoterms 2020, often FCA at the US port of loading, CIF Port Klang, or DAP at the plant.

Port Klang Free Zone and the Westports and Northport terminals

The Port Klang Free Zone at Pulau Indah sits beside Westports on the west Port Klang waterfront and offers duty-suspended storage and light processing for goods held outside the customs territory, which some owners use to stage spares or modules before release to site. At Port Klang, Westports and Northport each handle containers and out-of-gauge cargo, and Paul names the terminal on the booking so flat racks and heavy lifts are planned with that operator. Port Klang port charges, storage and haulage are priced into the freight line of the proposal when the plant chooses delivered terms.

Malaysia import duty and SST on process equipment

Malaysia import duty and SST are charged at clearance on the K1 customs declaration, with duty rates set by tariff heading in the Malaysia Customs Duties Order 2022 and sales tax at 0, 5 or 10 percent depending on the goods. The Malaysia SST rate schedule was revised for goods imported from 1 July 2025, with more tariff lines moved into the 5 percent band. Manufacturers endorsed by MIDA can claim sales tax exemption on machinery and equipment used directly in manufacturing under the item 55 exemption, whose eligible list was widened from 1 July 2025. Paul classifies every item, states values, weights and origin on the invoice and packing list, and separates machinery from spares so the importer’s customs agent can apply the right exemption.

Project stages from requirements to handover in Malaysia

A Malaysian project with Paul Industries moves through nine stages, and the DOSH design verification application is prepared during design so it never holds up shipment. The table sets out each stage and what the plant receives.

Stages of a process equipment project for a plant in Malaysia
StageWorkWhat the Malaysian plant receives
1. RequirementsProcess duty, water quality or GMP targets, 400 V, 50 Hz supply, pressure equipment listAgreed specification and code basis
2. DesignCode design to ASME VIII, B31.3 and BPE, 50 Hz rotating equipment selection, tropical panel designDrawings and calculations in English
3. DOSH fileFifth Schedule documents, inspecting body declaration where the vessel size requires itDesign verification application ready for MySKUD
4. FabricationWelding, examination, passivation and panel assembly in the United StatesMaterial certificates, weld maps, NDE reports
5. Factory testPressure test, functional run and water quality check, open to the plant’s engineersSigned test report and open items list
6. Export and entryCrating, sailing to Port Klang, Tanjung Pelepas or Penang, K1 declarationShipping documents and cleared equipment
7. InstallationPaul sets, pipes and wires the equipment, or supervises that workInstallation records and as-installed markups
8. Start-upCommissioning, certificate of fitness inspection support, IQ and OQCommissioning records and executed protocols
9. HandoverTraining, spares, inspection and maintenance scheduleManuals and as-built file in English, Malay where requested

Once the plant is running, Paul keeps supporting it with maintenance visits, spare parts, membrane and resin replacement, requalification and repairs, and updates the pressure equipment register ahead of each certificate of fitness inspection.

Who builds process systems for plants in Malaysia?

Paul Industries builds process systems for plants in Malaysia: ultrapure and DI water, process cooling and wastewater modules for semiconductor plants in Penang and Kulim; tanks, dosing and effluent systems for glove makers in Selangor and the northern states; refining vessels and heat exchangers for palm oil refineries in Selangor, Johor and Sabah; pressure vessels and piping for the Pengerang complex; chilled water plants for Johor data centres; and water, steam and process equipment for pharmaceutical plants under NPRA. Every system is engineered for 400 V at 50 Hz with a DOSH design verification file for its pressure vessels, and Paul installs and commissions it or supervises installation as one accountable contractor. The Singapore page covers the neighbouring market across the Johor Strait, with its own pressure vessel rules.

What sets the delivered cost of a process system for a Malaysian plant?

Six cost drivers beyond the equipment decide the delivered price for a Malaysian plant, and Paul shows each one as a separate US dollar line.

  • 50 Hz engineering. Resized pumps and fans, IEC motors, 400 V drives and tropical panel design.
  • DOSH documentation. Fifth Schedule documents and any inspecting body review for large or Division 2 vessels.
  • Purity and materials. PVDF and electropolished stainless for fab and pharmaceutical utilities, lined tanks for glove chemicals.
  • Freight. Ocean transit of four to seven weeks, flat racks for oversize items and port charges at Port Klang, Tanjung Pelepas or Penang.
  • Border costs. Duty under the Customs Duties Order 2022 and sales tax at 0, 5 or 10 percent, less any exemption the plant holds.
  • Site route. Full installation and commissioning inside an operating plant costs more than supervision; Paul quotes both.

Paul Industries for Malaysian fabs, glove, palm oil and pharmaceutical plants

Paul Industries engineers, fabricates and tests pressure vessels, water and cooling systems, process skids and piping for plants across Malaysia, ships them through Port Klang, Tanjung Pelepas or Penang, and installs and commissions them or supervises the installation, with DOSH, electrical and qualification records in English. Share the process duty, the site, the supply and the required start-up, and Paul responds with a US dollar price, the DOSH document plan and a fabrication and shipping timeline. Get a quote for a Malaysian plant.

Standards referenced: Occupational Safety and Health Act 1994 as amended in 2022 · Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024 · Electricity Supply Act 1990 and Electricity Regulations 1994 · MS IEC 60038 · PIC/S GMP Guide (NPRA) · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · ASME B31.3 · Customs Duties Order 2022 · Incoterms 2020 · ISPM 15

Frequently asked questions

Is Malaysia 50Hz or 60Hz for plant equipment?

Malaysia runs at 50 Hz, with a permitted variation of plus or minus 1 percent, on a 400/230 V supply. US equipment designed for 60 Hz therefore turns about one sixth slower in Malaysia, which cuts pump head and flow. Paul Industries selects pumps, fans and motors for the 50 Hz duty point in the original design and tests them before shipment.

Where is Port Klang located, and which plants receive through it?

Port Klang sits on the Strait of Malacca in Selangor, west of Kuala Lumpur, and serves the Klang Valley, Shah Alam, glove plants, palm oil refineries and pharmaceutical and food manufacturers across the central region. Paul Industries ships equipment for those plants to Westports or Northport and checks the road route to each site before sizing modules.

Which transit time should a Selangor plant plan for between Savannah and Port Klang?

Forwarder transit data puts Savannah to Port Klang at about 29 to 38 days and New York to Port Klang at about 35 to 50 days, with carrier choice and transshipment making the difference. Clearance at the port and trucking to the site come on top. Paul Industries works back from the plant’s installation date to set the fabrication finish and the booking.

Does a pressure vessel need DOSH design verification before it ships to Malaysia?

Every pressure vessel needs DOSH design verification before it enters Malaysia, applied for in the MySKUD system with the Fifth Schedule documents of the 2024 certificate of fitness regulations, unless it is a vessel class excluded by the Second Schedule. Paul Industries prepares the drawings, calculations and test procedures for that application during design, so verification is in hand when the vessel ships.

When does a vessel for Malaysia need an authorized inspecting body?

DOSH’s guide for imported pressure vessels calls for an authorized inspecting body to verify designs made to ASME Section VIII Division 2 or Division 3, and for a declaration from an authorized inspecting body when the inside diameter in inches times the design pressure in psig is 3,000 or more. Paul Industries organizes the calculation package so that review moves quickly.

What replaced the Factories and Machinery Act for boilers and pressure vessels?

The Factories and Machinery Act 1967 was repealed on 1 June 2024, and boilers, pressure vessels and lifting machinery now fall under the amended Occupational Safety and Health Act 1994 and the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024. Paul Industries documents vessels for Malaysian plants to those current rules.

Who builds ultrapure water systems for semiconductor plants in Penang and Kulim?

Paul Industries designs, fabricates and commissions ultrapure and DI water systems, reclaim skids, process cooling packages and wastewater modules for semiconductor assembly, test and wafer plants in Penang and the Kulim Hi-Tech Park in Kedah. Each system is built for 400 V at 50 Hz, factory tested for water quality and installed by Paul or under Paul’s supervision.

What equipment do nitrile and latex glove plants in Selangor order?

Nitrile and latex glove plants in Selangor and elsewhere in Malaysia order compounding and latex storage tanks, coagulant, leaching and chlorination tanks, hot water and thermal oil systems for curing ovens, chemical dosing skids and wastewater treatment for the rinse streams. Paul Industries builds that equipment in stainless and lined steel and commissions it with the line.

Which equipment does a palm oil refinery in Johor or Sabah buy from a US fabricator?

A palm oil refinery in Pasir Gudang, Johor, or Sandakan and Lahad Datu, Sabah, buys bleaching and deodorizing vessels, heat exchanger trains, vacuum condensers, thermal oil and steam systems, fractionation cooling and tank farm piping. Paul Industries builds them to ASME Section VIII and B31.3 and prepares the DOSH design verification file for each vessel.

Who supplies chilled water and cooling plants for data centres in Johor?

Paul Industries designs and builds chiller plant modules, pump skids, coolant distribution units and prefabricated chilled water piping for data centres in Johor, including the Sedenak and Kulai areas, engineered for 400 V at 50 Hz and the tropical climate. Modules ship through the Port of Tanjung Pelepas and are installed and commissioned by Paul or under Paul’s supervision.

Which GMP standard do pharmaceutical plants in Malaysia follow?

Pharmaceutical plants in Malaysia follow the PIC/S Guide to GMP and its annexes, which NPRA adopted as its standard, and NPRA has been a PIC/S participating authority since January 2002. Paul Industries builds purified water, WFI, clean steam and process equipment for those plants to ASME BPE with qualification protocols in the plant’s format.

What is the Malaysia SST rate on imported machinery?

Sales tax on goods imported into Malaysia is charged at 0, 5 or 10 percent depending on the tariff line, under rates revised from 1 July 2025, and it is collected at clearance even where import duty is zero. MIDA-endorsed manufacturers can claim exemption for machinery used directly in manufacturing. Paul Industries separates machinery and spares on the invoice so exemptions are applied correctly.

How is Malaysia import duty and SST calculated for a process skid?

Import duty for a skid is set by the tariff heading of each item in the Customs Duties Order 2022, and sales tax is charged at the rate for that heading when the goods clear Customs on the K1 declaration. A skid can be declared as one machine or item by item. Paul Industries supplies classification details, values, weights and origin with the shipping documents.

What is Malaysia voltage tolerance for three-phase equipment?

Under normal conditions TNB supply at 400 V and 230 V is held between minus 6 and plus 10 percent of nominal, widening to plus or minus 10 percent under contingency conditions, and frequency stays within 1 percent of 50 Hz. Paul Industries rates motors, drives and heaters for that band and adds ride-through settings for critical utilities.

Which language should documents for a Malaysian plant use?

DOSH accepts design verification documents in Malay or English, and Malaysian plants generally run engineering records in English. Paul Industries prepares drawings, calculations, manuals and qualification documents in English with metric units, and adds Malay versions of labels and operating instructions where the plant requests them.

Can Malaysian engineers witness the factory acceptance test in the United States?

Engineers from Malaysian plants are welcome at Paul Industries factory acceptance tests in the United States, or can follow them by live video, covering pressure tests, functional runs, water quality checks and record review. Items raised at the test are closed and signed off before the equipment is crated for Port Klang, Tanjung Pelepas or Penang.

What does a Malaysian plant need to send for a quote in US dollars?

Paul Industries prices a Malaysian system from the process duty or user requirements, the list of pressure vessels, the site and its supply, water quality or GMP targets, the start-up date and the preferred Incoterm. The US dollar proposal lists equipment, DOSH documentation, freight, border charges and site work separately.

How does Paul Industries service equipment after start-up in Malaysia?

After start-up Paul Industries services Malaysian plants with planned maintenance, spare parts, membrane and resin replacement, passivation of stainless systems, requalification and repairs. The pressure equipment register is kept current ahead of each certificate of fitness inspection, and service findings are added to the asset file handed over at commissioning.

Planning process equipment for a plant in Malaysia?

Share the process duty, the site and the required start-up with Paul Industries, and the response sets out the DOSH document plan, the sailing and a US dollar budget. Call 201-450-8280 or request a quote.